LNGC Disha Machinery Operating Manual

302
 PETRONET Machinery Operating Manual LNGC DISHA (H2210) 

description

Machinery Operating Manual for LNG carrier

Transcript of LNGC Disha Machinery Operating Manual

Page 1: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 1/302

 

PETRONET

Machinery Operating Manual

LNGC DISHA (H2210) 

Page 2: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 2/302

Page 3: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 3/302

Page 4: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 4/302

Page 5: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 5/302

 

Part 1 : Ship Particulars 

1.1 Principal Particulars......... ............ ............. ............ ............ ............ .... 1 - 1 

1.1.1 Principal Particulars of the Ship ............ ............ ............ ........ 1 - 1 

1.2 G/A Plan ........................................................................................... 1 - 3 

1.3 Engine Room Arrangement .............................................................. 1 - 4 

Part 1

Ship Particulars

Page 6: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 6/302

Page 7: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 7/302

LNGC DISHA  Machinery Operating Manual

1 - 2  Part 1 Ship Particulars

Air capstan

Maker Yong Nam Marine Mach.

Type Pneumatic type

 No. of Set 4Capacity 0.5 Tons X 25 m/min.

Rope reel winch

Type Manual type

 No. of Set 2

Stowage capacity 38 mm Dia. X 90 m

Accommodation ladder

Maker Sam Gong Co., Ltd

Type Vertical self stowing type

 No. of Set 2

Hawsers

Type 6 X 36 IWRC Galv’d

 No of Set 22

Size 42 mm Dia. X 275 m

Page 8: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 8/302

LNGC DISHA  Machinery Operating Manual

1 - 3  Part 1 Ship Particulars

1.2 G/A Plan

Page 9: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 9/302

LNGC DISHA  Machinery Operating Manual

1 - 4  Part 1 Ship Particulars

1.3 Engine Room Arrangement

Casing A Deck

 D U C  T

   E   X   H .

   G  A  S

   P   I   P   E

    T   R   U   N

 P A I N  T

  S  T O R

 E S  W

 I M M I N G

  P O O L

   T A N K

 D U C  T

 D U C  T

 D U C  T

     D     U     C     T

UP

UP

BOIL-OFF GAS

EXTRACTION FAN

NO.1

NO.2

VOID SPACE

 E M / C Y 

 G E N E R A

 T O R  R O

 O M

I-BEAM

1 TON

DN

UPDN

 

Casing B Deck

 S  W I M M

 I N G  P O

 O L

 D U C  T

 D U C  T

 D U C  T

 D U C  T

      D      U     C      T

UP

UP

ELECTRIC HORN

& SIREN

UP

UP

DN

DN

DN

VOID SPACE

 E M ' C Y 

 S W I T C

 H  B O A R

 D  R O O

 M

DN

DN

DEAERATOR

F.W EXP. TK

 

Casing C Deck

UP

DN

DN

UP

NO.4 E/R SUP. FAN ROOM

DEAERATOR

NO.2 E/R SUP. FAN ROOM

I-BEAM 1TON

      H      Y      D .       P

     O      W      E      R

      P     A     C      K      R     O     O      M

NO.2 E/R EXH. FAN

NO.1 E/R EXH. FAN

NO.3 E/R SUP. FAN ROOM NO.1 E/R SUP. FAN ROOM

 

Page 10: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 10/302

LNGC DISHA  Machinery Operating Manual

1 - 5  Part 1 Ship Particulars

Casing Upper Deck

UP

DN

DN UP

UP

UP

DN

   G   A   S    H   O   O   D

    R   O   O   M

DN

DN

DN

SEAL AIR FAM

 C O 2  / 

 H I G H  E

 X P.  F O

 A M  R O

 O M

 D U C  T

 D U C  T

 D U C  T

   E   N  G .    R   O   O   M

    H  A   T   C   H

   H  A   T  C

   H

 D U C  T

  I  N  C  I  N  E  R

 A  T  O  R

   R  O  O

  M

    D    E   C

    K    /    L   A    M    P     S    T

   O    R    E

  F  I  R  E

   S  T  A  T  I  O  N

  G  A   R   B

  A  G   E 

  S   T  O   R

   E

  A   I   R    L  O

  C   K

     A     C

      R    O    O     M

      O       X       R      O      O       M

NO.1 STEAM

 AIR HEATER

NO.2 STEAM

 AIR HEATER

NO.1 ECONOMIZER

INCINERATOR

NO.2 ECONOMIZER

NO.1

F.D FAN

NO.2

F.D FAN

NO.1

NO.2

 

E/R 1st Platform

DN

   D .   O

    T   K    F   O

   R   I .   G

 .    G   E   N

   E   R   A   T   O

   R

    D .   O

    S    E    R

    V .    T    K

 E/ R  W A T E R  B A

 L L AS T  T K

 N O. 2  H. F

. O  S E T T

.  T K

N2 GENERATORNO.1 NO.2

N2 BUFFER TANK

N2 FEED AIR COMP.

NO.1

NO.2UP

NO.2 MAIN BOILER

NO.1 MAIN BOILER

CONDENSING UNIT FOR

 ACCOM. AIR CON SYSTEM

NO.1

I.G.GEN.

TOP SPACE

PROV. REF. PLANT

NO.2

GALLEY/LAUNDRY

NO.2LV TR

NO.1LV TR

DN

UP

DN

UP

DN

STEP-UPTR

GALLEY/PANTRY

NO.2 E/R H.F.O TK

    N   O .   2    S    W    I    T   C

    H    B   O   A    R    D

     R   O   O    M

   T  O  I  L  E

   T

  E  L  E   V

  A  T  O  R

   E   N   G   I   N   E   C   O   N   T   R

   O   L   R   O   O   M

    N   O .   1    S    W

    I    T   C    H    B   O

   A    R    D    R   O   O    M

   N   O

 .  1    E   /   R   H .   F .   O

    T   K

 N O. 1  H. F. O 

 S E T T.  T K

 E/ R  W A T E R  B A

 L L AS T  T K

    D   G     L .   O

    S    T   O    R .

     T    K

    D   G     L .   O

     S    E    T

    T .    T    K

  M A  I  N

   L.  O   S  E

  T  T.   T  K

  T G   L. O  S  T

 O  R.  T  K

    T   G     L .   O

     S    E    T

    T .    T    K

LOW SULPHUP STOR. TK

 AIR CON. FOR SWBD ROOM

 AIR CON. FOR SWBD ROOM

    D    U   C

    T

 D U C  T

 D U C  T

 D U C  T

    D    U   C    T

 D U C  T

GREASETRAP

 

Page 11: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 11/302

LNGC DISHA  Machinery Operating Manual

1 - 6  Part 1 Ship Particulars

E/R 2nd Platform

   D .   O   S   T

   O   R

 .    T   K

E/R  W A TER  B A L L

 AS T  T K

NO.2 E/R H.F.O TK

WORK BENCH

DIESEL GENERATOR ENGINE

CARGO MACH. COOL.

F.W. BOOST. P/P

NO.2

NO.1

I-BEAM 5 TON

I-BEAM 2 TON

NO.2 TURBO GENERATOR

I-BEAM 5 TON

I-BEAM 5 TON

HYD. CONT.V/V CABINET

SEWAGE UNIT

SEWAGETREAT PLANT

I.G DRYER UNIT

 N O. 1  H.

 F. O  S E T

 T.  T K

   N   O

 .  1   E   /   R   H

 .   F .   O

    T   K

   L .   S .

    S   E   T

   T .    T   K

DRAIN COOLER

   D   U  C

   T

DE-OILER

I.G COOLING UNITI.G.G F.O P/P

I.G GENERATOR SCUBBER

NO.1 MAIN BOILER

NO.2 MAIN BOILER

CHEMICAL F. TK

(AMINE)

CHEMICAL F. TK(HYDRAZINE)

I-BEAM 2 TON

ELEC. HOIST (L.P 15 TON X 2SETS)

D/G START AIR COMP.

EM'CY D.O P/P

D/G D.O P/P

ELEC. HOIST (L.P 10 TON X 2SETS)

NO.2

NO.1

 D U C  T

   D   I  S   T   I   L   L

   E   D    W  A   T   E   R

   T   K   (   S   )

     D     I    S     T     I     L     L     E     D

     W    A     T     E     R

     T     K    (       P     ) 

  M A  I  N   L.  O

  S  E  T  T

.  T  K

 M A I N  L. O

 G R A  V I  T  Y

   T K

NO.1

NO.2

NO.1 TURBO GENERATOR

L.P FEED W. HEATER

CLEAN OIL

GEN. SERV. TK

TURBINE OIL

GEN. SERV. TK   E   L   E   V

  A   T  O   R

 D U C

 T

 N O. 2  H. F

. O  S E T T.

  T K

LOW SULPHUR STOR. TK

 E/ R  W A T E R  B A L

 L AS T  T K

UP

UP

UP UP

UP

UP

DN

DN

   L  A   N   D

  G  A   R   E  A

DN

UP

   E   M   '   C   Y    E

   X   I   T

I-BEAM 2 TON

D/G START AIR RESERVOIR

W/S AIR-CON.

COOLING WATER PRE-HEATER

 

E/R 3rd Platform

  S  I  D  E

   R  E  C

  E  S  S

S  I  D  E   R  E  C  E  S  S  

UP

   E   M   '   C    Y

   E   X   I   T

    E    M    '   C    Y    E    X

    I    T

SOOT COLL. TANK

HOT W. CALORIFIER

U.V STERILIZER

FRESH W. HYD. UNIT

REH. FILTER

HOT W.CIRC. P/P

NO.2

NO.1

MAIN FEED W. P/P

GEN. SERV. TK

MAIN L.O COOLER

MAIN L.O AUTO.W/BYPASS FILTER

DRAIN INSP. TK

MAIN FEED W. P/P

L.OPURIFIER

M/B F.O SERV. P/P

MAKE-UP VALVE UNIT

D-S

STEAM V/V

NO.2

NO.2

NO.1

NO.1

NO.2

NO.2

NO.2

ION EXCHANGER UNIT

MAIN COND.

