Make & Move Larynx Construction Tutorial

20
© 2011 Make & Move Larynx Construction Tutorial 1

Transcript of Make & Move Larynx Construction Tutorial

Page 1: Make & Move Larynx Construction Tutorial

© 2011

Make & Move Larynx

Construction Tutorial

1

Page 2: Make & Move Larynx Construction Tutorial

© 2011 2

This is all you need!

Page 3: Make & Move Larynx Construction Tutorial

© 2011 3

Pull pieces out & remove insets

All of them!

Page 4: Make & Move Larynx Construction Tutorial

© 2011 4

Pre-Assembly Overview

Hyoid bone &

posterior pharyngeal wall

(stabilizer)

Thyroid cartilage

Cricoid cartilage arch

& lamina

Arytenoid cartilages

& elastics

Page 5: Make & Move Larynx Construction Tutorial

© 2011 5

Helpful Hints

• Make note of anatomical landmarks.

• Watch for matching letters.

• Use narrow strips of adhesive tape.

• Preassemble components (as seen in previous slide).

Slide Order:

Cricoid cartilage pre-assembly (6 & 7)

Arytenoid cartilage pre-assembly (8 & 9)

Hyoid bone & posterior pharyngeal wall pre-assembly (10)

Crico-arytenoid attachment (11 & 12)

Thyro-hyoid attachment (13, 14, 15)

Crico-thyroid attachment (16)

Epiglottic attachment (17)

Thyro-arytenoid ligament (blue elastics) attachments

Page 6: Make & Move Larynx Construction Tutorial

© 2011 6

Assemble cricoid cartilage

Line up the “A”s and

“B”s to hide gray tabs.

Page 7: Make & Move Larynx Construction Tutorial

© 2011 7

The cricoid cartilage

The cricoid cartilage “ring”

provides structural support

for an open airway.

It is the lowest cartilage in

the larynx and base of our

Make & Move Larynx.

(Do not tape over the C

and D holes!)

Page 8: Make & Move Larynx Construction Tutorial

© 2011 8

Arytenoid cartilage & blue elastic preassembly

Arytenoid cartilages are

complex pyramidal

structures (and tricky to

assemble).

The blue elastics in back

will help to attach the

arytenoid to the cricoid.

The blue elastics in front

represent a sliver of the

vocal ligament.

Page 9: Make & Move Larynx Construction Tutorial

© 2011 9

Arytenoid Cartilages & Elastics

1. Run elastic through tiny hole above

rectangular strip.

2. Fold paper along dotted lines and lay

elastic over to the semi-circular cut

labeled as the vocal process.

3. Wrap the pyramid around the elastic,

folding gray flaps in. Tape together.

1

2 3

Page 10: Make & Move Larynx Construction Tutorial

© 2011 10

Hyoid bone & posterior pharyngeal wall

Align the strips by the tilt of the

letters (they will not be at a 90

degree angle).

Page 11: Make & Move Larynx Construction Tutorial

© 2011 11

Crico-Arytenoid Attachment

The arytenoids sit atop the

cricoid lamina where they can

glide, rock, and rotate.

The anatomically incorrect slots

in the lamina and C-A facet loop

recreate this mobility.

Start Finish

Page 12: Make & Move Larynx Construction Tutorial

© 2011 12

Crico-Arytenoid Attachment

1. Slip strip through

slot from inside – out.

2. Curl strip up and

pass elastic through

hole.

3. Pull other end of

elastic to snug up

connection and tape

metal end tip down.

Page 13: Make & Move Larynx Construction Tutorial

© 2011 13

Thyro-hyoid attachment

Note anatomical landmarks

as you fold along the

dotted lines of the thyroid

cartilage. That thyroid

notch is the “Adam’s

Apple”.

Page 14: Make & Move Larynx Construction Tutorial

© 2011 14

Tape F over F

The letters tilt. Line them up over one

another. The gray strip between the

greater horn of the hyoid and superior

horn of the thyroid will not be covered.

Page 15: Make & Move Larynx Construction Tutorial

© 2011

Tape G over G

15

Page 16: Make & Move Larynx Construction Tutorial

© 2011 16

Crico-thyroid attachment

Tab C will need to be curled into

a mini cylinder to slip through

Hole C (from outside in).

No tape here! The crico-thyroid

joint should allow movement.

Repeat for Tab D and Hole D

on the right side.

Page 17: Make & Move Larynx Construction Tutorial

© 2011 17

Tape epiglottis to thyroid c.

Tape the petiole to inside of thyroid

cartilage, between the thyroid notch

and hole (leave hole open).

Page 18: Make & Move Larynx Construction Tutorial

© 2011 18

Thyroarytenoid connections

Thread blue elastics through the

hole and tape to outside of thyroid

lamina.

Page 19: Make & Move Larynx Construction Tutorial

© 2011 19

All Done – Congratulations!

Page 20: Make & Move Larynx Construction Tutorial

© 2011 20

Make & Move Larynx available at www.EstillVoice.com