Major Project Submission ............................................................................................................................. 6 Workflow ....................................................................................................................................................... 7 Create the Major Project Submission (Art. 101 and 102(2)) ......................................................................... 9 Record/Edit the Major Project Submission ................................................................................................. 11 General ........................................................................................................................................................ 12 Version Information ................................................................................................................................. 12 Officials in Charge .................................................................................................................................... 13 History ...................................................................................................................................................... 15 Documents ............................................................................................................................................... 16 Uploading & Sending Documents ........................................................................................................ 16 Sending a non-integral Document ....................................................................................................... 20 Deletion of an Unsent Document ........................................................................................................ 21 Hiding a Sent Document ...................................................................................................................... 22 Observations ............................................................................................................................................ 23 A Bodies Responsible .................................................................................................................................. 24 A.1 for Project Application ...................................................................................................................... 24 A.2 for Project Implementation .............................................................................................................. 25 A.3 Details of the understanding ............................................................................................................. 26 A.4 Capacity ............................................................................................................................................. 29 A.4.1 Technical Capacity ...................................................................................................................... 29 A.4.2 Legal Capacity ............................................................................................................................. 30 A.4.3 Financial Capacity ....................................................................................................................... 31 A.4.4 Administrative Capacity .............................................................................................................. 33 A.5 Institutional arrangements ................................................................................................................ 34 A.5.1 Infrastructure management ....................................................................................................... 35 B Description of the Investment ................................................................................................................. 37 B.1 Operational Programmes & Priority Axes ......................................................................................... 37 B.2 Categorisation of project activity ...................................................................................................... 38

Transcript of Major Project Submission 6 - European Commission · The status of the Major Project Submission is...

Page 1: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

Major Project Submission ............................................................................................................................. 6

Workflow ....................................................................................................................................................... 7

Create the Major Project Submission (Art. 101 and 102(2)) ......................................................................... 9

Record/Edit the Major Project Submission ................................................................................................. 11

General ........................................................................................................................................................ 12

Version Information ................................................................................................................................. 12

Officials in Charge .................................................................................................................................... 13

History ...................................................................................................................................................... 15

Documents ............................................................................................................................................... 16

Uploading & Sending Documents ........................................................................................................ 16

Sending a non-integral Document ....................................................................................................... 20

Deletion of an Unsent Document ........................................................................................................ 21

Hiding a Sent Document ...................................................................................................................... 22

Observations ............................................................................................................................................ 23

A Bodies Responsible .................................................................................................................................. 24

A.1 for Project Application ...................................................................................................................... 24

A.2 for Project Implementation .............................................................................................................. 25

A.3 Details of the understanding ............................................................................................................. 26

A.4 Capacity ............................................................................................................................................. 29

A.4.1 Technical Capacity ...................................................................................................................... 29

A.4.2 Legal Capacity ............................................................................................................................. 30

A.4.3 Financial Capacity ....................................................................................................................... 31

A.4.4 Administrative Capacity .............................................................................................................. 33

A.5 Institutional arrangements ................................................................................................................ 34

A.5.1 Infrastructure management ....................................................................................................... 35

B Description of the Investment ................................................................................................................. 37

B.1 Operational Programmes & Priority Axes ......................................................................................... 37

B.2 Categorisation of project activity ...................................................................................................... 38

Page 2: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

B.2.1 Intervention Field(s) .................................................................................................................... 39

B.2.2 Form(s) of finance ....................................................................................................................... 40

B.2.3 Territorial dimension(s) .............................................................................................................. 41

B.2.4 Territorial delivery mechanism .................................................................................................. 42

B.2.5 Thematic objective(s) .................................................................................................................. 43

B.2.6 Economic dimension(s) .............................................................................................................. 44

B.2.7 Location Dimension(s) (NUTS III) ............................................................................................... 45

B.2.8 Nature of the investment........................................................................................................... 46

B.2.9 Product concerned ..................................................................................................................... 47

B.3 Project description ............................................................................................................................. 49

B.3.1 Concise description .................................................................................................................... 49

B.3.2 Phase of major project ............................................................................................................... 50

B.3.3 Description of phases ................................................................................................................. 51

B.3.4 Previously approved ................................................................................................................... 52

B.3.5 Part of a Trans-European Network (TEN) .................................................................................. 54

B.3.7 Coverage .................................................................................................................................... 55

B.4 Project objectives .............................................................................................................................. 57

B.4.1 Main Project objectives ............................................................................................................. 57

B.4.2 Project's consistency .................................................................................................................. 58

B.4.3 Socio-economic development ................................................................................................... 60

B.4.4 Optimal utilisation of infrastructure .......................................................................................... 61

C Total cost and total eligible cost .............................................................................................................. 63

C.1 Table Article 101 ................................................................................................................................ 63

C.2 Compliance with State aid rules ........................................................................................................ 66

C.3 Total eligible cost calculation............................................................................................................. 69

D Feasibility studies ..................................................................................................................................... 73

D.1 Demand analysis ................................................................................................................................ 73

D.2 Option analysis .................................................................................................................................. 74

Page 3: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

D.2.1 Alternative options .................................................................................................................... 75

D.2.2 Criteria for best solution ............................................................................................................ 76

D.3 Feasibility of selected option ............................................................................................................. 77

D.3.1 Institutional aspect .................................................................................................................... 77

D.3.2 Technical aspects ....................................................................................................................... 78

D.3.3 Environmental aspects .............................................................................................................. 80

D.3.4 Other aspects ............................................................................................................................. 81

E Cost-benefit analysis ................................................................................................................................ 83

E.1 Financial Analysis .............................................................................................................................. 83

E.1.1 Methodology ............................................................................................................................... 83

E.1.2 Main elements and parameters .................................................................................................. 84

E.1.3 Main indicators ........................................................................................................................... 86

E.1.4 Tariff strategy and affordability .................................................................................................. 89

E.1.4.1 Charging system .................................................................................................................. 89

E.1.4.2 Operating costs .................................................................................................................... 90

E.1.4.3 Proportional to use .............................................................................................................. 91

E.1.4.4 Proportional to pollution ..................................................................................................... 93

E.1.4.5 Affordability of charges ....................................................................................................... 94

E.2 Economic analysis ............................................................................................................................. 95

E.2.1 Methodology ............................................................................................................................... 95

E.2.2 Economic benefits and costs ....................................................................................................... 97

E.2.3 Main indicators ........................................................................................................................... 98

E.2.4 Employment effects .................................................................................................................. 100

E.2.5 Non-quantifiable benefits and costs ......................................................................................... 102

E.3 Risk assessment and sensitivity analysis ......................................................................................... 103

E.3.1 Methodology ............................................................................................................................. 104

E.3.2 Sensitivity analysis ..................................................................................................................... 105

Page 4: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

E.3.3 Risk assessment ......................................................................................................................... 107

E.3.4 Additional assessments ............................................................................................................. 108

F Analysis of environmental impact .......................................................................................................... 110

F.1 Consistency with environmental policy ........................................................................................... 110

F.1.1 How policy objectives are taken into account .......................................................................... 110

F.1.2 Respect of principles ................................................................................................................. 111

F.2 SEA directive .................................................................................................................................... 112

F.3 EIA directive ..................................................................................................................................... 114

F.3.1 Link to agreed action plan ......................................................................................................... 114

F.3.2 Listed in annexes ....................................................................................................................... 115

F.3.3 Covered by Annex I ................................................................................................................... 116

F.3.4 Covered by Annex II .................................................................................................................. 119

F.3.5 Development consent/construction permit ............................................................................. 120

F.4 Habitats directive ............................................................................................................................. 122

F.5 Water framework directive .............................................................................................................. 125

F.5.1 Link to agreed action plan ......................................................................................................... 125

F.5.2 New modification ...................................................................................................................... 126

F.5.3 River basin management plan ................................................................................................... 129

F.6 Other environmental directives ....................................................................................................... 130

F.6.1 UWWT directive ........................................................................................................................ 131

F.6.2 Waste framework directive ....................................................................................................... 132

F.6.2.1 Link to agreed action plan ................................................................................................. 132

F.6.2.2 How objectives are met ..................................................................................................... 134

F.6.3 Industrial emissions directive .................................................................................................... 135

F.6.4 Other environmental directives ................................................................................................ 136

F.7 Costs to mitigate negative environmental impacts ......................................................................... 137

F.8 Climate change adaptation and mitigation...................................................................................... 139

F.8.1 Contribution to climate change targets .................................................................................... 139

Page 5: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

F.8.2 Assessment of climate change risks .......................................................................................... 140

F.8.3 Measures adopted .................................................................................................................... 141

G Financing plan, indicators and risks ....................................................................................................... 142

G.1 Financing plan.................................................................................................................................. 142

G.1.1 Sources of co-financing............................................................................................................. 143

G.1.2 Annual plan ............................................................................................................................... 144

G.1.3 Other Union financing sources ................................................................................................. 145

G.1.3.1 Other Union source ........................................................................................................... 145

G.1.3.2 Complementary ............................................................................................................... 147

