Management part-1
Transcript of Management part-1
-
8/14/2019 Management part-1
1/26
Unanimous World of Blues
In The Name Of Allah The Most Beneficent And The Most Merciful
ACKNOWLEDGEMENTS:
We are grateful to Almighty Allah; who blessed us with the
determination in completing the following project. We are thankful to our
instructor Mr. Asif Ayub Kiyani, who helped us in conducting the project.
We appreciate the participation of the groups members who co-operated
a lot in conducting this project. We are thankful to Mr. M.Shafique and
Mr. Ch.M. Asghar (Managers, PTCL); to provide us all relevant
information and helping us in every possible way .we are in great debt to
web organizations, which facilitated us with the required data. Thank you
all.
Page 1
-
8/14/2019 Management part-1
2/26
Unanimous World of Blues
DEDICATION:
We dedicate the following project to our Parents, and most
importantly to all group members who worked hard in completion of this
project.
Page 2
-
8/14/2019 Management part-1
3/26
Unanimous World of Blues
Preface:
This report is intended for the people who are intended to join the
telecomm industry in future in departments concerning Management and
communication.
Page 3
-
8/14/2019 Management part-1
4/26
Unanimous World of Blues
Information:
We visited Islamabad Head quarters (Main office , PTCL) and
customer care services office in Rawalpindi (Bank road,Sadar).
Page 4
-
8/14/2019 Management part-1
5/26
Unanimous World of Blues
Abstract:
The project is about the management and communication of
Pakistan TeleCommunication Limited (PTCL) that how PTCL is working
and competing in the industry, our main focus was on SWOT and, PEST
analysis, Management and channels of the communication.
Page 5
-
8/14/2019 Management part-1
6/26
Unanimous World of Blues
Executive Summary:
PTCL is restructuring and re-emerging its all departments, it
is forming new departments like Human Resource Department
(RHD), Customer Service Department (CSD), and look forward in
establishing the departments like Research & development
Department (RDD). PTCL is converting the old and urinary file
system network to the digital world of computers and technologies.
It shows their positive attitude towards technological changes and
wishes to lead the telecommunication market.
Although they are facing a lot of threats by the competitors
like Wateen Telecomm, Mobilink, Warid, Telenor, Zong (Paktel),
but still they are fighting the best way they can. PTCL has worked
hard to eliminate its weaknesses and still there are the weak points
,PTCL is trying to overcome those weaknesses.
Mission Statement:
Page 6
-
8/14/2019 Management part-1
7/26
Unanimous World of Blues
To be the leading Information and Communication
Technology Service Provider in the region by achieving customer
satisfaction and maximizing shareholders' value'.
Vision Statement:
The future is unfolding around us. In times to come, we will
be the link that allows global communication. We are striving
towards mobilizing the world for the future. By becoming partners
in innovation, we are ready to shape a future that offers telecom
Page 7
-
8/14/2019 Management part-1
8/26
Unanimous World of Blues
services that bring us closer.
Chapter number.1
PTCL Historical Background and Company Profile
(1.1) History:
From the humble beginnings of Posts & Telegraph Department in
1947 and establishment of Pakistan Telephone & Telegraph Department
in 1962, PTCL has been a major player in telecommunication in Pakistan.Despite having established a network of enormous size, PTCL workings
Page 8
-
8/14/2019 Management part-1
9/26
Unanimous World of Blues
and policies have attracted regular criticism from other smaller operators
and the civil society of Pakistan.
Pakistan Telecommunication Corporation (PTC) took over
operations and functions from Pakistan Telephone and Telegraph
Department under Pakistan Telecommunication Corporation Act 1991.
This coincided with the Government's competitive policy, encouraging
private sector participation and resulting in award of licenses for cellular,
card-operated pay-phones, paging and, lately, data communication
services.
Pursuing a progressive policy, the Government in 1991, announced
its plans to privatize PTC, and in 1994 issued six million vouchers
exchangeable into 600 million shares of the would-be PTCL in two
separate placements. Each had a par value of Rs. 10 per share. These
vouchers were converted into PTCL shares in mid-1996.
In 1995, Pakistan Telecommunication (Reorganization) Ordinance
formed the basis for PTCL monopoly over basic telephony in the country.
It also paved the way for the establishment of an independent regulatory
regime. The provisions of the Ordinance were lent permanence in
October 1996 through Pakistan Telecommunication (Reorganization) Act.
