    MAINTAIN

    TRAINING

    FACILITIES

    TrainersMethodology Level I

    Templates

    Date Developed:December 2014

    Date Revised:December 2014

    Document No.NTTA-TM1-07

    Issued by:

    Jayson C. Molina Page 1 of 11

    Developed by:

    jcmolinaRevision # 01

  • 8/10/2019 Maintain CHS

    2/13

  • 8/10/2019 Maintain CHS

    3/13

  • 8/10/2019 Maintain CHS

    4/13

    WORKSHOP INSPECTION CHECKLIST

    Qualification COMPUTER HARDWARE SERVICING NC II

    Area/Section COMPUTER ROOM In-Charge Pepito Masagca

    YES NO INSPECTION ITEMS

    1. Are the personal computers accessories clean from dust and properlysecured?

    2. Are the working tables for personal computers properly arranged andcleaned? Are the tables checked for stability?

    3.Are the floor, windows, walls and ceilings cleaned and checked?

    4. Is the workshop cleaned and checked? Is it well ventilated and with enough

    illumination by dusting lamps/bulbs and replacing non-functional lamps?Is the aircon kept clean?

    5.Is the computer set -monitor, CPU, keyboards, mouse cleaned andchecked if free from unnecessary markings, dust? Are the cables and plugsin order and well-arranged? Are all items functional?

    6.Is the Tool Room cleaned, checked and maintained if free of dust, tools inappropriate positions/locations, with visible labels/signage, logbook andforms complete, in order and updated? Are the lights functional and withgood ventilation?

    7. Is there available receptacle for waste, are the waste materials properlysegregated & disposed?

    Remarks: Workshop and equipment/materials are operational and in

    good condition

    jcmolina

    Inspected by: JAYSON C. MOLINA Date: Dec. 1, 2014

    TrainersMethodology Level I

    Templates

    Date Developed:December 2014

    Date Revised:December 2014

    Document No.NTTA-TM1-07

    Issued by:

    Jayson C. Molina Page 4 of 11

    Developed by:

    jcmolinaRevision # 01

  • 8/10/2019 Maintain CHS

    5/13

    CHS EQUIPMENT MAINTENANCE SCHEDULE

    EQUIPMENT TYPE COMPUTER/SYSTEM UNIT

    EQUIPMENT CODE CL-0001

    LOCATION COMPUTER LABORATORY

    ACTIVITIES MANPOWER

    Schedule for the Month of November,

    2014

    Daily Every

    Other

    Day

    Weekly Every

    15th

    Day

    Monthly Remarks

    1. Clean and wipe

    personal computer

    Pepito

    Masagca

    Activity

    Donebeforeusing theequipment

    2. Run malware, anti-spyware and antivirusprograms start-up.

    PepitoMasagca

    ActivityDone afterusing theequipment

    3. Empty the recycle binin the desktop.

    PepitoMasagca

    ActivityDone afterusing the

    equipment

    4. Clean out browserfiles, or set browsingfiles to zero.

    PepitoMasagca

    ActivityDone afterusing theequipment

    5. Log off your useraccount

    PepitoMasagca

    ActivityDone afterusing theequipment

    TrainersMethodology Level I

    Templates

    Date Developed:December 2014

    Date Revised:December 2014

    Document No.NTTA-TM1-07

    Issued by:

    Jayson C. Molina Page 5 of 11

    Developed by:

    jcmolinaRevision # 01

  • 8/10/2019 Maintain CHS

    6/13

    6. Shutdown thecomputer if necessary

    PepitoMasagca

    ActivityDone afterusing theequipment

    7. Run disk clean-up

    utility to get rid ofcookies and othertemporary files

    Pepito

    Masagca

    Activity

    Done afterusing theequipment

    8. Check hard drives forerrors and capacity withcheck disk utility

    PepitoMasagca

    ActivityDone afterusing theequipment

    9. Update anti-virusand malware todownload new virusdefinition.

    PepitoMasagca

    ActivityDone

    beforeusing the

    equipment

    10. Verify allconnections tocomputer workstation,printers, networks, andother peripherals.

    PepitoMasagca

    Activitydone beforeusing theequipment

    11. Defrag harddiskdrive of personalcomputer

    PepitoMasagca

    Activitydone afterusing theequipment

    12. Back-up files Pepito

    Masagca

    Depends

    on user/companies need

    13. Restore files ifnecessary

    PepitoMasagca

    Restore ifneeded

    14. Uninstallunnecessary files

    PepitoMasagca

    Activitydone totune-upcomputer

    TrainersMethodology Level I

    Templates

    Date Developed:December 2014

    Date Revised:December 2014

    Document No.NTTA-TM1-07

    Issued by:

    Jayson C. Molina Page 6 of 11

    Developed by:

    jcmolinaRevision # 01

  • 8/10/2019 Maintain CHS

    7/13

    EQUIPMENTMAINTENANCE INSPECTION CHECKLIST

    Equipment Type : Desktop Computers

    Property Code/Number : CLR212

    Location : Computer Laboratory

    YES NO INSPECTION ITEMS

    1. Are the peripherals (power cord, mouse, etc) returned totheir proper place?

    2. Is the personal computer properly shutdown?

    3. Is the personal computer properly working or in goodcondition.

    4. Is personal computer properly cleaned?

    5. Is the equipment properly arranged for safety and

    TrainersMethodology Level I

    Templates

    Date Developed:December 2014

    Date Revised:December 2014

    Document No.NTTA-TM1-07

    Issued by:

    Jayson C. Molina Page 7 of 11

    Developed by:

    jcmolinaRevision # 01

  • 8/10/2019 Maintain CHS

    8/13

    maintenance of the personal computer ?

