Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and...

29

Transcript of Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and...

Page 1: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.
Page 2: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.

Malawi 2014

Page 3: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.

Building Progress

• Administration block and staff toilets internally painted with PVA and 2 topcoats

•Window frames repainted with 2 coats now glazed

Page 4: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.
Page 5: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.

Classrooms 1&2

• Re-painting all the glazed window frames with two coats of gloss and cleaning the glass

• Painted murals

Page 6: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.
Page 7: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.
Page 8: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.
Page 9: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.
Page 10: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.
Page 11: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.

Classroom 4

Cleared rubbish, swept and re-organised all the building materials (including 10 tonnes of roof timber), making room for next consignment of roof timber

Page 12: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.
Page 13: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.

Teachers Houses 1&2

• Cleared rubbish• Scraped concrete debris from

floors & walls• Swept & prepared for painting• PVA & 2 topcoats completed

in house 1• PVA completed in house 2

Page 14: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.
Page 15: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.
Page 16: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.

Builder & labourers work• Five sections of floors poured

for second school block

• Walkway between block 1 and toilet block poured

• Bricks made and 2 brick kilns built and fired

Page 17: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.
Page 18: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.
Page 19: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.
Page 20: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.

Fundraising Matters• £9125 was taken out for the

project this year.• Parachute purchased &donated to

the school• 200 book bags purchased • Personal donations given to mission

partners

Page 21: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.

Good Job done!

Page 22: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.

Time Out

Page 23: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.

Sunrise Devotions

Page 24: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.

Bible Translation Project

Page 25: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.

R&R at Lake Malawi

Page 26: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.
Page 27: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.

What Next?• Please continue to pray:• Head-teacher still needed.• Toilet block needs completing

before school can be inspected & opened

• Second block of 4 classrooms + library to be built

• 6 more teachers houses to build

Page 28: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.

Staff Team Plans

David & Pauline are still committed to lead the Malawi project forward.

Page 29: Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.