Volume 2 Lower Thames Crossing Pre-Consultation Scheme Assessment Report Volume 2: Introduction and Existing Conditions Section 13: Appendices Lower Thames Crossing Route Consultation 2016

Transcript of Lower Thames Crossing - Citizen Space · 2016. 1. 30. · Globe Pit SSSI The Purfleet Chalk Pits...

  • Vo

    lum

    e 2Lower Thames Crossing

    Pre-Consultation Scheme Assessment Report

    Volume 2: Introduction and Existing Conditions

    Section 13: Appendices

    Lower Thames Crossing Route Consultation 2016

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 – SECTION 13 APPENDICES)

    Contents

    Description

    Appendix 2.1

    Appendix 2.2

    Appendix 2.3

    Previous Studies References

    Key Plan

    Public Rights of Way and Cycle Routes

    Appendix 2.4 Existing Geology and Mining

    Appendix 2.5

    Appendix 2.6

    Appendix 2.7

    Appendix 2.8

    Existing Utilities

    Highway and River Operation and Maintenance

    Air and Noise Constraints and Air Quality Modelling Receptor Locations

    Landscape/ Townscape Constraints 

    Appendix 2.9

    Appendix 2.10

    Historic Environment Constraints 

    Biodiversity Constraints

    Appendix 2.11 Water Constraints

    Appendix 2.12 Community Land Use Constraints

    ii PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 - SECTION 13 APPENDICES) HA540039-HHJ-ZZZ-REP-ZZZ-010 DATE PUBLISHED JANUARY 2016 UNCONTROLLED WHEN PRINTED

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT – (VOLUME 2 - SECTION 13 APPENDICES)

    A2.2 - 1

    PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 - SECTION 13 - APPENDICES HA540039-HHJ-ZZZ-REP-ZZZ-010

    DATE PUBLISHED JANUARY 2016UNCONTROLLED WHEN PRINTED

    Appendix 2.1

    Previous Studies References

    Previous Studies References

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT – (VOLUME 2 - SECTION 13 APPENDICES )

    A2.2 - 2

    PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 - SECTION 13 APPENDICES HA540039-HHJ-ZZZ-REP-ZZZ-010 DATE PUBLISHED JANUARY 2016UNCONTROLLED WHEN PRINTED

    Title Date Client Author(s)

    Assessment of Lower Thames Crossing Capacity

    November 2008 Essex County Council and Kent County Council

    Gifford, MVA Consultancy and Capita

    Dartford River Crossing Study into Capacity Requirement

    January 2009 Department for Transport/ Highways Agency

    Parsons Brinckerhoff

    Lower Thames Capacity Study: Option A

    March 2010 Department for Transport/ Highways Agency

    Halcrow Hyder Joint Venture (HHJV)

    Dartford Crossing Review of Financing Options

    March 2010 Department for Transport PricewaterhouseCoopers

    Delivering a Sustainable Transport System London to Dover/ Channel Tunnel Final Report

    May 2010 Kent County Council Jacobs

    The Lower Thames Crossing (KPMG Regeneration and Funding Report)

    August 2010 Kent County Council KPMG

    Third Thames Crossing Regeneration Impact Assessment

    May 2012 Kent County Council, Essex County Council and Thurrock Council

    URS

    Review of Lower Thames Crossing Options: Final Review Report

    April 2013 Department for Transport AECOM

    Review of Lower Thames Crossing Options: Output 2 Design & Costing Report

    April 2013 Department for Transport AECOM

    Options for a New Lower Thames Crossing; Consultation Document

    May 2013 Department for Transport Department for Transport

    Options for a New Lower Thames Crossing; Consultation Response Summary

    December 2013 Department for Transport Department for Transport

    Module 1: Lower Thames Crossing Study: Comparative Air Quality Assessment of Options

    May 2014 Department for Transport Jacobs

    Module 2: Scoping the cost of potential environmental mitigation of Option C

    May 2014 Department for Transport Jacobs/ AECOM

    Module 3: Potential Additional Network investment at M25 Junction 30 and on the A13

    May 2014 Department for Transport Jacobs/ AECOM

    Module 4: Integration of Option A with the M25 and A282

    May 2014 Department for Transport Jacobs/ AECOM

    Module 5: Review of Potential Employment and Housing Growth

    May 2014 Department for Transport Jacobs

    Technical Note Overall Cost Information for Options A+ and C2

    May 2014 Department for Transport Jacobs/ AECOM

    Government Response to Consultation: Options for a New Lower Thames Crossing

    July 2014 Department for Transport Department for Transport

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT – (VOLUME 2 - SECTION 13 APPENDICES)

    Appendix 2.2 Key Plan Key Plan 

    PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 - SECTION 13 - APPENDICES HA540039-HHJ-ZZZ-REP-ZZZ-010 DATE PUBLISHED JANUARY 2016UNCONTROLLED WHEN PRINTED

    A2.2 - 1

  • Bulphan

    A132

    A132

    Shorne and

    Ashenbank

    Woods SSSI

    Orsett

    A127

    M25

    GRAVESEND

    M2

    Chalk

    South

    Ockendon

    North

    Ockendon

    GRAYS

    A289

    A13

    Chadwell

    St Mary

    M25

    J29

    A226

    TILBURY

    A2

    East

    Tilbury

    M25

    J30

    Tilbury

    Power Station

    London

    Distribution

    Park

    BASILDON

    Doesgate Lane

    Fen Lan

    e

    Dunnin

    gs Lane

    St Mary's Lane

    A128

    Child

    erd

    itch L

    ane

    Birds L

    ane

    B186

    Park

    er's

    Farm

    Road

    B188

    Conw

    ay's

    Road

    B188

    B188

    Stifford Clays Road

    Nort

    h R

    oad

    B187

    B1421

    Pik

    e L

    an

    e

    B1007

    Horndon

    on the Hill

    Bla

    ck B

    ush L

    ane

    A128

    Low

    er

    Dunto

    n R

    oad

    Linford Roa

    d

    Turn

    pik

    e L

    ane

    Fort

    Road

    Low

    Str

    eet Lane

    Muckingford Road

    Buckin

    gham

    Hill

    Road

    A1013

    Stanford-le-Hope

    B1007

    B148

    B1036

    B1007

    B1036

    B148

    A1235

    A1321

    B146

    4

    A176

    Tilbury

    Fort

    Tilbury

    Docks

    Coalhouse

    Fort

    B1420

    Hig

    h R

    oad

    Bowaters

    Farm

    West Road

    A13

    Manor

    FarmHall

    Farm

    Bramble Lan

    e

    A1306

    Su

    nn

    ing

    s L

    an

    e

    Dennis

    Road

    South Ockenden

    HallWarwick Lane

    AVELEY

    B1421

    B1421

    Ockend

    on

    Road

    UPMINSTER

    Corringham

    DARTFORD

    Station

    Road

    Bre

    ntw

    ood R

    oad

    Butts L

    ane

    A1013

    A1306

    HSIHSIHSIHSIHSIHSIHSIHSIHSIHSIHSIHSIHSI

    A2

    B1335

    A1090

    London Road

    South

    Stifford

    A126

    A1012

    B149

    A126

    Prince

    ss M

    arg

    are

    t R

    oad

    Church Road

    Orsett

    Fen

    Dry Street

    Old Church Road

    Higham

    A2

    B210

    8

    A226

    A228

    Warren Road

    Istead

    Rise

    Hartley

    Churc

    h L

    ane

    Gre

    en F

    arm

    La

    ne

    Queen's

    Farm

    Road

    A226

    Churc

    hes

    Lane

    Pea

    rtree

    Lan

    e

    Shorne

    Cro

    wn L

    ane

    Forg

    e L

    ane

    Thong L

    ane

    Shorne Ifield Road

    White

    hill

    Lane

    Halfp

    ence

    LaneJeskyns Road

    Cobham

    Churc

    h R

    oad

    Hook Green

    Longfield Road

    Longfield

    New

    House

    B261

    B2175

    B2175

    A226

    A206B225

    B2500

    B262

    Hall R

    oad

    B255

    B2

    17

    4

    M25

    A296

    B262

    B260

    B260

    B260

    B259

    A22

    60

    Thames Way

    B186

    B186

    Pea L

    ane

    St. Mary's

    Church

    Lower Higham Road

    Lower Rochester Road

    Thames and Medway Canal

    NortNortNortNortNortNortNortNortNortNortNortNortNortNortNorth Keh Keh Keh Keh Keh Keh Keh Keh Keh Keh Keh Kent Rnt Rnt Rnt Rnt Rnt Rnt Rnt Rnt Rnt Rnt Rnt Rnt Rnt Railwailwailwailwailwailwailwailwailwailwailwailwayayayayayayayayayayayayayay

