lwesi cenvpp map6to9 - Province of...

10
! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ¾ À 304 S05 S06 LWE-Aqua-311 LWE-Aqua-310 LWE-Aqua-309 LWE-Wild-102 LWE-Wild-103 LWE-Acss-109 LWE-Acss-108 LWE-Acss-107 LWE-Aqua-106 LWE-Aqua-105 LWE-Aqua-107 LWE-Eco-303 LWE-Ruse-204 LWE-Ruse-205 62 63 64 65 66 L7 L8 L9 L10 Tower 5 E-694863, N-5651164 S A N D Y RI V E R Coordinate System: UTM Zone 14N NAD83 Data Source: MB Hydro, ProvMB, NRCAN Date Created: July 29, 2014 Version: Draft ± 1:10,000 0 250 500 125 Metres Lake Winnipeg East Side Initiative Transmission Project Construction Environmental Protection Plan Environmentally Sensitive Site Locations DOCUMENT PATH: G:\_GIS_PROJECT_FOLDER\00_HYDRO\_LWESI\ARCMAP\LWESI_CENVPP_ESS_10K_MAPS_20140728.MXD ESS Features Access ! ( Intersection Ecosystem ! ( Species of Concern Resource Use ! ( Food/Medicinal Water ! ( Water Crossing Wildlife Birds and Habitat Heritage Cultural Water Wetland Project Infrastructure Land Base 60 m Right of Way LWESI Final Preferred Route Angle Tower Locations Mining ! ! Transmission Line Highway Major Road Local Road Winter Road Railway (Operational) Railway (Discontinued) Manigotagan Corner Station Preferred Site MAP 6 DRAFT: FOR DISCUSSION PURPOSES ONLY

Transcript of lwesi cenvpp map6to9 - Province of...

Page 1: lwesi cenvpp map6to9 - Province of Manitobagov.mb.ca/.../environmental.protection.plan/lwesi_cenvpp_map6to9.pdf · L7 L8 L9 L10 Tower 5 E-694863, N-5651164 S A N D Y R I V E R Coordinate

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

¾À304

S05

S06

LWE-Aqua-311

LWE-Aqua-310LWE-Aqua-309

LWE-Wild-102

LWE-Wild-103

LWE-Acss-109

LWE-Acss-108

LWE-Acss-107

LWE-Aqua-106

LWE-Aqua-105

LWE-Aqua-107

LWE-Eco-303

LWE-Ruse-204

LWE-Ruse-205

61

62

6364

6566

L7L8

L9

L10

Tower 5E-694863, N-5651164

SAN D Y

R I VE R

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 29, 2014Version: Draft

±

1:10,000

0 250 500125Metres

Lake Winnipeg East Side Initiative Transmission Project

Construction Environmental Protection PlanEnvironmentally Sensitive Site Locations

DOCU

MENT

PAT

H: G

:\_GI

S_PR

OJEC

T_FO

LDER

\00_

HYDR

O\_L

WES

I\ARC

MAP\

LWES

I_CE

NVPP

_ESS

_10K

_MAP

S_20

1407

28.M

XD

ESS FeaturesAccess!( Intersection

Ecosystem!( Species of Concern

Resource Use!( Food/Medicinal

Water!( Water Crossing

WildlifeBirds and Habitat

HeritageCultural

WaterWetland

Project InfrastructureLand Base

60 m Right of WayLWESI Final Preferred RouteAngle Tower Locations

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)

Manigotagan Corner Station Preferred Site

MAP 6DRAFT: FOR DISCUSSION PURPOSES ONLY

Page 2: lwesi cenvpp map6to9 - Province of Manitobagov.mb.ca/.../environmental.protection.plan/lwesi_cenvpp_map6to9.pdf · L7 L8 L9 L10 Tower 5 E-694863, N-5651164 S A N D Y R I V E R Coordinate

Version: Draft

ESS Group: Food/Medicinal

Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone Source

LWE-S05 LWE-Ruse-204 Gathering Area 694820 5650904 14N ATK

LWE-S05 LWE-Ruse-205 Gathering Area 694811 5650850 14N ATK Potential Effects: Loss of plants as a result of clearing, construction, maintenance and decommissioning activities

