MAJOR CONSTRUCTION MAP - California … DIEGO COUNTY MAJOR CONSTRUCTION MAP March 2017 Camp...

1
SAN DIEGO COUNTY MAJOR CONSTRUCTION MAP March 2018 Camp Pendleton (USMC) Fallbrook Pala Pauma Valley Rincon Bonsall Escondido Del Mar La Mesa Dulzura Coronado Tijuana MEXICO USA Imperial Beach Jamul Ramona Encinitas Carlsbad Solana Beach Poway La Jolla Oceanside Vista San Marcos San Ysidro Chula Vista El Cajon Lakeside Santee National City Lemon Grove San Diego 4 17 16 3 5 2 7 1 12 9 14 8 6 13 15 V 18 V 11 10 54 125 905 805 94 5 5 15 78 125 75 805 282 5 15 56 94 67 8 78 8 52 76 76 163 15 5 54 805 = 2018 New Construction = Ongoing Construction = TransNet Funded T Not To Scale FOLLOW US ON @SDCaltrans quickmap.dot.ca.gov Please note that all costs and completion dates are estimated. Funding for these highway improvements comes from the federal gas tax, state gas tax, the TransNet half-cent sales tax and local contributions. For real-time map information and updates on regional transportation projects visit: dot.ca.gov/d11 KeepSanDiegoMoving.com Call Caltrans @ (619) 688-6670 8 9 10 11 12 14 15 16 1 2 3 7 6 5 4 13 17 18 V V T T T T T T T Construct a roundabout and realign the curve on SR-76 at Valley Center Road. Cost: $15.5 million. Completion: Spring 2019. Construct auxiliary lanes in both directions on SR-78 from Twin Oaks Valley Road to Rancheros/Barham Roads. Cost: $11.5 million. Completion: Summer 2018. Segment 1-Phase One of the I-5 North Coast Corridor Project. Extend HOV lane from Lomas Santa Fe Drive to Birmingham Avenue, replace and lengthen the San Elijo lagoon highway and rail bridges, and construct bike/pedestrian improvements. Cost: $260 million. Completion: Winter 2021. Replace Genesee Avenue Bridge over I-5 with a new 10 lane bridge, widen ramps, and construct a separated bike and pedestrian facility between Sorrento Valley Road and Voigt Drive. Cost: $105 million. Completion: Summer 2018. Pavement rehabilitation on I-805 from Mira Mesa Boulevard Road to Sorrento Valley Boulevard. Cost $7.9 million. Completion: Summer 2020. Construct a new overcrossing over I-5 at Gilman Drive north of La Jolla Village Drive to connect the east and west campus on UCSD. Cost: $20 million. Completion: Spring 2019. Construct the new Mid-Coast Trolley Blue Line which will run adjacent to I-5 between Old Town and Voigt Drive, then to a new transit center at Westfield UTC. Completion: Fall 2021. Modify the SR-163 interchange at Friars Road by widening the overcrossing and making operational improvements. Cost: $40 million. Completion: Fall 2019. Install roadway safety improvements on WB I-8 from Morena Boulevard to Hotel Circle Drive. Cost: $19.5 million. Completion: Spring 2019. Pavement rehabilitation on I-8 from Lake Murray Boulevard to Johnson Avenue to include slab replacement and hot mix asphalt on shoulders and ramps. Cost: $18 million. Completion: Summer 2020. Upgrade gore paving, maintenance vehicle pullouts, and guardrail systems; replace 4 gates and improve freeway features on State Route 94 & 125 from College Grove Way to Spring Street. Cost: $3.7 million. Completion: Spring 2021. Repaint steel surfaces on the San Diego-Coronado Bridge. Cost: $25.5 million. Completion: Fall 2018. Upgrade electrical system and street lights on the San Diego- Coronado Bridge. Cost: $14.6 million. Completion: Summer 2019. Pavement rehabilitation on SR-125 from Otay Mesa Road to San Miguel Road. Cost $7.9 million. Completion: Spring 2018. Realign roadway, culvert, and shoulder widening on SR-94 in the vicinity of the community of Dulzura. Cost: $8.9 million. Completion: Summer 2019. Construct soundwalls on I-805 from East Naples Street to Bonita Road. Cost: $16.9 million. Completion: Fall 2019. Install ramp meters on northbound I-5 between Coronado Avenue and E Street. Cost: $9.4 million. Completion: Summer 2018. South Bay Rapid from Otay Mesa to Downtown San Diego via, SR-125, East Palomar, I-805 and SR-94. Completion: Fall 2018. Overhead sign panel replacements, Various urban routes Cost: 20 million. Completion: Early 2019. Upgrade curb ramps in San Diego County at various locations to Americans with Disability Act (ADA) standards. Cost: $2.8 million. Completion: Spring 2019.