The same year, Pakistan Telecommunication Company Limited was
formed and listed on all stock exchanges of Pakistan.
PTCL launched its mobile and data services subsidiaries in 2001 by
the name of Ufone and PakNet respectively. None of the brands made it
to the top slots in the respective competitions. Lately, however, Ufone had
increased its market share in the cellular sector. The PakNet brand has
effectively dissolved over the period of time. Recent DSL services
launched by PTCL reflect this by the introduction of a new brand name
Page 9
-
8/14/2019 Management part-1
10/26
Unanimous World of Blues
and operations of the service being directly supervised by PTCL instead
of Paknet.
As telecommunication monopolies head towards an imminent end,
services and infrastructure providers are set to face even bigger
challenges. Pakistan also entered post-monopoly era with deregulation of
the sector in January 2003. On the Government level, a comprehensive
liberalization policy for telecom sector is in the offing. Last Year, in
middle of 2005 Government of Pakistan had decided to sell at least 26
percent of this company to some private agency. There were three
participants in the bet for privatization of PTCL. Etisalat, a Dubai based
company was able to get the shares with a large margin in the bet.
Last year when Government was going to privatize the company
there was country wide protest and strike by PTCL workers. They even
disrupted Phone lines of some big Government institutions like Punjab
University Lahore and many lines of public sector were also blocked.Military had to take over the management of all the Exchanges in the
country. They arrested many workers and put them behind bars. The
contention between Government and employees ended with a 30%
increase in the salaries of workers.
(1.2) Historical Background:
1947 Posts & Telegraph Dept established
1961 Pakistan Telegraph & Telephone Deptt.
1990-91 Pakistan Telecom Corporation
1995 About 5% of PTC assets transferred to PTA, FAB & NTC.
1996 PTCL Formed listed on all Stock Exchanges of Pakistan.
Page 10
-
8/14/2019 Management part-1
11/26
Unanimous World of Blues
1998 Mobile(Ufone)& Internet(PakNet)subsidiaries established.
2000 Telecom Policy Finalized
2003 Telecom Deregulation Policy Announced
2006 Etisalat Takes Over PTCL
(1.3) CURRENT STATUS:
Many big change events are taking place at PTCL, after its
privatization. These include the VSS (Voluntary Separation Scheme for
its employees), ERP (SAP based), restructuring, B& CC (Billing and
Customer Care Software) etc, IPTV (Cable television), DSL (Broad Band
Internet services), Another seemingly minor change was change of brand
identity (logo) that will present PTCL's new face after privatization, with
greater focus on customer satisfaction and bringing about of new
advancements in telecom for Pakistani consumers.
(1.4) Company Profile:
With an employee strength of 65,000 (Regular) and 5.7 million
customers, PTCL is the largest telecommunications provider in Pakistan.
PTCL also continues to be the largest CDMA operator in the country with
0.8 million V-fone customers.
The company maintains a leading position in Pakistan as an infrastructure
provider to other telecom operators and corporate customers of the
country. It has the potential to be an instrumental agent in Pakistans
economic growth. PTCL has laid an Optical Fibre Access Network in the
major metropolitan centres of Pakistan and local loop services have
started to be modernized and upgraded from copper to an optical network.
On the Long Distance and International infrastructure side, the capacity
Page 11
http://en.wikipedia.org/wiki/Ufonehttp://en.wikipedia.org/wiki/Etisalathttp://en.wikipedia.org/wiki/Etisalathttp://en.wikipedia.org/wiki/Ufone -
8/14/2019 Management part-1
12/26
Unanimous World of Blues
of two SEA-ME-WE submarine cable is being expanded to meet the
increasing demand of International traffic.
(1.5) Products and Services:
(1.5.1) Home Services:
Broadband Pakistan (DSL), Calling Card Connectivity, Errors
DialUp Setting, Dialup ,Vfone, E-mail & Browsing, Fixed Line,
IPTV, International Calls, New Packages PTCL ,0900
entertainment, Payphone Phone, Net Phone , Internet, Procedure-
Dowtel Sets, Procedure-Huawei Sets , Procedure-ZTE Sets,
Security Questions, Vfone, Vfone FAQs, Vfone new packages,
Vfone Sales Outlets.