    A127

    M25

    A10

    13

    A13

    Thurrock

    Thameside

    Nature Park

    London Gateway Port

    (DP World)

    Cliffe FortSwanscombe

    Peninsular

    Hever Ct. Road

    A126

    A 1

    089

    The Gateway

    Academy

    Baker

    Stree

    t

    Lakeside

    Shopping Centre

    Bluewater

    Shopping Centre

    A127

    West

    Horndon

    Lindford

    West

    Tilbury

    North

    Stifford

    West

    Thurrock

    Belhus Wood

    Country Park

    A13

    Purfleet

    QE

    II B

    ridge

    Littlebrook

    Power Station

    Fast track Bus RouteDartford

    Control Centre

    A282

    J1a

    A282

    A225

    A282

    J1b

    M25

    J2

    A2

    Darenth

    Bean

    Bean

    Junction

    A227

    A227 Thong

    M2 J1

    Great Crabbles

    Woods SSSI

    Milton Rifle Range

    (Metropolitan Police

    Training Facility)

    Thorndon Park

    Registered Park

    and Garden

    Belhus Park

    Registered Park

    and Garden

    Mardyke Valley

    Crop mark

    complex, Orsett

    Scheduled

    monument

    Hangman's

    Wood and

    Denehole's

    SSSI

    Globe Pit

    SSSI

    The Purfleet

    Chalk Pits

    SSSI

    Thurrock Lagoon

    and Marshes SSSI

    West

    Tilbury

    Marshes

    East

    Tilbury

    Marshes

    Mucking Flats

    and Marshes

    SSSI

    Anglo Saxon

    Cemetery at

    Darenth Park

    Darenth Wood

    SSSI & Country

    Park

    New Tavern Fort

    Thames Estuary and

    Marshes

    SPA, SSSI and

    Ramsar Site

    River Thames rMCZ

    Shorne Woods

    Country Park

    Brew

    ers R

    oad

    Cobham Hall Registered

    Park and Garden SSSI

    Kent Downs

    AONB

    Cobham Woods

    SSSI

    HSIHSIHSIHSIHSIHSIHSIHSIHSIHSIHSIHSIHSIHSI

    Tilb

    Tilb

    Tilb

    Tilb

    Tilb

    Tilb

    Tilb

    Tilb

    Tilb

    Tilb

    Tilb

    Tilb

    Tilb

    Tilb

    ury

    ury

    ury

    ury

    ury

    ury

    ury

    ury

    ury

    ury

    ury

    loop

    loop

    loop

    loop

    loop

    loop

    loop

    loop

    loop

    loop

    loop

    loop

    loop

    loop

    loop

    loop

    loop

    loop

    loop

    lin lin lin lin lin lin lin lin lin lin lin lin lineeeeeeeeee

    Tilb

    ury

    loop

    line

    Tilb

    ury

    loop

    line

    Tilb

    ury

    loop

    line

    Tilb

    ury

    loop

    line

    Tilb

    ury

    loop

    line

    Tilb

    ury

    loop

    line

    Tilb

    ury

    loop

    line

    Tilb

    ury

    loop

    line

    Tilb

    ury

    loop

    line

    Tilb

    ury

    loop

    line

    Tilb

    ury

    loop

    line

    Tilb

    ury

    loop

    line

    Upm

    iU

    pm

    iU

    pm

    iU

    pm

    iU

    pm

    iU

    pm

    iU

    pm

    iU

    pm

    inste

    nste

    nste

    nste

    nste

    nste

    nste

    nste

    r an

    r an

    r an

    r an

    r an

    r an

    r an

    r an

    r an

    r an

    r and G

    rd G

    rd G

    rd G

    rd G

    rd G

    rd G

    rd G

    rd G

    rd G

    rays

    ays

    ays

    ays

    ays

    ays

    ays

    ays

    ays

    ays

    ays

    ays

    ays

    ays

    ays

    ays

    ays

    Bra

    nB

    ran

    Bra

    nB

    ran

    Bra

    nB

    ran

    Bra

    nB

    ran

    Bra

    nchchchchchchchch

    ShoeShoeShoeShoeShoeShoeShoeShoeShoeShoeShoeburyburyburyburyburyburyburyburyburyburyburyburynessnessnessnessnessnessnessnessnessnessnessnessnessnessnessnessness Rai Rai Rai Rai Rai Rai Railwaylwaylwaylwaylwaylwaylwaylway

    LondLondLondLondLondLondLondLondLondLondLondLondLondLondLondLondLondLondLondLondLondLondLondLondon Ton Ton Ton Ton Ton Ton Ton Ton Ton Ton Ton Ton Ton Ton Ton Ton Tilbuilbuilbuilbuilbuilbuilbuilbuilbuilbuilbuilbuilbuilbuilbuilbuilbury Sry Sry Sry Sry Sry Sry Sry Sry Sry Sry Sry Sry Sry Sry Sry Sry Sry So

    uthouthouthouthouthouthouthouthouthouthouthouthouthouthouthouthouthouthouthend end end end end end end end end end end end end end end end (LTS(LTS(LTS(LTS(LTS(LTS(LTS(LTS(LTS(LTS(LTS(LTS(LTS(LTS))))))))))))))))

    London Tilbury So

    uthend (LTS)

    London Tilbury So

    uthend (LTS)

    London Tilbury So

    uthend (LTS)

    London Tilbury So

    uthend (LTS)

    London Tilbury So

    uthend (LTS)

    London Tilbury So

    uthend (LTS)

    London Tilbury So

    uthend (LTS)

    London Tilbury So

    uthend (LTS)

    London Tilbury So

    uthend (LTS)

    RailRailRailRailRailRailRailRailRailRailRailRailRailRailRailRailRailRailwaywaywaywaywaywaywaywaywaywaywaywaywaywaywaywaywaywayway

    Bow Ar

    row

    Rail B

    ridge

    HSI

    HSI

    HSI

    HSI

    HSI

    HSI

    HSI

    HSI

    HSI

    HSI

    HSI

    HSI

    HSI

    HSI

    HSI

    HSI

    HSI

    HSI

    HSI

    A1089

    A 1

    089

    Anglo-Saxon

    Cemetery

    Bishop Banners

    Palace

    South Thames

    Estuary and Marshes

    Orsett Cock

    Roundabout

    Mard

    yke R

    iver

    Mardyke River M25

    J31

    M2 J2

    Ebbsfleet

    International

    Station

    Ebbsfleet

    Junction

    SEVENOAKS

    Thurrock

    Brentwood

    Thurrock

    Havering

    Thurrock

    Basildon

    Thurrock

    Gravesham

    Gra

    vesham

    Dartfo

    rd

    DartfordSevenoaks

    Gravesham

    Medway

    Gravesham

    Medway

    Thurrock

    Dartford

    The Greater

    Thames Estuary

    The Manorway

    ROCHESTER

    Coopers ShawRoad

    Shi

    p La

    ne

    A206

    A226

    A1014

    Saffro

    n G

    ard

    ens

    B188

    Codham Hall

    Farm

    Codh

    am H

    all

    Lane

    Paramount Park

    Development

    Wrotham Road

    Roudabout

    Henhurst Road

    Roudabout

    Brewers Road

    Roudabout

    Valle

    y D

    rive

    Stanfo

    rd Ro

    ad

    Landfill site

    Coveredreservoir

    Tilbury Cable

    Tunnel

    East Tunnel

    West Tunnel

    Dartford

    Cable Tunnel

    Bre

    ntwoo

    d

    Hav

    erin

    g Basild

    on

    Bre

    ntw

    ood

    Ave

    ley

    Road

    Hig

    h H

    ouse

    Lane

    Key Plan

    M Rojas-Gómez

    13-01-16

    M Robinson

    HML-ZZZZZZZZZZ-DR-RD-1002

    NTS

    P01S5

    G Hodge

    P01 18-01-16 SAR ISSUE M R G M R G HS5

    HHJ

    HA540039-HHJ-HML-ZZZZZZZZZZ-DR-RD-1002.dwg

    HA540039

    Drawing number

    Scale

    Project No.

