Project 1:Marathon Refinery Expansion – Garyville, Louisiana

Total Number of Heavy Lifts: 30Ranging from 18 mt to 110 mt

Total Revenue Tons of Cargo: 16,897

Project Time Frame: First Quarter 2009

Total Barge Moves: 4

Load Port: Port of Altamira, Mexico

Page 3: Lugo Marine - Barge Presentation 2011

Pre-planning meetings with fabrication yards in Mexico to ensure that the cargo wasbeing fabricated to the specifications needed to make an ocean voyage via barge.

Page 4: Lugo Marine - Barge Presentation 2011

Survey of the Port of Altamira and the roads entering the facility to specify routes tobe taken as the cargo is shipped from fabrication yards to port for loading onto barges.

Page 5: Lugo Marine - Barge Presentation 2011

Preparing of the barges in Louisiana including the barge layouts, loading and pre-welding of elevated stow components and materials used for final tiedown of cargo in

Mexico.

Page 6: Lugo Marine - Barge Presentation 2011

Transporting of cargo from fabrication yards to the laydown yard at the Port ofAltamira in proximity to the wharf identified for loading the barges.

Page 7: Lugo Marine - Barge Presentation 2011

Lugo Marine managed the Ro-Ro operations with the Port of Altamira, the stevedores,heavy hauling companies, marine surveyors and the tug/barge crew.

Page 8: Lugo Marine - Barge Presentation 2011

Cargo being loaded on barges as outlined in the ballast and stow plans engineered byLugo Marine.

Page 9: Lugo Marine - Barge Presentation 2011

Heavy lifts loaded , securing inspected and approved by underwriting surveyor, sailaway certificate issued and barge cleared for transport to Garyville, Louisiana for off

loading.

Page 10: Lugo Marine - Barge Presentation 2011

Project 2:Power Plant Expansion Project

Total Number of Heavy Lifts: 6

Total Revenue Tons of Cargo: 1,263

Project Time Frame: First Quarter 2009

Total Barge Moves: 1

Load Port: Port of Houston

Page 11: Lugo Marine - Barge Presentation 2011

Performing barge layout, loading dunnage with the assistance of the stevedoringcompany and shifting the barge along side the vessel for loading of heavy lifts with the

ship’s gear.

Page 12: Lugo Marine - Barge Presentation 2011

Heavy lifts discharged from the number three starboard hatch, were loaded on bargeas outlined in the stow plan designed by Lugo Marine.

Page 13: Lugo Marine - Barge Presentation 2011

Vessel discharging to barge continued the next day for heavy lifts stowed in thenumber three portside lower hold.

Page 14: Lugo Marine - Barge Presentation 2011

Final welding and securing of all heavy lifts and departure of the tug/barge fromthe Port of Houston.

Page 15: Lugo Marine - Barge Presentation 2011

Project 3:

Reactor Vessel Barge Tiedown

Total Number of Heavy Lifts: 1 @ 1,000 mt

Project Time Frame: Third Quarter 2009

Total Barge Moves: 1

Load Port: Port of New Orleans, Louisiana

Page 16: Lugo Marine - Barge Presentation 2011

Reactor arrived via heavy lift steamship vessel and discharged directly tobarge using ship’s gear.

Page 17: Lugo Marine - Barge Presentation 2011

Reactor vessel was positioned on the elevated stow equipment as per Lugo Marineengineering and stow plan calculations .

Page 18: Lugo Marine - Barge Presentation 2011

Final welding of steel tiedown devices and wirerope lashing of the reactor vessel to thebarge for transport up the Mississippi River to Chicago.

Page 19: Lugo Marine - Barge Presentation 2011

For additional information, please contact:

- Robert Lugo, Jr.Managing DirectorEmail: [email protected]

- Norbert LugoManaging Director – Operations & EngineeringEmail: [email protected]

-Stacy BrowningDirector of International TransportationEmail: [email protected]