LEVEL CONT. V/V

GLAND CONDENSER EXH. FAN

CENT. F.W.

COOLER

CENT. COOL. F.W. P/PDUMP. STEAM CON. V/V, SILENCER & EXT. DSHTR

GREASE EXTRACTOR

   D .   O   S   T   O

   R .    T   K

 E/ R  W A T E R  B A

 L L AS T  T K

 N O. 2  E/ R

  H. F. O  T K

DEHUMIDIFIER

DOMESTIC F.W.

COOL. PLANT

DOMESTIC F.W. COOL.

PLANT CIRC. P/P

EM'CY FEED W. P/P

NO.2 NO.1

NO.2

  E  L  E  V

 A  T  O  R

NO.2

NO.1

NO.1

NO.1

NO.2

NO.1

NO.2

NO.1

NO.1

NO.1

SERV. AIR RESERVOIR

CONT. AIR DRYER(REPRIGERATED)

 L O W  S U L

 P H U R  S T

 O R.  T K

   P   U   R   I   F   I   E   R   R   O   O   M

 E/ R  W A T E R B A

 L L AS T  T K

    N   O .   1     E   /    R

     H .    F .   O

     T    K

CONT. AIR DRYER(REGENERATIVE)

GEN. SERV. TK

SERV. AIR COMP.

F.W GENERATOR

MAIN COND. VACUUM PUMP

  D  U  C  T

       L .      O      S       L       U       D      G       E       T       K

    F .   O    S    L    U    D   G    E    T    K

D.O

PURIFIER

I-BEAM

1 TONWORK BENCH

NO.1

NO.2

T/G EXH. PIPE

DN

DN

DN

DN

UP

UPNO.1 NO.2

 

Page 12: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 12/302

LNGC DISHA  Machinery Operating Manual

1 - 7  Part 1 Ship Particulars

E/R Floor Deck

    H    I   G    H   S    E

   A    C    H    E   S

    T

FIRE & G/S P/PJOCKEY P/P

I.G SCUBBER P/P

BALLAST P/P

S.W STRAINER

S.W STRAINER

NO.2

NO.2

NO.2

NO.1 F.W. GENEJEC. P/P

NO.1NO.1

NO.1

NO.2

NO.1

NO.1

NO.1

NO.2

NO.2

NO.2

 AUX. L.O P/PI-BEAM 30 TON

   E   M   '  C   Y    E   X

   I   T

S/T L.O P/P

L.O PURI. FEED P/P

L.O TRANS. P/P

SLUDGE P/P

S/T L.O COOLER

E/R BILGE P/P

B.W SEP. P/P

B.W SEPARATOR

S/T TK

NO.2

MAIN COND. P/P

L.P TURBINE

H.P TURBINE

UP

UP

UP

REDUCTION GEAR

L.D COND. P/P

NAV. DRAIN P/PDRAIN P/P

I-BEAN 1 TON

 ATMOSCONDESER

NO.1

NO.1

    H    I   G    H

    S    E   A

   C    H    E   S

    T

 L O  W  S U

 L P H U R

  S  T O R

.   T K

I-BEAM3 TON

H.F.O TRANS. P/PD.O TRANS.P/P

UP

     F     E     E     D

      W .     D     R     A     I     N     T     K

  L A  N  D

  I  N  G

 A  R  E A

NO.2

NO.2

MAIN S.WCIRC. P/P

NO.3

NO.1

STAND-BY

MAIN COOL. S.W P/P  E  L  E  V

 A  T  O  R

NO.1

NO.2 F.W. GENEJEC. P/P

NO.2 BILGE& G.S. P/P

NO.1 BILGE& G.S. P/P

NO.1NO.2W/SPRAY P/P

NO. 2 M .G .P .S . NO. 1 M .G .P .S .

 

Page 13: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 13/302

Page 14: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 14/302

Page 15: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 15/302

LNGC DISHA  Machinery Operating Manual

2 - 2  Part 2 Ship System

Part 2 : Ship System

2.1 Steam Systems

2.1.1 Superheated Steam System

Boiler Details

Maker : Mitsubishi Heavy Industries Ltd.

 No. of Sets : 2

Model : MB-4B-NS

Maximum Evaporation : 63,000 kg/h

 Normal Evaporation : 54,600 kg/h

Steam Condition : 6.03MPag superheated steam at 515°C

Safety Valve Settings

Drum High Set : 7.65 MPag

Drum Low Set : 7.60 MPag

Superheater : 6.34 MPag

All the steam requirements for the vessel are generated within the two main

 boilers. Steam from the steam drum is led to the primary superheater section

through an orifice where the drop in pressure is measured and converted to a

signal for steam flow. The steam, then, flows through the primary section of

the superheater and on to the secondary superheater section.

Taking steam from the primary superheater and leading it through the

temperature control desuperheater, which is located in the water drum that

regulates the outlet temperature of the steam. The control valve, then, regulatesthe outlet from the desuperheater to the secondary superheater, depending on

the outlet temperature on the steam leaving the boiler. To ensure that there is

always a steam flow through the secondary superheater, a line fitted with an

orifice bypasses the temperature control desuperheater and the control valve.

The temperature control valve also has a bypass orifice.

The main turbine main stop valves MS001 and MS014 interconnect both

 boilers. A common line supplies the main turbine. Each boiler has an auxiliary

machinery stop valve, which supplies a manifold line, and in turn supplies the

three main boiler feed water pumps and both turbo generators. The circuit is

designed to supply the auxiliary machinery from either side of the manifold,

giving greater flexibility for maintenance. Warming through bypass valves are provided at all the principal stop valves.

Steam from the superheater outlet is led to the internal desuperheater which is

distributed to the various steam service.

Control and Alarm Settings

BLR STM DRUM H/L PRESS. 7.50 / 5.10 MPag

BLR SHTR STM H/H-H 525 / 530 °C

BLR SHTR PRESS. H/L 6.25 / 5.3 MPag

BLR DSHTR STM PRESS. H 6.25 MPag

BLR DSHTR TEMP H 400 °C

Page 16: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 16/302

LNGC DISHA  Machinery Operating Manual

2 - 3  Part 2 Ship System

Illustration 2.1.2i Desuperheated Steam

DS016

TI

Steam Drum

Water Drum

No.2 Main Boiler (PORT)

To Feed W.Drain Tank

To General service & heating steam

To Main Boiler Soot Blower 

To HP Exh. Make-up Steam

To LPT Solo Run

No.1 Main Boiler (STBD)

Water Drum

Steam Drum

5.88/0.76MPag PRV

   M   S   0   3   5

   M   S   0   5   2

5.88/0.24MPag PRV

To Atmos.

5.88MPag Soot Blower Steam

To Main Boiler  Atomizer 

To Atmos.

To GlandSteam System

To M/T Warming up

Silencer 

Silencer 

Main Condenser 

 Atmos.Condenser 

From M/C W P/P

 And Drain P/P

SB008

SB009

   S   B   0   1   0

NO.1 Dump SteamCont. v/v (STBD)

NO.2 Dump SteamCont. v/v (Port)

DS006

DS007

DS020 DS021 D S041

DS024

DS023

NO.2 DUMP STEAMEXT. DSHTR (PORT)

DS001

DS011

DS010

5.88/1.57MPag PRV

   4   6   6   B

   1   4   5   B

   1   4   5   B

   1   4   6   B

SB091SB050

   S   B   0   6   9   S   B   0   6   8

ES080 ES082ES081

ES078

330B

332B

331B

335B

SB001 SB003

SB004

SB002

GS003GS001 GS002

GS004

GS015

GS012 GS014GS013

   G   S   1   9

   G   S   1   6

   G   S   1   8

      S      B      5      4

      S      B      5      3

ES24-D2C-125A MS37-7LB-125A

MS35-7LB-50A

 Atomizer Air 

MS38-7LB-150A

333B

333B

PCPICTC TIC

PC PIC

PC PIC

MS34-7LB-80A

   G   S   1   9  -   E   I   X  -   1   5   A

GS12-BIX-150A

GS11-F3B-100A

GS03-F3B-150A

HP BLEED

GS005

GS16-EIX-15A

DS18-EIX-400A

DS022DS042

TT

NO.1 DUMP STEAMEXT. DSHTR (STBD)

334B

SB011

WSWS

Key

Condensate Line

DesuperheaterL ine

Drain Line

 Air Line

WS

WS

   D   S   0   2   7

   D   S   0   2   6

   D   S   0   2   8

   D   S   0   2   5

   4   6   3   B

   4   6   3   B

DS017

DS018

DS019

   G   S   0   1   0

   G   S   1   7

GS008

GS007

1.57/0.78MPagGS006

SB005

GS011

 

Page 17: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 17/302

LNGC DISHA  Machinery Operating Manual

2 - 4  Part 2 Ship System

2.1.2 Desuperheated Steam Systems

Desuperheated Steam System

Superheated steam from each boiler’s outlet is led to an internal

desuperheater that is fitted in each boiler’s steam drum.