    Drawn By

    Checked By

    Approved By

    Original Size A1

    Date -

    Drawing title

    Halcrow Hyder Joint VentureBurderop Park

    Swindon, SN4 0QD

    Tel. +44(0)1793 812479

    Client

    Apprv'dPurpose of revisionRev Status Chck'd

    Project LOWER THAMES

    CROSSING

    HA PIN Originator

    Rev. Date

    Status Revision

    Drawn

    This map is reproduced from Ordnance Survey material with the permission

    of Ordnance Survey on behalf of the controller of Her Majesty's Stationery

    Office © Crown copyright.

    Unathorised reproduction infringes Crown copyright and may lead to

    prosecution or civil proceedings. AL 100030649 (2014)

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 – SECTION 13 APPENDICES)

    PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 - SECTION 13 APPENDICES)HA540039-HHJ-ZZZ-REP-ZZZ-010 DATE PUBLISHED JANUARY 2016 UNCONTROLLED WHEN PRINTED

    Appendix 2.3 Public Rights of Way and Cycle RoutesPublic Rights of Way and Cycle Routes

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 – SECTION 13 APPENDICES)

    PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 - SECTION 13 APPENDICES)HA540039-HHJ-ZZZ-REP-ZZZ-010 DATE PUBLISHED JANUARY 2016 UNCONTROLLED WHEN PRINTED

    Appendix 2.4Existing Geology and Mining

    Existing Geology and Mining

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT – VOLUME 2 - SECTION 13 APPENDICES

    A2.2 - 1 PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2) - SECTION 13 APPENDICES HA540039-HHJ-ZZZ-REP-ZZZ-010 DATE PUBLISHED 18/01/2016 UNCONTROLLED WHEN PRINTED

    Existing Geology and Mining

    A2.4.1. Existing Geology A2.4.1.1 The generalised geological succession of the study area is summarised in

    Table 1. For Geological plans refer to the SAR Volume 4 TABLE 1 -GENERALISED GEOLOGICAL SUCCESSION

    System / Period

    Series Group Formation General Description Stratigraphical

    Thickness

    Quaternary Holocene Alluvium Marine and Estuarine Alluvium

    Silt and clay with lenses and beds of peat, and seams of sand and gravel.

    1 - 20m

    Quaternary Pleistocene Head Deposits

    Terrace Gravels

    (Taplow Gravel)

    (Lynch Hill Gravel)

    (Boyn Hill Gravel)

    (Black Park Gravel)

    Undifferentiated, pebbly sandy clay; some gravel.

    River Terrace Deposits - Gravel, sandy and clayey in part.

    Not identified

    Palaeogene Eocene Thames Group

    London Clay Formation

    Harwich Formation

    Dark bluish to brownish grey clay, containing variable amounts of fine-grained sand and silt.

    Cross-bedded shelly sand (the Oldhaven Beds) with a basal pebble bed.

    Up to 150m

    0 - 12m

    Palaeogene Palaeocene Lambeth Group

    No Group

    Woolwich Formation

    Upnor Formation

    Thanet Sand Formation

    The upper beds are clay with shells, ferruginous sand, lignitic sand and lignite. The lower beds are coarse sand with pale grey clay partings and coarse gravel of black flint.

    Greenish to brownish grey silty, fine-grained sand, clayey and more silty in lower part, with a conglomerate of flint pebbles and nodular flints at the base.

    5-20m

    Up to 32m

    Cretaceous Upper Cretaceous

    Upper Chalk Group

    Undivided, mainly Seaford Chalk

    Lewes Chalk

    Fossilferous nodular chalk with bands of nodular flints, hardgrounds and marl seams.

    Up to 70m

    20 – 40m

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT – VOLUME 2 - SECTION 13 APPENDICES

    A2.2 - 2 PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2) - APPENDICES HA540039-HHJ-ZZZ-REP-ZZZ-010 DATE PUBLISHED 18/01/2016 UNCONTROLLED WHEN PRINTED

    System / Period

    Series Group Formation General Description Stratigraphical

    Thickness

    White chalk with hard nodular beds.

    Notes: Excludes stratigraphical units that are absent from the study area. Stratagraphical thicknesses have been taken from Geological Maps.

    A2.4.1.2 The study areas for Locations A and C are situated on the southern limb of the London Basin syncline, which include the strata up to the Thames Group. The strata dips very gently to the northwest at generally less than 2 degrees. Unconformably overlying the Upper Chalk in the central part of the London Basin are Palaeogene deposits, which are mainly comprised of the Thanet Sand Formation and Lambeth Group, these are dominated by sands and clays. The Thames Group (mainly the London Clay Formation) is also present, although mainly in the area north of the A13.

    A2.4.1.3 The Palaeogene and Late Cretaceous deposits are overlain in places by Quaternary deposits mainly of Alluvium (with peat lenses and beds), River Terrace and Head Deposits. The Alluvium deposits are most evident along the River Thames channel and subsidiary river channels, such as the Mardyke and the River Darent. The River Terrace Deposits are also present in places below the Alluvium to varying thicknesses. River Terrace Deposits dominate the hill tops and higher ground, especially to the north and also to the south of the River Thames valley.

    A2.4.1.4 In the north, generally north of the Mardyke channel, around Ockendon but also continuing eastwards to Orsett, the London Clay Formation is present below the River Terrace and Head Deposits. It is shown in outcrop in many places where there have been old quarries and pits. However, most of these areas are shown on the geological maps as Worked Ground (described as mainly chalk, sand and gravel pits with little or no fill), and as Worked Ground and Made Ground (described as wholly or partly backfilled pits). The natural London Clay outcrops begin to appear intermittently around North Ockendon and become more regular in the far north of the study are near Little Warley along the A127 and to the east of the A128.

    A2.4.1.5 South of the Mardyke Valley and north of the West Thurrock and Tilbury Marshes, the higher ground and hill tops consist of River Terrace Deposits overlying the Lambeth Group and Thanet Sand Formation; these in turn unconformably overlie the Upper Chalk Formation. In the West Thurrock area, where the land slopes gently towards the West Thurrock Marshes, the Upper Chalk is shown in outcrop. Although most of the area is shown as Worked Ground, which is described as mainly chalk, sand and gravel pits with little or no fill on the geological maps and Worked Ground and Made Ground, which is described as wholly or partly backfilled pits. Similarly on the south side of the River Thames Valley the Upper Chalk outcrops on the lower sides of the hills, although in the western area from Swanscombe to Dartford it is shown with hatching identifying Worked Ground and Worked Ground and Made Ground.

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT – VOLUME 2 - SECTION 13 APPENDICES

    A2.2 - 3 PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2) - SECTION 13 APPENDICES HA540039-HHJ-ZZZ-REP-ZZZ-010 DATE PUBLISHED 18/01/2016 UNCONTROLLED WHEN PRINTED

    A2.4.2. Mining A2.4.2.1 Quarrying of sand and gravel for building materials and the excavation of

    chalk and clay for the manufacturing of cement was extensive either side of the River Thames, the majority of which has now ceased. The chalk quarries, of which there are many between the A13 in the north and the A2 in the south, were 25m deep or more. Since the end of manufacture of cement the quarries have either been backfilled with waste, left as water-filled lakes or been redeveloped for industrial, retail and residential development.

    A2.4.2.2 Chalk extraction in the area has not just been limited to open quarries. Numerous deneholes and even underground mines (beneath Dartford) are present throughout the area from the A13 south to the A2. Deneholes comprise a small shaft excavated down to the chalk off which small adits were driven. The chalk mining in this way was undertaken in medieval times and was used for liming agricultural fields. Some deneholes are known to have been constructed in pre-Roman times. The location of deneholes is very difficult to predict and several of these were encountered during the construction of HS1.