G.1.3.3 Loan or equity support ...................................................................................................... 148

G.1.3.4 Other Union support ......................................................................................................... 150

G.1.4 Public-private partnership ........................................................................................................ 151

G.1.5 Financial instruments ............................................................................................................... 153

G.1.6 Impact of Union assistance ....................................................................................................... 154

G.2 Indicators ......................................................................................................................................... 157

G.3 Risk assessment ............................................................................................................................... 161

H Timetable ............................................................................................................................................... 162

H.1 Project timetable ............................................................................................................................. 162

H.2 Project maturity............................................................................................................................... 164

H.2.1 Technical ................................................................................................................................... 164

H.2.2 Administrative .......................................................................................................................... 165

H.2.3 Public procurement .................................................................................................................. 167

H.2.4 Financial .................................................................................................................................... 168

H.2.5 Current state of implementation .............................................................................................. 170

I Project subject to legal procedure .......................................................................................................... 171

J Undertaking subject to procedure .......................................................................................................... 173

K Jaspers .................................................................................................................................................... 174

Page 6: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

L Subject to quality review ........................................................................................................................ 176

M Summary of revisions ............................................................................................................................ 177

N Endorsement of national authority ....................................................................................................... 179

Additional Functionality ............................................................................................................................ 180

Early Warning Notification ..................................................................................................................... 180

Validate the Major Project Submission ..................................................................................................... 181

Send the Major Project Submission .......................................................................................................... 186

Delete the Major Project Submission ........................................................................................................ 188

Withdraw a Major Project Submission ...................................................................................................... 190

Create a New Version of the Major Project Submission ........................................................................... 192

Resubmit a Major Project Submission ...................................................................................................... 193

Major Project Submission

PURPOSE

This document describes the specifications and details related to the Major Project Submission procedure as described under Articles 101 and 102(2) of Regulation (EU) No 1303/2013.

REGULATIONS

More details about the regulation regarding the MAJOR PROJECT SUBMISSION can be found in the About SFC2014 section of this portal.

ROLES

Roles involved in the Major Project Submission are:

MS Managing Authority

Record the Major Project Submission

Upload the Major Project Submission

Consult the Major Project Submission

Delete the Major Project Submission

Validate the Major Project Submission

Page 7: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

Send the Major Project Submission

Return the Major Project Submission

Create New Version of a Major Project Submission

MS Audit Authority Consult the Major Project Submission

FUNDS

ERDF, CF

PRE-CONDITIONS

The CCI number used for the Major Project must have been previously allocated by the Commission.

Another Major Project with the same CCI cannot exist, not even as a Major Project Notification (Art. 102(1) and 103 of Regulation (EU) No 1303/2013).

Workflow

This section shows the lifecycle to create and manage the Major Project Submission:

Page 8: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State
Page 9: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

Create the Major Project Submission (Art. 101 and 102(2))

REMARK

To create the Major Project Submission:

You must have MS Managing Authority role with Update rights.

No other Major Project already exists, not even as a Major Project Notification (Art. 102(1) and 103).

A CCI must have been previously ALLOCATED by the Commission.

1. To access into the MAJOR PROJECT SUBMISSION section, first click on the PROGRAMMING menu (1) and then on the Major Project Submission (Article 102(2)) menu item (2).

Page 10: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Click on the Create New Major Project link to create a new Major Project Submission.

You are redirected to the Major Project Submission creation wizard:

3. Enter or Select the following information:

(1) Select a CCI.

Page 11: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The CCI list contains all allocated Major Project CCIs for the country of your node and which contain the Funds for which you are registered (you need to have permission for all Funds covered by the CCI). The list returns the CCI and the Programme Title.

If the CCI code is not in the list, you can request a new CCI via the Request a new CCI Number link.

(2) Enter a Title

The title of the Major Project comes from the previously allocated CCI number, but can be overwritten.

(3) Select the Type

(4) Click on the FINISH button to confirm the creation.

The status of the Major Project Submission is OPEN.

NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State aid rules table (C.2) are automatically created.

Record/Edit the Major Project Submission

Find all the information to complete each screen of the Major Project Submission. Below are the links to the main sections:

Major Project Submission:

- General

- A. Bodies responsible

- B. Description of the investment

- C. Total cost and total eligible cost

- D. Feasibility studies

- E. Cost-benefit analysis

- F. Analysis of environmental impact

- G. Financing plan, indicators and risks

- H. Timetable

- I. Project subject to legal procedure

- J. Undertaking subject to procedure

- K. Jaspers

- L. Subject to quality review

- M. Summary of revisions

Page 12: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

- N. Endorsement of national authority

General

Version Information

The Version Information contains information on the identification and status of the Major Project Submission version; like the CCI, the Title, the Version Number, the Status, the Current Node, etc. It also shows the results of the last validation done on this Major Project Submission version.

1. Clicking on the EDIT button will enable you the modification of the Major Project Submission.

The Edit Details pop-up window appears:

Page 13: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter or select the modifications:

(1) Select a new CCI

The CCI can only be updated when Version 1 and it can only be replaced by a CCI with the same Budget Source.

The CCI list contains all allocated Major Project CCIs of the same Budget Source for the Country of your Node and which contain the Funds for which you are registered (you need Update permission for all Funds covered by the CCI).

(2) Enter the Title.

(3) Select the Type.

(4) Click on the Update link to save the information.

Officials in Charge

NOTE

Officials in Charge can be updated at any time, independent from the status of the Major Project Submission.

The email is directly accessible via the email link.

Page 14: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

Click on the ADD button to add a new official in charge.

Select an official and click in the EDIT button to modify the information of this official.

Select an official and click on the REMOVE button to delete the official in charge selected.

1. Click on the ADD button to add a new official in charge.

The Edit Details pop-up window appears:

Page 15: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the Name.

(2) Enter the Email.

(3) Click on Update to save the information.

NOTE Commission Officials (email domain "ec.europa.eu") can only be created/updated/deleted by Commission Users.

History

This section shows all the actions that happened in the Major Project Submission since it was created, for example:

Page 16: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

Documents

Uploading & Sending Documents

Multiple documents can be uploaded in the Major Project Submission.

Clicking on the ADD button will open a pop-up window allowing you to add a new document type with attachments.

Selecting a document row and click in the EDIT button will allow you to modify the document information. If a document of type 'Other Member State Document' must be sent, you can select the edit button in order to send the document.

Selecting a row of a previously uploaded document and click on the REMOVE button to delete the document and associated attachments.

1. Click on the ADD button to add a new document.

The document detail pop-up window appears:

Page 17: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter or select the following information:

(1) Select a Document Type

(2) Enter a Title for your Document

(3) Enter a Document Date

(4) Click on the ADD button to add a new attachment

- You can add multiple attachments by clicking on the ADD button

- You can remove unwanted attachments by selecting the attachment and clicking on the REMOVE

button

(5) Enter a Title for your attachment.

(6) Select the Language of the document.

(7) Select the file to upload.

(8) Click on Update to save the information or Update & Send to send the document to the Commission.

REMARK Commission Registration N° is only enabled for Commission Users, while Local Reference is enabled for both Member State Users and Commission Users.

Page 18: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The following document types will be foreseen for the Member States:

Page 19: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

Description Integral System Required

Appendix 1 – Declaration by authority responsible for monitoring of NATURA 2000 sites including map

X Conditionally

Appendix 2 – Declaration by competent authority responsible for water management

X Conditionally

Appendix 3 – Table concerning compliance of the agglomerations subject to the application form, with the urban wastewater treatment directive

X Conditionally

Appendix 4 – Feasibility studies (or business plan if productive investment) and cost-benefit analysis (as required in D and E)

X X

Appendix 5 – Map identifying the project area and geo-referenced data (as required in B.3.1)

X X

Appendix 6 – Documentation including non-technical summary of the EIA report, information on consultations and the decision of the competent authority (as required in F.3.3)

X Conditionally

Non-technical summary of the environmental report and the information required by Article 9(1)(b) of the Directive (as required in F.2.2)

X Conditionally

NATURA 2000 negative effects document including decision of competent authority and assessment carried out, copy of standard notification form and opinion of the Commission under Article6 (4) of the Directive (as required in F.4.2)

X Conditionally

Summary schedule of the main categories of works (as required in H.1)

X X

Withdrawal justification letter X1

Documentation from JASPERS (eg. Action Completion Node)

X Conditionally see validation

2.67

Other Member State Document

Snapshot of data before send X X X

1 This document type is normally integral, but since it can be created and send when the Major Project resides at MS or

Commission level, the integral feature will be implemented programmatically.

Page 20: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

Sending a non-integral Document

1. To send a non-integral document that is not yet sent: once the document and attachment(s) have been uploaded select the document row in the list (1) and click on the EDIT button (2):

2. Click on Update & Send to send the document to the Commission.

Page 21: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

NOTE

The Update & Send link will only be shown for documents which are not integral part of the Object and after at least one attachment was added.

If more than one file are uploaded from the same document table, when clicking the Update & Send link, will send all the files and not only the one(s) for which the check-box has been ticked.