(1.5.2) Business Services:
Analogue Channels, Co-Location, DPLC, DXX, LIT PairSkylink,
TV Transmission, Broadband Pakistan, IP / IPLC, Call Centers,
Calling Cards, Fixed Line, ISDN - BRI, Payphone, Radio
Maritime, Satellite Phone, FAX, Value Added Services, Vfone,
Voice Messaging Service (VMS)
Page 12
http://www.ptcl.com.pk/contentp.php?NID=47http://www.ptcl.com.pk/contentp.php?NID=67http://www.ptcl.com.pk/contentp.php?NID=137http://www.ptcl.com.pk/contentp.php?NID=135http://www.ptcl.com.pk/contentp.php?NID=88http://www.ptcl.com.pk/contentp.php?NID=138http://www.ptcl.com.pk/contentp.php?NID=38http://www.ptcl.com.pk/contentp.php?NID=159http://www.ptcl.com.pk/contentp.php?NID=122http://www.ptcl.com.pk/contentp.php?NID=155http://www.ptcl.com.pk/contentp.php?NID=148http://www.ptcl.com.pk/contentp.php?NID=148http://www.ptcl.com.pk/contentb.php?NID=77http://www.ptcl.com.pk/contentp.php?NID=134http://www.ptcl.com.pk/contentp.php?NID=134http://www.ptcl.com.pk/contentp.php?NID=120http://www.ptcl.com.pk/contentp.php?NID=120http://www.ptcl.com.pk/contentp.php?NID=118http://www.ptcl.com.pk/contentp.php?NID=119http://www.ptcl.com.pk/contentp.php?NID=139http://www.ptcl.com.pk/contentp.php?NID=64http://www.ptcl.com.pk/contentp.php?NID=112http://ptcl.com.pk/vsop.phphttp://www.ptcl.com.pk/contentb.php?NID=84http://www.ptcl.com.pk/contentb.php?NID=82http://www.ptcl.com.pk/contentb.php?NID=43http://www.ptcl.com.pk/contentb.php?NID=81http://www.ptcl.com.pk/contentb.php?NID=83http://www.ptcl.com.pk/contentc.php?NID=150http://www.ptcl.com.pk/contentb.php?NID=85http://www.ptcl.com.pk/contentp.php?NID=47http://www.ptcl.com.pk/contentb.php?NID=80http://www.ptcl.com.pk/contentb.php?NID=75http://www.ptcl.com.pk/contentb.php?NID=79http://www.ptcl.com.pk/contentb.php?NID=45http://www.ptcl.com.pk/contentb.php?NID=74http://www.ptcl.com.pk/contentb.php?NID=77http://www.ptcl.com.pk/contentb.php?NID=78http://www.ptcl.com.pk/contentb.php?NID=78http://www.ptcl.com.pk/contentb.php?NID=76http://www.ptcl.com.pk/contentb.php?NID=143http://www.ptcl.com.pk/contentb.php?NID=73http://www.ptcl.com.pk/contentb.php?NID=133http://www.ptcl.com.pk/contentp.php?NID=47http://www.ptcl.com.pk/contentp.php?NID=67http://www.ptcl.com.pk/contentp.php?NID=137http://www.ptcl.com.pk/contentp.php?NID=135http://www.ptcl.com.pk/contentp.php?NID=88http://www.ptcl.com.pk/contentp.php?NID=138http://www.ptcl.com.pk/contentp.php?NID=38http://www.ptcl.com.pk/contentp.php?NID=159http://www.ptcl.com.pk/contentp.php?NID=122http://www.ptcl.com.pk/contentp.php?NID=155http://www.ptcl.com.pk/contentp.php?NID=148http://www.ptcl.com.pk/contentp.php?NID=148http://www.ptcl.com.pk/contentb.php?NID=77http://www.ptcl.com.pk/contentp.php?NID=134http://www.ptcl.com.pk/contentp.php?NID=134http://www.ptcl.com.pk/contentp.php?NID=120http://www.ptcl.com.pk/contentp.php?NID=120http://www.ptcl.com.pk/contentp.php?NID=118http://www.ptcl.com.pk/contentp.php?NID=119http://www.ptcl.com.pk/contentp.php?NID=139http://www.ptcl.com.pk/contentp.php?NID=64http://www.ptcl.com.pk/contentp.php?NID=112http://ptcl.com.pk/vsop.phphttp://www.ptcl.com.pk/contentb.php?NID=84http://www.ptcl.com.pk/contentb.php?NID=82http://www.ptcl.com.pk/contentb.php?NID=43http://www.ptcl.com.pk/contentb.php?NID=81http://www.ptcl.com.pk/contentb.php?NID=83http://www.ptcl.com.pk/contentc.php?NID=150http://www.ptcl.com.pk/contentb.php?NID=85http://www.ptcl.com.pk/contentp.php?NID=47http://www.ptcl.com.pk/contentb.php?NID=80http://www.ptcl.com.pk/contentb.php?NID=75http://www.ptcl.com.pk/contentb.php?NID=79http://www.ptcl.com.pk/contentb.php?NID=45http://www.ptcl.com.pk/contentb.php?NID=74http://www.ptcl.com.pk/contentb.php?NID=77http://www.ptcl.com.pk/contentb.php?NID=78http://www.ptcl.com.pk/contentb.php?NID=78http://www.ptcl.com.pk/contentb.php?NID=76http://www.ptcl.com.pk/contentb.php?NID=143http://www.ptcl.com.pk/contentb.php?NID=73http://www.ptcl.com.pk/contentb.php?NID=133 -
8/14/2019 Management part-1
13/26
Unanimous World of Blues
Chapter number.2
Management styles
(2.1) Introduction:
From the emergence of PTCL till 2006, PTCL was the only
telecommunication company providing the land line telephone services.