These desuperheaters discharge to a common line and supply the following

services to the :

LP turbine solo running operation

Main dump external desuperheaters

Main boilers soot blowers

General service and heating steam

5.88/1.57 MPag reducing valve (SB002) which supplies:

Main turbine warming up steam

Boiler atomizing steam

Turbines gland packing steam

The 5.88/0.24 MPag reducing valve (ES081) supplies the HP exhaust make-

up steam to heat up the deaerator, steam air heaters, fresh water generators,

along with the IP bleed steam.

Control and Alarm Settings

BLR STM DRUM H/L PRESS. 7.50 / 5.10 MPag

BLR SHTR STM H/H-H 525 / 530 °C

BLR SHTR PRESS. H/L 6.25 / 5.3 MPag

BLR DSHTR STM PRESS. H 6.25 MPag

BLR DSHTR TEMP H 400 °C

Page 18: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 18/302

LNGC DISHA  Machinery Operating Manual

2 - 5  Part 2 Ship System

Illustration 2.1.3i Generator Steam System

Gland SteamReceiver 

Near Scupper 

Steam Strainer 

Main Stop V/V

No.2 Turbine

Generator 

Gland SteamReceiver 

Near Scupper 

Steam Strainer 

Main Stop V/V

From HPExhaust Steam

Atmos. Condenser 

To Gland Condenser 

AES196

ES197

ES198ES203

ES200 ES201 ES205

ES193

ES192 ES204

From FW Gen.FD W. Heater Drain

No.1 Turbine

Generator 

MS088

MS087

Main Condenser 

FS23-EIX-50A

   B   I   X  -   1   0   0   0   A

   B   I   X  -   1   0   0   0   A

   B   I   C  -   2   0   0

   A

ESF6-BIC-350A

ES206

ES207

ES208

   E   S   2   5  -   B   I   C  -   2   0   0   A

ESF9-BIC-125AESE1-BIC-200A

   E   S   1   9   4

   E   S   1   9

   9

ESG1-BIC-1000A

Gland SteamReceiver Spill

Contr. V/V

Gland SteamReceiver Spill

Contr. V/V

Gland Steam PressureMake-up V/V

Gland Steam PressureMake-up V/V

PS011 PS010

Superheated Steam

MS07-4MB-150A

MSB3-4MB-125A

MSB4-4MB-125A

     1     5     A

15A 15A

     1     5     A

   P   S   0   7  -   E   2   X  -   5   0   A

   P   S   1   3  -   F   3   B  -   2   5   A

SBB7-E3B-50A PS12-F3B-40A

   P   S   2   1  -   E   I   C  -   6   5   A

PS09-E2X-65A PS08-E2X-50A

   P   S   0   8  -   E   2   X  -   5   0   A

   P   S   2   1  -   E   I   C  -   6   5   A

WS

WS

WS

WS

Key

Steam Line

Exhaust Steam Line

FW Line

Drain Line

[Emergency Use]

A

[Emergency Use]

[Emergency Use]

From 1.57MPag steam

POS

V29

V27 V28V2

   V   5

POS

V1V25V24

V26

POS

V1V25V24

V26

POS

V29

V27 V28V2

   V   5

H

ES191

H

 

Page 19: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 19/302

Page 20: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 20/302

Page 21: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 21/302

Page 22: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 22/302

Page 23: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 23/302

LNGC DISHA  Machinery Operating Manual

2 - 10  Part 2 Ship System

2.1.5 General Service Steam System

The low pressure steam service system is supplied from the external

desuperheater & HP bleed steam at an initial pressure of 0.78 MPag.

The services supplied at this pressure include :

Inert gas dryer and generator

Boiler fuel oil heaters

Air conditioning plant

E/R H.F.O. tank (P), (S)

H.F.O. sett. tank (P), (S)

Low sulphur tank

Low sulpher FO settling tank

HFO overflow tank

Turbine generator LO settling tank

Diesel generator LO settling tank

Main LO settling tank

 No.1 & 2 Calorifier

Boiler smothering steam

Incinerator waste oil tank

Bilge holding tank

Waste oil tankLO sludge tank

FO sludge tank

Deck services, including the forward HFO deep tank heating

De-oiler back washing

Boiler sprayer cleaning device

Sea chest blowing steam

Steam trace heating lines

Steam to hose connections

Cargo Machinery Room

L/D and H/D gas heater

LNG vaporiserForcing vaporiser

Glycol heating system

LO heater for compressors

General Service Steam Temperature Control

A temperature control external desuperheater is provided to regulate the

temperature of the general service steam at 175ºC.

The general service steam is supplied from the HP bleed steam or from

internal desuperheater of main boilers, and is connected to the externaldesuperheater, where the steam temperature is reduced up to the saturation

 point of that pressure to be stated, and then fed to the consumers throughout

the engine room, cargo, and accommodation areas.

Spray water for the external desuperheater is supplied from the outlet of the

HP feed water system. The IAS controls the flow of the spray water

according to the temperature variation at the outlet of the external

desuperheater.

A PID temperature controller is used to reduce steam temperature from

290ºC to 174ºC.

The set point for the external de-superheater can be adjusted in the IAS

whilst it is operating in Auto Mode.

Direct operation of the control valve can be achieved by changing the

controller to Manual Mode.

If the controller fails, the control valve position of the external desuperheater

will be maintained at its last position.

Page 24: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 24/302

LNGC DISHA  Machinery Operating Manual

2 - 11  Part 2 Ship System

Illustration 2.1.6i Gland Packing and Leak Off System

LP Turbine

HP Turbine

Constant Level Pot

ManeuveringV/V Astern Guard

V/V

Gland Condenser 

Deaerator 

(0.23 MPag, 136˚C, 21 m3

)

No.2 T/G

Turbine

No.1 T/GTurbine

From 1.59 MPag Steam System

To Main Condenser

FAN

To Feed Water Drain Tank

To T/G Exh.Steam Line

No.1No.2

 Air Vent

V/V

PS013

Gland Steam Receive

PS010

PS011

PS23-EIC-15A

   P   S   2   1  -   E   I   C  -   6   5   A

   P   S   1   3  -   E   3   B  -   2   5   A

   P   S   7   0  -   E   2   X  -   5   0   A

PS22-EIC-15A

   P   S   2   0  -   E   I   C  -   6   5   A

Gland Steam Receiver 

   P   S   1   2  -   F   3   B  -   4   0   A

SBB7-E3B-50A

To T/G Exh.Steam Line

To Main Condenser

PS015

PS020PS021

PS019

   P   S   2   9  -   E   I   X  -   1   5   A

To FW Drain TK

   P   S   0   1   6

   P   S   0   1   7

   P   S   0   1   8

PS15-F3B-15A

PS05-E2X-100A

   P   S   0   3  -   E   2   X  -   4   0   A

   P   S   0   4  -   E   2   X  -   2   5   A

PS09-E2X-65A

   P   S   1   9  -   E   I   X  -   2   5   A

   P   S   0   1  -   E   2   X  -   4   0   A

   P   S   0   2  -   E   2   X  -   4   0   A

PS002 PS001

Turbine of Main FD W. Pump

   P   S   0   0   6

   P   S   2   6  -   B   I   X  -   1   5   A

GlandLeak Off 

Gland Leak Off Reservoir 

Packing Steam Reservoir 

   P   S   3   3  -   E   2   C  -   1   5

   A

M/T Internal PipeWS

WS

M/T Internal Pipe

 Air Vent

(Above Top Side of Deaerator)

GlandLeak Off 

Key

Steam Line

Drain Line

Make-up V/V Spill V/V

V2

V28V27

V29

V1

V25V24

V26

Make-up V/V Spill V/V

V2

V28V27

V29

V1V25V24

V26

T-29

T-27 T-28

T-303

T-26

T-25

T-302

T-24

T-71A

   O

  -   3   0

   O

  -   3   1

   O  -   3   5

   O  -   3   2

   O  -   3   3

   V   5

   V   5

Near Scupper 

Near Scupper 

   T  -   7   1

PI

PT

 

Page 25: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 25/302

LNGC DISHA  Machinery Operating Manual

2 - 12  Part 2 Ship System

2.1.6 Gland Packing and Leak Off System

Steam for the gland sealing for both turbine generators and the main turbine is

supplied from the 1.57 MPag system, which is supplied from the 5.88/1.57

MPag desuperheated steam system.

Main Turbine

Two air-operated control valves normally control the packing steam. In case of

low packing steam pressure, the make up valve opens and supplies the packing

steam to the glands. In case of high packing steam pressure, the spill valve

opens and the packing steam is dumped to the main condenser.

In order to prevent hunting or cycling, the packing steam controller should be

adjusted with a small dead band between the opening of the spill and make up

valves. The steam pressure is maintained at about 19.6 kPag.

The packing steam reservoir is permanently drained to the condenser via an

orifice. Leak off from the gland packing is collected in the gland leak off

reservoir where it is drawn to the gland condenser, and goes to the drain tank.

The gland exhaust can be directed to the gland condenser. Exhaust from the

deaerator and leak off from the feed pumps are also drawn into the gland

condenser.

Turbine Generators

The turbine generator gland sealing is supplied in a similar manner, with

 pressure maintained in the gland packing steam reservoir by the make up and

spill valve. Excess pressure is dumped to the respective turbine exhaust line.

The reservoir is constantly drained to the exhaust line via an orifice. The leak

off from the glands is drawn to the gland condenser.