REMARK

Non-integral documents (ie. 'Other Member State Document') can be sent at any time independently of the status of the Major Project Submission.

The 'Other Member State Document' type demands a manual submission (they are NOT sent automatically within the Programme). The other document types, integral documents, are automatically sent - together with the encoded data – when the Programme is submitted to the EC.

You can find in our Portal the types of documents that can be uploaded and sent by the Member State.

A document is only visible to the Commission when the Sent Date is visible.

Deletion of an Unsent Document

1. Select a row (1) of a previously uploaded document and click on the REMOVE button (2) to delete the document and associated attachments.

Page 22: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

A confirmation window appears:

2. Click on Yes to confirm deletion. Click on No to return to the Major Project Notification documents.

Hiding a Sent Document

NOTE Sent Documents can never be deleted, but the sender can decide to hide the content for the receivers in case of an erroneous and/or accidental send.

1. Select a row (1) of a previously sent document and click on the EDIT button (2) to hide the document and associated attachments.

Page 23: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Select the HIDE CONTENT option (1) and click on the Update link (2) to hide the Major Project Submission document.

Observations

This section is used to provide any relevant information to the Major Project Submission. It can be used as a type of 'chat' between the Member State and Commission.

Page 24: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(1) Enter an observation.

All users who have Read and Observation permission on the Major Project Submission will be able to send an Observation and participate in the conversation.

(2) Click on Add to save the information.

All Observations are kept against the specific version of the Major Project Submission.

A Bodies Responsible

The Body responsible for project application (managing authority or intermediate body).

A.1 for Project Application

1. Clicking on the ADD button will open a pop-up window allowing you to enter the details of the Authority responsible for Project Application (managing authority or intermediate body).

Page 25: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit Details pop-up window appears:

2. Enter the following information:

(1) Enter the Name

(2) Enter the E-mail

(3) Click on the Update link to save the information.

A.2 for Project Implementation

1. Clicking on the ADD button will open a pop-up window allowing you to enter the information of the Bodies responsible for Project Implementation.

Page 26: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit Details pop-up appears:

2. Enter the following information:

(1) Enter the Name

(2) Enter the E-mail

(3) Click on the Update link to save the information.

A.3 Details of the understanding

Page 27: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

1. Clicking on the EDIT button will open a pop-up window allowing you to enter the information for the A.3.1, A.3.2, A.3.3, A.3.4 and A.3.5.

The Edit details pop-up window appears:

Page 28: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the A.3.1. Name of the undertaking

(2) Select Yes or No for the question A.3.2. Is the undertaking on SME?

(3) Enter the A.3.3. Turnover (value in million EUR and year)

(4) Enter the A.3.4. Total number of persons employed (value and year)

Page 29: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(5) Select Yes or No for the A.3.5. Group structure; Are 25% or more of the capital or voting rights of the undertaking owned by one enterprise or a group of enterprises falling outside the definition of on SME?

(6) Use the text box to Indicate the name and describe the group structure

(7) Click on the Update link to save the information

A.4 Capacity

Capacity of the body responsible for project implementation by referring to its technical, legal, financial and administrative capacity.

A.4.1 Technical Capacity

1. Clicking on the EDIT button will open a pop-up window allowing you to enter information on the Technical capacity.

The Edit Details pop-up window appears:

Page 30: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

A.4.2 Legal Capacity

1. Clicking on the EDIT button will open a pop-up window allowing you to enter information on the Legal capacity.

Page 31: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit Details pop-up window appears:

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

A.4.3 Financial Capacity

1. Clicking on the EDIT button will open a pop-up window allowing you to enter information on the Financial capacity.

Page 32: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit Details pop-up window appears:

2. Enter the following information:

(1) Enter the description for the financial capacity

(2) Click on the Update link to save the information

Page 33: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

A.4.4 Administrative Capacity

1. Clicking on the EDIT button will open a pop-up window allowing you to enter information on the Administrative capacity.

The Edit Details pop-up window appears:

Page 34: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the description for the administrative capacity

(2) Click on the Update link to save the information

A.5 Institutional arrangements

1. Clicking on the EDIT button will open a pop-up window allowing you to provide information on all relevant institutional arrangements.

The Edit Details pop-up window appears:

Page 35: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the description for the relevant institutional arrangements

(2) Click on the Update link to save the information

A.5.1 Infrastructure management

1. Clicking on the EDIT button will open a pop-up window allowing you to enter the details of how the infrastructure will be managed after the project is completed.

Page 36: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit Details pop-up window appears:

2. Enter the following information:

(1) Enter the description for the infrastructure management

(2) Click on the Update link to save the information

Page 37: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

B Description of the Investment

Description of the Investment, its location, explanation as to how it is consistent with the relevant Priority Axes of the Operational Programme(s) concerned.

B.1 Operational Programmes & Priority Axes

1. Clicking on the ADD button will open a pop-up window allowing you to enter the OP and priority axes.

The Edit Details pop-up window appears:

2. Enter the following information:

(1) Select the CCI of OP

Page 38: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The CCI list will contain all adopted IGJ/ETC/IPA-CB Programmes covering one of the Funds of the Budget Source of the Major Project CCI.

(2) Select the Priority Axis of OP

The Priority Axis list will contain Priority Axes of the above selected OP covering one of the Funds of the Budget Source of the Major Project CCI.

(3) Select the Co-financing fund

The Fund list will contain the Funds covered by the above selected Priority Axis limited to the Funds of the Budget Source of the Major Project CCI.

(4) Click on the Update link to save the information

3. Clicking on the EDIT button will open a pop-up window allowing you to answer the question B.1.1 Is the project contained in the list of major projects in the operation programme(s)?

The screen becomes editable:

4. Enter the following information:

(1) Select yes or no

(2) Click on the Update link to save the information

B.2 Categorisation of project activity

Page 39: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

B.2.1 Intervention Field(s)

1. Clicking on the ADD button will open a pop-up window allowing you to enter the information for the intervention field dimension(s).

The Edit Details pop-up window appears:

2. Enter the following information:

(1) Select the Code

(2) Enter the Amount

(3) Click on the Update link to save the information

NOTE The codes used here are independent of the codes used in the Operational Programme(s).

Page 40: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

B.2.2 Form(s) of finance

1. Clicking on the ADD button will open a pop-up window allowing you to enter the codes for the forms of finance.

The Edit Details pop-up window appears:

2. Enter the following information:

(1) Select the Code

(2) Enter the Amount

(3) Click on the Update link to save the information

NOTE The codes used here are independent of the codes used in the Operational Programme(s).

Page 41: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

B.2.3 Territorial dimension(s)

1. Clicking on the ADD button will open a pop-up window allowing you to enter the codes for the territorial dimensions.

The Edit Details pop-up window appears:

2. Enter the following information:

(1) Select the Code

(2) Enter the Amount

(3) Click on the Update link to save the information

Page 42: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

NOTE The codes used here are independent of the codes used in the Operational Programme(s).

B.2.4 Territorial delivery mechanism

1. Clicking on the ADD button will open a pop-up window allowing you to enter the information for the codes for the territorial delivery mechanism.

The Edit Details pop-up window appears:

2. Enter the following information:

(1) Select the Code

(2) Enter the Amount

(3) Click on the Update link to save the information

Page 43: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

NOTE The codes used here are independent of the codes used in the Operational Programme(s).

B.2.5 Thematic objective(s)

1. Clicking on the ADD button will open a pop-up window allowing you to enter the codes for the thematic objective dimension(s).

The Edit Details pop-up window appears:

2. Enter the following information:

(1) Select the Code

(2) Enter the Amount

Page 44: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(3) Click on the Update link to save the information

NOTE The codes used here are independent of the codes used in the Operational Programme(s).

B.2.6 Economic dimension(s)

1. Clicking on the ADD BUTTON will open a pop-up window allowing you to enter the codes for the economic dimension(s).

The Edit Details pop-up window appears:

2. Enter the following information:

(1) Select the Code

Page 45: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(2) Enter the Amount

(3) Click on the Update link to save the information

NOTE The codes used here are independent of the codes used in the Operational Programme(s).

B.2.7 Location Dimension(s) (NUTS III)

1. Clicking on the ADD button will open a pop-up window allowing you to enter the codes for the location dimension(s) (NUTSIII).

The Edit details pop-up window appears:

Page 46: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Select the Code

(2) Enter the Amount

(3) Click on the Update link to save the information.

REMARK The list is restricted to NUTS 3 codes of the country of the Major Project.

B.2.8 Nature of the investment

1. Clicking on the ADD button will open a pop-up window allowing you to enter the codes for the nature of the investment (to be filled in for productive investment only).

The Edit details pop-up window appears:

Page 47: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Select the Code

The product code will be validated and its description will be displayed next to the code

(2) Enter the Amount

(3) Click on the Update link to save the information.

NOTE The codes used here are independent of the codes used in the Operational Programme(s).

B.2.9 Product concerned

1. Clicking on the ADD button will open a pop-up window allowing you to enter the codes for the Product concerned (for productive investments only).

