LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA) NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11 Laporan Fotograf Bulanan No.30 (sehingga 25/5/2018) 1 | FOTOGRAPH LOCATION : SECTION C FOTOGRAPH 1: Zone 2 – MB 1-107/4A Jacking Pit (24/5/18) Activity: Pipe jacking from MB 1-107/4A to MB 1-107/5 (450 mm DN) FOTOGRAPH 2: Zone 2 – MB 1-101/1 (10/5/18) Activity: Manhole Construction

Transcript of LOCATION : SECTION Cpapan1.com/upload/gallery/2018/LFB-30.pdfDI PAPAN, DAERAH KINTA- PAKEJ 1:...

Page 1: LOCATION : SECTION Cpapan1.com/upload/gallery/2018/LFB-30.pdfDI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA) NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11 Laporan Fotograf Bulanan

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11

Laporan Fotograf Bulanan No.30 (sehingga 25/5/2018)

1 | F O T O G R A P H

LOCATION : SECTION C

FOTOGRAPH 1: Zone 2 – MB 1-107/4A Jacking Pit (24/5/18) Activity: Pipe jacking from MB 1-107/4A to MB 1-107/5 (450 mm DN)

FOTOGRAPH 2: Zone 2 – MB 1-101/1 (10/5/18) Activity: Manhole Construction

Page 2: LOCATION : SECTION Cpapan1.com/upload/gallery/2018/LFB-30.pdfDI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA) NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11 Laporan Fotograf Bulanan

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11

Laporan Fotograf Bulanan No.30 (sehingga 25/5/2018)

2 | F O T O G R A P H

LOCATION : SECTION C

FOTOGRAPH 3: Zone 2 – MB 1-107/12 (21/5/18) Activity: Manhole Construction

Page 3: LOCATION : SECTION Cpapan1.com/upload/gallery/2018/LFB-30.pdfDI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA) NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11 Laporan Fotograf Bulanan

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11

Laporan Fotograf Bulanan No.30 (sehingga 25/5/2018)

3 | F O T O G R A P H

LOCATION : SECTION C

FOTOGRAPH 4: ZONE 2 – Jacking Pit of River Crossing (21/5/18) Activity: Cofferdam Pit Construction

Page 4: LOCATION : SECTION Cpapan1.com/upload/gallery/2018/LFB-30.pdfDI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA) NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11 Laporan Fotograf Bulanan

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11

Laporan Fotograf Bulanan No.30 (sehingga 25/5/2018)

4 | F O T O G R A P H

LOCATION : SECTION C

FOTOGRAPH 5: ZONE 3A – NPS 4 (20/5/18) Activity: Pump house construction.

FOTOGRAPH 6: ZONE 3A – MB 6-11 (7/5/18) Activity: Pit Construction

Page 5: LOCATION : SECTION Cpapan1.com/upload/gallery/2018/LFB-30.pdfDI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA) NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11 Laporan Fotograf Bulanan

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11

Laporan Fotograf Bulanan No.30 (sehingga 25/5/2018)

5 | F O T O G R A P H

LOCATION : SECTION C

FOTOGRAPH 7: ZONE 3A – MB 6-30 Jacking Pit (2/5/18) Activity: Pipe jacking from MB 6-30 to MB 6-31 (1050 mm DN)

FOTOGRAPH 8: ZONE 3A – MB 6-13/2 Jacking Pit (15/5/18) Activity: Pipe jacking from MB 6-13/2 to MB 6-13/1 (225 mm DN)

Page 6: LOCATION : SECTION Cpapan1.com/upload/gallery/2018/LFB-30.pdfDI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA) NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11 Laporan Fotograf Bulanan

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11

Laporan Fotograf Bulanan No.30 (sehingga 25/5/2018)

6 | F O T O G R A P H

LOCATION : SECTION C

FOTOGRAPH 9: ZONE 3A – MB 6-21 (15/5/18) Activity: Manhole Construction

Page 7: LOCATION : SECTION Cpapan1.com/upload/gallery/2018/LFB-30.pdfDI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA) NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11 Laporan Fotograf Bulanan

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11

Laporan Fotograf Bulanan No.30 (sehingga 25/5/2018)

7 | F O T O G R A P H

LOCATION : SECTION C

FOTOGRAPH 10: ZONE 3A– NPS 4 (17/5/18) Activity: Installation of Mechanical Course Screen

Page 8: LOCATION : SECTION Cpapan1.com/upload/gallery/2018/LFB-30.pdfDI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA) NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11 Laporan Fotograf Bulanan

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11

Laporan Fotograf Bulanan No.30 (sehingga 25/5/2018)

8 | F O T O G R A P H

LOCATION : SECTION C

FOTOGRAPH 11: ZONE 3B– MB 1-32 Jacking Pit (26/4/18) Activity: Pipe jacking from MB 1-32 to MB 1-31A (750 mm DN)

FOTOGRAPH 12: ZONE 3C – MB 4-01/1A Jacking Pit (15/5/18) Activity: Pipe jacking from MB 4-01/1A to MB 4-01/1 (225 mm DN)

Page 9: LOCATION : SECTION Cpapan1.com/upload/gallery/2018/LFB-30.pdfDI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA) NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11 Laporan Fotograf Bulanan

LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI PAPAN, DAERAH KINTA- PAKEJ 1: NETWORK (REKA BINA)

NO. KONTRAK : KeTTHA/JPP/PAPAN1/RMK 10/15/K11

Laporan Fotograf Bulanan No.30 (sehingga 25/5/2018)

9 | F O T O G R A P H

LOCATION : SECTION C

FOTOGRAPH 13: ZONE 3C – MB 5-19/5/1 Jacking Pit (10/5/18) Activity: Pipe jacking from MB 5-19/5/1 to MB 5-19/5 (250 mm DN)