    A2.4.2.3 North of Junction 30 (M25), gravel, sand and clay extraction was extensive. In many locations the underlying deposits of London Clay have been excavated for cement production, in particular north of South Ockendon. The mining that occurred around Ockendon reached its zenith post 1920. At one point 1.5 million tonnes were extracted per annum from a quarry. The clay was mixed with water to turn it to slurry, allowing it to be pumped to a cement plant in Grays initially, and later to a plant in Northfleet for addition to the raw cement mix. This involved an 11km pipeline beneath the Thames. As aforementioned the remains of these pits are depicted as outcropped London Clay or worked ground due to the majority being backfilled with landfill material. Information provided by the current landfill operator during previous studies suggests the backfilled pit known as Area 3 at Ockendon was licensed to accept hazardous waste within the last 40 years in the form of asbestos and liquid toxic for a period of time after changes in legislation. Area 3 is still operational and is planned to be extended to the east, although it does not accept hazardous waste anymore. It is unknown when this ceased and the amount of waste accepted.

    A2.4.2.4 Other areas of chalk, sand and gravel extraction have occurred near the A2 at Shorne, the surrounding land between East Tilbury and Chadwell St Mary and around Junction 30 of the M25 and along the A13. The majority of these have been backfilled with landfill material.

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 – SECTION 13 APPENDICES)

    PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 - SECTION 13 APPENDICES)HA540039-HHJ-ZZZ-REP-ZZZ-010 DATE PUBLISHED JANUARY 2016 UNCONTROLLED WHEN PRINTED

    Appendix 2.5Existing Utilities

    Existing Utilities

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT – VOLUME 2 - SECTION 13 APPENDICES

    Existing Utilities

    A2.5.1.1 Existing utility information has been obtained from utility companies for Locations A and C. This process has identified the location and type of significant utility infrastructure within the Study Area. The key utilities are described below.

    Location A

    A2.5.1.2 On the south side of the River Thames there is a sub-surface medium pressure gas pipeline crossing beneath existing A282 on the approximate line of Bow Arrow Lane south footway.

    A2.5.1.3 On the south side of the River Thames there is one or more sub-surface oil pipeline(s) at Junction 1a crossing the A282 roughly perpendicular to the carriageways. The depth of the oil pipeline(s) is currently unknown.

    A2.5.1.4 On the south side of the River Thames is an existing high voltage overhead electricity line that originates from Littlebrook Power Station. The electricity line crosses over Junction 1a in the east-west direction and again at a skew in the north-west direction around the fast track bus route.

    A2.5.1.5 On the north side of the River Thames there are overhead electricity lines that cross existing A282 between Junction 31 and Junction 30.

    A2.5.1.6 There is a National Grid underground power cable tunnel (Dartford Cable Tunnel) crossing the river and running parallel approximately 120m to the west of the existing Dartford west tunnel. It is understood to carry National Grid high voltage cables and underground cables (including those associated with the existing tunnel ventilation buildings) and drainage.

    A2.5.1.7 On the north side there are various sub surface national grid conductors and high voltage cables.

    A2.5.1.8 Other utility infrastructure within Location A includes low voltage cables, fibre optic cables, telephone lines, drainage pipes, technology and lighting cabling and infrastructure.

    Location C

    A2.5.1.9 On the south side of the River Thames are overhead electricity lines and a major gas pipeline. Adjacent to the A2 near Cobham London Road services there is a large electricity pylon and associated overhead cables. These overhead cables go north over the A2, approximately 1km to the east of Chalk and then over the Thames and Medway Canal west of the railway sidings.

    A2.5.1.10 There are overhead cables from the east which generally run parallel with the Thames and Medway Canal and these cables connect into a large pylon on the south bank of the River Thames to the east of the Metropolitan Police Specialist Training Centre. At this point the cables go beneath the river in a cable tunnel in a north westerly direction towards Tilbury power station.

    A2.5.1.11 On a similar alignment to the overhead cables there is a National Grid gas pipeline that runs under the A2 and north east towards the river where it crosses the river via a tunnel towards Coalhouse Fort.

    PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2) - SECTION 13 APPENDICES HA540039-HHJ-ZZZ-REP-ZZZ-010

    DATE PUBLISHED JANUARY 2016 UNCONTROLLED WHEN PRINTED

    A2.3 - 1

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT – VOLUME 2 - SECTION 13 APPENDICES

    A2.3 - 2 PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2) - SECTION 13 APPENDICES HA540039-HHJ-ZZZ-REP-ZZZ-010 DATE PUBLISHED JANUARY 2016 UNCONTROLLED WHEN PRINTED

    A2.5.1.12 On the north side of the river there are a large number of overhead cables that originate at Tilbury power station and run north.

    A2.5.1.13 The gas pipeline from south of the river runs between West Tilbury and East Tilbury and then north, eventually crossing the A127 to the east of the A127/ A128 grade separated junction.

    A2.5.1.14 Within Location C there is a significant amount of other utility infrastructure, this includes low voltage cables, fibre optic cables, telephone lines and sewer pipes.

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 – SECTION 13 APPENDICES)

    PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 - SECTION 13 APPENDICES)HA540039-HHJ-ZZZ-REP-ZZZ-010 DATE PUBLISHED JANUARY 2016 UNCONTROLLED WHEN PRINTED

    Appendix 2.6Highway and River Operation and Maintenance

    Highway and River Operation and Maintenance

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT – VOLUME 2 - SECTION 13 APPENDICES

    Highway and River Operations and Maintenance

    A2.6.1 Highway Operations and Maintenance A2.6.1.1 Connect Plus operate and maintain the Dartford Crossing and its

    approaches under the M25 DBFO Contract, a 30 year concession contract which commenced in 2009 (see Figure 1).

    A2.6.1.2 Area 4 is maintained by Balfour Beatty Mott Macdonald (BBMM) on behalf of Highways England (see Figure 1)

    FIGURE 1 - EXTENT OF M25 DBFO AND AREA 4 CONTRACTS

    A2.6.1.3 At present the motorway network is accessed via short/medium term stops on the hard shoulder or under traffic management following the road space booking procedure. Off network access is also used in some locations.

    A2.6.1.4 At the Dartford Tunnels, maintenance is undertaken during planned closures. On the QEII Bridge, maintenance is carried out during lane closures or full bridge closures.

    A2.6.1.5 The existing tunnel system includes fire detection and suppression systems, public address (PA) system, lane control signs, Communications/SCADA (Supervisory Control and Data Acquisiton), emergency services radio/telephone re-broadcast system, tunnel specific CCTV, drainage & pumping systems, ventilation and road lighting and emergency lighting. This is operated from the Dartford River Crossing Control Centre (DRCC) which is located adjacent to the southern end of the crossing. There are two compounds where Highways England Traffic

    PRE-CONSULTATION SCHEME ASSESSEMNT REPORT (VOLUME 2) - SECTION 13 APPENDICES HA540039-HHJ-ZZZ-REP-ZZZ-010 DATE PUBLISHED JANUARY 2016 UNCONTROLLED WHEN PRINTED

    A2.4 - 1

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT – VOLUME 2 - SECTION13 APPENDICES

    A2.4 - 2 PRE-CONSULTATION SCHEME ASSESSEMNT REPORT (VOLUME 2) - SECTION 13 APPENDICES HA540039-HHJ-ZZZ-REP-ZZZ-010 DATE PUBLISHED JANUARY 2016 UNCONTROLLED WHEN PRINTED

    Officers and Traffic Management (TM) crews are located to provide immediate assistance for incidents on the crossings. Additionally there are twelve observation points at the extents of the crossing which Highways England Traffic Officers can use to gain access to the crossing to assist road users. There is currently a northbound and a southbound depot which have a TM crew and Traffic Officers on site enable small incidents to be dealt with quickly on site. Communication with the Highways England Traffic Officers and TM crews is managed by Connect Plus via the DRCC.

    A2.6.2 River OperationsA2.6.2.1 The River Thames is Britain’s busiest inland waterway, handling some

    50m tonnes of cargo each year and contributing over £3bn to the economy annually. Each year 230,000 commercial and leisure vessels pass within the Port of London’s 95 miles of river and estuary between Teddington and the North Sea. Of these, 10,000 larger vessels are guided by Thames pilots annually.

    A2.6.2.2 Marine traffic information produced by the Port of London Authority (PLA)consisting of shipping data from May 2011 to January 2015 has been analysed for each of the locations being considered.