Page 48: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Enter the Code

(2) Enter the Amount

(3) Click on the Update link to save the information.

REMARK The Product code will be validated and its description will be displayed next to the code.

Page 49: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

B.3 Project description

B.3.1 Concise description

1. Clicking on the EDIT button will enable you to enter a concise project description.

The Edit details pop-up window appears:

Page 50: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the description of the project

(2) Click on the Update link to save the information.

B.3.2 Phase of major project

1. Clicking on the EDIT button will enable you to select yes or no for the question 'Is this project a phase of a major project (1)?'

The Edit details pop-up window appears:

Page 51: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Select yes or no

(2) Click on the Update link to save the information.

B.3.3 Description of phases

1. Clicking on the EDIT button will allow you to enter a concise description of the proposed phases of implementation.

The Edit details pop-up window appears:

Page 52: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information.

B.3.4 Previously approved

1. Clicking on the EDIT button will allow you to select yes or no for the question 'Has the Commission previously approved any part of this major project?'

Page 53: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Select Yes or No

Page 54: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(2) If yes, provide the CCI of the major project approved

(3) If this project is a part of the major project for which the first phase was carried out in the 2007-2013, provide a detailed description of the project.

(4) Click on the Update link to save the information.

B.3.5 Part of a Trans-European Network (TEN)

1. Clicking on the EDIT button will allow you to select yes or no for the question 'Does the project form part of a Trans-European Network agreed at Union level?

The Edit details pop-up window appears:

Page 55: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Select Yes or No

(2) If this project is a part of a TEN, provide the details and give reference to the relevant EU legislation.

(3) Click on the Update link to save the information.

B.3.7 Coverage

1. Clicking on the EDIT button will allow you to select yes or no for the question 'covered under Article 3(1)(a) of Regulation (EU) N° 1301/2013 of the European Parliament and of the Council?'

Page 56: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Select Yes or No

(2) If yes, provide an explanation on how it contributes to creating and safeguarding jobs

Page 57: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(3) Click on the Update link to save the information.

B.4 Project objectives

Project objectives and its consistency with the relevant priority axes of the operational programme or operational programmes concerned, and its expected contribution to achieving the specific objectives and results of those priority axes and the expected contribution to socio-economic development of the area covered by the operational programme.

B.4.1 Main Project objectives

1. Clicking on the EDIT button will allow you to list and explain the main project objectives.

The Edit details pop-up window appears:

Page 58: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the explanation

(2) Click on the Update link to save the information.

B.4.2 Project's consistency

1. Clicking on the EDIT button will allow you to enter the details on the project's consistency.

Page 59: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Enter the explanation

(2) Click on the Update link to save the information.

Page 60: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

B.4.3 Socio-economic development

1. Clicking on the EDIT button will allow you to enter a description on how the project will contribute to socio-economic development of the area covered by the OP.

The Edit details pop-up window appears:

Page 61: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the explanation

(2) Click on the Update link to save the information.

B.4.4 Optimal utilisation of infrastructure

1. Clicking on the EDIT button will allow you to enter an explanation on what measures have been planned/taken to ensure optimal utilisation of the infrastructure.

Page 62: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

Page 63: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(1) Enter the explanation

(2) Click on the Update link to save the information.

C Total cost and total eligible cost

C.1 Table Article 101

1. Clicking on the EDIT button will allow you to complete the table.

The table becomes editable:

Page 64: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the Total project costs (A) and the Ineligible costs (B)

(2) Click on the Update link to save the information.

REMARK

The records in this table are automatically foreseen.

'Ineligible costs' must be <= 'Total project costs', but Total of 'Ineligible costs' must be < Total of 'Total project costs'.

The Input fields are numbers and you either leave it empty when not applicable or fill in a number when applicable.

3. Clicking on the EDIT button will allow you to provide the exchange rate and the reference (where applicable).

Page 65: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

4. Enter the following information:

(1) Enter the exchange rate and the reference

(2) Click on the Update link to save the information

5. Clicking on the Edit button will allow you to provide any comment regarding any of the items above.

Page 66: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

6. Enter the following information:

(1) Enter any comment regarding any of the items above

(2) Click on the Update link to save the information

C.2 Compliance with State aid rules

1. Clicking on the EDIT button will allow you to answer yes or no to the question 'Do you consider that this project involves the granting of State aid?'

Page 67: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Select Yes or No

(2) Click on the Update link to save the information

3. If No, clicking on the EDIT button will allow you to explain in detail the basis for establishing that the project does not involve state aid.

Page 68: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

Page 69: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

4. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

5. If Yes, clicking on the EDIT button will allow you to fill in the table:

6. Enter the following information:

(1) Enter the amount of Aid (EUR)

(2) Enter the total amount of eligible costs (EUR)

(3) Enter the % of Aid Intensity

(4) Enter the State Aid Number/Registry number for block-exempted aid

(5) Click on the Update link to save the information

REMARK The records in this table are automatically foreseen.

C.3 Total eligible cost calculation

1. Clicking on the EDIT button will allow you to enter the total eligible cost calculation.

Page 70: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Choose the Method of calculation of the potential net revenue (1). The information required will dynamically change depending on the Method selected:

- When the method is Calculation of the discounted net revenue:

Page 71: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

3. Enter the following information:

(1) Enter the method of calculation of the potential net revenue: Calculation of the discounted net revenue

(2) Enter the total amount of eligible cost before taking account of the requirements set out in Article 61 of Regulation (EU) N° 1303/2013

Enter the pro-rata application of discounted net revenue (%) (no mandatory)

(3) Click on the Update link to save the information

- When the method is Decreased co-financing rate:

Page 72: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

4. Enter the following information:

(1) Enter the method of calculation of the potential net revenue: Decreased co-financing rate method

(2) Enter the total eligible cost before taking account of the requirements set out in Article 61 of Regulation (EU) N° 1303/2013

Enter the net revenue flat rate as defined in Annex V to Regulation (EU) N° 1303/2013 or delegated acts (FR) (%) (no mandatory)

Enter the Total eligible cost after taking account of the requirements set out in Article 61 of Regulation (EU) N°1303/2013 (no mandatory)

(3) Click on the Update link to save the information

REMARK When method is "Decrease co-financing method" then field 3 "Total eligible cost after taking account of the requirements…" needs to be input manually. For the other calculation methods, this field is automatically calculated.

- When the method is Flat rate:

Page 73: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

5. Enter the following information:

(1) Enter the method of calculation of the potential net revenue: Flat rate method

(2) Enter the total amount of eligible cost before taking account of the requirements set out in Article 61 of Regulation (EU) N° 1303/2013

Enter the pro-rata application of discounted net revenue (%) (no mandatory)

(3) Click on the Update link to save the information

D Feasibility studies

Feasibility studies carried out, including option analysis and the results.

D.1 Demand analysis

1. Clicking on the EDIT button will allow you to enter a description for the demand analysis.

Page 74: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

D.2 Option analysis

Page 75: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

D.2.1 Alternative options

1. Clicking on the EDIT button will allow you to enter a description for the alternative options considered in feasibility studies.

The Edit details pop-up window appears:

Page 76: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

D.2.2 Criteria for best solution

1. Clicking on the EDIT button will allow you to enter a description to specify the criteria considered in selecting the best solution and present a justification for the option chosen in accordance with Annex III.

The Edit details pop-up window appears:

Page 77: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

D.3 Feasibility of selected option

D.3.1 Institutional aspect

1. Clicking on the EDIT button will allow you to enter a description for the institutional aspect.

Page 78: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

D.3.2 Technical aspects

1. Clicking on the EDIT button will allow you to enter a description for the technical aspects.

Page 79: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

Page 80: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

D.3.3 Environmental aspects

1. Clicking on the EDIT button will allow you to enter a description for the environmental and climate change mitigation and adaptation aspects.

The Edit details pop-up window appears:

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

Page 81: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

D.3.4 Other aspects

1. Clicking on the EDIT button will allow you to enter other aspects.

The Edit details pop-up window appears:

2. Enter the following information:

Page 82: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(1) Enter the description

(2) Click on the Update link to save the information

3. In the reference table select a row and click on the EDIT button to allow you to complete the different key dimension of feasibility studies; demand analysis, optional analysis, institutional, technical, environmental and other aspects:

The Edit details pop-up window appears:

4. Enter the following information:

(1) Enter the reference

Page 83: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(2) Click on the Update link to save the information

E Cost-benefit analysis

A cost-benefit analysis, including a financial and an economic analysis, and including a risk assessment.

E.1 Financial Analysis

E.1.1 Methodology

1. Clicking on the EDIT button will allow you to enter a description of methodology.

The Edit details pop-up window appears:

Page 84: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

E.1.2 Main elements and parameters

1. Clicking on the EDIT button will allow you to enter the main elements and parameters used in the CBA for financial analysis.