PTCL enjoyed the monopoly over the market till 2006; the emergence of
another company Wateen telecom provides land line services. But ptcl
has earned a name, build the trust of the customers, developed the
company from the starch. PTCL introduced a company U-fone as its co
venture and now has provided V-fone (wireless services), and is meeting
all the technolological changes worldwide after its privatization. It has
Page 13
-
8/14/2019 Management part-1
14/26
Unanimous World of Blues
become better in provision of services and innovative in introducing new
and new products, every passing day.
(2.2) Management Style at PTCL:
PTCL has got very broad structure in term of span of control. Since
PTCL is the largest telecommunication organization so it has got
wide management levels.
Managers at PTCL are controlling and organization supervising
employees working under it. The procedure of planning in the
company is very traditional and all the planning process takes place
at top level, all the planning related to the companys future or its
progress is made by the directors of the company, for example if
they want to launch a new product or service then this decision of
launching this product and service will be made at top level Only
Top level. Managers plan and they negotiate their plans with
middle level and then finally middle level managers negotiate the
plans with the first line managers and operatives.
Managers are not much
equipped with management
skills. They are making
relations only with their employees and not with the organization. It is the
task of higher level management to formulate the network with other
organizations in the market. As manager; they are giving presentations for
innovation and creativity and improved management to their employees.
But PTCL is very bad at time management. Employers, managers and
Page 14
-
8/14/2019 Management part-1
15/26
Unanimous World of Blues
employees often come late.
It is changing organization and learning
organization. They are rigid in some rules.
They are skill focused. Employees are not
trained in the field of management or business.They have done some short courses and
working in PTCL. They were individual
oriented but now they are converting to team orientation. Before there
was no proper feed back channel or evaluation process. Just managers
evaluate others and peers were not evaluating the managers and other
peers. Now PTCL employees are evaluating each other because they are
working as peer to peer and are using 360 degree process after the
restructuring of the organization.
When we visited the organization the Managers were patrolling here andthere to observe their employees and they were talking to their
employees, this shows the free and flexible style of management, so we
may say the managers were very friendly. So there is not any single
Management style, which PTCL is following. They are rather using
contingency approaches according to which they are communicating
indirectly We would see what would happen, or their decision depends
at the situation.
Decision Making is a complex process at PLTCL According to the
companys policy they give responsibility first to the internal
management for any internal problems but they have to inform to his Top
management because all the important decision will be taken by Top
management. The main head office is in Islamabad; so all divisional or
regional managers have to communicate through a proper channel to the
top level management.
As defined earlier, decisions are made at top level of managementand negotiation takes place as shown in the diagram:
Page 15
-
8/14/2019 Management part-1
16/26
Unanimous World of Blues
(2.3) Mr. Walid as a CEO of PTCL
Mr.Walid Irshaid as a CEO and President of PTCL says:
I have taken immense pride in assuming the duty as President andCEO of PTCL, which is a great opportunity for me to execute my
responsibilities as a team leader.
To me Pakistan and PTCL are synonymous with an opportunity forgrowth. The potential of this growth is visible to me as it is about
the human capital we have in the form of talented and experiencedemployees. I can assure you that with the traditional dedication
and determination of PTCL workers we will transform this companyinto a world class ICT company.
I am proud of my fellow colleagues who have been leading themarket so far and have been adapting to changing technological
advancements. After the deregulation in the telecom sector ofPakistan, PTCL is now again ready to face new challenges in a
competitive environment.