    Location A

    A2.6.2.3 The number of vessel movements along the River Thames at Location Aare summarised in Figure 2:

    FIGURE 2 - MARINE TRAFFIC LOCATION A

    0

    500

    1000

    1500

    2000

    2500

    3000

    3500

    4000

    4500

    0-24 25-49 50-74 75-99 100-124 125-149 150-174 175-199 200+

    No

    . of

    vess

    els

    pas

    sin

    g

    Vessel Length (m)

    Marine traffic passing Route 1 in 2014

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT – VOLUME 2 - SECTION 13 APPENDICES

    A2.4 - 3 PRE-CONSULTATION SCHEME ASSESSEMNT REPORT (VOLUME 2) - SECTION13 APPENDICES HA540039-HHJ-ZZZ-REP-ZZZ-010 DATE PUBLISHED JANUARY 2016 UNCONTROLLED WHEN PRINTED

    Location C

    A2.6.2.4 The number of vessel movements along the River Thames at Location Care summarised in Figure 3

    FIGURE 3 - MARINE TRAFFIC LOCATION C

    A2.6.3 Future Marine TrafficA2.6.3.1 At present limited information is available on the future development

    anticipated in: - The ports and berths along the River Thames.- The volume of marine traffic navigating the locations.- The size of the vessels navigating the locations.

    A2.6.3.2 This information is in the process of being requested from relevantstakeholders under the stakeholder engagement process. In the absence of this information, a functional assessment of the river channel, constraints and physical limitations has been undertaken to determine the initial design vessels that can traverse the river and use the terminals.

    A2.6.3.3 Based on the information currently available, the minimum air draftclearance for shipping at Location A is 57.5m AOD over a clear width of 100m and 50m AOD over an additional 205m. Bridge pylon foundations would likely require to be designed for similar levels of accidental ship collision as the existing crossing (accidental head on impact of a 65,000 Dead Weight Tonnage (DWT) vessel fully laden or in ballast approaching at 10 knots).

    A2.6.3.4 Based on the information currently available, the minimum air draftclearance for shipping at Location C is assumed as 75.19m AOD over a clear width of 305m. Bridge pylon foundations located in the river would require to be designed to resist the accidental ship collision loads. For a structure spanning approximately 800m at Location C, the likely design

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    0-24 25-49 50-74 75-99 100-124 125-149 150-174 175-199 200+

    No

    . of

    vess

    els

    pas

    sin

    g

    Vessel Length (m)

    Marine traffic passing Routes 2,3 and 4 in 2014

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT – VOLUME 2 - SECTION 13 APPENDICES

    A2.4 - 4 PRE-CONSULTATION SCHEME ASSESSEMNT REPORT (VOLUME 2) - SECTION 13 APPENDICES HA540039-HHJ-ZZZ-REP-ZZZ-010 DATE PUBLISHED JANUARY 2016 UNCONTROLLED WHEN PRINTED

    vessel is assessed as a 120,000 DWT vessel fully laden or in ballast approaching at 10 knots. If the span is reduced and the main pylon foundations moved to deeper water then the likely design vessel is assessed as increasing to 145,000 DWT vessel fully laden and in ballast.

    A2.6.3.5 The final design vessels would be determined from a risk analysis whichwould be undertaken if a bridge solution is selected.

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 – SECTION 13 APPENDICES)

    PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 - SECTION 13 APPENDICES)HA540039-HHJ-ZZZ-REP-ZZZ-010 DATE PUBLISHED JANUARY 2016 UNCONTROLLED WHEN PRINTED

    Appendix 2.7Air and Noise Constraints and Air Quality

    Modelling Receptor Locations

    Air and Noise Constraints and Air Quality Modelling Receptor Locations

  • Air a nd No ise Co nstra ints a nd Air Qua lity M o d elling Rec epto r Lo c a tio ns

    18/01/161:75,000L.HU LM E

    Co pyright

    Path: K:\UA

    projects\UA007080-Lower Thames Crossing\D-Calcs\GIS\Environmental Planning\mxd\HA540039-HHJ-EGN-ZZZZZZZZEG

    -MP-EN-0007.mxd

    S.RIM ELLA.SAU NDERS

    HHJ –EGN –ZZZZZZZEG-M P-EN-007

    © Cro wn c o pyright a nd d a ta b a se rights lic ensedund er Defra 's Pub lic Sec to r M a pping Agreem entwith Ord na nc e Survey (lic enc e No .100022861)a nd the La nd a nd Pro perty Servic es Depa rtm ent(No rthern Irela nd ) M OU 206. Co nta ins Ord na nc e Survey d a ta © Cro wnc o pyright a nd d a ta b a se rights 2015 Ord na nc eSurvey 100030649

    Revisio nSta tus

    Sc a leDra wn ByChec ked ByAppro ved By

    Dra wing Num b er

    PINHA | Origina to r Origina l Size A3 | | |

    Pro ject LOW ER T HAM ESCROSSINGDra wing T itle

    Pro ject No .

    Da te -Client

    Rev Sta tus Rev. Da te Purpo se o f revisio n Dra wn Chc k'd Apprv'd

    Halcrow Hyder Joint VentureBurd ero p Pa rkSwind o n, SN4 0QDT el. +44(0)1793 812479 HA540039

    S5P01 18/01/16 SAR ISSU E LH SR AS

    S5 P01

    HHJ

    #*

    #*

    #*#*

    #*

    #*

    #*

    #*

    #*

    #*

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !( !(

    !(

    !(

    !(

    !( !(

    !(

    !(!(

    !(

    !(

    !(

    !(!(

    !(

    !(

    !(

    !(

    !(

    !(!(!(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(!(!(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(!(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !( !(

    !(

    !(!(

    !(!(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !( !(

    !( !(

    !(

    !(!(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(!(

    !(

    !(

    !(

    !(

    !(

    !(

    !(!(

    !(

    !(

    !(!(

    !(

    !(

    XWXWXW XWXWXWXWXWXWXWXWXWXWXWXW

    XW

    XWXW

    XW

    XW

    XW

    XW

    XW

    XW

    XW XWXW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW XW

    XW XWXW

    XW

    XW

    XW

    XW

    XWXW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XW

    XWTHURROCK

    BRENTWOODDISTRICTHAVERINGLONDON BOROBASILDONDISTRICT

    GRAVESHAMDISTRICT

    DARTFORDDISTRICT

    B2108

    B1007

    B1335

    B258

    B260

    B1335

    B188

    B2174

    B2175

    B261

    B1464

    B186

    B149

    B2000

    B189

    B2174

    B255

    B262

    B1036

    B1421 B1420

    B148B186

    B186

    B187

    B255

    B3228

    A227

    A227A225

    A225

    A12

    A126

    A226

    A226

    A2

    A2026

    A129

    A228

    A225

    A1014

    A226

    A118

    A126A126

    A20

    A226

    A13(T)

    A296

    A176

    A124

    A282(T)

    A1235

    A1012

    A206

    A2(T)

    A2(T)

    A1089

    A176

    A128

    A128

    A2(T)

    A1014

    A206

    A282

    A13

    A13

    A2018

    A1090

    A127A1321

    A126(T)

    A2(T)

    A226 A226

    A132

    A1089(T)

    A2260

    A282(T)

    A1306

    A1306A1013

    A1013

    A127 A127

    A127

    A127

    A289

    A2(T)

    A13(T)

    A13(T)

    A13

    M2

    M25

    M20

    M25

    M25

    M25

    R1R2 R4 R16R17

    R18

    R19

    R20

    R21

    R22

    R23

    R24

    R25 R26R27

    R28

    R29R30

    R31

    R32

    R33

    R34

    R35

    R36

    R37 R38

    R39 R40R42

    R43

    R45R44

    R46R47

    R49

    R51

    R50

    R52

    R53R54

    R55

    R56

    R61

    R62

    R63

    R64

    R67R68

    R70

    R73

    R74

    R75

    R76

    R81

    R82

    R83

    R85

    R48

    R86

    R89

    R87

    R88

    K E N TC O U N T Y

    E S S E XC O U N T Y

    0 1 2 3 4Kilo m etres

    ¯

    Air Quality ConstraintsDefra 's Na tio na l Po llutio n Clim a teM a pping (PCM ) m o d el netwo rkBa sild o n Distric t Co unc il AQM ADa rtfo rd Bo ro ugh Co unc il AQM AGra vesha m Bo ro ugh Co unc il AQM ALo nd o n Bo ro ugh o f Bexley AQM ALo nd o n Bo ro ugh o f Ha vering AQM AM ed wa y Co unc il AQM ASeveno a ks District Co unc il AQM AT hurro c k Co unc il AQM A