Page 85: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Table becomes editable:

2. Enter the following information:

(1) Enter the value for the reference period (years)

(2) Enter the value for the financial discount rate (%)

Page 86: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(3) Enter the values and reference to CBA document for the total investment cost excluding contingencies

(4) Enter the values and reference to CBA document for the residual value

(5) Enter the value discounted and the reference to CBA document for the revenues

(6) Enter the value discounted and the reference to CBA document for the operating and replacement costs

(7, 8, 9) Enter the pro-rata application of discounted net revenue

(10) Click on the Update link to save the information

E.1.3 Main indicators

1. Clicking on the EDIT button will allow you to enter the main indicators of the financial analysis in accordance with the CBA document.

The table becomes editable:

Page 87: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the values without Union support A, with Union support B and the Reference to CBA document for the Financial rate of return (%)

(2) Enter the values without Union support A, with Union support B and the Reference to CBA document for the Net present value (Euro)

(3) Click on the Update link to save the information

3. If a Major Project shows high financial profitability, justify Union contribution in accordance with

Annex III to this Regulation. Clicking on the EDIT button will allow you to enter the justification.

The Edit details pop-up window appears:

(1) Enter the justification

Page 88: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(2) Click on the Update link to save the information

4. In case of productive investments provide results of FRR(kp) calculation and its comparison with

national benchmarks on expected profitability in the given sector. Clicking on the EDIT button will allow you to enter the results.

The Edit details pop-up window appears:

(1) Enter the justification

Page 89: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(2) Click on the Update link to save the information

E.1.4 Tariff strategy and affordability

- E.1.4.1 Charging system

- E.1.4.2 Operating costs

- E.1.4.3 Proportional to use

- E.1.4.4 Proportional to pollution

- E.1.4.5. Affordability of changes

E.1.4.1 Charging system

1. Clicking on the EDIT button will allow you to enter the details of the charging system if the project is expected to generate revenues through tariffs or charges borne by users.

The Edit details pop-up window appears:

Page 90: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the details of the charging system

(2) Click on the Update link to save the information

E.1.4.2 Operating costs

1. Clicking on the EDIT button will allow you to answer yes or no to the question 'Do the charges cover the operational costs including maintenance and replacement costs of the project?'

Page 91: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Select Yes or No

(2) Enter the details with reference to the tariff strategy

(3) Click on the Update link to save the information

E.1.4.3 Proportional to use

1. Clicking on the EDIT button will allow you to answer yes or no to the question 'if the charges differ between various users, are they proportional to the different use of the project/real consumption?'

Page 92: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Select Yes or No

(2) Enter the details

(3) Click on the Update link to save the information

Page 93: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

E.1.4.4 Proportional to pollution

1. Clicking on the EDIT button will allow you to answer to the question 'Are the charges proportional to the pollution generated by users?'

The Edit details pop-up window appears:

Page 94: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Select Yes or No

(2) Enter the details

(3) Click on the Update link to save the information

E.1.4.5 Affordability of charges

1. Clicking on the EDIT button will allow you to answer and enter the details for the question 'Has affordability of the charges for users been taken into account?'

The Edit details pop-up window appears:

Page 95: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Select Yes or No

(2) Enter the details

(3) Click on the Update link to save the information

E.2 Economic analysis

E.2.1 Methodology

1. Clicking on the EDIT button will allow you to enter a short description of methodology.

Page 96: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

Page 97: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

E.2.2 Economic benefits and costs

1. Clicking on the EDIT button will allow you to enter the details of economic benefits and costs identified in the analysis together with values assigned to them.

The Edit details pop-up window for the benefits appears:

2. Enter the following information:

(1) Enter the benefit

(2) Enter the unit value (where applicable)

(3) Enter the total value (in Euro)

Page 98: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(4) Click on the Update link to save the information

The Edit details pop-up window for the costs appears:

3. Enter the following information:

(1) Enter the cost

(2) Enter the unit value (where applicable)

(3) Enter the total value (in Euro)

(4) Click on the Update link to save the information

E.2.3 Main indicators

1. Clicking on the EDIT button will allow you to enter the main indicators of the economic analysis in accordance with the CBA document.

Page 99: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The table becomes editable:

2. Enter the following information:

(1) Enter the values and the reference to CBA document for the Social discount rate (%)

(2) Enter the values and the reference to CBA document for the Economic rate of return ERR (%)

(3) Enter the reference to CBA document for the Economic net present value ENPV (in Euro)

(4) Enter the reference to CBA document for the Benefit-cost ratio

(5) Click on the Update link to save the information

Page 100: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

E.2.4 Employment effects

1. Clicking on the EDIT button will allow you to provide an indication of the number of jobs to be created.

The table becomes editable:

Page 101: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the values for the number of jobs directly created for the NO (FTE) (A) and the average duration of these jobs during the implementation phase

(2) Enter the values for the number of jobs directly created for the NO (FTE) (A) and the average duration of these jobs during the operational phase

(3) Enter the values for the number of jobs indirectly created for the NO (FTE) (A) and the average duration of these jobs during the operational phase

(4) Enter the values for the number of jobs indirectly created for the NO (FTE) (A) for the number of jobs safeguarded

(5) Click on the Update link to save the information

3. In addition, clicking on the EDIT button will allow you to enter the details for expected impact of the project on employment in other regions of the Union and define whether the financial contribution from the Funds doesn’t result in a loss of jobs within the Union.

Page 102: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

4. Enter the following information:

(1) Enter the details

(2) Click on the Update link to save the information

E.2.5 Non-quantifiable benefits and costs

Page 103: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

1. Clicking on the EDIT button will allow you to identify the main non-quantifiable benefits and costs.

The Edit details pop-up window appears:

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

E.3 Risk assessment and sensitivity analysis

Page 104: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

E.3.1 Methodology

1. Clicking on the EDIT button will allow you to provide a short description of the methodology and summary results including main risks identified.

The Edit details pop-up window appears:

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

Page 105: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

E.3.2 Sensitivity analysis

1. Clicking on the ADD BUTTON will allow you to enter the percentage change applied to the variables tested.

The Edit details pop-up window appears:

2. Enter the following information:

(1) Enter the variable tested

(2) Enter the economic Net Present Value variation (ENPV) (%)

(3) Enter the financial Net Present Value (FNPV(C)) variation (%)

(4) Enter the financial Net Present Value (FNPV(K)) variation (%)

Page 106: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(5) Click on the Update link to save the information

3. Clicking on the EDIT button will allow you to provide which variables have been identified as critical.

The Edit details pop-up window appears:

(1) Enter the criterion for the variables

(2) Click on the Update link to save the information

4. Clicking on the EDIT button will allow you to provide information on what are the switching values of the critical variables.

Page 107: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

(1) Enter the estimated percentage change for FNPV or ENPV

(2) Click on the Update link to save the information

E.3.3 Risk assessment

1. Clicking on the EDIT button will allow you to provide a description for the risk assessment.

Page 108: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

E.3.4 Additional assessments

Page 109: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

1. Clicking on the EDIT button will allow you to provide a description for the additional assessments carried out, if applicable.

The Edit details pop-up window appears:

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

Page 110: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

F Analysis of environmental impact

An analysis of the environmental impact, taking into account climate change adaptation, mitigation needs and disaster resilience.

F.1 Consistency with environmental policy

F.1.1 How policy objectives are taken into account

1. Clicking on the EDIT button will allow you to provide a description on how the project contributes and takes into account the environmental policy objectives including climate change.

The Edit details pop-up window appears:

Page 111: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

F.1.2 Respect of principles

1. Clicking on the EDIT button will allow you to describe how the project respects the precautionary principle, the principle of preventive action and the principle that environmental damage should be rectified.

Page 112: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

F.2 SEA directive

Application of Directive 2001/42/EC of the European Parliament and of the Council (1) (the 'SEA Directive').

1. Clicking on the EDIT button will allow you to answer the questions F.2.1 'Is the project implemented as a result of a plan or programme, other than Operational Programme?

Page 113: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

Page 114: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(1) Select on YES or NO

(2) If the answer is YES, specify if the plan or programme was made subject to a strategic environmental assessment.

(3) Enter a description for the non-technical summary of the Environmental Report

(4) Click on the Update link to save the information

F.3 EIA directive

Application of Directive 2011/92/EU of the European Parliament and of the Council (1) (the ‘EIA Directive’)

F.3.1 Link to agreed action plan

1. Clicking on the EDIT button will allow you to demonstrate link to the agreed action plan in case of non-fulfilment of the ex-ante conditionality on environmental legislation.

The Edit details pop-up window appears:

Page 115: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

F.3.2 Listed in annexes

1. Clicking on the EDIT button will allow you explain if the project is listed in EIA Directive annexes.

Page 116: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

F.3.3 Covered by Annex I

1. Clicking on the EDIT button will allow you to provide information when covered by Annex I.

Page 117: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The table becomes editable:

2. Enter the following information:

(1) Select yes or no.

Paragraph on MS to commit on timely action will only be displayed when answer to above question is 'Yes'.

'Member State' will be filled in automatically with the Member State description of the Major Project CCI Country code.

(2) Click on the Update link to save the information.

3. Clicking on the ADD button will allow you to add multiple project elements:

Page 118: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit Details pop-up window appears:

Page 119: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

4. Enter the following information:

(1) Enter the project element.

