    Casablanca in figures

    Casablanca:

    Population: Around 5 M inhabitants

    Network:

    Network length: 350 km of primary network 4450 km secondary network

    Customers: Around 250 000 connections for 960 000 meters

    Volume:

    Daily consumption: 450 000 to 650 000 m3/d Storage capacity: 634 330 m3 for 29 reservoirs Pressure zone: 11 zones from 0 to 240 m above sea level (25 to 1200 km) Price of m3 purchased: 4,34 MAD

    2011: 186 Mm3 purchased / 141 Mm3 supplied / 45 Mm3 lost

  • "date" LYDEC NRW Action Plan – Mediterranean NRW Workshop – World Bank, Marseille, January 2013 3

    Start of the first

    NRW Action Plan

    Increasing of the yield till 2002

    Leak detection

    Meter replacement

    Network renewal

    Results maintened and yield remain stil

    Start of pressure modulation on 1000 km of network

    Hard winter conditions

    Yield collapses

    NRW Action Plan reinforced

    Start of sectorization

    Active leakage control

    Pressure modulation on 1500 km

    Evolution of the yield

    October 2012: 75,5%

  • "date" LYDEC NRW Action Plan – Mediterranean NRW Workshop – World Bank, Marseille, January 2013 4

    CERCLE DES EAUX DISPARUES – Evaluation 2009

    Strong actions to reduce physical

    losses

    Metering losses 5%

    Physical losses 17%

    Commercial losses 5%

    Sales 73%

    Total losses in 2009

    50 Mm3

    NRW Diagnosis

  • "date" LYDEC NRW Action Plan – Mediterranean NRW Workshop – World Bank, Marseille, January 2013 5

    55 D

    85

    85 i

    110

    180 240

    153

    58

    85 nm

    96

    140

    160

    82

    60

    115

    55

    Flow monitoring

  • "date" LYDEC NRW Action Plan – Mediterranean NRW Workshop – World Bank, Marseille, January 2013 6

    Flow monitoring

  • "date" LYDEC NRW Action Plan – Mediterranean NRW Workshop – World Bank, Marseille, January 2013 7

    Pressure > 5 bars: Increase the risk of damaging the network Pressure Modulation on 1500 km

    Modulation 2010

    Modulation 2011

    Modulation 2005 – 2007

    Pressure Modulation

  • "date" LYDEC NRW Action Plan – Mediterranean NRW Workshop – World Bank, Marseille, January 2013 8

    Network before pressure modulation / Peak day 2008 Night Time Nodals Pressure

    (m)

    20

    30

    40

    50

    60

    Pressure Model

  • "date" LYDEC NRW Action Plan – Mediterranean NRW Workshop – World Bank, Marseille, January 2013 9

    Nodals Pressure

    (m)

    20

    30

    40

    50

    60

    Network after pressure modulation / Peak day 2008 Night Time

    Pressure Model

  • "date" LYDEC NRW Action Plan – Mediterranean NRW Workshop – World Bank, Marseille, January 2013 10

    20 m 30 m 7 m

    Flow before and after: - 100 L/s

    Zone 140: Pressure upstream /downstream

  • "date" LYDEC NRW Action Plan – Mediterranean NRW Workshop – World Bank, Marseille, January 2013 11

    55 D 4000 m3/j

    30 L/s

    85 m 40000 m3/j

    360 L/s

    85 i 9000 m3/j

    60 L/s

    110 23000 m3/j

    95 L/s

    180 3500 m3/j

    30 L/s 240 9000 m3/j

    50 L/s

    153 1500 m3/j

    10 L/s

    85 nm 120000 m3/J

    380 L/s

    96 61000 m3/j

    300 L/s

    140 13000 m3/j

    350 L/s

    160 20000 m3/j

    80 L/s

    82 1200 m3/j

    5 L/s

    60 23000 m3/j

    92 L/s

    115

    55 9000 m3/j

    45 L/s

    58 6000 m3/j

    200 L/s

    Sectorisation – DMZ / DMA

    Sectorization 2011

    Sectorization 2010

    Sectorization 2012

  • "date" LYDEC NRW Action Plan – Mediterranean NRW Workshop – World Bank, Marseille, January 2013 12

    Etage 96 Zone 2

    Zone 2 secteur 1 et 2 Zone 2 Steps

    Sectorisation – DMZ / DMA

  • "date" LYDEC NRW Action Plan – Mediterranean NRW Workshop – World Bank, Marseille, January 2013 13