Control and Alarm Settings

M/T AST STEAM CHEST TEMP. HIGH 350 °C

T/G GLAND STM PRESS. H/L 20/3 kPag

M/T GLAND PACK STM PRESS. H/L 50/5 kPag

Page 26: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 26/302

LNGC DISHA  Machinery Operating Manual

2 - 13  Part 2 Ship System

Illustration 2.1.7i Soot Blower Panel

L2

L1

R2

R1

R6

R5

R4

R3

L2

L1

R2

R1

R6

R5

R4

R3

   S   B   0   6   4

   S   B   0   6   5

   S   B   0   6   0   S

   B   0   5   8

NO.2

MAIN BOILER

NO.1

MAIN BOILER

SB061 SB056

SB050

SB068

SB069

SB091

S   B   0   5   

3   S   B   0   5   4   

   S   B   0   5   7

   S   B   0   5   5

   S   B   0   6   2

LONGSOOTBLOWER

LOCALLOCAL ECR

CONT POSITION

LOCALNO.2BLR

BOTHBLR

NO.1BLR

CONT MODE

LOCALSEQ

STARTECO

START

PT

PI

PSPS

NEAR

SCUPPER

FR M/B DSHTR

For SB AutoStart Intl.

284B

SB063

285B 285B

SB058

SB092SB093

NEAR

SCUPPER

TO OUTLET LINEOF THE STARTUP VENT V/V

 

Page 27: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 27/302

Page 28: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 28/302

Page 29: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 29/302

Page 30: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 30/302

Page 31: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 31/302

Page 32: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 32/302

LNGC DISHA Machinery Operating Manual

Page 33: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 33/302

LNGC DISHA  Machinery Operating Manual

2 - 20  Part 2 Ship System

Blank Page

LNGC DISHA  Machinery Operating Manual

Page 34: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 34/302

y p g

2 - 21  Part 2 Ship System

Illustration 2.2.2i(3) Clean Steam Drain System

TT SD

   S   D   2   0   1

SD202

FROM DECK DRAININSPECTION TK

FROM E/R DRAININSPECTION TK

NO.1 M.FD W. P/P TURB.STOP V/V INLET DRAIN

NO.2 M.FD W. P/P TURB.STOP V/V INLET DRAIN

0.24 MPag PRESS. CONT. V/VOUTLET DRAIN LINE

0.24 MPag PRESS. CONT. V/VOUTLET DRAIN LINE

FROM M/T WARM UP LINE

   S   D   A   9  -   B   I   X  -   5   0   A

SDA1-EIX-50A

SDA3-EIX-40A

SD66-EIX-50A

SD67-EIX-80A MSB9-EIX-15A

MSC1-EIX-15A

NO.2 M. FD W. P/P TURB.

STEAM CHEST DRAIN

MSD1-EIX-15A

DUMP STEAM PISTONV/V OUTLET DRAIN

DS26-EIX-15A

0.79MPag STM PRESS. CONT. V/V

GS16-EIX-15A

FROM SLCC-ADOSING TK(100 LTR)

BT24-EIX-15A

F.W GEN HEATING STEAMSUPPLY LINE CONDENSATE DRAIN

FS27-EIX-15A

NO.1 M. FD W. P/P TURB.CASING DRAIN

MSC6-EIX-15A

NO.2 M. FD W. P/P TURB.CASING DRAIN

MSD0-EIX-15A

FROM NO.1 M/B STM

DRAIN SEPA.

SB75-EIX-15A

FROM AUX. EXTERNAL DESUPERHEATER INLET LINE DRAIN

GS19-EIX-15A

HP BLEED LINE DRAIN

ESDZ-EIX-15A

ES07-EIX-15A

ES09-EIX-15A

HP EXHAUST STEAM LINE DRAIN

ES32-EIX-15A

M/T PACKING STEAMMAKE UP LINE

PS29-EIX-15A

TS21-EIX-15A

   S   D   A   2  -   E   I   X  -   4   0   A

TI

ESC7-EIX-125A

FROM LP FD.W.HEATER

M/T LPT SOLO RUNSTOP V/V INLET DRN

TS12-EIX-15A

NO.1 M. FD W. P/P TURB.STWAM CHEST DRAIN

MSC7-EIX-15AFROM NO.2 M/B STMDRAIN SEPA.

SB77-EIX-15A

CP

 Atmos.Condenser 

   S   D   A   5  -   E   I   X  -   2   5   0   A

SDB2-LIX-5A

FROM F.W.GEN EVAPORATORCONDENSATE PUMP

FS24-EIX-50A

FROM GLANDCONDENSER

PS19-EIX-25A

FROM F.W.GEN EVAPORATORCONDENSATE PUMP

FSA2-EIX-25A

   S   D   A   4  -   E   I   X  -   2   5   A

FD W. DRAIN TK.

(10 m3)

   S   D   6   8  -   E

   I   X  -   8   0   A

 

Page 35: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 35/302

Page 36: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 36/302

Page 37: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 37/302

Page 38: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 38/302

LNGC DISHA  Machinery Operating Manual

Page 39: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 39/302

2 - 26  Part 2 Ship System

Illustration 2.2.3.1i Main Feed Water Pump & Turbine Governor Section

Drain Valve

Bowl Valve

Hex Nut

Main Control Lever (X77)

Cotter Pin

Linkage Pin

Vent & Fill Cap

Vent & Fill Pipe

45 Street Elbow

Bolt

Oil Batonet

Oil Batonet Shield

Pipe Plug

Worm Gear Bearing Bracket Oil Sump

Cover Gasket

Stud

Hex Nut

Oil Sump Cover 

Pipe Plug

(Oil Drain Location)

"A"

"A"

"B"

Gasket

Nipple & Flange Welding Assembly

Steam Chest Bracket

& Oil Relay Cylinder 

Linkage Pin

Main Control Lever & Rod Connector 

Main Control Lever Rod (X118)Governor Spindle Bearing Upper Cover 

Section "C - C"

View In Direction of Arrows "B - B"

(Oil Fill Location)

Limiting Speed Governor 

& Governor Housing

Governor Gear Box

& Oil Pump

Hex Nut

Bolt

Reducing Street Elbow

Turbine Sentinal Relief Valve

TeeNipple Bolt

Nipple & Flange Weld Assembly

Gasket

Cotter Pin

Hex Nut

Casing Alignment Stud

Stud

Back Pressure Trip

Key

Worm Gear Key

Worm Gear 

Lube Overflow& Gear Lube Nozzle

Worm

Gover Driver Shaft

Worm Key

Main Shaft

Governor Drive

Shaft Bearing

 Allen

Set Screw

R.H. Spiral Mitre Gear 

Governor Drive Shaft Bearing

Worm Gear Bearing Bracket

(Gov. Side)

"B"

 

LNGC DISHA  Machinery Operating Manual

Page 40: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 40/302

2 - 27  Part 2 Ship System

Illustration 2.2.3.1i Main Feed Water Pump & Turbine Centrifugal Speed Governor

Main Control Lever 

"A"

"A"

Main Control Lever & Rod Connector 

Bolt

Main Control Lever Rod Guide

Governor Spindle Bearing Body

Linkage Pin

Linkage Pin

Heavy Hex Nut

Cotter Pin

Trip Latch Plate

Linkage Pin

Governor Spindle Bearing

Upper Cover 

Governor Spindle Bearing

Lower Cover 

Governor Weight Thrust Button

Bolt

Heavy Hex Nut

Linkage Pin

Hex Jam Nut

Rivet

Governor Spindle

Upper Guide

Governor Spring

 Alignment Bearing

Lock Washer 

Governor Spindle

Self-alignmentBearing

Governor Spring

 Alignment Bearing

Lock Nut

Lubricating Oil

Inlet

Part Section "A - A"

Governor Spindle Bearing

Body

Governor Weight

Governor 

Weight Bearing

Governor Housing

Resetting Spring Pin

Back Pressure Trip

Resetting Lever (x117)

Trip Latch Spring

Back Pressure

Trip Latch Pin

Back Pressure

Trip Latch

Governor Spring

Cotter Pin

Governor Weight Shaft Pin

Governor Frame

Governor 

Frame Key

Gov. Thrust Brg.

Lower Retainer 

Governor Thrust Bearing

Gov. Thrust Brg. Upper Retainer 

& Gov. Spindle Ass'y

Bolt

Set Screw

Hex Jam Nut

Overspeed Trip Bracket

Linkage Pin

Governor Spindle

Lower Guide

Governor Frame

& Gov. Spindle Lower Guide Ass'y

Overspeed Trip Action

Governor Resetting Link

 

LNGC DISHA  Machinery Operating Manual

Page 41: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 41/302

2 - 28  Part 2 Ship System

2.2.3.1 Main Feed Water Pump & Turbine

Capacity Normal: 136 m3 / HR(HVC), Maximum: 160 m3 / HR(HVO)

Total Developed Head 855 / M.

