LUTP REVIEW FOR THE PROJECT REPORT ON TECHNICAL AND FINACIAL VIABILITY OF ELECTRICAL BUSES IN CITY OF CHANDIGARH Presented by:- Amit Gupta

Transcript of LUTP REVIEW FOR THE PROJECT REPORT ON...

  • LUTP REVIEW FOR THE PROJECT REPORTON TECHNICAL AND FINACIAL VIABILITY OFELECTRICAL BUSES IN CITY OFCHANDIGARH

    Presented by:-Amit Gupta

  • CHANDIGARH

    FORMED IN 1966 CHANDIGARHAS UNION TERRITORY ANDCAPITAL OF PUNJAB ANDHARYANA

    PLANNED BY FRENCHARCHITECT LE CORBUISER

    ONE OF THE PLANNED CITY OFINDIA IN GRID PATTERN

    IT HAS AREA OF 114 SQ.KMSAND POPULATION OF 1.05MILLION WITH POPULATIONDENSITY OF 9262 PER KM2

  • CHANDIGARH TRANSPORT FLEET

    FOUND IN 1966 WITH JUST 30 BUSES IN ITS FLEET

    PRESENTLY 533 BUSES(DIESEL) : 130 BUSES FOR INTER CITY OPERATIONS AND 403 FOR INTRA CITY/SUB URBAN OPERATIONS

    NO PRIVATE OPERATORS/BUSES

    Chart1

    130

    170

    133

    100

    Number of Buses

    Sheet1

    Number of Buses

    Depot 1 (Inter-City)130

    Depot 2 (City)170

    Depot 3(Suburban)133

    Depot 4(City)100

    To resize chart data range, drag lower right corner of range.

  • CTU ROUTES

    TOTAL OPERATION OF 1,00,000 KMS DAILY FROM 4 DEPOTS

    80,000 KMS IN LOCAL/SUB URBAN ON 60 ROUTES 40,000 KMS IN INTER CITY OPERATION ON 54

    ROUTES DAILY RIDER SHIP IS 1.60 LAC PASSENGERS

    Chart1

    51000

    14000

    35000

    K.M. Operation

    Sheet1

    K.M. Operation

    City/Tri-City51000

    Sub-Urban14000

    Inter-City35000

    To resize chart data range, drag lower right corner of range.

  • ISBTMohali

    9091

    8180797877767574

    6667686970717273

    60 61 63 64 6558 59

    55 54

    53 52 51 50 49 48

    474645444342414039

    38 37 36 35 34 33 32 31

    293020212224 2325

    282719181615

    1

    432 5 6

    26891011

    Khuda Alisher

    P.G.I

    LOCAL ,TRICITY ROUTES OF CTU (DEPOT-II)

    LEGEND

    7

    8586878889127

    116

    82

    78

    9 10 11

    14151617

    18 12

    5 4 21

    PANCHKULA

    PEC

    PB Civil Sectt.

    High Court

    R.Garden Lake

    Kaimbwala Saketri Mansa DeviCantonment

    M.Majra

    RailwayStation

    Baltana

    ZIRAKPURBehlana

    AIRPORT

    RamDarbar

    MOHALI

    Sohana

    Santemajra

    Phase-6

    20

    ISBT17

    CHANDIGARH

    KHARAR

    LANDRAN

    MALOYA

    DHANAS

    SARANGPURBARRIER

    Balongi

    I.T Park

    P.U

    Elan

    te

    M.TOWN

    HB

    MW

    56

    DERABASSI

    CHHATBIR

    KHIZRABADKUBHAHERI

    KURALI

    CTU

    Nada Shaib

    Ram G

    arh

    M.COMP

    Routes :-

    2A-2C

    2A-2C

    2D

    2D

    2F

    2F

    8

    8

    9A-9C

    9A-9C

    RLY. STMOHALI

    10

    10

    17

    17

    18

    18

    18B

    18B

    23

    23

    26

    DHAKOLI

    26

    30

    30

    30A

    30A

    30B

    30B

    34

    34

    79

    79

    71

    71

    123

    123

    143

    143

    211

    211

    212

    212

    80

    80

    82

    82

    213

    213

    214

    214

    216

    216

    254

    254

    TOTAL ROUTE S 34TOTAL OPERATION 30,000 KMsTOTAL BUSES 170 (9.0MTR)

    KALKA49

    49

  • ISBTMohali

    9091

    8180797877767574

    6667686970717273

    60 61 63 64 6558 59

    55 54

    53 52 51 50 49 48

    474645444342414039

    38 37 36 35 34 33 32 31

    293020212224 2325

    282719181615

    1

    432 5 6

    26891011

    Khuda Alisher

    P.G.I

    LOCAL AND TRI CITY ROUTES OF CTU (DEPOT-IV)

    LEGEND

    7

    8586878889127

    116

    82

    78

    9 10 11

    14151617

    18 12

    5 4 21

    PANCHKULA

    PEC

    PB Civil Sectt.