Transcript of MAJOR CONSTRUCTION MAP - California … DIEGO COUNTY MAJOR CONSTRUCTION MAP March 2017 Camp...

SAN DIEGO COUNTYMAJOR CONSTRUCTION MAP

March

2018

CampPendleton

(USMC)

Fallbrook Pala

Pauma Valley

RinconBonsall

Escondido

Del Mar

LaMesa

DulzuraCoronado

TijuanaMEXICO

USAImperial

Beach

Jamul

RamonaEncinitas

Carlsbad

Solana Beach

Poway

LaJolla

OceansideVista

SanMarcos

SanYsidro

Chula Vista

ElCajon

LakesideSantee

NationalCity

LemonGrove

SanDiego

4

17

16

3

5

2

7

1

12

9

14

8

6

13

15

V

18

V

11

10

54

125

905

805

94

5

5

15

78

125

75

805

282

5

15

56

94

67

8

78

8

52

76

76

163

15

5

54

805

= 2018 New Construction = Ongoing Construction = TransNet FundedT

Not To Scale

FOLLOW US [email protected]

Please note that all costs and completion dates are estimated.

Funding for these highway improvements comes from the federal gas tax, state gas tax, the TransNet half-cent sales tax and local contributions.

For real-time map information and updates on regional transportation projects visit:

dot.ca.gov/d11KeepSanDiegoMoving.com

Call Caltrans @ (619) 688-6670

8

9

10

11

12

14

15

16

1

2

3

7

6

5

4

13

17

18

V

V

T

T

T

T

T

T

T

Construct a roundabout and realign the curve on SR-76 at Valley Center Road. Cost: $15.5 million. Completion: Spring 2019.

Construct auxiliary lanes in both directions on SR-78 from Twin Oaks Valley Road to Rancheros/Barham Roads. Cost: $11.5 million. Completion: Summer 2018.

Segment 1-Phase One of the I-5 North Coast Corridor Project. Extend HOV lane from Lomas Santa Fe Drive to Birmingham Avenue, replace and lengthen the San Elijo lagoon highway and rail bridges, and construct bike/pedestrian improvements.Cost: $260 million. Completion: Winter 2021.

Replace Genesee Avenue Bridge over I-5 with a new 10 lane bridge, widen ramps, and construct a separated bike and pedestrian facility between Sorrento Valley Road and Voigt Drive. Cost: $105 million. Completion: Summer 2018.

Pavement rehabilitation on I-805 from Mira Mesa Boulevard Road to Sorrento Valley Boulevard. Cost $7.9 million. Completion: Summer 2020.

Construct a new overcrossing over I-5 at Gilman Drive north of La Jolla Village Drive to connect the east and west campus on UCSD. Cost: $20 million. Completion: Spring 2019.

Construct the new Mid-Coast Trolley Blue Line which will run adjacent to I-5 between Old Town and Voigt Drive, then to a new transit center at West�eld UTC. Completion: Fall 2021.

Modify the SR-163 interchange at Friars Road by widening the overcrossing and making operational improvements. Cost: $40 million. Completion: Fall 2019.

Install roadway safety improvements on WB I-8 from Morena Boulevard to Hotel Circle Drive.Cost: $19.5 million. Completion: Spring 2019.

Pavement rehabilitation on I-8 from Lake Murray Boulevard to Johnson Avenue to include slab replacement and hot mix asphalt on shoulders and ramps.Cost: $18 million. Completion: Summer 2020.

Upgrade gore paving, maintenance vehicle pullouts, and guardrail systems; replace 4 gates and improve freeway features on State Route 94 & 125 from College Grove Way to Spring Street.Cost: $3.7 million. Completion: Spring 2021.

Repaint steel surfaces on the San Diego-Coronado Bridge.Cost: $25.5 million. Completion: Fall 2018.

Upgrade electrical system and street lights on the San Diego-Coronado Bridge. Cost: $14.6 million. Completion: Summer 2019.

Pavement rehabilitation on SR-125 from Otay Mesa Road to San Miguel Road. Cost $7.9 million. Completion: Spring 2018.

Realign roadway, culvert, and shoulder widening on SR-94 in the vicinity of the community of Dulzura.Cost: $8.9 million. Completion: Summer 2019.

Construct soundwalls on I-805 from East Naples Street to Bonita Road.Cost: $16.9 million. Completion: Fall 2019.

Install ramp meters on northbound I-5 between Coronado Avenue and E Street. Cost: $9.4 million. Completion: Summer 2018.

South Bay Rapid from Otay Mesa to Downtown San Diego via, SR-125, East Palomar, I-805 and SR-94. Completion: Fall 2018.

Overhead sign panel replacements, Various urban routesCost: 20 million. Completion: Early 2019.

Upgrade curb ramps in San Diego County at various locations to Americans with Disability Act (ADA) standards. Cost: $2.8 million. Completion: Spring 2019.