SELF-PROPELLED SELF-ELEVATING ACCOMMODATION JACKUP BARGE
Specifications provided in good faith but without guarantee and are subjected to change without prior notice.
GMS SHARQI 5603
LOA Beam Depth Draft Variable Load Deck Area
56 m32 m5.5 m3.6 m905 to 1555 t800 m²
Generator Sets Emergency Generator Azimuth Thrusters Speed Kongsberg Dynamic Positioning
4 x 1380 kW1 x 400 kW2 FWD + 2 AFT7 KnotsDP2
Main Particulars Propulsion and Generators
Single Cabins Two Berth CabinsFour Berth CabinsTotal POB(*6 additional 4 man cabins at maindeck level can be allocated as perClient’s requirement as offices orCabins, always within max POB 150) Hospital Offices
4932150
13
Main CraneAuxiliary Crane Deck Strength
150 t @ 15 m15 t @ 25 m5 t / m²
Deck MachineryAccommodation
Jacking Units per leg Jacking Speed Effective lifting capacity per leg Pre-Load holding capacity per leg
120.8m / min1080 t1800 t
LegsLeg length Max Water Depth Spudcans
4x Triangular Truss Design 75 m55 m30m² each
Leg DesignJacking System
Lifeboats 2 x 150 man D ValueAircraft
22.2 mS6IN + S92
HelideckSafety Equipment
Independent: Dynamic Positioning (DP2) allows the vessel to move under her own power with high accuracy positioning alongside a platform.Fast: The vessel can move faster than conventional jackups between locations due to higher transit speeds of six knots and by not requiring anchor deployment.Flexible: GMS is both builder and operator and can adapt/configure the vessel to clients’ requirements, with the vessel able to move easily between oil and gas operations to wind farm installation and maintenance contracts.Safe: Day-to-day work is free from the added hazards a moving vessel introduces. A safer working environment for large numbers of offshore workers.
GMS Sharqi is a self-propelled jackup barge that provides the stable platform for the delivery of a wide range of services throughout the total lifecycle of offshore oil, gas and renewable energy activities.
Key advantages of GMS Sharqi over conventional barges include:
Comfortable: The four-legged design provides a stable platform for those living on board; the efficiency of a man well-rested in a stable bed is greater than someone trying to sleep on a moving vessel (for crew and non-seafarers).Convenient: Two gangways installed in combined operations provide an effective solution for top side maintenance on a smaller platform.Cost effective: The weather window for a conventional jackup barge to move in-field is an average of three days; GMS Sharqi can do it in a few hours. No need for tug support/anchor handling. Fuel-efficient.
• •
•
•
•
•
•
www.gmsuae.com
Gulf Marine Services
UAE
Mussafah BaseP.O. Box 46046 Abu Dhabi, United Arab EmiratesPh: +971 2 5028888; Fax: +971 2 5553421Email: [email protected]
UK
36 Abercrombie Court, Prospect RoadArnhall Business Park, Westhill, ScotlandAB32 6FE, United KingdomPh: +44 (0) 1224 737200; Fax: +44 (0) 1224 737239Email: [email protected]
Commercial
Mr. Mark PrestonCommercial DirectorPh: +971 2 5028810Email: [email protected]
Operations
Mr. Simon CookChief Operating OfficerPh: +971 2 5028740Email: [email protected]
C0 10 20 30 40 50 60 70 80 90 100 110 115L.
O.S
. 150
°
Gulf Marine Services Abu Dhabi
2015
Delivery
BuildersOperator
Gulf Marine Services
ClassA1, Self-Elevating Unit + AMS + ACCU + DP2