Authors: Andre Zander / Raul Latorre / Thomas Seitz / Antonio Ciriello CONFIDENTIAL FRAMATOME Long Term Operation Dr. Antonio Ciriello Sales and Offer Manager Head of Sales BU I&C for South America I&C, EDGs and Electrical Systems Brazil, August, 2018

Transcript of Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging...

Page 1: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Authors: Andre Zander / Raul Latorre / Thomas Seitz / Antonio Ciriello

CONFIDENTIAL FRAMATOME

Long Term Operation

Dr. Antonio Ciriello

Sales and Offer Manager

Head of Sales BU I&C for South America

I&C, EDGs and Electrical Systems

Brazil, August, 2018

Page 2: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.2Long Term Operation – May 2018

Customer Issue1

Value Drivers & Value Proposition2

Our Solution3

4 Differentiators & Battlecard

Long Term Operation

5 Summary

Page 3: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.3Long Term Operation – May 2018

Customer Issue1

Value Drivers & Value Proposition2

Our Solution3

4 Differentiators & Battlecard

Long Term Operation

5 Summary

Page 4: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.4Long Term Operation – May 2018

Long Term OperationAnalogy with human life

Birth 80 years

Monitoring & Diagnosis

Products and Services

Aging Management &

Long Term Operation Services

Spare Parts and

Obsolescence Business &

Component Replacement and Repair

Strong interaction and connection and even dependency

Page 5: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.5Long Term Operation – May 2018

Long Term OperationsGlossary

• SSCs: System Structures and components

• TLAAs: Time-Limited Aging Analysis

• RCM: Reliability Centered Maintenance

• AP-913: INPO Equipment Reliability Process

• AMR: Aging Management Review

• AMP: Aging Management Program

• PSR: Probabilistic Safety Review

• eMCO: I&C Obsolescence Management Website

• APOTS: AREVA Proactive Obsolescence and Tracking Service

• ACT: ACTive Cooling System

Page 6: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.6Long Term Operation – May 2018

Long Term OperationIAEA Definition

“The LTO of an NPP may be defined as operation beyond an established

time frame set forth by, for example, license term, design, standards,

license or regulations, which have been justified by safety assessment

with consideration given to life limiting processes and features of

Systems Structures and Components.

Long term operation is conditioned by regulatory requirements and

subject to regulatory authorization, and usually also to public or political

acceptance.

In practice, LTO is only possible when an appropriate safety assessment

has been performed, and the results have been found to be favorable

concerning safety of the NPP involved.”

Page 7: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.8Long Term Operation – May 2018

Long Term OperationIAEA Overview -Year in which the plants

reach their respective design life

Until 2025, 15 to 20 NPPs per year on average will need to renew their operating license

→ About 50% will apply for LTO

Page 8: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.9Long Term Operation – May 2018

Long Term OperationCustomer Issue

▪ Other energy sources can generate a higher investment

rather than nuclear long term operation

▪ Building new NPP (or dismantling a NPP) can be

expensive for major utilities, so one of the best

alternative is to operate longer

▪ Justification is needed but uncertainties exist on:

• Regulation evolutions

• Potential replacement of components

• Political situations

• Public acceptance

Page 9: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.10Long Term Operation – May 2018

Customer Issue1

Value Drivers & Value Proposition2

Our Solution3

4 Differentiators & Battlecard

Long Term Operation

Launch / Relaunch Briefing

5 Summary

Page 10: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.11Long Term Operation – May 2018

Long Term OperationValue Drivers & Value Proposition

▪ Show the Return on Investment to the NPP shareholders to operate

longer while maintaining a high level of safety and availability

▪ Get the approval from regulator to operate longer:

◆ Get the right and most sufficient solution with the short-term ROI

◆ Respect schedule

◆ Meet budget

◆ Apply the right concept in accordance to national/international guidelines

◆ Minimize project risks

◆ Get public acceptance

Customer Value proposition:

Framatome LTO solutions enable NPPs to operate

longer while meeting state-of-the-art safety in balance

with Return On Investment.

Page 11: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.12Long Term Operation – May 2018

Customer Issue1

Value Drivers & Value Proposition2

Our Solution3

4 Differentiators & Battlecard

Long Term Operation

Launch / Relaunch Briefing

5 Summary

Page 12: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.13Long Term Operation – May 2018

Long Term OperationOur Solution - What do we sell?

Long Term

Operation

activities

Methodology

Products

Repair & Replacement

Modernization & safety

improvements

Lifetime improvements

Page 13: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.14Long Term Operation – May 2018

Long Term OperationOur Solution – Techno Brief 1/5

Physical Aging – Determination of Scope(Scoping / Screening)

Technological AgingIdentification of Scope

Conceptual AgingIdentification of Scope

Staff Aging

Obsolescence Management

Periodic Safety Review (PSR)

Mostly 10 year interval

Know How /

Know Why Transfer

Passive SSCs Active SSCs TLAAs

· RPV

Embrittlement· Mechanical

Fatigue· Environmental

Qualification· Leak Before

Break

Periodic Aging Surveillance / Trending

Aging Management

Review (AMR)

· Mechanical· Electrical + I&C· Structural

· Containment

integrity...