 NPSH Req’d 11.7 / M.(max.)Steam Inlet 5.88 MPag

Initial Temp. 510°C 

Exhaust 0.29 MPag

Type “DEB-16”

HP/KW 724/540

rpm 7,210

Rated Design rpm 10,000

Overspeed Trip Set 7,900 rpm

Turbine Sentinel Valve Set 0.34 MPag

Back Pressure Trip Set 0.41 MPag

Remote Start Pressure Switch Set 0.20 MPag

High Oil Temperature (Alarm) Set 80 °C

Low Oil Pressure Switch (Trip) Set 0.17 MPag

Deaerator Level Low-Low (Trip) Set -1100 mm

Aux. L.O. pump remote stop switch Set 0.22 MPag

Aux. L.O. pump start fail switch (alarm) Set 0.20 MPag

Turbine Rotor Vibration Alarm : 7.1 mm/sec RMS

Trip : 11.2 mm/sec RMS

Mechanical seal flush line flow meter

Maker : BAILEY FICHER PORTER

Type : SI-6788/1

Pressure : 1.21 MPag @ 121°C

Performance Curves

Minimum

Flow 28.4 m3/h

at 855 m TDH

5025 125 150 175

50

45

40

35

30

25

20

15

10

5

0

10075

1000

900

800

700

600

500

400

300

200

100

0

0

EXPECTED CHARACTERISTIC CURVE

COFFIN TYPE "DEB" TURBO PUMP

Total Head = 855m; Suction Temperature = 136.13C; NPSHA = 13m;Steam Inlet Pressure = 5.88 MPag at Temperature = 510C, Exhaust Pressure = 294 KPag

NPSHR

TDH

760

750

740

730

720

710

700

690

680

670

660

Feed Water Flow Rate (m3 / h)

7000

8000

6000

5000

4000

3000

50

2000

25 125 150 175100750

7600

7400

7200

7000

6800

6600

6

5

4

3

2

<<<< Hand Valve Closed

BOWL PRESSURE

rpm

EXHAUST ENTHALPY

STEAM FLOW

Hand Valve Open >>>>  

Page 42: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 42/302

Page 43: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 43/302

LNGC DISHA  Machinery Operating Manual

Page 44: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 44/302

2 - 31  Part 2 Ship System

Illustration 2.3.1i Main Sea Water Circulating System

CW026

65A

Saw Dust

Box(0.5 m3)

Main Condenser

From SW. Cooling

Service System

No.1 Main SWC Pump

(9,500/4,700 m3

/h x 5/8 mth)

TO Bilge P/P SUC.

CW027

CW041

CW037

   C   W   0   2   8

CW006

CW009CW007

CW003

CW023

   C   W   0   2   1

   C   W   0   2   2

CW036

CW005CW004

CW008CW010

C  W  0  9  - B  I  X  - 1  6  0  0   A 

CW24-BIX-400A

   C   W

   0   1   6

  C   W  0  1  7

CW15-BIX-50A

   5   0   A

25A

CW02-BIX-1000A

CW04-BIX-1000A

TI

TI

   C   W   1   3  -   B   I   X  -   7   0   0   A

TI

CW018

PT

CW024

PI

CW08-BIX-1600A

DRAINTO BILGE

CW013CW011CW012

CW014

CW06-BIX-1000A

   C   W   0   1   5

   C   W   0   2   0

No.2 Main SWC Pump(9,500/4,700 m3/h x 5/8 mth)

No.3 Main SWC Pump

(9,500/4,700 m3/h x 5/8 mth)

   C   W   0   2   5

Low Sea Chest (STBD)

From MGPS

DIAPHRAGM

VALVE

   C   W   9   2  -   B   I   X  -   1   2   5   A

DRAIN HOLE 100mm

High Sea Chest (STBD)

From MGPS

CW93-CIX-125A

 AIR VENT HOLE 100mm

DRAIN HOLE 100mm

   C   W   0   1  -   B   I   X  -   1   6   0   0   A

TT

TI

DIAPHRAGMVALVE

 AtmosphericCondenser 

Key

Sea Water Line

MGPS Line

   C   W   0   4   4

CW28-BIX-400A

   C   W   1   2  -   B   I   X  -   7   0   0   A

CW25-BIX-450ACW042

DRAIN

TO BILGE

FR Ballast Pump

CW019CW27-BIX-400A

TT

B.WCW038

   HH  

H

   H

H

H

H

 

Page 45: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 45/302

Page 46: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 46/302

Page 47: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 47/302

Page 48: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 48/302

Page 49: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 49/302

LNGC DISHA  Machinery Operating Manual

Page 50: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 50/302

2 - 37  Part 2 Ship System

Illustration 2.3.2.2i Marine Growth Preventing System (MGPS)

MAIN CSW PUMP

MAIN SW

CIRC. PUMP

MAIN

CONDENSER

 ATMOS

CONDENSER

HIGH SEA CHEST

LOW SEA CHEST

CW52-C1X-1000A

CW12-P1X-700A

   C   W   0   8  -   C   1   X  -   9   0   0   A

H

CW09-C1X-1500A

HIGH SEA CHEST LOW SEA CHEST

NO.1&2 MainCSW PP

NO. 1&2 Aux.CSW PP

A

A

CW092No.1

MGPS

Unit

CW096No.2

MGPSUnit

F22

F4

F3

F2

B

To Bilge Well

B

CW68-BIX-100A

CW67-BIX-100A

   C   W   8   9  -   B   I   X  -   1   2   5   A

CW92-BIX-125ACW93-CIX-125A

Flow Switch(F21)

F1

Flow Switch (F21)

F2

HH

CW025CW026

 

Page 51: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 51/302

Page 52: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 52/302

Page 53: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 53/302

LNGC DISHA  Machinery Operating Manual

Illustration 2.5i Boiler Water Sampling and Treatment System

Page 54: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 54/302

2 - 41  Part 2 Ship System

p g y

PIChemical Feed Tank (Amine)

Pump

No.2

(PORT)

No.1

(STBD)

To FWCooling System

From MFW. P/PSuction Line

To Bilge WellTo Bilge Well

No.2 Main Boiler (PORT)

Water Drum

Steam Drum

Bottom WW. HDR

From Main Cond. P/P

BT004

   B   T   0   0   6

   B   T   0   0   9

BT001 BT002

To Bilge

Well

NO.2 BLR W.Sample CLR

SinkWater Analysis Unit

BT005

FWSample CLR

NO.1 BLR W.Sample CLR

   1   5   A

CD07-E3X-25A

   2   5   A

   2   5   A

   2   5   A

   2   5   A

   2   5   A

FD04-E2X-15A

BT10-FMB-15A BT09-FMB-15A

   B   T   1   4  -   F   M   B  -   1   5   A

   B   T   1   3  -   F   M   B  -   1   5   A

PI PI

PI

SURFACE BLOW OFF

CHEMICAL FEED

BLOW OFF

   B   T   0   5  -   Z   M   B  -   4   0   A

25A

BLOW OFF

CHEMICAL FEED

Chemical Feed Tank(Hydrazine N

2H

4)

   B   T   0   2   2

   B   T   3   3  -   B   I   X  -   4   0   A

   B   T   2   9  -   B   I   X  -   4   0   A

64B 65B

61B 62B

65B 64B

KeyFW Line

Steam Line

Drain Line

Chemical Feed Line

   B   T   0   2   8

To FD WDrain Tank

From Main Cond.P/P

SLCC-ADosing

Tank

   B   T   0   1   6

   B   T   0   1   2

CDB0-E3X-15A

BT24-E3X-15A

To Bilge Well To M FD P/P Suct.

To Scupper Sys.

25A

16B 15B

67B

15B 16B

67B 68B

No.1 Main Boiler (STBD)

Water Drum

Steam Drum

Bottom WW. HDR

62B 61B

68B

   B   T   0   0   3

   B   T   0   1   9

CFA3-BIX-25AFrom FW

Cooling System

   2   5   A

   B   T   1   7  -   E   3   X  -   1   5   A

   B   T   3   4  -   B   I   X  -   1   5   A

   B   T

   1   6  -   E   3   X  -   1   5   A

 

Page 55: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 55/302

Page 56: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 56/302

Page 57: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 57/302

Page 58: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 58/302

Page 59: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 59/302

LNGC DISHA  Machinery Operating Manual

Illustration 2.6.2i DO Purifying and G/E Fuel System

Page 60: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 60/302

2 - 47  Part 2 Ship System

Diesel Oil Purifier System 

LM

To Sludge Pump

FO SLUDGE TK(3.1 m3)

OP005

OP061

OP007

   O   P   0   0   8

Near Scupper 

DO ServiceTank (37.7 m3)

DO Purifier (2,000 L/H)

OP06-BIX-25A

CP

   O   P   0   7  -   B   I   X  -   2   5   A

OP08-BIX-125A

   O   P   5   1  -   B   I   X  -   1   0   0   A

   O   P   5   2  -   B   I   X  -   5   0   A

LS

PI

OP62-BIX-65A

   1   2   5   A

Fr DO Tk

For IGG

   O   P   0   0   4

OP003OP002

OP006

PI

OP01-BIX-40A

   O   P   0   1   3

OP011

OP02-BIX-25A

OP03-BIX-25A

 OP  0  5 1 

OP05-BIX-25A

Fr Incinerator DO Serv. Tk

DO Tkfor IGGEmpty

DO Serv. TkEmpty

   5   0   A

   O   F   B   3  -   B   I   X  -   4   0   A

   O   F   B   4  -   B   I   X  -   4   0   A

Key

Sludge Line

DO Line

LEAKAGE

MONITOR

P

   O   P   0   0   1

   P

DO Storage

Tank (332.7 m3)

 

Diesel Generator Fuel Oil System 

PIPI FMOG006OG007

OG008

   O   G   0   1  -   B   I   X  -   4   0   A

OG001

   O   G

   0   3  -   B   I   X  -   4   0   A

OG04-BIX-40A

   R  e   t  u  r  n   C   h  a  m   b  e  r

OG11-BIX-25A

150A PIPE

   O   G   1   8  -   B   I   X  -   2   5   A

O G0 21 O G0 12

DPS

DPI

PTOG024

16K

OG011LS

Leakage Tank

OG10-BIX-15ATo FO Overflow Tank

OG010 OG009

PI

   O   G   0   8  -   B   I   X  -   4   0   A

Em’cy DO Serv.P/P Unit(0.8 m3/h X 0.59 MPag)

D/G Eng. DO Serv. P/P

(1.1 m3/h X 0.39 MPag)

   O   G   0   6  -   B   I   X  -   4   0   A

   O   G   0   5  -   B   I   X  -   4   0   A

Diesel Gen. Engine

(4,950 BHP)