    Air Quality FeaturesXW Air Qua lity M o d elling Rec epto rs !(Nitro gen d io xid e d iffusio n tub ec o nc entra tio n less tha n 36 µg/m 3

    !(Nitro gen d io xid e d iffusio n tub ec o nc entra tio n 36 – 40 µg/m 3

    !(Nitro gen d io xid e d iffusio n tub ec o nc entra tio n grea ter tha n 40 µg/m 3

    #*Nitro gen d io xid e a uto m a tic m o nito ringc o nc entra tio n grea ter tha n 40 µg/m 3

    #*Nitro gen d io xid e a uto m a tic m o nito ringc o nc entra tio n less tha n 36 µg/m 3

    Noise ConstraintsNo ise Im po rta nt Area

    No te: All d iffusio n tub e a nd a uto m a tic m o nito ring d a tais fro m 2014 fo r a ll sites

    !(

    !(

    !(

    !(

    !(!(

    !(

    !(

    !(!(

    !(

    !(

    !(

    !(

    !(

    !(

    XWXW

    XWXW

    XWXW

    XW

    XWXW

    XWXW

    XWXW

    XWXW

    XW

    XW

    XW

    M25A282

    WatlingStreet

    CottonLane

    R9R11

    R13R15

    R1R2R3 R4R5R6R7

    R8R10

    R12R14

    R41

    R46

    District Bo und a ryCo unty Bo und a ry

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 – SECTION 13 APPENDICES)

    PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 - SECTION 13 APPENDICES)HA540039-HHJ-ZZZ-REP-ZZZ-010 DATE PUBLISHED JANUARY 2016 UNCONTROLLED WHEN PRINTED

    Appendix 2.8Landscape/ Townscape Constraints

    Landscape/ Townscape Constraints

  • La nd sc a pe / T o wnsc a pe Co nstra ints

    18/01/161:75,000L.HU LM E

    Co pyright

    Path: K:\UA

    projects\UA007080-Lower Thames Crossing\D-Calcs\GIS\Environmental Planning\mxd\HA540039-HHJ-EGN-ZZZZZZZZEG

    -MP-EN-0008.mxd

    S.RIM ELLA.SAU NDERS

    HHJ –EGN –ZZZZZZZEG-M P-EN-008

    © Na tura l Engla nd c o pyright 2015. Co nta ins Ord na nc e Survey d a ta© Cro wn c o pyright a nd d a ta b a serights 2015 Ord na nc e Survey100030649

    Revisio nSta tus

    Sc a leDra wn ByChec ked ByAppro ved By

    Dra wing Num b er

    PINHA | Origina to r Origina l Size A3 | | |

    Pro ject LOW ER T HAM ESCROSSINGDra wing T itle

    Pro ject No .

    Da te -Client

    Rev Sta tus Rev. Da te Purpo se o f revisio n Dra wn Chc k'd Apprv'd

    Halcrow Hyder Joint VentureBurd ero p Pa rkSwind o n, SN4 0QDT el. +44(0)1793 812479 HA540039

    S5P01 18/01/16 SAR ISSU E LH SR AS

    S5 P01

    HHJ

    B2108

    B1007

    B1335

    B258

    B260

    B2000

    B1335

    B2500

    B188

    B2174

    B2175

    B261

    B256

    B186

    B149

    B189

    B2174

    B255

    B262

    B1036

    B1421 B1420

    B148B186

    B186

    B1464

    B187

    B255

    B3228

    A228A227

    A227A225

    A225

    A12

    A126

    A226

    A226

    A2026

    A226

    A225

    A1014

    A226

    A118

    A126A126

    A20

    A2

    A13(T)

    A296

    A176

    A132

    A124

    A282(T)

    A282(T)

    A1235

    A129

    A1012

    A206

    A2(T)

    A2(T)

    A1089

    A282

    A176

    A128

    A128

    A228

    A2(T)

    A1014

    A206

    A282

    A13

    A13

    A2018

    A1090

    A127A1321

    A126(T)

    A12(T)

    A2(T)

    A226 A226

    A1089(T)

    A2260

    A282(T)

    A1306

    A1306 A1013

    A1013

    A127A127

    A127

    A127

    A289

    A2(T)

    A13(T)

    A13(T)

    A13

    M2M20

    M25

    M25

    M25

    M25

    K E N TC O U N T Y

    E S S E XC O U N T Y

    SEVENOAKSDISTRICT

    THURROCK

    BRENTWOODDISTRICT

    MEDWAY

    HAVERINGLONDONBORO

    BASILDONDISTRICT

    GRAVESHAMDISTRICTDARTFORDDISTRICT

    0 1 2 3 4Kilo m etres

    ¯Area o f Outsta nd ing Na tura lBea uty (Na tio na l va lue)Green Belt (Regio na l va lue)

    Distric t Bo und a ryCo unty Bo und a ry

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 – SECTION 13 APPENDICES)

    PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 - SECTION 13 APPENDICES)HA540039-HHJ-ZZZ-REP-ZZZ-010 DATE PUBLISHED JANUARY 2016 UNCONTROLLED WHEN PRINTED

    Appendix 2.9Historic Environment Constraints

    Historic Environment Constraints

  • Historic En viron m en t Con stra in ts

    19/11/20151:80,000L .HU L ME

    Copyright

    Path: K:\UA

    projects\UA007080-Lower Thames Crossing\D-Calcs\GIS\Environmental Planning\mxd\HA540039-HHJ–EGN–ZZZZZZZZEG

    -MP-EN-0009.mxd

    S .RIMEL LA.S AU NDERS

    HHJ –EGN –ZZZZZZZEG-MP-EN-009

    © En glish Herita ge 2015. © Natura l En gla n d 2015. Con ta in s Ordn a n c e S urvey da ta© Crown c opyright a n d da ta b a serights 2015 Ordn a n c e S urvey100030649

    RevisionS ta tus

    S c a leDra wn ByChec ked ByApproved By

    Dra win g Num b er

    PINHA | Origin a tor Origin a l S ize A3 | | |

    Project L OW ER T HAMESCROS S INGDra win g T itle

    Project No.

    Date -Clien t

    Rev S ta tus Rev. Date Purpose of revision Dra wn Chc k'd Apprv'd

    Halcrow Hyder Joint VentureBurderop ParkS win don , S N4 0QDTel. +44(0)1793 812479 HA540039

    S 5P01 18/01/16 S AR IS S U E L H S R AS

    S 5 P01

    HHJ

    Church OfSt Mary

    Causewayed enclosure and Anglo-Saxon cemetery 500m ENE of Heath Place

    Roman barrow 260mnorth east of SouthOckendon Hall

    Bowl barrowin Ashenbank Woodsouth of CobhamPark reservoir

    Earthworks nearchurch, WestTilbury

    Gatehouse andmoat of South OckendenOld Hall

    Second World Waranti-aircraft batteryat Bowaters FarmEastTilburyBattery

    Springfield styleenclosure and IronAge enclosuressouth of Hill House,Baker Street.

    Crop markcomplex, Orsett

    North OckendonConservationArea

    Anglo-Saxon cemetery at Darenth Park

    THURROCK

    BRENTWOODDISTRICT

    HAVERINGLONDONBORO BASILDONDISTRICT

    GRAVESHAMDISTRICTDARTFORDDISTRICT

    Coalhouse Fortbattery andartillery defences

    Old ThorndonHall andgardens

    TilburyFort

    SpringheadRoman site

    Dagnam Park Farmmoated site, NoakHill, Romford

    Bishop Bonner'sPalace, Orsett

    Deserted medievalmanorial settlementof Cossington

    Moat atBasildonHall

    Moated siteand fishpondsat Botelers

    Palaeolithicsites nearBaker's Hole

    Cranham ConservationArea

    CobhamHall

    ThorndonPark

    WarleyPlace

    BelhusPark

    WealdPark

    B1007

    B1335

    B258

    B260

    B1335

    B2500

    B2108

    B188

    B2174

    B2175B261

    B186

    B2186

    B149

    B1464

    B189

    B2174

    B262

    B1036

    B1421 B1420

    B148

    B2000

    B2173

    B186

    B187

    B255

    B3228

    A1023

    A227

    A227

    A225

    A225

    A12

    A228

    A228

    A226

    A226

    A2

    A2026

    A225

    A1014

    A226

    A118

    A126A126

    A296

    A176

    A125

    A124

    A282(T)