    6. Is the unit free for any viruses?

    7. The unit is updated for viruses scanner?

    Remarks: Computer system/Materials/peripherals are operational andin good condition

    jcmolina

    Inspected by: Jayson C. Molina Date: Dec. 1, 2014

    BREAKDOWN / REPAIR REPORT

    Breakdown / Repair Report # 1

    Property ID

    Number

    DC-001

    Descriptive

    Name

    DESKTOP COMPUTER

    Location 1.COMPUTER LABORATORY SERVER

    2.COMPUTER LABORATORY CLIENT no. 3

    TrainersMethodology Level I

    Templates

    Date Developed:December 2014

    Date Revised:December 2014

    Document No.NTTA-TM1-07

    Issued by:

    Jayson C. Molina Page 8 of 11

    Developed by:

    jcmolinaRevision # 01

  • 8/10/2019 Maintain CHS

    9/13

    Findings:

    1.DEFECTIVE HARDDRIVE 2Terabyte Sata

    2.DEFECTIVEMOTHERBOARD LGA1155

    Recommendation:

    REPLACEMENT OF NEW HARD DRIVE andMOTHERBOARD

    Inspected by:

    jcmolina

    JAYSON C. MOLINA

    Reported to:

    PPM

    PEPITO MANALOTO

    Date : DECEMBER 1,2014

    Date: DECEMBER 1, 2014

    Subsequent Action

    Taken:

    Inspection of theequipment

    Recommendation:

    REPLACEMENT OF NEW HARD DRIVE andMOTHERBOARD

    By: jcmolina

    JAYSON C. MOLINA

    Reported to: PPM

    PEPITO MANALOTO

    Date :December 1, 2014 Date : DECEMBER 1, 2014

    TAG-OUT BILL

    DANGER/CAUTION TAG-OUT INDEX AND RECORD AUDITS

    TrainersMethodology Level I

    Templates

    Date Developed:December 2014

    Date Revised:December 2014

    Document No.NTTA-TM1-07

    Issued by:

    Jayson C. Molina Page 9 of 11

    Developed by:

    jcmolinaRevision # 01

  • 8/10/2019 Maintain CHS

    10/13

  • 8/10/2019 Maintain CHS

    11/13

    WASTE SEGREGATION LIST

    Qualification : Computer Hardware Servicing NC II

    Area / Section : Computer Laboratory

    In - Charge :April T. Tatad

    GENERAL / ACCUMULATEDWASTES

    WASTE SEGREGATION METHODRecycle Compose Dispose

    Personal computer Broken Battery

    Broken Mouse

    Used wire/Cables/

    Use Brushes/cleaning materials

    Broken Keyboard Computer cases

    Broken RJ 45/Networking

    Broken Monitor

    Broken Hard disk Drive

    Broken CD/DVD rom

    CD/DVD/Memory stick

    Motherboard

    AVR/UPS

    Memories/RAM

    Headset/Speaker/

    Camera

    TrainersMethodology Level I

    Templates

    Date Developed:December 2014

    Date Revised:December 2014

    Document No.NTTA-TM1-07

    Issued by:

    Jayson C. Molina Page 11 of 11

    Developed by:

    jcmolinaRevision # 01

  • 8/10/2019 Maintain CHS

    12/13

    Scanner/Printer

    Power Supply

    PURCHASE REQUEST

    Date: December 2, 2014

    Requested by: April T. Tatad

    Department/Location

    :Information Technology Department

    Phone #: 09497341040

    Approved by:Jayson C. Molina

    Purpose of Purchase:

    1.Replacement of defective hard drive of thecomputer lab Server and

    2.Replacement of motherboard of Computerlab Client no. 3

    If purchasing equipment/parts, please check the appropriate box:

    New Equipment

    Replacement of Equipment Parts

    TrainersMethodology Level I

    Templates

    Date Developed:December 2014

    Date Revised:December 2014

    Document No.NTTA-TM1-07

    Issued by:

    Jayson C. Molina Page 12 of 11

    Developed by:

    jcmolinaRevision # 01

  • 8/10/2019 Maintain CHS

    13/13

    MATERIAL

    NUMBERDESCRIPTION

    QUANTIT

    Y

    UNIT

    COST

    TOTAL

    COST

    2014-01

    Seagate Hard Disk 2

    Terabyte Sata (internal) 1P2,900.00

    P 2,900.00

    2014-02Asus motherboard LGA1155 DDR3

    1 P3,000.00 P3,000.00

    TOTAL P5,900.00

    Prepared by: Approved:

    Att jcmolina

    April T. Tatad Jayson C. MolinaTrainer Supervisor

    TrainersMethodology Level I

    Templates

    Date Developed:December 2014

    Date Revised:December 2014

    Document No.NTTA-TM1-07

    Issued by:

    Jayson C. Molina Page 13 of 11

    Developed by:

    jcmolinaRevision # 01