    High Court

    R.Garden Lake

    Kaimbwala Saketri Mansa DeviCantonment

    M.Majra

    RailwayStation

    Baltana

    ZIRAKPURBehlana

    AIRPORT

    RamDarbar

    MOHALI

    Sohana

    Santemajra

    Phase-6

    20

    ISBT17

    CHANDIGARH

    KHARAR

    LANDRAN

    MALOYA

    DHANAS

    SARANGPURBARRIER

    Balongi

    I.T Park

    P.U

    Elan

    te

    M.TOWN

    HB

    MW

    56

    TOTAL Routes :- 12TOTAL OPERATION:- 20,000TOTAL BUSES :- 100 BUSES(12.0 MTR)

    DERABASSI

    CHHATBIR

    KHIZRABADKUBHAHERI

    KURALI

    CTU

    Nada Shaib

    Ram G

    arh

    M.COMP

    Routes :-

    DMC

    4A-4C

    5A-5C

    2B

    1A-1C

    7A-7C

    22

    39

    201

    202203

    205

    206

    239A-C

    240

    241

    1A-1C 4A-4C 5A-5C

    22 39 201 202 203

    205 206 239A-C 240 241

    242242

  • WHY ELECTRIC BUSES. ???

    TO CURB DEPENDENCE ON FOSSIL FUEL.

    TO REDUCE CO2 EMISSIONS AS PER NITI AAYOG REPORT INDIACAN SAVE 35% OF CARBON EMISSIONSBY 2030 THROUGH ELECTRIC VEHICLEPROGRAMME BY 2030.

  • WHY ELECTRIC BUSES. ???

    CHANDIGARH SELECTED ASSMART CITY

    FINANCIAL ASSISTANCE FROMDEPTT OF HEAVYINDUSTRIES, GOI SINCEPROCUEMENT COSTIS HIGH

  • Electric Emission free at

    point of operation

    Battery Buses

    (full Battery Electric)

    Hybrid Buses

    Trolley Buses

    With option of Opportunity /Slow charging

    Series and parallelcombination withCNG/ Diesel engine

    Types of Electric buses

    Types of Electric BusesElectric Buses electric motor in place of combustion engine and use

    electricity from the grid stored in batteries.Hybrid Electric Buses which uses batteries to power an electric motors

    and liquid fuel such as Diesel to recharge the batteries.

    Types of Electric Buses and Charging Infrastructure

    Draws Power from Overhead Wires

  • ELECTRIC BUS TECHOLOGY Powered by electricity and propelled

    by traction motor instead of conventional IC Engines

    Bus components are divided into four major parts Body design, Electric propulsion system, Power accessories and Battery Charging.

    Body design structure, frame, suspension

    Electric propulsion system electronic controller, power converter, motor, wheels

    Power accessories brakes, steering, auxiliary supply, temperature control

    Battery charging batteries and charger

  • Types of Electric Buses and Charging Infrastructure Types of Charging Infrastructure

    Slow ChargingMainly done in Bus Depots.

    Opportunity Charging At end of Route At Intermediate Bus Stop/Terminal

    Battery Swapping

  • TYPES OF CHARGING FOR ELECTRIC BUSES

    OFF BOARD TOP DOWN PANTOGRAPH CHARGING

    It is useful for opportunity charging when is stops at bus stop

    Charging via connector

    It is Conventional method of charging used to charge the bus when bus is off route and it is more user friendly

  • Project Proposal

    PROPOSAL OF INDUCTION OF ELECTRIC BUSES AS PILOT PROJECT

    Taking Step Forward CTU conducted trails on electric buses ..

  • Taking initiatives for the greencity, CTU undertook couple ofelectric bus trials .

    These trials involved pure EVbuses from two differentmanufacturers.

    One bus provided a maximumrange of 183 kms whereasanother provided range of 255kms

    Slow Charging used.

    ARAI Approved

    ELECTRIC BUS TRIALS IN CHANDIGARH FOR 15 DAYS

  • SUMMARY OF TRIALS

    Manufacturer 1 (NAC)

    Manufacturer 2 (HVAC)

    1. TOTAL KMS COVERED /Day IN SINGLE CHARGE

    180 Kms 230 Kms

    2. TOTAL UNITS CONSUMED 146 Units 190 Units

    3. AVERAGE kWh consumed PER KM

    0.81 Kwh per K.M. 0.82 Kwh per K.M.

    5. COST PER KILOMETRE(@Rs 6/K.M.)

    4.86 4.95

  • Comparison.Parameters BE bus Diesel Bus

    Power source Electricity DIESEL

    Power generator Battery IC engine

    Cost (INR) 1.9 crores (HimachalRoadways)

    30.00 Lacs

    Cost per Km Rs 5/km Rs 25-30/km

    Emissions Zero High

    Noise Minimum High

    Maintenance Lowest High

    KMPL --- 4

    Operating Cost (Powersource only)

    Rs 4-5 Per K.M. Rs 12-15 per K.M.