Specific Mitigation:

• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Minimize surface disturbance around the site to the extent possible • Remove trees by low-disturbance methods • No Herbicide to be applied during construction • Confine vehicle traffic to established trails to the extent possible ESS Group: Intersection

Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone Source

LWE-S05 LWE-Acss-107 Trail crossing 694603 5651681 14N Manitoba Hydro Consultants

LWE-S05 LWE-Acss-108 Trail crossing 694766 5651356 14N Manitoba Hydro Consultants

LWE-S06 LWE-Acss-109 Trail crossing 694379 5648219 14N Manitoba Hydro Consultants

Potential Effects: May provide increased sightlines from the road and additional access for hunters Specific Mitigation:

• Maintain existing shrubs and understory for 100m on both sides of the crossing • Minimize centerline trail clearing width

ESS Group: Species of Concern

Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone Source

LWE-S06 LWE-Eco-303 Plant - Sagittaria rigida 694817 5650886 14N Manitoba Hydro Consultants

Potential Effects: Loss of plants of conservation concern from clearing and construction activities. Specific Mitigation:

• Identify and flag prior to start of work • Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Provide 5m vegetated (shrub and herbaceous) buffer around site • Remove trees by low-disturbance methods • Confine vehicle traffic to established trails to the extent possible ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone Source

LWE-S05 LWE-Aqua-105 Unnamed Drain 694429 5652027 14N Manitoba Hydro Consultants

LWE-S06 LWE-Aqua-106 Sandy River 694814 5650870 14N Manitoba Hydro Consultants

LWE-S06 LWE-Aqua-107 Unnamed Drain 694587 5649494 14N Manitoba Hydro Consultants

Potential Effects: Habitat loss & contamination from structure foundations & installations; Increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Rutting of floodplain Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction

MAP NUMBER: 6

Page 3: lwesi cenvpp map6to9 - Province of Manitobagov.mb.ca/.../environmental.protection.plan/lwesi_cenvpp_map6to9.pdf · L7 L8 L9 L10 Tower 5 E-694863, N-5651164 S A N D Y R I V E R Coordinate

Version: Draft

ESS Group: Birds and Habitat

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM

Zone Distance Source

LWE-S06 LWE-Wild-102 Sandy River Crossing Site: L7 to L8 E-694821

N-5650915 E-694809 N-5650838 14N 78m Manitoba Hydro

Consultants

LWE-S06 LWE-Wild-103

Waterfowl and other waterbird sensitivity area

Site: L9 to L10

E-694593 N-5649531

E-694425 N-5648514 14N 1031m Manitoba Hydro

Consultants Potential Effects: Higher risk of wire collision, Risk of wire collision is localized to the right-of-way Specific Mitigation:

• Conduct priority assessment for bird diverters and other measures prior to transmission line stringing • Install bird diverters or other measures at high priority sites ESS Group: Wetland /Fens

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM

Zone Distance Source

LWE-S05 LWE-Aqua-309

Wetland sensitivity area Site: 61 to 62 E-694378

N-5652126 E-694424 N-5652034 14N 102 m MBCWS

LWE-S05 LWE-Aqua-310

Wetland sensitivity area Site: 63 to 64 E-694653

N-5651580 E-694700 N-5651485 14N 105 m MBCWS

LWE-S06 LWE-Aqua-311

Wetland sensitivity area Site: 65 to 66 E-694571

N-5649397 E-694555 N-5649301 14N 96 m MBCWS

Potential Effects: Potential Disruption to sensitive wetland habitat

Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Provide 30 m vegetated (shrub and herbaceous) buffer around site • Remove trees by low-disturbance methods within buffer • The application of herbicides is prohibited within buffer

MAP NUMBER: 6

Page 4: lwesi cenvpp map6to9 - Province of Manitobagov.mb.ca/.../environmental.protection.plan/lwesi_cenvpp_map6to9.pdf · L7 L8 L9 L10 Tower 5 E-694863, N-5651164 S A N D Y R I V E R Coordinate

 

 

 

 

 

 

 

 

 

 

 

 

This page is intentionally left blank.