Aging Management

Aging Management and

Long Term Operation Activities

Aging Management Project(e.g. LTO)

Preliminary Work(e.g. Investment Study, Feasibility

Study, Verification of Preconditions)

Physical Aging – Determination of Scope(Scoping / Screening)

Technological AgingIdentification of Scope

Conceptual AgingIdentification of Scope

Staff Aging

Obsolescence

Management

Periodic Safety

Review (PSR)Mostly 10 year interval

Know How /

Know Why

Transfer

Active SSCs Passive SSCs TLAAs

• RPV

Embrittlement

• Mechanical

Fatigue

• Environmental

Qualification

• Leak Before

Break

...

Maintenance

Rule or similar

approach

Aging Management

(Review)

• Mechanical

• Electrical + I&C

• Structural

Periodic Aging Surveillance / Trending

Maintenance

AP913

RCM

Monitoring&

Diagnosis

Methodology

Page 14: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.15Long Term Operation – May 2018

COMSY-Civil

Structural SSCs

COMSY-MEC

Mechanical

components

COMSY-ELT

Electrical and

I&C-Components

FAMOSi,

Fatigue Monitoring

System

COMSY-Active

predictive

maintenance

Framatome concept

Script for commodity

groups

Catalog of Aging

mechanisms

Equipment qualification

database

APOTSData Analytics

N-Vision

Long Term OperationOur Solution – Techno Brief 2/5

Long Term

Operation products

SIPLUG, DIROM…eMCO

Products

Page 15: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.16Long Term Operation – May 2018

Long Term OperationOur Solution – Techno Brief 3/5

Baffle Bolt Replacement

Dissimilar weld

Machining of a nozzle

Austenitic cladding

Machining of RPV flange

PENTARC®

In-situ Valve Repair Welding of Aluminum pipes

Services:

• Project Management (turnkey)

• Engineering, design,

design calculations, licensing

• Planning, scheduling,

preparation of all construction

activities

• Subcontracting, purchasing,

qualifications, training of

personnel

• Planning and performance of

all required activities

Sampling by EDM

Repair & Replacement

Page 16: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.17Long Term Operation – May 2018

Long Term OperationOur Solution – Techno Brief 4/5

Plant and system modifications related to safety and

modernization for all kinds of NPP’s at NSSS,

BNI and other auxiliary systems

▪ NPP specific LTO plant modification related to safety and

technological improvement include:

◆ Increase of safety margins

◆ Increase of performance components

◆ Increase in component lifeExamples:

▪ Modernization of safety and operational I&C: TELEPERM XS, Tricon, Foxboro DCS,

▪ Digital Control: TELEPERM XS, Variable Frequency Drive, Rod Control System

▪ Computerized AIDS

▪ Primary Bleed & Feed Implementation (mechanical, electrical and I&C)

▪ Improvement of cooling systems (Residual heat Removal System and Spent Fuel Cooling Systems)

▪ Physical Plant Protection Systems (Explosion Pressure Wave Dampers, Toxic Gas retention Systems, …)

▪ Filtered Containment Venting (FCVS), Hydrogen Recombiners

▪ EDG (Emergency Diesel Generator sets) and related control systems

▪ Separation of signals into different categories (monitoring systems, protection systems)

▪ Fixed Incore Detectors

▪ Ex-Core and In-Core Instrumentation

▪ Data Analytics: N-Vision

▪ New Safety studies due to the evolution of the regulation

Passive cooled spent

fuel storage

ACT

Primary

Bleed

Valve

Modernization & safety

improvements

Page 17: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.18Long Term Operation – May 2018

▪ Effective neutron fluence control of RPV base

material by implementing shielding fuel assemblies

▪ Film Forming Amines to protect inner surfaces of

structures and component against corrosion and

corrosive damage

▪ Cavitation peening to protect dissimilar welds

Long Term OperationOur Solution – Techno Brief 5/5

Cavitation Peening

FFA Application

Shielding Assemblies

Lifetime improvements

Page 18: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.19Long Term Operation – May 2018

Long Term OperationOur Solution – Key Features

▪ Increase margins for mechanical

◆ Pressurized Thermal Shock studies (use of Advanced Methodology)

◆ Fast fracture analysis (primary components)

◆ Fatigue Analysis based on online monitoring (FAMOSi) to reduce conservatism

◆ Apply COMSY reliable degradation assessment to minimize maintenance effort

▪ Increase margins for electrical and I&C

◆ Equipment qualification: Perform tests, Performing of calculations based on real data (e.g. COMSY – Electrical)

◆ Cable Aging; Evaluation of Electrical and I&C components

• Evaluation based on Arrhenius and Power law considers e.g. Temperature Index TI*, qualification,

manufacturer information, activation energy, ambient temperature, installation time of equipment, qualified

total dose, exponent of the Power law

◆ Electrical Motors and Actuators

◆ Field Instrumentation

▪ Modernization / Safety Improvement

◆ Regulatory requirements and practices leading to safety upgrading, e.g. findings

of PSR, new regulations, serious events, like TMI, Chernobyl, Fukushima, etc.