(2) Enter the additional information and explanations.

(3) Click on the Update link to save the information.

F.3.4 Covered by Annex II

1. Clicking on the EDIT button will allow you to provide information when covered by Annex II to that Directive if an EIA has been carried out.

The Edit details pop-up window appears:

Page 120: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the Project element.

(2) Select yes or no.

(3) Enter a short explanation.

Additional information is only enabled and required when EIA has not been carried out (=No).

(4) Click on the Update link to save the information.

F.3.5 Development consent/construction permit

Page 121: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

1. Clicking on the EDIT button will allow you to answer F.3.5.1, F.3.5.2, F.3.5.3, F.3.5.4, F.3.5.5, F.3.5.6 and F.3.5.7 questions.

The Edit details pop-up window appears:

Page 122: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Select Yes or NO for the question F.3.5.1 'is the Project in the construction phase?'

(2) Select Yes or No for the question F.3.5.2 'has already the construction permit been given?'

(3) If yes to F.3.5.2, select the date.

(4) If no to F.3.5.2, select the formal date request for the consent.

(5) If no to F.3.5.2, specify the administrative steps accomplished and those remaining.

(6) Select for which data is the final decision expected

(7) Specify the competent authority which has issued the development consent.

(8) Click on the Update link to save the information

F.4 Habitats directive

Application of the Directive 92/43/EEC on the conservation of natural habitats and of wild fauna and flora (Habitats Directive); assessment of effects on Natura 2000 sites.

1. Clicking on the EDIT button will allow you to answer Yes or No to the question 'Is the project likely to have significant negative effects on sites included or intended to be included in the Natura 2000 network?'

Page 123: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

Page 124: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Select Yes or NO

(1) Enter the description

(3) Click on the Update link to save the information

Page 125: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

F.5 Water framework directive

Application of Directive 2000/60/EC of the European Parliament and of the Council (the ‘Water Framework Directive’); assessment of effects on water bodies.

F.5.1 Link to agreed action plan

1. Clicking on the EDIT button will allow you to demonstrate link to the agreed action plan in case of non-fulfilment of the corresponding ex-ante conditionality.

The Edit details pop-up window appears:

Page 126: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

F.5.2 New modification

1. Clicking on the EDIT button will allow you to answer if the project involves a new modification to the physical characteristics of a surface water body or cause failure to achieve good water status.

Page 127: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

- If the reply is Yes, provide the assessment of the impacts and an explanation of how all conditions are to be fulfilled.

Page 128: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(1) Click on Yes

(2) Enter the description

(3) Click on the Update link to save the information

- If the reply is No, attach a completed Appendix 2 declaration. For a non-infrastructure major project this should be explained in the text box.

Page 129: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(1) Click on No

(2) Enter the description

(3) Click on the Update link to save the information

F.5.3 River basin management plan

1. Clicking on the EDIT button will allow you to explain how the project fits with the River Basin Management Plan's objectives.

Page 130: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

F.6 Other environmental directives

Page 131: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

Where applicable, information on compliance with other environmental directives.

F.6.1 UWWT directive

1. Clicking on the EDIT button will allow you to explain how the project is consistent with the plan or programme associated with the implementation of the Urban Waste Water Directive.

The Edit details pop-up window appears:

Page 132: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

F.6.2 Waste framework directive

Application of Directive 2008/98/EC of the European Parliament and of the Council (1) (the ‘Waste Framework Directive’) — projects in waste management sector.

F.6.2.1 Link to agreed action plan

1. Clicking on the EDIT button will allow you to demonstrate the link to the agreed action plan in case of non-fulfilment of the corresponding ex-ante conditionality.

Page 133: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

Page 134: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

F.6.2.2 How objectives are met

1. Clicking on the EDIT button will allow you to explain how the project meets the objectives.

The Edit details pop-up window appears:

Page 135: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

F.6.3 Industrial emissions directive

1. Clicking on the EDIT button will allow you to explain how the project complies with the requirements of Directive 2010/75/EU.

The Edit details pop-up window appears:

Page 136: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

F.6.4 Other environmental directives

1. Clicking on the EDIT button will allow you to explain how the project complies with any other relevant environmental directives.

Page 137: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

F.7 Costs to mitigate negative environmental impacts

Cost of measures taken to mitigate and/or compensate negative environmental impacts, in particular resulting from the EIA procedure or other assessment procedures or national/regional requirements.

Clicking on the EDIT button will allow you to answer to the questions F.7.1 and F.7.2.

Page 138: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

Page 139: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

1. Enter the following information:

(1) Select yes or no for the question In case of such costs, were these included in the Cost Benefit Analysis?

(2) Enter the estimated proportion of the cost of measures

(3) Enter a description to explain the measures

(4) Click on the Update link to save the information

F.8 Climate change adaptation and mitigation

Climate change adaptation and mitigation, and disaster resilience.

F.8.1 Contribution to climate change targets

1. Clicking on the EDIT button will allow you to explain how the project contributes to climate change targets.

The Edit details pop-up window appears:

Page 140: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

F.8.2 Assessment of climate change risks

1. Clicking on the EDIT button will allow you to explain how climate change related risks, adaptation and mitigation considerations and disaster resilience have been taken into account.

The Edit details pop-up window appears:

Page 141: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

F.8.3 Measures adopted

1. Clicking on the EDIT button will allow you to explain what measures have been adopted to ensure resilience to current climate variability.

Page 142: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

G Financing plan, indicators and risks

The financing plan showing the total planned financing resources and the planned support from the funds, the EIB and all other sources of financing, together with physical and financial indicators for monitoring progress, taking account of the identified risks.

G.1 Financing plan

Total planned financial resources and planned support from the Funds, the EIB, and all other sources of financing.

Page 143: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

G.1.1 Sources of co-financing

1. Click on the ADD button to add the sources of co-financing.

The table becomes editable:

2. Enter the following information:

(1) Enter the National public (d)

(2) Enter the National private (E)

(3) Enter the Other sources (F)

(4) Enter the EIB/EIF financing (G)

(5) Click on the Update link to save the information

REMARK The Union Support columns for ERDF and CF will only be shown when used.

Page 144: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

3. Clicking on the EDIT button will allow you to provide information on Other sources.

The Edit details pop-up window appears:

(1) Enter the description

(2) Click on the Update link to save the information

G.1.2 Annual plan

1. Click on the ADD button to add the values for the total eligible expenditure to be declared to the Commission.

Page 145: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The table becomes editable:

2. Enter the following information:

(1) (2) Enter the values for each priority axis

(3) Click on the Update link to save the information

G.1.3 Other Union financing sources

G.1.3.1 Other Union source

Clicking on the EDIT button will allow you to answer to the question 'Has an application been made for assistance from any other Union source for this project?'

Page 146: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

3. Enter the following information:

(1) Select Yes or No

Page 147: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(2) If yes, give details

(3) Click on the Update link to save the information

G.1.3.2 Complementary

1. Clicking on the EDIT button will allow you to answer to the question 'Is this project complementary to any project already financed or to be financed by the Union?'

The Edit details pop-up window appears:

Page 148: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Select Yes or No

(2) If yes, give details

(3) Click on the Update link to save the information

G.1.3.3 Loan or equity support

1. Clicking on the EDIT button will allow you to answer to the question 'Has an application been made for loan or equity support from the EIB or the EIF for this project?'

Page 149: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Select Yes or No

Page 150: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(2) If yes, give details

(3) Click on the Update link to save the information

G.1.3.4 Other Union support

1. Clicking on the EDIT button will allow you to answer to the question 'Has an application been made for assistance from any other Union source for an earlier phase of this project?'

The Edit details pop-up window appears:

Page 151: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Select Yes or No

(2) If yes, give details

(3) Click on the Update link to save the information

G.1.4 Public-private partnership

1. Clicking on the EDIT button will allow you to answer to the question 'Will the construction of the infrastructure be delivered through a public-private partnership?'

Page 152: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Select Yes or No

Page 153: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(2) If yes, give a description of the PPP

(3) Click on the Update link to save the information

G.1.5 Financial instruments

1. Clicking on the EDIT button will allow you to describe the form of financial instruments if they are to be used for financing the project.

The Edit details pop-up window appears:

Page 154: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

G.1.6 Impact of Union assistance

1. Clicking on the EDIT button will allow you to answer if the Union assistance will accelerate the implementation of the project.

The Edit details pop-up window appears:

Page 155: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Select Yes or No

(2) If yes, specify how and what extent it will accelerate implementation. If no, enter an explanation.

(3) Click on the Update link to save the information

3. Clicking on the EDIT button will allow you to answer if the Union assistance will be essential to implementation of the project.

Page 156: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

(1) Select Yes or No

(2) If yes, specify how much it will contribute to implementation. If no, justify the need for Union support

(3) Click on the Update link to save the information

Page 157: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

G.2 Indicators

REMARK

The system will automatically foresee records for all Common Output Indicators defined on the OP/Priority Axes used by this Major project. These cannot be deleted. Additionally, the Member State will be able to select and use any of the other Common Output Indicators or defined Physical Indicators.