Page 5: lwesi cenvpp map6to9 - Province of Manitobagov.mb.ca/.../environmental.protection.plan/lwesi_cenvpp_map6to9.pdf · L7 L8 L9 L10 Tower 5 E-694863, N-5651164 S A N D Y R I V E R Coordinate

!(!(!(

!(!(!(!(!(!(

¾À304

S06 LWE-Aqua-312

LWE-Aqua-313

LWE-Aqua-313

LWE-Aqua-313

LWE-Aqua-313

LWE-Acss-109LWE-Acss-112 LWE-Acss-111 LWE-Acss-110LWE-Acss-1136768697071727374757576

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 29, 2014Version: Draft

±

1:10,000

0 250 500125Metres

Lake Winnipeg East Side Initiative Transmission Project

Construction Environmental Protection PlanEnvironmentally Sensitive Site Locations

DOCU

MENT

PAT

H: G

:\_GI

S_PR

OJEC

T_FO

LDER

\00_

HYDR

O\_L

WES

I\ARC

MAP\

LWES

I_CE

NVPP

_ESS

_10K

_MAP

S_20

1407

28.M

XD

ESS FeaturesAccess!( Intersection

WaterWetland

Project InfrastructureLand Base

60 m Right of WayLWESI Final Preferred RouteAngle Tower Locations

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)

Manigotagan Corner Station Preferred Site

MAP 7DRAFT: FOR DISCUSSION PURPOSES ONLY

Page 6: lwesi cenvpp map6to9 - Province of Manitobagov.mb.ca/.../environmental.protection.plan/lwesi_cenvpp_map6to9.pdf · L7 L8 L9 L10 Tower 5 E-694863, N-5651164 S A N D Y R I V E R Coordinate

Version: Draft

ESS Group: Intersection

Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone Source

LWE-S06 LWE-Acss-110 Trail crossing 694284 5647654 14N Manitoba Hydro Consultants

LWE-S06 LWE-Acss-111 Trail crossing 694181 5647034 14N Manitoba Hydro Consultants

LWE-S06 LWE-Acss-112 Trail crossing 694052 5646231 14N Manitoba Hydro Consultants

Potential Effects: May provide increased sightlines from the road and additional access for hunters Specific Mitigation:

• Maintain existing shrubs and understory for 100m on both sides of the crossing • Minimize centerline trail clearing width ESS Group: Wetland /Fens

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM

Zone Distance Source

LWE-S06 LWE-Aqua-312

Wetland sensitivity area Site: 67 to 68 E-694244

N-5647415 E-694220 N-5647272 14N 144 m Manitoba Hydro

Consultants

LWE-S06 LWE-Aqua-313

Wetland sensitivity area Site: 69 to 70 E-694034

N-5646146 E-693784 N-5644633 14N 1533 m Manitoba Hydro

Consultants

LWE-S06 LWE-Aqua-313

Wetland sensitivity area Site: 71 to 72 E-693779

N-5644604 E-693751 N-5644429 14N 176 m Manitoba Hydro

Consultants

LWE-S06 LWE-Aqua-313

Wetland sensitivity area Site: 73 to 74 E-693744

N-5644389 E-693722 N-5644257 14N 133 m Manitoba Hydro

Consultants Potential Effects: Potential Disruption to sensitive wetland habitat

Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Provide 30 m vegetated (shrub and herbaceous) buffer around site • Remove trees by low-disturbance methods within buffer • The application of herbicides is prohibited within buffer

MAP NUMBER: 7

Page 7: lwesi cenvpp map6to9 - Province of Manitobagov.mb.ca/.../environmental.protection.plan/lwesi_cenvpp_map6to9.pdf · L7 L8 L9 L10 Tower 5 E-694863, N-5651164 S A N D Y R I V E R Coordinate