◆ Fields of safety enhancement based on external and internal events, increase of redundancy/ separation/

independence, isolation, decoupling, safety of Spent Fuel Pool…

Page 19: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.20Long Term Operation – May 2018

Customer Issue1

Value Drivers & Value Proposition2

Our Solution3

4 Differentiators & Battlecard

Long Term Operation

Launch / Relaunch Briefing

5 Summary

Page 20: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.21Long Term Operation – May 2018

Long Term OperationDifferentiators

Long Term

Operation

activities

Methodology

Products

Repair & Replacement

Modernization & safety

improvements

Lifetime improvements

Page 21: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.22Long Term Operation – May 2018

Long Term OperationDifferentiators 1/4

▪ COMSY is a unique tool which has the capability to perform

automatic evaluation of the degradation mechanisms

▪ FAMOSi is an online monitoring tool which has the capability to

perform automatic evaluation of the individual components usage

factors

▪ Framatome script grouping which performs automatically

commodity grouping based on existing data

▪ Equipment qualification database (I&C, Electrical and Mechanical)

▪ N-Vision fulfils the Data Analytics Promise: Reduce / optimize cost

while maintaining or improving plant reliability

▪ Framatome offers engineering knowledge of systems, failures, and plant

programs unique among providers of data analytics services

Products

Page 22: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.23Long Term Operation – May 2018

▪ High level Engineering and Project Management resources

▪ Turnkey heavy component repair & replacement services

▪ Expertise in welding, mechanical, tooling, robotics, controls engineering

▪ Nuclear safety focus

▪ Global experience base – “bench strength”

Long Term OperationDifferentiators 2/4

▪ Wide scope of technical skills and experience:

▪ Repair / replacement process engineering

▪ Implementation of sophisticated on-site techniques: handling, machining, welding…

▪ Development of special processes and tools: tailored solutions to challenging and complex problems

▪ Knowledge of components, their design basis and aging issues

▪ Reactive Culture: Ability to mobilize crews quickly to support emergent problems

▪ Quality Assurance: ”High standard” quality control for all circumstances

▪ Global experience in interpreting and qualification to Codes and Standards

▪ Qualification and field hardening of new / innovative processes

Repair & Replacement

Page 23: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.24Long Term Operation – May 2018

▪ Framatome as Architect Engineer and Original Equipment

Manufacturer (OEM) of the Nuclear Island provides tailored

and dedicated products and solutions, (Mechanical, Electrical

and I&C)

▪ Framatome as Architect Engineer and OEM of the Nuclear

Island has the expertise available to utilities at any field in

order to guarantee an optimal implementing process tailored

for the individual needs.

▪ Based on participation in national and international working

groups (e.g. KTA, RCC-M/E, IEC, IEEE, ASME, IAEA, WANO,

FROG, PWROG, INPO, EPRI etc.) Framatome is aware of new

regulations and follow-up of international trends related to

safety improvements

Long Term OperationDifferentiators 3/4

Modernization & safety

improvements

Page 24: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.25Long Term Operation – May 2018

▪ Shielding fuel assemblies

Only Framatome has a proven Shielding assembly design

▪ Film-forming amines is a patented chemical solution by

Framatome used to prevent fast-progressing damages on the

structural materials inside the steam generator due to

corrosion or pollution. The amines are introduced into the

working fluid and deposit on the surfaces, thus creating a

water-repellent protective layer that keeps corrosion

particles and other debris from adhering to the surfaces

(lotus effect).

▪ Cavitation peening: The Ultra High Pressure Cavitation

Peening process will help mitigate the risk of occurrence of

Primary Water Stress Corrosion Cracking (PWSCC) for the

remaining life of the plant at a much lower cost and lower

outage impact than traditional repair methods and without

risk of damaging the primary circuit components, and will

likely reduce the frequency of Non Destructive Examination

inspections

Long Term OperationDifferentiators 4/4

Lifetime improvements

Page 25: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.26Long Term Operation – May 2018