We are poised to retain our leadership position by giving PTCL anew and improved look. The new colors of the Logo are in contextwith every Pakistanis sense of identity and patriotism; green and
white being the colors of purity and honesty, the colors oftrustworthiness and integrity, the colors of Pakistans flag and the
colors of every Pakistanis passion.
Be assured that PTCL will remain the peoples first choice of communication in the future.
Promising you the best of our services, at all times.
Walid IrshaidPresident & CEO
Mr. Walid Irshaid is the CEO and President of PTCL.
He is also the leading personality of the Tunnel. He is responsible for the each
Page 16
-
8/14/2019 Management part-1
17/26
Unanimous World of Blues
and every activity of the Organisation. He not only initiates the every new
activity but also motivates the employees as well.
He uses his personal resources and provides the benefits to the organization.
He has a strict policy for the check and measure. He has an open door policyfor the customers, any one who has any problem he can discuss with him at
any time through a proper channel. He goes to the employees personally for
the monitoring purpose.
He is the disseminator of the company. For example when any customer is
not satisfied with the service or the behavior of the host or other persons He is
the person who faces the media and public while they required him. He has to
handle these persons respectively. He is the disturbance handler and resource allocator of the organization,
this is the reason that why PTCL fired out its old employees which it didnt
need, because company had an over employee rate, they fired out more than
10,000 employees
He negotiates with the staff and employees.
The company has high efficiency and high effectiveness as well. As they areproviding the best facilities in communication services in Pakistan. In response of the
best facilities the number of customers is increasing.
Chapter no.3
Organizational Culture and Environment
Page 17
-
8/14/2019 Management part-1
18/26
Unanimous World of Blues
(3.1) Culture
When PTCL was a governmental organization employees were
required to follow extensive rules and regulations. Managers superviseemployers to ensure that there are no deviations. Management was
concerned by high productivity. Work was designed around individuals
and not in teams. But now management encourages and rewards risk
taking and change. Now they are experimenting new technologies. There
are few rules and regulations and job activities are designed in teams.
New and innovative ideas are encouraged. Thats why every second daywe see a new package and technology in introduced in PTCL.
(3.1.1) SEVEN Dimension of Organizational Culture:
PTCL is following seven dimensions of organizational culture. They are
OUTCOME ORIENTED: The manager of the company is only
focusing on how to increase the number of customers. They are
outcome oriented they care about their customers. They focus on
results rather how those results are met. They provide their
customer with every possible package. Managers at PTCL told us
that they choose those employees who work in time by any mean
and it doesnt matter that what way they followed or what was the
procedure of doing it.
PEOPLE ORIENTED: PTCL is people oriented. They take
into account the effects of their decisions on people because
customer is their basic focus and asset.
RISK TAKING AND INNOVATIVE: They believe in risk
Page 18
-
8/14/2019 Management part-1
19/26
Unanimous World of Blues
taking. Like the way they commercialized their packages is risk
taking and new technology like IPTV is extremely a risk taking
step.
AGGRESSIVENESS: The aggressive behavior exists among
employees.
TEAM ORIENTED: Work between teams is appreciated.
STABILITY: they are stable and maintain the status quo.
ATTENTION TO DETAIL: The employees are expected to pay
attention to details and they must be precise in their results.
PTCL has developed its culture according to the norms and
traditions laid by the earlier founders of the organization. They are also
following the norms and culture of Pakistan. Their logo, slogans and
language shows their great love and patriotism towards their country, so
they impress their customers in the way, by following the culture of the
country.
Following an innovative culture PTCL in recent few years has
launched so many new services which were never available before, like
IPTV, Broad Band (Internet service), Wireless and Satellite
communication, frequency allocation, customer care services like 0800
Page 19
-
8/14/2019 Management part-1
20/26
Unanimous World of Blues
fones and much more.
(3.2) Environment:
(3.2.1) Customers:
Company has customers belonging from all the cultures within the
country and from all the social classes of the society. Therefore almost all
business organizations are taking communication facilities from PTCL,
doesnt matter that they are also customers of the other organizations but
for the land line services they are only using PTCL.
(3.2.2) Suppliers:Donatel , ZTE and Huwai are the suppliers of the company
(3.2.3) Competitors: Wateen Telecom, Warid Telecom , Telenor, Zong,
Mobilink, insta phone are the competitors of the company.