1. Click on the ADD button to add the output indicators, including common indicators and other physical indicators for monitoring progress.

The table becomes editable:

- When you select Common output indicator

Page 158: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Select the output indicator: Common output indicator

(2) Select the OP – Priority Axis – Fund

(3) Select from the list the common output indicator

(4) Enter the target value for the major project

(5) Enter the target year

(6) Click on the Update link to save the information

- When you select Physical indicator

Page 159: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

3. Enter the following information:

(1) Select the output indicator: Physical indicator

(2) Select the OP – Priority Axis – Fund

(3) Select from the list the physical indicator

(4) Enter the qualitative value for the major project

(5) Enter the target year

(6) Click on the Update link to save the information

- When you select New physical indicator:

Page 160: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

4. Enter the following information:

(1) Select the output indicator: New physical indicator

(2) Select the OP – Priority Axis – Fund

(3) Enter the ID

(4) Enter the Indicator

(5) Enter the Measurement unit

(6) Select if it is qualitative or no. If yes, the field qualitative target value for the major project will be editable.

(7) Enter the order

The order by box defines the order by which the indicator is displayed in the table of contents

(8) Enter target value for the major project

Page 161: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(9) Enter the target year

(10) Click on the Update link to save the information

G.3 Risk assessment

1. Clicking on the EDIT button will allow you to enter a short summary of the main risks to the successful physical and financial implementation of the project and the proposed risk mitigation measures.

The Edit details pop-up window appears:

Page 162: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

H Timetable

The timetable for implementing the Major Project.

H.1 Project timetable

1. Clicking on the EDIT button will allow you to enter the timetable for the development and implementation of the overall project.

Page 163: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The table becomes editable:

2. Enter the following information:

(1) Enter the start date (A)

(2) Enter the completion date (B)

(3) Click on the Update link to save the information

Page 164: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

H.2 Project maturity

H.2.1 Technical

1. Clicking on the EDIT button will allow you to enter a short description for the Technical (Project maturity).

The Edit details pop-up window appears:

Page 165: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

H.2.2 Administrative

1. Clicking on the EDIT button will allow you to enter a short description for the Administrative (Project maturity).

Page 166: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

Page 167: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

H.2.3 Public procurement

1. Clicking on the ADD button will allow you to enter the dates for the Public procurement (Project Maturity).

The table becomes editable:

Page 168: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the contract name

(2) Select the contract type

(3) Enter the value

(4) Enter the body responsible for the contract

(5) Select the date of publishing tender

(6) Select the date of completing evaluation of tenders

(7) Select the date of signature of contract

(8) Click on the Update link to save the information

H.2.4 Financial

Page 169: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

1. Clicking on the EDIT button will allow you to enter a short description for Financial (Project Maturity).

The Edit details pop-up window appears:

Page 170: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

H.2.5 Current state of implementation

1. Clicking on the EDIT button will allow you to enter a short description for the current state of implementation.

The Edit details pop-up window appears:

Page 171: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the description

(2) Click on the Update link to save the information

I Project subject to legal procedure

1. Clicking on the EDIT button will allow you to answer if the project is subject to a legal procedure for non-compliance with Union Law.

Page 172: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Select Yes or No

(2) If yes, give details and justify the proposed contribution

Page 173: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(3) Click on the Update link to save the information

J Undertaking subject to procedure

1. Clicking on the EDIT button will allow you to answer if the undertaking previously has been, or it is currently, subject of a procedure to recover Union Support.

The Edit details pop-up window appears:

Page 174: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Select Yes or No

(2) If yes, give details and justify the proposed contribution

(3) Click on the Update link to save the information

K Jaspers

1. Click on the EDIT button to complete information on the Involvement of Jaspers in the project preparation.

Page 175: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

Page 176: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(1) Select Yes or No

(2) If yes, describe the elements of the project where Jaspers had an input

(3) Click on the Update link to save the information

REMARK K.1: If Yes, include a document of type 'Documentation from JASPERS (e.g. Action Completion Note)' and use the text box in paragraph K.2. to describe the elements of the project where Jaspers had an input.

L Subject to quality review

Status of the project in relation to Article 102 of Regulation (EU) N° 1303/2013.

1. Clicking on the EDIT button will allow you to answer if in case the project is submitted, if it has been subject to the quality review by independent experts.

The Edit details pop-up window appears:

Page 177: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Select Yes or No

(2) If yes, give details and justify the change of procedure for submission

(3) Click on the Update link to save the information

M Summary of revisions

1. Clicking on the EDIT button will allow you to enter a short summary of revisions to the application form in case the major project is subject to modification.

Page 178: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The Edit details pop-up window appears:

2. Enter the following information:

(1) Enter the description

Page 179: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(2) Click on the Update link to save the information

N Endorsement of national authority

1. Clicking on the EDIT button will allow you to endorsement of competent national authority.

The Edit details pop-up window appears:

Page 180: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Enter the following information:

(1) Enter the name for the confirmation that the information presented is accurate and correct.

(2) Enter the Organisation (Managing authorities)

(3) Enter the date

(4) Click on the Update link to save the information

Additional Functionality

Early Warning Notification

An early warning notification job will run every year starting from 2015 on the 1st, 15th, 20th, 26th, 27th, 28th, 29th and 30th of June. It will select all adopted FEAD Programmes for which no Implementation Report for Reporting Years smaller than the current year has been sent to the Commission.

For these Programmes, an email notification will be sent to the MS Officials in Charge of the Programme and to the subscribers of this Event Type. The notification will say:

"The Implementation Report [YYYY] for Programme [CCI] has not yet been sent to the Commission. Please submit it as soon as possible."

Page 181: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

Validate the Major Project Submission

REMARK

A Major Project Submission can be validated only if it currently resides at your node and its status is 'OPEN'.

It is a must to have the role of MS Managing Authority with Update rights.

1. Click on the Validate link to validate the Major Project Submission.

REMARK An ERROR will block you from sending the Major Project Submission. The error(s) should be resolved and the Major Project must be revalidated. NOTE that a WARNING does not block you from sending the Major Project Submission.

The system validates the following information:

Code Validation Rule Severity

2 The system validates the integrity of the input fields

2.1 Validate that at least one Official in Charge of the Member State exists. WARNING

2.2 Validate that the CCI code matches the following regular expression (implicit in web):

(……16RFMP…| ……16CFMP…| ……16M1MP…)

ERROR

Page 182: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2.3 Validate that at least one Authority responsible for project notification (A.1) has been defined.

ERROR

2.4 Validate that at least one Body responsible for project implementation (A.2) has been defined.

ERROR

2.5 Validate in A.3.5 that the text is not empty when the answer is "Yes". ERROR

2.6 Validate in B.3.4 that the CCI is not empty when the Commission previously approved any part of this Major Project.

ERROR

2.7 Validate in B.3.4 that the Description is not empty when the CCI is from 2007-2013.

ERROR

2.8 Validate in B.2.7 that the NUTS codes are from level 3 of the country of the Major Project.

ERROR

2.9 Validate in B.1 that the linked Programme(s) are for; IGJ or ETC or IPA-CB, have been adopted and belong to the same Member State as the Major Project.

ERROR

2.10 Validate in B.1 that the linked Priority Axes cover the Fund covered by the Major Project.

ERROR

2.11 Validate in B.1 that the Co-financing Fund is covered by the Priority Axis and by the Major Project (see Budget Source in the Major Project CCI).

ERROR

2.12 Validate in H.1 that the timetable contains all Implementation Phases. ERROR

2.13 Validate in H.1 that the Completion date is >= Start date. ERROR

2.14 Validate in C.1 that the cost table contains all Cost Types. ERROR

2.15 Validate in C.1 that the Ineligible costs are <= Total project costs. ERROR

2.16 Validate in C.2 that the Compliance with State aid rules table contains all State Aid Types.

ERROR

2.17 Validate in C.3 when the Calculation Method is "Decreased co-financing rate" that the "Total eligible cost after taking account of the requirements …" is not null.

ERROR

2.18 Validate in G.1.1 that Union Support is only provided for the Funds covered by the Major Project.

ERROR

Page 183: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2.19 validate in G.1.1 when Other sources is used that they are specified ERROR

2.20 Validate in G.1.2 that records are created for all OP, Priority Axis, Fund combinations from B.1.

ERROR

2.21 Validate in G.2 that all Common Output Indicators defined against the OP-Priority Axis-Fund exists.

ERROR

2.22 Validate in I that the Justification is not empty when the answer is "Yes". ERROR

2.23 Validate in J that the Justification is not empty when the answer is "Yes".

ERROR

2.25 Validate that all integral documents have at least one attachment with a length > 0

ERROR

2.27 Validate in C.1 that the total of Ineligible costs is < Total of Total project costs

ERROR

2.35 Validate that Appendix 1 (MP.AP1) is uploaded when the answer on F.4.1 is "No" and the Major Project is of type Infrastructure Investment.

ERROR

2.36 Validate that Appendix 2 (MP.AP2) is uploaded when the answer on F.5.2 is "No" and the Major Project is of type Infrastructure Investment.