Long Term OperationReferences

FINLAND

Olkiluoto 1, 2 &3

Loviisa

USA

ARGENTINA

SWEDEN

Oskarshamn 3

Ringhals 1,3,4

SOUTH

AFRICA

Koeberg 1&2

NETHERLANDS

Borssele

GERMANY

Vattenfall

Isar 1&2

Atucha 1

Embalse

Susquehanna

Indian Point

Cooper

TMI

DC Cook

Oconee

Beaver Valley

McGuire

Catawba

Pilgrim

VC SummerTurkey Point

Davis Besse

Browns Ferry Columbia

FRANCE

EDFN4, 1300 MW,

900 MW

RUSSIA

Kola 3&4

SLOVAKIA

Bohunice 3&4

HUNGARY

Paks 1-4

CHINA

Qinshan 1

SPAIN

St. M. de Garona

SWITZERLAND

Beznau 1&2

Gösgen

Doel 1&2

BELGIUM

Page 26: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.27Long Term Operation – May 2018

Customer Issue1

Value Drivers & Value Proposition2

Our Solution3

4 Differentiators & Battlecard

Long Term Operation

Launch / Relaunch Briefing

5 Summary

Page 27: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.28Long Term Operation – May 2018

Page 28: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.29Long Term Operation – May 2018

Page 29: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.30Long Term Operation – May 2018

Long Term OperationExploratory Questions

Questions Answers

Why should I apply Framatome’s concepts and

solutions?

Framatome makes its global expertise available to

utilities in order to guarantee an optimal

implementing process tailored for the individual

needs

What is the advantage to contract a large company

like Framatome?

High global expertise All in one hand

How Framatome products help and/or support the

process of LTO?

- Systematic data collection and degradation

assessment function

- Maintenance and inspection procedures as well

as NDT results can easily be validated in

respect to their sufficiency to control

degradation

What would be the rough investment I need to

operate beyond the design life?

Thanks to the feasibility studies, we analyze the

necessary improvements based on state-of-the-art

safety issues. It can vary between 100 and 700M€.

What could be the estimated Return Of

Investment?

The ROI can be 2 years at a minimum depending

on the investments.

Page 30: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.31Long Term Operation – May 2018

Long Term OperationGo To Market Strategy

Consolidate (within 6 months)

• France (EDF fleet)

• Belgium (Tihange 3&4)

• China (Daya Bay)

• RSA (Koeberg)

• Switzerland (Goesgen, Leibstadt)

• USA (Oconee 1,2,3; ANO-1; North Anna; Surry)

• Brazil (Angra 1)

• Canada (Bruce, Pickering, Darlington, Point Lepreau)

Grow(within 1 year 1/2)

• Sweden (Ringhals 3&4, Oskarsham 3, Forsmark 1&2)

• Finland (Olkiluoto 1&2, Lovisaa)

• Bulgaria (Kosloduy)

• South Korea (Hanul 1&2)

Pursue market penetration (within 1 year)

• Argentina (Atucha 1)

• UK (Sizewell B)

• Czech republic (Temelin 1&2)

• Romania (Cernavoda)

Explore(Within 2 years)

• Brazil (Angra 2)

• Spain (Almaraz, …)

Page 31: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.32Long Term Operation – May 2018

Long Term OperationSuccess Story

▪ Customer target

◆ Borsselle

▪ Customer issue

◆ Operate beyond the design life (20 years of longer operation)

◆ Small utility with limiting resources

▪ Framatome solution

◆ A turnkey solution has been proposed with experts from each field (mechanical, electrical and

I&C)

◆ COMSY and FAMOS were successfully implemented

▪ Customer results

◆ Approval from the regulator

◆ 3 years ROI

▪ Framatome Results

◆ Good example of LTO capabilities

◆ Framatome OIT > 10 Mill.€

Page 32: Long Term Operation - LAS-ANS• AP-913: INPO Equipment Reliability Process • AMR: Aging Management Review • AMP: Aging Management Program • PSR: Probabilistic Safety Review

Confidentiality Framatome (internal)

Property of Framatome © Framatome

All rights reserved, see liability noticep.33Long Term Operation – May 2018

Long Term OperationSummary

OUR SOLUTION

CUSTOMER ISSUE▪ Other energy sources can generate a high investment

rather than nuclear long term operation

▪ Building new NPP (or dismantling a NPP) can be

expensive for major utilities, so one of the best

alternative is to operate longer

▪ Justification is needed but uncertainties exist on:

• Regulation evolutions

• Potential replacement of components

• Political situations

• Public acceptance

❑ …

▪ Show the Return on

Investment to the NPP

shareholders to operate

longer while maintaining a

high level of safety and

availability

▪ Get the approval from

regulator to operate longer:

• Get the right and most

sufficient solution with the

short-term ROI

• Respect schedule

• Meet budget

• Apply the right concept in

accordance to

national/international

guidelines

• Minimize project risks

• Get public acceptance

Long Term

Operation

activities

Methodology

Products

Repair & Replacement

Modernization & safety

improvements

Lifetime improvements