2ND DK (P)

Sett.0.39 MPag

OG003

PI

 A Air 

Motor 

From Serv. Air System

DO Service

Tk (37.7 m3)

P

 

Page 61: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 61/302

Page 62: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 62/302

Page 63: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 63/302

LNGC DISHA  Machinery Operating Manual

Illustration 2.6.4i Boiler Fuel Gas Service System

Page 64: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 64/302

2 - 51  Part 2 Ship System

Base No.3No.2

Base No.3No.2

Burner N2

Purge V/V

Burner N2

Purge V/V

Master N2

Purge V/V

Gas Header

N2 Vent V/V

No.2 Main Boiler (PORT)

No.1 Main Boiler (STBD)

FG FlowCont. V/ V

FG FlowCont. V/V

To Vent Riser 

FR N2 BUFFER TK

   N  o .   2   F   G   H  e  a   d  e  r

   N  o .   1   F   G   H  e  a   d  e  r

NO.1(STBD)

NO.2(PORT)

Motor Motor  

Boil-Off Leak GasExtraction Fan

Gas HeaderN2 Vent V/V

GF010

   G   F   2   0  -   B   2   X  -   5   0   A

GF23-B2X-15A

GF035

GF037

GF036

GF22-B2X-15A

GF21-B2X-15A

GF038

   G   F   2   4  -   B   2   X  -   1   5   A

   G   F

   2   5  -   B   2   X  -   5   0   A

250A

250A

GF01-E2C-300A

GF40-B2X-65A

GF26-B2X-50A

125A

125A

125A

125A

125A

125A

GF16-B2X-15A

GF15-B2X-15A

GF14-B2X-15A

GF031

GF032

GF033

   G   F   1   7  -   B   2   X  -   1   5   A

GF034

GF19-B2X-50A

   G   F   1   8  -   B   2   X  -   5   0   A

   G   F   1   3  -   B   2   X  -   5   0   A

GF11-B2X-15A

   G   F   1   2  -   B   2   X  -   3   2   A

   2   1   2   B

208B

208B

   3   8   0   B

217B

217B

217B

214B214B

218B

211B

   2   0   7   B

213B

213B

213B

   2   1   2   B

   2   0   7   B

211B

218B

213B

213B

213B

 G a s 

D e t   e c  t   or 

Gas Detector 

 G a s D e t   e c  t   or 

214B214B

214B214B

214B214B

214B214B

214B214B

217B

217B

217B

H

CG405F.G.MasterV/V

LNG Vapour Line

N2 Line

Key

 

Page 65: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 65/302

LNGC DISHA  Machinery Operating Manual

Illustration 2.6.5i Normal Boil-Off Gas Burning

Page 66: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 66/302

2 - 53  Part 2 Ship System

FM

FM

FM

FM

FM

FM

FM

FM

KEY

IG021 IG020

CG405

IG022 CG527

CG525

CG524

CG523

CG522

CG516

CG512

CG508

CG507

CG503

CG504

CG515

CG511

CG514

CG513CG002

CG509

CG505

CG501

CN683

CG528

CS003

CS002 CS001

CG510

CG506

CG502

NO.2 HIGH DUTY COMP.

NO.1 HIGH DUTY COMP.

NO.2 LOW DUTY COMP.

NO.1 LOW DUTY COMP.

TO INS.PRESS.

CG519

C G5 18 C G5 17

CG532

CG530

CG521

CS506

CS505

CS504

CS501

CF101

CF102

CF201

CF202CF302

CF301

CF402

NO.4 CARGO TANK NO.3 CARGO TANK NO.2 CARGO TANK NO.1 CARGO TANK

CF401

CS502

CS503

CG526

CG520

GAS MAIN

LNG VAPOUR LINE

VAPOUR MAIN

STRIPPING/SPRAY MAIN

LIQUID MAIN

CS004

CG533

DEMISTER

FORCINGVAPORIZER

LNGVAPORIZER

HIGH DUTYHEATER

LOW DUTYHEATER

FUEL GAS

TO BOILERS

FROM IGG

SP502

SP401 SP301 SP201

SP101

SP102

SP601

SP501

BUTTERFLY VALVE REMOTE HYD. CONTROL

GLOBE VALVE  AUTOMATIC CONTROL

LIFT CHECK VALVE MANUAL CONTROL

SWING CHECK VALVE REDUCER

SAFETY RELIEF VALVE SPOOL PIECE

STRAINER

SYMBOL SYMBOLDESCRIPTION DESCRIPTION

 

Page 67: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 67/302

LNGC DISHA  Machinery Operating Manual

Illustration 2.6.6i Forced Boil-Off Gas Burning

Page 68: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 68/302

2 - 55  Part 2 Ship System

FM

FM

FM

FM

FM

FM

FM

KEY

IG021 IG020

CG405

I G0 22 C G5 27

CG525

CG524

CG523

CG522

CG516

CG512

CG508

CG507

CG503

CG504

CG515

CG511

CG514

CG513CG002

CG509

CG505

CG501

CN683

CG528

CS003

CS002 CS001

CG510

CG506

CG502

NO.2 HIGH DUTY COMP.

NO.1 HIGH DUTY COMP.

NO.2 LOW DUTY COMP.

NO.1 LOW DUTY COMP.

TO INS.PRESS.

CG519

C G5 18 C G5 17

CG532

CG530

CG521

CS506

CS505

CS504

CS501

CF101

CF102

CF201

CF202CF302

CF301

CF402

NO.4 CARGO TANK NO.3 CARGO TANK NO.2 CARGO TANK NO.1 CARGO TANK

CF401

CS502

CS503

CG526

CG520

GAS MAIN

LNG VAPOUR LINE

LNG LIQUID LINE

VAPOUR MAIN

STRIPPING/SPRAY MAIN

LIQUID MAIN

CS004

CG533

FM

DEMISTER

FORCINGVAPORIZER

LNGVAPORIZER

HIGH DUTYHEATER

LOW DUTYHEATER

FUEL GASTO BOILERS

FROM IGG

SP502

SP401 SP301 SP201

SP101

SP102

SP601

SP501

BUTTERFLY VALVE REMOTE HYD. CONTROL

GLOBE VALVE  AUTOMATIC CONTROL

LIFT CHECK VALVE MANUAL CONTROL

SWING CHECK VALVE REDUCER

SAFETY RELIEF VALVE SPOOL PIECE

STRAINER

SYMBOL SYMBOLDESCRIPTION DESCRIPTION

 

Page 69: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 69/302

LNGC DISHA  Machinery Operating Manual

Illustration 2.6.7i Incinerator Fuel Oil and Sludge transfer System

OI008

OI013 OI012

OI009

Page 70: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 70/302

2 - 57  Part 2 Ship System

Waste Oil Tank

For Incinerator (2.0 m3)

Sludge Pump(10 m3/h X 0.39 MPag)

From FW

System

Upper Dk

OI008

“A” DECK

Incinerator (700,000 kcal/Hr)

M

   O

   I   0   3   7

   O   I   0   3   7

   O   I   0

   3   4

DO Pump

OI032

DO Tank For 

Incinerator (0.6 M3)

WO Pump

CIRC. P/P

P

OI017   P

   O   I   0   1   6

OI023

OI022

OI033

To Waste

Oil Tk

From Waste Oil Tk

OI006

OI005

OI007

   O   I   0   1   0

OI011

To HFO Sett. Tk(S)

   O   I   1   0  -   B

   I   C  -   2   5   A

   O   I   1   1  -   B   I   C  -   2   5   A

OI34-CIX-50A

OF41-BIX-40AFrom DO Trans. P/p

   T  o   D   O   S   t  o  r .   T   k

   O   I   3   2  -   B   I   X  -   1   5   A

   O   I   3   3  -   B   I   X  -   5   0   A

   O   I   0   3   5

   O   I   3   1  -   B   I   X  -   1   5   A

   O   I   0   3  -   B   I   X  -   5   0   A

OI04-BIX-50A

OI07-BIX-50A

BG50-BIX-50A

From E/R Bilge Pump

   F  r  o  m   F   O   S   l  u   d  g  e   T   k

   F  r  o  m   L   O   S   l  u   d  g  e   T   k

OI004

OI003

OI002OI02-BIX-65A

   O   I   0   1  -   B   I   X  -   6   5   A

   O   I   0   8  -   B   I   X  -   5   0   A   O

   I   1   5  -   B   I   X  -   6   5   A

   O   I   1   6  -   B   I   X  -   6   5   A

OI015

OI009

   S   E   T

   0 .   4   4   M   P  a  g

 

Page 71: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 71/302

LNGC DISHA  Machinery Operating Manual

Illustration 2.7.1i Main Turbine Lubricating Oil System

TO W t Oil T k

Dehumidifier 

Page 72: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 72/302

2 - 59  Part 2 Ship System

A

B

C

A

B

C

D

E

Oil Servo for 

Maneuv. V/V

F

F

Main LO Cooler 

No.1 No.2

Oil MistTank

Auto Filter (20 Micron)

D

E

Aux. LO P/P(180 m3/h X 0.44MPag)No.2 No.1

Main LO P/P(210 m3 /h x 0.44 MPag)

TIC

TC

HP Turbine

LP Turbine

IntermediateShaft Bearing

TO Oil Mist Chamber 

(In Funnel)

TO Waste Oil Tank

   L   M   0   1   9

   L   M   0   2   0

   L   M   0   2   1

   L   M   0   2   2

LM023

   L   M   0   2   6

   L   M   0   2   7

   L   M   0   2   4

LM052

LM014 LM010

LM013 LM011

LM015 LM017

LM016

LM018

   L   M   0   0   3

   L   M   0   0   1

   L   M   0   0   7

   L   M   0   3   5

   L   M   0   3   6Main LO Sump Tank

(68.1 m3)

   L   M   0   3   7

   L   M   0   3   4

   L   M   6   2  -   B   I   X  -   1   5   0   A

LM36-BIX-125A

   8   0   A

   5   0   A

   L   M   0   2   8

   L   M   0   2   5

LM14-B8X-200A

LM16-B8X-200A

LM15-B8X-200A

LM030

   2

   5   A

   1   5   A

TO INTERM

SHAFT BRG   L   M   2   2  -   B   8   X  -   2   0   0   A

   L   M   0   6  -   B   8   X  -   2   0   0   A

250ALM004LM005

   L   M   1   0  -   B   8   X  -   1   5   0   A

   L   M   5   0  -   B   I   X  -   5   0   A

   L   M   4   6  -   B   8   X  -   8   0   A

SOL.V/V FORTRIP DEVICE

LM42-B8X-125A

LM43-B8X-200A

LM71-B8X-100A

LM006

   L   M   0   3   3

   L   M   0   4   7

LM44-B8X-65A

   L   M   0   5   3

Near 

B.W.