  • Parameters for Electric Bus

    Parameters:- Route Length:- 22 Kms round Trip and eBus will cover

    approx 10 trips and will cover 220 KMs Schedule Proposed Two routes from ISBT-43 to IT Park, PGI

    to I.T. Park, shall be called as Green Routes.Number of Buses No. Of buses en-route shall be 20.

    Charging TypeSlow Charging

  • ISBTMohali

    9091

    8180797877767574

    6667686970717273

    60 61 63 64 6558 59

    55 54

    53 52 51 50 49 48

    474645444342414039

    38 37 36 35 34 33 32 31

    293020212224 2325

    282719181615

    1

    432 5 6

    26891011

    Khuda Alisher

    P.G.I

    LOCAL AND TRI CITY ROUTES OF CTU (DEPOT-IV)

    LEGEND

    7

    8586878889127

    116

    82

    78

    9 10 11

    14151617

    18 12

    5 4 21

    PANCHKULA

    PEC

    PB Civil Sectt.

    High Court

    R.Garden Lake

    Kaimbwala Saketri Mansa DeviCantonment

    M.Majra

    RailwayStation

    Baltana

    ZIRAKPURBehlana

    AIRPORT

    RamDarbar

    MOHALI

    Sohana

    Santemajra

    Phase-6

    20

    ISBT17

    CHANDIGARH

    KHARAR

    LANDRAN

    MALOYA

    DHANAS

    SARANGPURBARRIER

    Balongi

    I.T Park

    P.U

    Elan

    te

    M.TOWN

    HB

    MW

    56

    TOTAL Routes :- 2TOTAL OPERATION:- 4500 k.m.

    DERABASSI

    CHHATBIR

    KHIZRABADKUBHAHERI

    KURALI

    CTU

    Nada Shaib

    Ram G

    arh

    M.COMP

    DMC5A-C

    22

    20

    20220

    206

    22 206

    242

  • Technical Specifications (Proposed)

    Bus Length :- 9.0 mtrs Range per Charge :- 220 Kms Charging Time :- 6-7 Hrs Seating Capacity :- 23 + Driver Floor Height :- 650 mm(Floor height) Gangway :- As per UBS-II (which has good

    standee capacity forpassengers, Disabledfriendly)

    Should be equipped with CCTV, Dash board camera and ITS hardware(BDC,AVLS,SCN)

    Approval :- ARAI/CIRT/ICAT Certifications Life Cycle of Battery :- 2500 Cycles @ 100% Depth of

    Discharge

  • CHARGING INFRASTRUCTURE Required.

    AT DEPOT NO. 2 11 KVA SUB STATION 2.2 MW ELECTRICITY 20 CHARGING STATIONS

  • STAKEHOLDERS TO MAKE PROJECT SUSTAINABLE

    CHANDIGARH ELECTRCITY DEPTT FOR PROVIDING ELECTRICITY

    DEPARTMENT OF HEAVY INDUSTRIES, GOVT. OF INDIA FOR PROVIDING SUBSIDY

    OEM FOR PROVIDING OF BUSES AND TRAINING TO EMPLOYEES OF CTU

  • Challenges for Electric Buses High Procurement Cost but even though initial cost of electric

    bus is very high, its running and maintenance cost is really low which mean investing in electric buses is investing in future

    Setting up of Dedicated charging station for 20 electric buses will be a challenge.

    Imparting Training to Maintenance Staff for Electric buses

    Impact of ancillary loads (lights, HVAC, air compressor, power steering, battery cooling) reduces available range. During extreme weather these can be as much as the energy for moving the vehicle

    Opportunity charging can effect the bus service during inter-peak periods but Infrastructure will be issue.

  • Financial Analysis

    Thank You

    Working On .

    LUTP REVIEW FOR THE PROJECT REPORT ON TECHNICAL AND FINACIAL VIABILITY OF ELECTRICAL BUSES IN CITY OF CHANDIGARHCHANDIGARHCHANDIGARH TRANSPORT FLEETCTU ROUTESSlide Number 5Slide Number 6WHY ELECTRIC BUSES. ???WHY ELECTRIC BUSES. ???Slide Number 9ELECTRIC BUS TECHOLOGYTypes of Electric Buses and Charging InfrastructureTYPES OF CHARGING FOR ELECTRIC BUSESProject ProposalSlide Number 14SUMMARY OF TRIALSComparison.Parameters for Electric BusSlide Number 18Technical Specifications (Proposed)CHARGING INFRASTRUCTURE Required.STAKEHOLDERS TO MAKE PROJECT SUSTAINABLEChallenges for Electric BusesFinancial Analysis