1Amulsar – Path to ProductionNovember 2016 – Photo Journal
Lydianinternational.co.uk | TSX:LYD
2
Topsoil Removal at the Camp Platform.
3
Excavation for the Temporary Construction Office / Contractor Laydown Area Platform
4
Initial Upgrades to RD-5 from Gndevaz to Site 14
5
Sediment Control Near the Temporary Construction Offices Platform, at the Base of the HLF
Sediment Control on the Extended Side of the Temporary Construction Offices Platform
6
Widening of RD-5
7
Ripping and Removal of Materials as Part of Access Road Construction
8
RD-5 Widening
9
Slope Cutting and Material Removal
10
Re-Routed Powerline Near the HLF