   L   M   4   1  -   B   8   X  -   1   0   0   A

   P

Main LO

Gravity Tank(33.6 m3)

   L   M   0   2   9   (   N .   O .   )

   S   L   U   D   G   E

   C   H   E   C   K   E   R

   L   M   0   0   2

1,000 mm

IntermediateShaft Bearing

   T  -   1   4   4 T-141With Stopper 

(Locked Shut)

   W   i   t   h   S   t  o  p  p  e  r

   (   L  o  c   k  e   d   S   h  u   t   )

O-40

With Stopper (Locked Open)

 

Control and Alarm Settings

M/T HP THR BRG TEMP. HIGH 75 °C

M/T HP FORE BRG TEMP. HIGH 75 °C

M/T HP AFT BRG TEMP. HIGH 75 °C

M/T LP THR BRG TEMP. HIGH 75 °C

M/T LP FORE BR TEMP. HIGH 75 °C

M/T LP AFT BRG TEMP. HIGH 75 °C

M/T HP 1P FORE BRG TEMP. HIGH 75 °C

M/T HP 1P AFT BRG TEMP. HIGH 75 °C

M/T HP 1W FORE BRG TEMP. HIGH 75 °C

M/T HP 1W AFT BRG TEMP. HIGH 75 °C

M/T HP 2P FORE BRG TEMP. HIGH 75 °C

M/T HP 2P AFT BRG TEMP. HIGH 75 °C

M/T LP 1P FORE BRG TEMP. HIGH 75 °C

M/T LP 1P AFT BRG TEMP. HIGH 75 °C

M/T LP 1W FORE BRG TEMP. HIGH 75 °C

M/T LP 1W AFT BRG TEMP. HIGH 75 °C

M/T LP 2P FORE BRG TEMP. HIGH 75 °C

M/T LP 2P AFT BRG TEMP. HIGH 75 °C

M/T MAIN WHEEL FWD BRG TEMP. HIGH 55 °C

M/T THRUSTER BRG TEMP. HIGH 55 °C

M/T MAIN WHEEL AFT BRG TEMP. HIGH 55 °C

M/T MAIN THR PAD TEMP. HIGH 100 °CM/T MAIN THR PAD TEMP. H-H (M/T SLD) 110 °C

INTERMEDIATE SHAFT FWD BRG TEMP. HIGH 65 °C

INTERMEDIATE SHAFT AFT BRG TEMP. HIGH 65 °C

M/T MAIN GEAR LO INL. PRESS. LOW 70 kPag

M/T MAIN BRG LO INL. PRESS. LOW 70 kPag

MAIN LO PRESS. LOW 350 kPag

M/T AUX. LO P/P PRESS. LOW 320 kPag

M/T LO SUMP TK LVL H/L 1.58 / 0.87 m

MAIN LO GRAVITY TK LVL LOW 3.56 m 

Page 73: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 73/302

Page 74: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 74/302

Page 75: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 75/302

LNGC DISHA  Machinery Operating Manual

Illustration 2.7.3i Lubricating Oil Purifying Systems

PIPI

LP016

E   T   T .   T   K

U   M   P   T   K

M   P   T   A   N   K

T .   T   K   &

T   T .   &

LP017

Page 76: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 76/302

2 - 63  Part 2 Ship System

NO. 1 LO PURIFIER(2,100 L/H)

TI

PI

FI

NO. 2 LO PURIFIER(2,100 L/H)

TI

PI

FI

LP033 LP035

   L   P   0   2   3

LP019TT

NO. 1 LO PURIFIERHEATER

LP015TI

TI

   L   P   0   8  -   B   I   X  -   4   0   A

   L   P   1   0  -   B   I   X  -   2   5   A

   L   P   2   4  -   B   I   X  -   5   0   A

   L   P   0   2   4

LP018

PI

LP014TI

TI

   L   P   0   7  -   B   I   X  -   4   0   A

CONTROL

 AIR SYSTEM

   L   P   2   6  -   B   I   X  -   2   5   A

PI

CP

   L   P   0   1   0

   L   P   0   0   8

   L   P   0   3  -   B   I   X  -   4   0   A

PI

CP

LP011

   L   P   0   0   9

   L   P   0   0   7

   L   P   0   2  -   B   I   X  -   4   0   A

LP013

LP04-BIX-40A

   L   P   0   6  -   B   I   X  -   4   0   A

   L   P   0   5  -   B   I   X  -   4   0   A

   L   O   P   U   R   I .   F   E   E

   D   P   U   M   P

   (   2 .   1  m   3   /   h  x   0 .   2

   5   M   P  a  g   )

NO.1NO.2

OP006

   L   P   0   0   1

   L   F   3   6  -   B   I   X  -   4   0   A

   F   R   S   /   T   L   O

   D   R   A   I   N   T   K

   L   P   0   0   2

   L   F   1   2  -   B   I   X  -   4   0   A

   F   R   M   A   I   N   L   O

   S   U   M   P   T   K

   L   P   0   3   9

   L   F   7   0  -   B   I   X  -   4   0   A

   F   R   M   A   I   N   L   O

   S   E   T   T .   T   K

   L   P   0   0   5

   L   F   3   8  -   B   I   X  -   4   0   A

   F   R   D   /   G   L   O

   S   E   T   T .   T   K   &

   S   U   M   P   T   K

LP025

   L   P   1   8  -   B   I   X  -   4   0   A

LP026

   L   P   3   0  -   B   I   X  -   4   0   A

LP027

   L   P   1   9  -   B   I   X  -   4   0   A

LP036

LP028

   L   P   2   0  -   B   I   X  -   4   0   A

LP029

   L   P   2   1  -   B   I   X  -   4   0   A

   L   P   0   2   1

   L   P   1   1  -   B   I   X  -   4   0   A

LP13-BIX-40A

LP14-BIX-40A

LP17-BIX-40A

   T   O   M   A   I   N

   L   O   S   E

   T   O   M   A   I   N

   L   O   S   U

   T   O   S   /   T   L   O

   S   U   M

   T   O   T   /   G   L   O

   S   E   T   T

   S   U   M   P   T   K

   T   O   D   /   G   L   O   S   E   T

   S   U   M   P   T   K

LO SLUDGE TANK(5.0 m3)

LP31-BIX-50A

LP038

LP16-BIX-40A

LP012

   L   P   0   2   0

TI

LPA1-C2X-25A

LP001

DIAL

TO SLUDGE PUMP

NO. 2 LO PURIFIERHEATER

PI CONTROL

 AIR SYSTEM

TT

   L   P   0   4   1

   L   P   0   4   2

P

   L   P   0   0   4

   L   F   3   7  -   B   I   X  -   4   0   A

   F   R   T   /   G   L   O

   S   E   T   T .   T   K   &

   S   U   M   P   T   K

FMFM

 

Page 77: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 77/302

Page 78: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 78/302

Page 79: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 79/302

Page 80: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 80/302

Page 81: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 81/302

Page 82: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 82/302

Page 83: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 83/302

Page 84: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 84/302

Page 85: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 85/302

Page 86: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 86/302

LNGC DISHA  Machinery Operating Manual

Page 87: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 87/302

2 - 74  Part 2 Ship System

Blank Page

Page 88: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 88/302

Page 89: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 89/302

LNGC DISHA  Machinery Operating Manual

Illustration 2.10i Steering Gear Flow Lines 

No.4 Cylinder No.3 Cylinder  Air Breather 

Page 90: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 90/302

2 - 77  Part 2 Ship System

No.2 Cylinder No.1 Cylinder 

SafetyValve

SafetyValve

PilotRelief ValveBoost

Relief Valve

M

Orifice

No.2 Hyd.

By-pass V/VNo.2 Oil Tank

L

No.2 Transfer Valve

N o.2 M ai  n c i  r  c  ui   t  

B  y - p a s  s v  al  v  e

Wi   t  h l  i  mi   t   s wi   t   c h 

No.2 Valve Block

No.2 Servo.Controller 

No.1

JanneyPump

No.2 AuxiliaryPump

No.2 Pump Unit

Hyd. Oil TankFor Steering Gear 

(1,240 L)

SafetyValve

SafetyValve

PilotRelief ValveBoost

Relief Valve

M

Orifice

No.1 Hyd.By-pass V/V

No.1 Transfer Valve

No.1 Valve Block

No.1 Servo.Controller 

No.1

JanneyPump

No.1 AuxiliaryPump

No.1 Pump Unit

No.2 Oil Tank

L

   H   S   0   0   4

   H   S   0   0   5

SV2SV1

   N  o .   1   M  a   i  n  c   i  r  c  u   i   t

   B  y  -  p  a  s  s  v  a   l  v  e

   W   i   t   h   l   i  m   i   t  s  w   i   t  c   h

Motor pump Hand pump

L.LL.L

L/L level switch for 

auto isolation controlL/L level switch for 

auto isolation control

B A

 

LNGC DISHA  Machinery Operating Manual

2.10 Steering Gear

General Description

YOOWON – MITSUBISHI Electro – hydraulic steering gear is compact in

construction and high in reliability and practical application.