    Minimum night flow

    Ref night flow: 0.2 to 0.8 L/s/km

    Read meter

    Estimated flow of leak

    Minimum Night Flow

  • "date" LYDEC NRW Action Plan – Mediterranean NRW Workshop – World Bank, Marseille, January 2013 14

    Correlation

    Direct listenning

    Leak detection

    Mobile or permanent prelocation :

    Helium tracking :

  • "date" LYDEC NRW Action Plan – Mediterranean NRW Workshop – World Bank, Marseille, January 2013 15

    GIS viewer for permanent prelocation

    New 01/2013

  • "date" LYDEC NRW Action Plan – Mediterranean NRW Workshop – World Bank, Marseille, January 2013 16

    Knowledge Transfer

    Sectorisation: - Design of zones and areas - Measurement: flowmeters and

    pressure loggers - Flow monitoring (analysis) - Check water tightness of zones

    by pressure drop test - Valve operation for step test

    Leak Detection

    Geophone Correlator Prelocation Helium tracking

  • "date" LYDEC NRW Action Plan – Mediterranean NRW Workshop – World Bank, Marseille, January 2013 17

    The flow of water delivered to the network is monitored and followed up every day.

    Each night the scada system calculates the minimum night flow of all the distribution zones.

    The MNF2012 was reduced by ~ 200 L/s compared with MNF2009, despite the increase of consumption.

    Result: Minimum night flow

  • "date" LYDEC NRW Action Plan – Mediterranean NRW Workshop – World Bank, Marseille, January 2013 18

    Water Meter Test Bench:

    2010, Lydec obtains the ISO 17025 Laboratory Accreditation

    Each year ~ 30000 meters are replaced following:

    - Meter replacement program: age of the meter, brend, tests…

    -  After meter defect or dysfunction

    -  Specific replacement program with electro magnetic flow meter on big customer.

    Meter replacement

  • "date" LYDEC NRW Action Plan – Mediterranean NRW Workshop – World Bank, Marseille, January 2013 19

    CIRSEE Research program PE Pipe

    "   Suez Environnement Research Center (C.I.R.S.E.E) leads a research program on PE Pipe ageing.

    "   LYDEC participated to this program sending samples to the CIRSEE PE Test Bench and collecting data on field.

    Leaking connection diagnosis:

    Assessment form: More than 1500 filled (field feedback) Analysis: + de 80% of leaks on LDPE (cracks) Action plan: Replace all connections (different from

    HDPE) at first leak

  • "date" LYDEC NRW Action Plan – Mediterranean NRW Workshop – World Bank, Marseille, January 2013 20

    In 2010, LYDEC built a new laboratory for Pipe Assessment Condition (corrosion, ageing…)

    The life expectancy of each pipe is evaluated measuring on sample:

    "   Thickness of the metallic pipe: Cavitymax (Inside) + Cavitymax (Outside) "   Environmental condition (soil,

    backfill…)

    All the data collected and sample tested are registered in the GIS and allow to plan the pipe renewal program.

    Metallic pipe assessment

  • "date" LYDEC NRW Action Plan – Mediterranean NRW Workshop – World Bank, Marseille, January 2013 21

    GIS: leaks report

    GIS is not only a tool for asset management

    Important to report data on customers, complains, operations, repairs…

    Leaks are reported in the GIS. Very useful for:

    "  Leak detection "  Pipe renewal program

  • "date" LYDEC NRW Action Plan – Mediterranean NRW Workshop – World Bank, Marseille, January 2013 22

    Commercial losses

    The NRW reduction action plan related to commercial losses involves most of the directorate of the company.

    All actions are followed up through a committee with indicators and benchmarking: frauds, reading, etc.

    Specific actions launched on: "  Fire hydrants "  Stand pipe (spring) "  Watering meters "  Big consumers

  • "date" LYDEC NRW Action Plan – Mediterranean NRW Workshop – World Bank, Marseille, January 2013 23

    Physical losses: Modulation: + 500 km and dynamic control Sectorisation: Full network with permanent monitoring

    (120 meter points for av. 50 zones) Leak Detection: Permanent prelocation (400 units)

    Helium, hydrophones, Sahara®, SmartBall® on feeders Metering losses: Small meter: 20 000 meter replaced / year Big meter: + 100 Electro Magnetic Flowmeter

    Action Plan 2012 – 2015:

    Asset management: Assessment: Casablanca Water Master plan Renewal program: 10500 connections / year

    45 km of network / year Commercial losses: Reading and billing: focus on violation and defective meter to replace

    10 000 meters / year

    Action plan management: Aquacircle Forecast, Optiflux, Aquadvance