ERROR

2.37 Validate that Appendix 3 (MP.AP3) is uploaded when the text in F.6.1 is not empty.

ERROR

2.38 Validate that Appendix 4 (MP.AP4) is uploaded. ERROR

2.39 Validate that Appendix 5 (MP.AP5) is uploaded. ERROR

2.40 Validate that Appendix 6 (MP.AP6) is uploaded when the text in F.3.3 is not empty or when the answer on F.3.4 is "Yes".

ERROR

2.41 Validate that the Non-technical summary of the environmental report (MP.F22) is uploaded when the answer on F.2.2 is "Yes".

ERROR

2.42 Validate that the NATURA 2000 negative effects document (MP.F42) is uploaded when the answer on F.4.1 is "Yes".

ERROR

2.43 Validate in B.3.5 that the text is not empty when the answer is "Yes". ERROR

2.44 Validate in B.3.6(i) that the text is not empty when the answer is "Yes". ERROR

Page 184: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2.45 Validate in B.3.6(ii) that the text is not empty when the answer is "Yes". ERROR

2.46 Validate in C.2 that the table is filled in when the answer is "Yes". ERROR

2.47 Validate in C.2 that the text is not empty when the answer is "No" and non-infrastructure Major Project.

ERROR

2.48 Validate in F.2.2 that the text is not empty when the answer on F.2.1 is "Yes".

ERROR

2.49 Validate in F.3.4 for each Project Element that the text is not empty when the answer is "No" and non-infrastructure Major Project.

ERROR

2.50 Validate in F.3.5.3 that the date is not empty when the answer on F.3.5.2 is "Yes".

ERROR

2.51 Validate in F.3.5.4 that the date is not empty when the answer on F.3.5.2 is "No".

ERROR

2.52 Validate in F.3.5.5 that the text is not empty when the answer on F.3.5.2 is "No".

ERROR

2.53 Validate in F.4.3 that the text is not empty when the answer on F.4.1 is "No" and the Major Project is of type Productive Investment.

ERROR

2.54 Validate in F.5.2.1 that the text is not empty when the answer on F.5.2 is "Yes".

ERROR

2.55 Validate in F.5.2.2 that the text is not empty when the answer on F.5.2 is "No" and the Major Project is of type Productive Investment.

ERROR

2.56 Validate in F.7.2 that the percentage and the text are not empty when the answer on F.7.1 is "Yes".

ERROR

2.57 Validate in G.1.3.1 that the text is not empty when the answer is "Yes". ERROR

2.58 Validate in G.1.3.2 that the text is not empty when the answer is "Yes". ERROR

2.59 Validate in G.1.3.3 that the text is not empty when the answer is "Yes". ERROR

2.60 Validate in G.1.3.4 that the text is not empty when the answer is "Yes". ERROR

2.61 Validate in G.1.4 that the text is not empty when the answer is "Yes". ERROR

2.62 Validate in G.1.6(a) that the text is not empty when the answer is "Yes". ERROR

Page 185: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2.63 Validate in G.1.6(b) that the text is not empty when the answer is "Yes". ERROR

2.64 Validate in K.2 that the text is not empty when the answer on K.1 is "Yes".

ERROR

2.65 Validate in L.1 that the text is not empty when the answer is "Yes". ERROR

2.66 Validate in C.2 that the question is answered. ERROR

2.67 Validate in E.2.4 that the Average duration of the jobs is either a number or permanent.

ERROR

2.68 Validate when K.1 is 'Yes' and version is 1.0 that a document of type 'Documentation from JASPERS (e.g. Action Completion Note)' is uploaded.

ERROR

2.69 Validate in F.3.3 when there exists a Major Project EIA Annex 1 that the question (=Major Project Environmental Analysis. eia1 Under Footnote 3) is answered.

ERROR

After all errors have been resolved the status of the Major Project Submission becomes READY TO SEND.

An example of a validation window:

Page 186: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

Send the Major Project Submission

REMARK

The Major Project can only be sent once the Validation Errors have been removed and the status is READY TO SEND.

It is a must to have the privilege to send the Major Project, the user has the role of MS Managing Authority with Send rights.

The Major Project Submission version has a status 'READY TO SEND' or 'SENT'.

The '4 eye principle' must be respected. Therefore, the user sending must be different from the user who last validated.

The Sending of information by a Member State to the Commission should be electronically signed in accordance with Directive 1999/93/EC. Sending of the different objects is generating a snapshot document and after the sending an acknowledge document is generated by the European Commission.

1. Click on the Send link to send the Major Project to the Commission or to an upper Node.

Page 187: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

The system will ask you to confirm the send action:

2. Click on Yes to confirm or click on No to return to the Major Project Submission. 3. The Sending of information by a Member State to the Commission should be electronically signed in

accordance with Directive 1999/93/EC.

Sending of the different objects is generating a snapshot document and after the sending an acknowledge document is generated by the European Commission.

This acknowledge document is signed but the Member State was not signing the snapshot document. The EU Login now provides a functionality of signing without forcing the user to have a certificate. The action to sign will only be triggered when sending to the European Commission:

Page 188: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(1) Enter your SFC2014 Password (2) Click on the 'Sign' button

On success, the Major Project Submission version has been sent to the Commission or to an upper Node and the status is set to 'SENT'.

Delete the Major Project Submission

Page 189: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

REMARK

A Major Project Submission can be deleted only if its status is 'OPEN', 'READY TO SEND' or 'RETURNED FOR MODIFICATION BY MS' and has never been sent to the Commission before and has no sent documents attached.

It is a must to have the role of MS Managing Authority with Update rights.

1. Click on the Delete link to remove the Major Project Submission from the system.

The system will ask you to confirm the delete action:

2. Click on Yes to confirm or click on No to return to the Major Project Submission.

On success, the Major Project Submission is removed physically from the system.

Page 190: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

Withdraw a Major Project Submission

REMARK

You can stop the procedure of a Major Project Submission using the Withdraw action when the last Major Project Submission version is in a status 'OPEN', 'READY TO SEND' or 'RETURNED

FOR MODIFICATION BY MS' and has previously been sent to the Commission or contains documents already sent to the Commission.

It is a must to have the role of MS Managing Authority with Update rights.

1. Click on the Withdraw link to stop the procedure of the Project submission.

The system will ask you to confirm the withdrawal:

Page 191: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(1) Enter a Title for your Document

(2) Enter a Date

(3) Click on the ADD button to add a document:

- You can add multiple attachments by clicking on the ADD button

- You can remove unwanted attachments by selecting the attachment and clicking on the REMOVE

button

(4) Enter a Title for your attachment.

(5) Select the Language of the document.

(6) Select the file to upload.

(7) Click on Yes to confirm or click on No to return to the Major Project Notification.

REMARK You can optional add a document "Withdrawal justification letter" with attachments that will be sent together with the withdrawal action to the Commission.

On success, the Major Project Submission version status was set to 'WITHDRAWN BY MS'.

Page 192: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

Create a New Version of the Major Project Submission

REMARK

A New Version can only be created by the Member State when the last Major Project Submission version has been 'TACITLY APPROVED', 'APPROVED', 'REFUSED' or 'MARKED AS

INCOMPLETE BY THE COMMISSION'.

It is a must to have the role of MS Managing Authority with Update access.

1. Click on the Create New Version link to create a new version of the Major Project Submission.

The system will ask you to confirm the creation of a new version:

Page 193: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

2. Click on Yes to confirm. Click on No to return to the Major Project.

On success, a new version of the Major Project Submission has been created as a copy of the last version. Its status was set to 'OPEN' and the version number was incremented by one when the last version was 'ADOPTED BY EC' OR 'INCOMPLETE SUBMISSION' (ex. 1.0 > 2.0) or the working version was incremented by one when the last version was 'RETURNED FOR MODIFICATION BY EC' (ex. 1.0 > 1.1).

Resubmit a Major Project Submission

REMARK

You can resubmit a Major Project Submission when is in status 'REFUSED BY EC' or 'WITHDRAWN BY MS'.

Resubmission can be done under the same Article or under Articles 102(1) and 103 as a Major Project Notification.

It is a must to have the role of MS Managing Authority with Update rights.

1. Clicking on the Resubmit link will enable you the resubmission of the Major Project.

The system will ask you to confirm the resubmit action:

Page 194: Major Project Submission 6 - European Commission · The status of the Major Project Submission is OPEN. NOTE The Timetable (H.1), the Cost table (C.1) and the Compliance with State

(1) Select under which Article you want to resubmit the Major Project Submission (same Article, Article 102(1) or Article 103).

(2) Click on the YES to confirm the resubmission action.

On success,

when under the same Article, a new version of the Major Project Submission has been created as a copy of the last version and the version number was incremented by one (ex. 1.0 2.0). Its status was set to 'Open'.

when under Articles 102(1) or 103, a new version of a Major Project Notification has been created by copying as much as possible information from the last Major Project Submission version and the version number was incremented by one (ex. 1.0 2.0). Its status was set to 'Open'.