(3.2.4) Pressure Group: Pressure groups include a circle of customers
and governmental and as well as non-governmental organizations.
3.3)PE
ST
ANALYSIS
Page 20
PTCL
Gov and
NGOs
People and
ORGS
ZTE ,Hawai
ect
Mobilink,
wateen etc
-
8/14/2019 Management part-1
21/26
Unanimous World of Blues
Pest analysis:
Pest analysis consists of political, economic, social and
technological issues.
Political issues:
The political condition of the country greatly effects the
organizations who are conducting business in that country. If there
is political instability in any country then the foreign countries are
reluctant to conduct business in that country. As far as our country
is concerned, we know that political instability exists here, as we
went there,there was a strike going on. As the governments change
very quickly in Pakistan, so it has negative effect on PTCL.
Foreign countries are not making any investment in PTCL.
Economic issues:
Further economic conditions also effects the business conditions in
the country. If the economical conditions are good, then the
government makes investment in that organization but as far as
PTCL is concerned, there is no such investment by the government
and this organization is now privatized.
Social issues:
Social issues are concerned with the social norms of that country.
As far as PTCL is concerned, their culture is in accordance with the
social values of the country like when we dial their help line, theoperator says ASSLAM-O-ALIKUM while there is no such
regard in any other country.
Technological issues:
PTCL is adapting new and new technology day by day. They are
Page 21
-
8/14/2019 Management part-1
22/26
Unanimous World of Blues
satisfying their customers by providing new packages and their
new packages definitely involves new technology for example with
the help of IPTV (which is their new package) they are providing
200 TV channels. Similarly PTCL VMS, VFONE, DSL,
SKYLINK (SATTELITE COMMUNICATION SERVICE FOR
OPERATORS AND CORPORATE CUSTOMERS) they all are
having new technology.
Chapter Number.4
Organizational Structure
Page 22
-
8/14/2019 Management part-1
23/26
Unanimous World of Blues
(4.1) PTCL Organizational Structure:
Though PTCL has been changing its structure or we can say it is
redeveloping its structure. Before the structure of the organization
was rigid and now they are innovative and changing their structure of
the organization with new and emerging technologies, like they are
now using computers and so number of employees has been reduced
and they have replaced old ordinary file system with new digital file
system, building structure was very out worn but now they are using
new style of furniture and having latest construction styles.
WORK SPECIALIZATION: In PTCL work is specialized around
teams and individuals. There is division of labor.
DEPARTMENTALIZATION: Every department has its own
organizational chart besides there is only one president. They have
different departments like product department and HRM.
CHAIN OF COMMAND: They somewhat had chain of command.
There is continuous line of authority.
CENTRALIZATION: Though it is privatized yet there exists
centralization.
SPAN OF CONTROL: Managers control a lot of employees. This
is a drawback of their miss management but may be this could be
their strength.
They have matrix and project structure that is work is specialized
among teams and when a project starts they assign specialists from other
departments to complete the project. Since two years has passed from its
privatization it organizational structure has changed it is a learning
Page 23
-
8/14/2019 Management part-1
24/26
Unanimous World of Blues
organization. Apart from this PTCL is dynamic organization.
Organisational Structure Diagram
Chapter number.5
Page 24
-
8/14/2019 Management part-1
25/26
Unanimous World of Blues
SWOT(Strengths,Weaknesses,Opportunities and
Threats)analysis:
SWOT Analysis:
Swot stands for strength, weaknesses, opportunities and threats.
Now here we see all these aspects of PTCL.
Strength:
1. The strength of PTCL is that they are satisfying their customers
by using new technologies, adapting new ways, providing new
packages.
2. They have made large capital expenses on network
improvement to stay competitive.
3. Theirlocal service revenue is ok; paying bills through phone is
a commendable startand they have vast infrastructure and real
estate assets, which can be leveraged further.
4. Their Global connectivity reliability has been improved. PTCL
is expanding the long distance and infrastructure side through
spreading out two SEA-ME-WE submarine cables.
Weaknesses:
1.Similarly, they have weaknesses as well.
2. They do not use their own resources instead depends upon others
as they have sold their 26% share to Etisalat.
3.In addition, there are risk factors in their projects. VOIP use is
increasing despite their ambiguous and discriminatory polices, this
will eat into its profit.
4. Paknet, the Internet service provider arm of PTCL continues to
incur losses due to poor management and lack of network
optimization.
Page 25
-
8/14/2019 Management part-1
26/26