!(

!(!(

!(

!(

!(

!(

!(!(

!(

!(!(

¾À304

S06S07

LWE-Aqua-315

LWE-Wild-315LWE-Wild-315LWE-Wild-315

LWE-Wild-315

LWE-Aqua-314

LWE-Aqua-314

LWE-Aqua-313

LWE-Aqua-313

LWE-Wild-104

LWE-Acss-116

LWE-Acss-115LWE-Acss-114

LWE-Acss-113757576

7778

79808182

L11L12L13L14

Tower 6E-693436, N-5642519

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 29, 2014Version: Draft

±

1:10,000

0 250 500125Metres

Lake Winnipeg East Side Initiative Transmission Project

Construction Environmental Protection PlanEnvironmentally Sensitive Site Locations

DOCU

MENT

PAT

H: G

:\_GI

S_PR

OJEC

T_FO

LDER

\00_

HYDR

O\_L

WES

I\ARC

MAP\

LWES

I_CE

NVPP

_ESS

_10K

_MAP

S_20

1407

28.M

XD

ESS FeaturesAccess!( Intersection

Ecosystem!( Species of Concern

WildlifeBirds and Habitat

WaterWetland

Project InfrastructureLand Base

60 m Right of WayLWESI Final Preferred RouteAngle Tower Locations

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)

Manigotagan Corner Station Preferred Site

MAP 8DRAFT: FOR DISCUSSION PURPOSES ONLY

Page 8: lwesi cenvpp map6to9 - Province of Manitobagov.mb.ca/.../environmental.protection.plan/lwesi_cenvpp_map6to9.pdf · L7 L8 L9 L10 Tower 5 E-694863, N-5651164 S A N D Y R I V E R Coordinate

Version: Draft

ESS Group: Intersection

Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone Source

LWE-S06 LWE-Acss-113 Trail crossing 693647 5643802 14N Manitoba Hydro consultants

LWE-S06 LWE-Acss-114 Trail crossing 693533 5643111 14N Manitoba Hydro Consultants

LWE-S06 LWE-Acss-115 Trail crossing 693472 5642738 14N Manitoba Hydro Consultants

LWE-S07 LWE-Acss-116 Road crossing 693449 5642374 14N Manitoba Hydro Consultants

Potential Effects: May provide increased sightlines from the road and additional access for hunters Specific Mitigation:

• Maintain existing shrubs and understory for 100m on both sides of the crossing • Minimize centerline trail clearing width ESS Group: Birds and Habitat

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance Source

LWE-S06 LWE-Wild-104

Waterfowl and other waterbird sensitivity area

Site: L11 to L12

E-693444 N-5642570

E-693435 N-5642518 14N 52m Manitoba Hydro

Consultants

LWE-S07 LWE-Wild-104

Waterfowl and other waterbird sensitivity area

Site: L13 to L14

E-693435 N-5642518

E-693461 N-5642248 14N 271m Manitoba Hydro

Consultants

Potential Effects:

Higher risk of wire collision, Risk of wire collision is localized to the right-of-way Specific Mitigation:

• Conduct priority assessment for bird diverters and other measures prior to transmission line stringing • Install bird diverters or other measures at high priority sites

ESS Group: Wetland /Fens

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance Source

LWE-S06 LWE-Aqua-313

Wetland sensitivity area

Site: 75 to 76

E-693692 N-5644072

E-693675 N-5643970 14N 103 m MBCWS

LWE-S06 LWE-Aqua-314

Wetland sensitivity area

Site: 77 to 78

E-693446 N-5642587

E-693435 N-5642518 14N 70 m MBCWS

LWE-S07 LWE-Aqua-314

Wetland sensitivity area

Site: 79 to 80

E-693435 N-5642518

E-693441 N-5642453 14N 65 m MBCWS

LWE-S07 LWE-Aqua-315

Wetland sensitivity area

Site: 81 to 82

E-693513 N-5641698

E-693519 N-5641633 14N 65 m MBCWS

Potential Effects: Potential Disruption to sensitive wetland habitat

Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Provide 30 m vegetated (shrub and herbaceous) buffer around site • Remove trees by low-disturbance methods within buffer • The application of herbicides is prohibited within buffer