    A282(T)

    A176 A1235

    A1012

    A206

    A2(T)

    A2(T)

    A1089

    A282

    A125

    A176

    A128

    A128

    A128

    A129A129

    A2(T)A2(T) A2(T)

    A1014

    A206

    A13

    A282

    A13

    A13

    A2018

    A1090

    A1321

    A126(T)

    A132

    A226 A226

    A2260

    A1089(T)

    A20

    A176

    A282(T)

    A1306

    A1306 A1013

    A1013

    A127 A127

    A127

    A127

    A12(T)

    A2(T)

    A289

    A13(T)A13(T)

    A13(T)

    M2

    M2

    M20

    M20

    M25

    M25

    M25

    M25

    M25

    0 1 2Kilom etres

    ¯ Cultural Heritage ConstraintsGra de I L isted Buildin g(Na tion a l va lue)Gra de II* L isted Buildin g(Na tion a l va lue)Gra de II L isted Buildin g(Region a l va lue)S c heduled Mon um en t(Na tion a l va lue)Registered Pa rks a n d Ga rden(Na tion a l va lue)Con servation Area(Na tion a l - L oc a l va lue)L oc a l Historic L a n dsc a pe(L oc a l va lue)

    District Boun daryCoun ty Boun dary

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 – SECTION 13 APPENDICES)

    PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 - SECTION 13 APPENDICES)HA540039-HHJ-ZZZ-REP-ZZZ-010 DATE PUBLISHED JANUARY 2016 UNCONTROLLED WHEN PRINTED

    Appendix 2.10Biodiversity Constraints

    Biodiversity Constraints

  • Bio d iversity Co nstra ints

    18/01/161:80,000L.HU LM E

    Co pyright

    Path: K:\UA

    projects\UA007080-Lower Thames Crossing\D-Calcs\GIS\Environmental Planning\mxd\HA540039-HHJ-EGN-ZZZZZZZZEG

    -MP-EN-0010.mxd

    S.RIM ELLA.SAU NDERS

    HHJ –EGN –ZZZZZZZEG-M P-EN-010

    © English Herita ge 2015. © Na tura l Engla nd 2015. Co nta ins Ord na nc e Survey d a ta© Cro wn c o pyright a nd d a ta b a serights 2015 Ord na nc e Survey100030649

    Revisio nSta tus

    Sc a leDra wn ByChec ked ByAppro ved By

    Dra wing Num b er

    PINHA | Origina to r Origina l Size A3 | | |

    Pro ject LOW ER T HAM ESCROSSINGDra wing T itle

    Pro ject No .

    Da te -Client

    Rev Sta tus Rev. Da te Purpo se o f revisio n Dra wn Chc k'd Apprv'd

    Halcrow Hyder Joint VentureBurd ero p Pa rkSwind o n, SN4 0QDT el. +44(0)1793 812479 HA540039

    S5P01 18/01/16 SAR ISSU E LH SR AS

    S5 P01

    HHJ

    ThamesEstuary &Marshes

    ThamesEstuary &Marshes

    South ThamesEstuary andMarshes

    Darenth Wood SSSIand Country Park

    Purfleet Chalk Pits

    Shorne WoodsCountry Park

    Mardyke Local Wildlife Site

    Goshems Farm

    Canal and grazing marsh, Higham

    Mucking HeathBlackshots Nature Area

    THURROCK

    BRENTWOODDISTRICT

    HAVERINGLONDONBORO BASILDONDISTRICT

    GRAVESHAMDISTRICTDARTFORDDISTRICT

    CobhamWoods

    GreatCrabbles Wood

    InnerThamesMarshes

    ThorndonPark

    West ThurrockLagoon &Marshes

    GraysThurrockChalk PitHangman'sWood &Deneholes

    Shorne andAshenbankWoods

    MuckingFlats andMarshes

    ThamesEstuary

    ThamesEstuary

    B1007

    B1335

    B185

    B258

    B260

    B1335

    B2500

    B2108

    B188

    B2174

    B2175

    B261

    B256

    B186

    B2186

    B149

    B1464

    B189

    B2174

    B255

    B262

    B1036

    B1421 B1420

    B148

    B2000

    B2173

    B186

    B187

    B255

    B3228

    A1023

    A227

    A227

    A225

    A225

    A12

    A228

    A228

    A126

    A226

    A226

    A2

    A2026

    A226

    A225

    A1014

    A118

    A126A126

    A296

    A176

    A226A207

    A125

    A124

    A282(T)

    A282(T)

    A176 A1235

    A1012

    A206

    A2(T)

    A2(T)

    A1089

    A282

    A125

    A176A128

    A128

    A128

    A129A129

    A2(T)

    A1014

    A2(T) A2(T)

    A206

    A13

    A282

    A13

    A13

    A2018

    A1090

    A127A1321

    A126(T)

    A132

    A226A226

    A2260

    A1089(T)

    A20

    A176

    A282(T)

    A1306

    A1306

    A1013

    A1013

    A127 A127

    A127

    A127

    A12(T)

    A2(T)

    A289

    A13(T)A13(T)

    A13(T)

    M2

    M2

    M20

    M20

    M25

    M25

    M25

    M25

    M25

    0 1 2Kilo m etres

    ¯Ecological Constraints

    Ra m sa r (Interna tio na l va lue)Spec ia l Area o f Co nserva tio n(Interna tio na l va lue)Spec ia l Pro tec tio n Area(Interna tio na l va lue)Anc ient W o o d la nd(Na tio na l va lue)Site o f Spec ia l Sc ientificInterest (Na tio na l va lue)Rec o m m end ed M a rineCo nserva tio n Zo ne (Na tio na l va lue)Lo c a l Na ture Reserve (Lo c a l va lue)Lo c a l W ild life Site(Lo c a l va lue)

    District Bo und a ryCo unty Bo und a ry

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 – SECTION 13 APPENDICES)

    PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 - SECTION 13 APPENDICES)HA540039-HHJ-ZZZ-REP-ZZZ-010 DATE PUBLISHED JANUARY 2016 UNCONTROLLED WHEN PRINTED

    Appendix 2.11Water Constraints

    Water Constraints

  • Wa ter Constra ints

    18/01/161:60,000L .HU L ME

    Copyright

    Path: K:\UAprojects\UA007080-Lower Thames Crossing\D-Calcs\GIS\Environmental Planning\mxd\HA540039-HHJ–EGN–ZZZZZZZZEG-MP-EN-0011.mxd

    S .RIMEL LA.S AU NDERS

    HHJ – EGN – ZZZZZZZEG-MP-EN-011

    © Environm ent Agency copyright 2015. Conta ins Ordna nce S urvey da ta © Crowncopyright a nd da ta b a se rights 2015Ordna nce S urvey 100030649

    RevisionS ta tus

    S ca leDra wn ByChecked ByApproved By

    Dra wing Num b er

    PINHA | Origina tor Origina l S ize A3 | | |

    Project L OWER T HAMESCROS S INGDra wing T itle

    Project No.

    Da te -Client

    Rev S ta tus Rev. Da te Purpose of revision Dra wn Chck'd Apprv'd

    Halcrow Hyder Joint VentureBurderop Pa rkS windon, S N4 0QDTel. +44(0)1793 812479 HA540039

    S 5P01 18/01/16 S AR IS S U E L H S R AS

    S 5 P01

    HHJ

    River Mardyke

    West T ilb uryMa rshes

    Ea st T ilb uryMa rshes

    S horneMa rshes

    S outh T ha m es Estua ry a ndMa rshes S S S I Filb oroughMa rshes

    Critica l Dra ina geArea CDA_011

    Critica l Dra ina geArea CDA_010a

    Critica l Dra ina geArea CDA_010B

    West T ilb uryFlood S tora ge Area

    Recom m ended Ma rineConserva tion Zone (rMCZ)

    T ha m es a nd Medwa y Ca na l

    River Thames

    Water ConstraintsDeta iled river networkFlood defenceWFD river wa terb odiescycle2 (Dra ft)Area b enefitting fromflood defences Authorised la ndfill siteHistoric la ndfill siteWFD - T ra nsitiona l wa terb odies

    S ource Protection ZonesZone I - Inner protection zoneZone II - Outer protection zoneZone III - Tota l ca tchm ent 0 1 2Kilom etres

    ¯

    Water ConstraintsDeta iled river networkFlood defenceWFD river wa terb odiescycle2 (Dra ft)Authorised la ndfill siteHistoric la ndfill siteWFD - T ra nsitiona l wa terb odies

    Source Protection ZonesZone I - Inner protection zoneZone II - Outer protection zoneZone III - Tota l ca tchm entZone of S pecia l Interest

  • PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 – SECTION 13 APPENDICES)

    PRE-CONSULTATION SCHEME ASSESSMENT REPORT (VOLUME 2 - SECTION 13 APPENDICES)HA540039-HHJ-ZZZ-REP-ZZZ-010 DATE PUBLISHED JANUARY 2016 UNCONTROLLED WHEN PRINTED

    Appendix 2.12 Community Land Use Constraints

    Community Land Use Constraints

  • Community Land Use Constraints

    18/01/161:75,000

    L.HULME

    Copyright

    Path

    : K:\U

    Apro

    ject

    s\U

    A00

    7080

    -Low

    er T

    ham

    es C

    ross

    ing\

    D-C

    alcs

    \GIS

    \Env

    ironm

    enta

    l Pla

    nnin

    g\m

    xd\H

    A54

    0039

    -HH

    J-E

    GN

    -ZZZ

    ZZZZ

    ZEG

    -MP

    -EN

    -001

    2.m

    xd

    S.RIMELL

    A.SAUNDERS

    HHJ-EGN-ZZZZZZZZEG-MP-EN-0012

    © Natural England copyright 2015. Contains Ordnance Survey data © Crown copyright and database rights 2015 Ordnance Survey100030649.Data reproduced with the permission of RSPB. © Crown Copyright. Ordnance Survey licencenumber 100021787 2016

    RevisionStatus

    Scale

    Drawn By

    Checked By

    Approved By

    Drawing Number

    PINHA | OriginatorOriginal Size A3

    | | |

    Project LOWER THAMESCROSSING

    Drawing Title

    Project No.

    Date -

    Client

    Rev Status Rev. Date Purpose of revision Drawn Chck'd Apprv'd

    Halcrow Hyder Joint VentureBurderop Park

    Swindon, SN4 0QDTel. +44(0)1793 812479

    HA540039ILLUSTRATIVEDESIGNThe design shown on these drawings is illustrative and may be subject to change in later stages of the scheme development.

    S5P01 18/01/16 SAR ISSUE LH SR AS

    S5 P01

    HHJ

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    TilburyFootballGround

    ThurrockFootballGroundLakeside RetailPark

    RidingSchool

    WoodlandsPrep School

    AveleyPrimarySchool

    HolidayInn

    DartfordAmbulanceStation

    Winners ChapelInternational

    St Peter'sChurch ofEngland

    All SaintsChurchTravelodgeHotel

    TreetopsSchoolWoodsidePrimarySchool

    Chadwell StMary Day Nursery RiverviewMethodist Church

    St MarysCemetery

    Manor Infantand NurserySchoolTilbury ManorJunior School

    Palmer'sCollege

    ShorneMethodistChurchShorne C ofE PrimarySchool

    Church of St Mary

    Davy DownRiverside Park

    Fieldsof Peace

    MardykeGolfClub

    Top MeadowGolf Club

    Dunton HillsFamily GolfCentre

    South Essex GolfCourse

    CranhamGolf Course

    Thurrock ThamesideNature Park

    OrsettGolf Course

    St CleresHall Golf Club

    KoalaPark

    Mackenzie WayOpenSpace

    ThamesValley GolfCentre Driving Range

    Southern ValleyGolfClub

    Rochester andCobham ParkGolf Club

    Route 4

    Route 3

    Route 2

    Eastern Southern Link

    Western Southern Link

    Route 1

    DuntonPlotlands

    Littlebrook NaturePark

    Memorial Park,Chalk

    Condover's ScoutActivity Camp

    DilkesPark

    The GatewayAcademy

    Claylane Wood

    Langdon Hills Golfand Country Club Hotel

    Residential includingpotential health facility

    Residential includinghotel and retail uses

    Residential including communityand health facilities

    Residential includingpublic open space

    Leisure resort

    Mixed use including residential,community and health uses.

    The LeighAcademy

    Dartford BridgeCommunity Primary SchoolJoyce GreenCemetery

    St Michael's Church

    Aveley Christian Centre

    Secondary Schooland Learning Centre

    Belhus ParkGolf Club

    Premier Inn ChaffordGorgesNature Park

    St Mary'sChurchPark Inn atRadisson

    WilliamEdwards AcademySchool

    Terrels HeathRecreation Ground

    The Winning Child Nursery

    St Mary Magdalene the ParishChurch of North Ockendon

    Sports Club

    Arena EssexRacewayLakeside Karting Caravan Park

    Orsett Fen

    ShorneMarshes

    CliffePools

    RainhamMarshes

    SouthEssexMarshes

    SouthEssexMarshes

    BushyBit

    Hangman's WoodMardyke Woods

    Dilkes Wood

    Oakwoodand AshPlantation

    Brickkiln Wood,Runing Water Woodand Whitehall Wood

    BroomHill HangmansWoodLinfordWood

    WarleyHall Wood

    OldHouseWood

    TheWarren

    Starmore WoodCole Wood

    GreatCrabblesWoodPuckleHill

    CodhamHall Wood

    ThamesChaseForest

    The OldPark

    Gurnett'sFields

    BelhusChase

    AshenbankWood

    B2108

    B1007

    B1335

    B258

    B260

    B1335

    B2500

    B188

    B2174

    B2175

    B261

    B256

    B1464

    B185

    B186

    B2186

    B149

    B189

    B2174

    B255

    B262

    B1036

    B1421 B1420

    B148B186

    B2173

    B187

    B255

    B3228

    A2

    A20

    A227

    A227

    A225

    A225

    A12

    A126

    A226

    A226

    A129

    A2026

    A226

    A1023

    A225

    A228

    A1014

    A118

    A126

    A126

    A296

    A176

    A226

    A124

    A282(T)

    A282(T)

    A176 A1235

    A176

    A1012

    A206

    A176

    A2(T)

    A2(T)

    A1089

    A132

    A128

    A128

    A2(T)

    A1014

    A2(T)A2(T)

    A206

    A282

    A13

    A13

    A2018

    A1090

    A127A1321

    A126(T)

    A2(T)

    A226 A226

    A2260

    A1089(T)

    A282(T)

    A1306

    A1306A1013

    A1013

    A289

    A12(T)

    A127A127

    A127

    A127

    A2(T)

    A13(T)A13(T)

    A13(T)

    A13

    M2M25

    M25

    M20

    M25

    M25

    K E N TC O U N T Y

    E S S E XC O U N T Y

    SEVENOAKSDISTRICT

    THURROCK

    BRENTWOODDISTRICT

    MEDWAY

    HAVERINGLONDON BORO

    BASILDONDISTRICT

    GRAVESHAMDISTRICT

    DARTFORDDISTRICT

    BEXLEYLONDONBORO

    0 1 2Kilometres

    ¯ ! Community Facilities PointPlanning ApplicationCommunity LandUse Facilities

    Country Park

    Parks, Open Spacesand Golf Courses

    Woodland

    Woodland Trust Site

    RSPB Reserve

    Open Access Land

    District Boundary

    County Boundary

  • If you need help accessing this or any other Highways England information,please call 0300 123 5000 and we will help you.

    © Crown copyright 2016.You may re-use this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence: visit www.nationalarchives.gov.uk/doc/open-government-licence/write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email [email protected].

    This document is also available on our website at www.gov.uk/highways

    If you have any enquiries about this publication email [email protected] or call 0300 123 5000*. Please quote the Highways England publications code PR133/15

    Highways England creative job number s150687

    Report No HA540039-HHJ-ZZZ-REP-ZZZ-010

    *Calls to 03 numbers cost no more than a national rate call to an 01 or 02 number and must count towards any inclusive minutes in the same way as 01 and 02 calls.These rules apply to calls from any type of line including mobile, BT, other fixed line or payphone. Calls may be recorded or monitored.

    Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZHighways England Company Limited registered in England and Wales number 09346363

    The Pre-Consultation Scheme Assessment Report details the assessment of options leading up to consultation. A final Scheme Assessment Report will be published post consultation.