MAP NUMBER: 8

Page 9: lwesi cenvpp map6to9 - Province of Manitobagov.mb.ca/.../environmental.protection.plan/lwesi_cenvpp_map6to9.pdf · L7 L8 L9 L10 Tower 5 E-694863, N-5651164 S A N D Y R I V E R Coordinate

!(

!(

!(

!(

¾À304

¾À304

S07

S08

LWE-Aqua-316 LWE-Wild-105LWE-Acss-117

LWE-Aqua-108

LWE-Ruse-206LWE-Ruse-20783

84

L15L16

Tower 7E-693847, N-5638204

B L A C K R I V E R

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 29, 2014Version: Draft

±

1:10,000

0 250 500125Metres

Lake Winnipeg East Side Initiative Transmission Project

Construction Environmental Protection PlanEnvironmentally Sensitive Site Locations

DOCU

MENT

PAT

H: G

:\_GI

S_PR

OJEC

T_FO

LDER

\00_

HYDR

O\_L

WES

I\ARC

MAP\

LWES

I_CE

NVPP

_ESS

_10K

_MAP

S_20

1407

28.M

XD

ESS FeaturesAccess!( Intersection

Heritage!( Archaeological

Resource Use!( Food/Medicinal

Water!( Water Crossing

WildlifeBirds and Habitat

WaterWetland

Project InfrastructureLand Base

60 m Right of WayLWESI Final Preferred RouteAngle Tower Locations

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)

Manigotagan Corner Station Preferred Site

MAP 9DRAFT: FOR DISCUSSION PURPOSES ONLY

Page 10: lwesi cenvpp map6to9 - Province of Manitobagov.mb.ca/.../environmental.protection.plan/lwesi_cenvpp_map6to9.pdf · L7 L8 L9 L10 Tower 5 E-694863, N-5651164 S A N D Y R I V E R Coordinate

Version: Draft

ESS Group: Food/Medicinal

Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone Source

LWE-S08 LWE-Ruse-206 Gathering Area 693817 5638523 14N ATK

LWE-S08 LWE-Ruse-207 Gathering Area 693822 5638464 14N ATK Potential Effects: Loss of plants as a result of clearing, construction, maintenance and decommissioning activities Specific Mitigation:

• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Minimize surface disturbance around the site to the extent possible • Remove trees by low-disturbance methods • No Herbicide to be applied during construction • Confine vehicle traffic to established trails to the extent possible ESS Group: Intersection

Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone Source

LWE-S08 LWE-Acss-117 Road crossing 693785 5638860 14N Manitoba Hydro Consultants

Potential Effects: May provide increased sightlines from the road and additional access for hunters Specific Mitigation:

• Maintain existing shrubs and understory for 100m on both sides of the crossing • Minimize centerline trail clearing width ESS Group: Water Crossing

Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone Source

LWE-S08 LWE-Aqua-108 Black River 693820 5638490 14N Manitoba Hydro Consultants

Potential Effects: Habitat loss & contamination from structure foundations & installations; Increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Rutting of floodplain Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg

Clearance Requirements. • 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction ESS Group: Birds and Habitat

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance Source

LWE-S08 LWE-Wild-105 Black River Crossing

Site: L15 to L16

E-693814 N-5638541

E-693824 N-5638441 14N 100m Manitoba Hydro

Consultants Potential Effects:

Higher risk of wire collision, Risk of wire collision is localized to the right-of-way Specific Mitigation:

• Conduct priority assessment for bird diverters and other measures prior to transmission line stringing • Install bird diverters or other measures at high priority sites ESS Group: Wetland /Fens

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance Source

LWE-S08 LWE-Aqua-316 Wetland sensitivity area Site: 83 to 84 E-693980 N-5637964

E-694059 N-5637821 14N 163m MBCWS

Potential Effects: Potential Disruption to sensitive wetland habitat

Specific Mitigation:

• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Provide 30 m vegetated (shrub and herbaceous) buffer around site • Remove trees by low-disturbance methods within buffer • The application of herbicides is prohibited within buffer

MAP NUMBER: 9