This steering gear is 2-Ram, 4-Cylinders, Rapson-slide type. Two variable

Operating procedure

Remote steering

a)  Supply the remote steering gear control system and power units with

electrical power.

 b)  Operate the mode selection switch of the remote steering gear control

Page 91: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 91/302

2 - 78  Part 2 Ship System

g g y p ypdisplacement pumps operate the steering rudder angle.

This steering gear operates as auto. pilot, follow-up control and non follow-up

control.

The maximum rudder angle is designed so that the ram stop at 47.5° for

maximum rudder angle of 45° to each side.

Particulars

Max working press. 21.7 MPagRudderstock diameter 588.16 mm

Maximum rudder angle 45 degrees

Relief valve setting 27.0 MPag

Design torque 3,334 kNm

Pump Unit

Type 3V-FH2B-MK X 2

Design tilting angle 97 %Theoretical delivery of oil quantity 386 l/min

Oil Capacity Total oil quantity abt 3,000 ltr.Storage tank capacity abt. 1,500 ltr.

Motor Unit

Output 90 Kw X 2

Revolution 1,200 rpmPower source 440V, 3φ, 60HzRating 25% Cont.

100% 1 hr.

200% 60 sec.

Alarm Function

Pump motor overloadPower failure

Low oil level

) p g g

system.

c)  Operate the power units by means of E/M start switch.

Mechanical lever steering(S/G compartment)

a)  Put the selector switch of the auto pilot control box(rudder servo unit)

to local or off position.

 b)  Select which janney pump will be used for manual steering.

c)  With the mechanical control lever in mid-position, operate the selected

 janney pump.

d)  Operate the manual control lever in accordance with the steeringcommand.

e)  Return the mechanical control lever its neutral position upon reaching

the ordered rudder angle.

Note !

1.  The changing of the power units should be done with the electric motor

start/stop switches.

2.  When an alarm should off due to for failure in any power unit ;

Stop the concerned power unit, and then start another power unit. In this

case, investigate the defective part.

3.  In case of any failure in the hydraulic circuit, operate the power unit and

the valves in accordance with the operating instruction mounted in the

steering gear compartment.

Operating Mode Valve Positions

By-pass

valve

Stop

valveCaseWorking

 pump

Working

cylinderA B SV1 SV2

 Notices

1 1 1,2 X X O OO-V/V to be

opened

2 2 3,4 X X O O

X-V/V to be

closed

LNGC DISHA  Machinery Operating Manual

Illustration 2.11i Turbine Generator  

MS087

MS07-4MB-150A

MSB3-4MB-125A

MSB4-4MB-125A

5A

Page 92: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 92/302

2 - 79  Part 2 Ship System

Gland SteamReceiver 

Near 

Scupper 

Steam Strainer 

Main Stop V/V

No.2 TurbineGenerator 

Gland SteamReceiver 

Near 

Scupper 

Steam Strainer 

Main Stop V/V

From HPExhaust Steam

Atmos. Condenser 

To Gland Condenser 

AES196

ES197

ES198ES203

ES200 ES201 ES205

ES193

ES192 ES204

From FW Gen.FD W. Heater Drain

No.1 TurbineGenerator 

MS088

Main Condenser 

FS23-EIX-50A

   B   I   X  -   1   0   0   0   A

   B   I   X  -   1   0   0   0   A

   B   I   C  -   2   0   0   A

ESF6-BIC-350A

ES206

ES207

ES208

   E   S   2   5  -   B   I   C  -   2   0   0   A

ESF9-BIC-125AESE1-BIC-200A

   E   S   1   9   4

   E   S   1   9   9

ESG1-BIC-1000A

Gland Steam

Receiver SpillContr. V/V

Gland SteamReceiver Spill

Contr. V/V

Gland Steam Pressure

Make-up V/V

Gland Steam PressureMake-up V/V

PS011 PS010

Super Heated Steam

     1     5     A

15A 15A

     1     5     A

   P   S   0   7  -   E   2   X  -   5   0   A

   P   S   1   3  -   F   3   B  -   2   5   A

SBB7-E3B-50A PS12-F3B-40A

   P   S   2   1  -   E   I   C  -   6   5   A

PS09-E2X-65A PS08-E2X-50A

   P   S   0   8  -   E   2   X  -   5   0   A

   P   S   2   1  -   E   I   C  -   6   5   A

WS

WS

WS

WS

Key

Steam Line

Exhaust Steam Line

FW Line

Drain Line

[Emergency Use]

A

[Emergency Use]

[Emergency Use]

From 1.57MPag steam

POS

V29

V27 V28V2

   V   5

POS

V1V25V24

V26

POS

V1V25V24

V26

POS

V29

V27 V28V2

   V   5

H

ES191

H

 

Page 93: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 93/302

Page 94: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 94/302

Page 95: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 95/302

Page 96: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 96/302

Page 97: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 97/302

LNGC DISHA  Machinery Operating Manual

Illustration 2.11.2i Diesel Generator Engine 

   b  e  rD/G Starting

 Air Compressor 

PIALTA048 D.O Service

Tank (37 7 m3)

Page 98: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 98/302

2 - 85  Part 2 Ship System

D/G Eng. D.O Service P/P

1.1 m3/hX 0.39 MPag

Em’cy D.O Service P/P0.8 m3/h X0.59 MPag

FMOG010 OG009 OG007 OG006

OG008

   R  e   t  u  r  n   C   h  a  m

P

OG001

OG003

From Service Air System

A

 Alternator 

Cylinder L.O

Pump UnitDPI

DPS

DT

To MainL.O Rail

OG024

OG021

Engine

Driven

L.O P/P

Pre L.O

P/P Hand

P/PCentrifugal

Filter To L.O

Trans. P/P

 Alternator 

Bearing L.O Cooler 

CF075

L/T Air Cooler 

From Cent.

Cooling F.W. P/P

CF026

L.O Cooler 

   C   F   0   2   9

Jacket C.F.W P/P

To C.F.W.

Cooling System

J.C.W Preheater P/P

Electric J.C.W Preheater 

D/G Starting

Air Reservoir 

Oil/Water 

Separator 

No.1

No.2

T A0 43 T A0 44

TA046

TA050

   T   A   0   6   0

To F.W. Expansion Tank

   T   A   0   5   2

   T   A   0   5   3

Fresh Water Line

L.O Line

D.O Line

 Air Line

Key

   C   F   0   2   7

To Expansion Tank OG012

CF025

HT Cooler 

From Cent.

Cooling F.W. P/P

Tank (37.7 m3)

 

Page 99: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 99/302

Page 100: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 100/302

LNGC DISHA  Machinery Operating Manual

Operating Procedure

1) Starting

The engine should normally be standing idle and ready for use. To start, the

only action required is to switch to local control in the engine control room,

and press the engine start button. The unit should then run up to speed, put

itself on the switchboard after synchronizing with the generator in use,

 parallel and sharing the load.

Page 101: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 101/302

2 - 88  Part 2 Ship System

The engine can be started manually by depressing the air start solenoid on

the air system to the engine. Always make sure that the hand lub oil pump

has been operated to ensure initial lubrication of the unit.

This engine has a turning device. By allowing the starting air to flow through

a needle valve to each cylinder, in turn, the flow being too small to turn the

engine fast enough to raise the cylinder compression level, the engine can be

rotated to turn freely. Once this sequence is completed, the needle valve will

close, and the full pressure starting air allowed into the cylinders will begine

to rotate and run the engine.

2) Stopping

After shedding the electric load from the unit, the engine should always be

allowed to run with no load for a few minutes to allow the unit to cool down

slowly. Once this has been done, the stop switch in the engine control room

can be pressed operating a solenoid valve in the fuel line, and stopping the

engine. The unit should then come to a standstill, with the solenoid valve

reset ready for the next start.

Safety and Alarm System

1) Shut Down Function

Over Speed Trip rpm 828

Lub. Oil low-low MPag 0.25

H.T.C.F.W Temp. High-High. °C 93

2) Alarm

Lub. Oil Pressure Low MPag 0.28

Lub. Oil Temp. High °C 70

Lub. Oil Diff. Press. Filter High MPag 0.12

Oil Mist Conc. High % 2.5

Fuel Oil Press. Low MPag 0.15

Fuel Oil Filter Diff. Press. High MPag 0.12Cylinder 1~9 Exhaust Temp High. °C 575

T/C Turbine Exhaust Inlet High Temp °C 575

T/C Turbine Exhaust Outlet High Temp °C 500

Wind R/S/T Temp. High °C 140

Fwd / Aft Bearing Temp. High °C 90

Power Failure - -

rpm Pick Failure  - -

Page 102: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 102/302

LNGC DISHA  Machinery Operating Manual

Illustration 2.12.1i Distribution and Loading 

Page 103: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 103/302

2 - 90  Part 2 Ship System

Page 104: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 104/302

Page 105: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 105/302

LNGC DISHA  Machinery Operating Manual

Illustration 2.12.2i Shore Power  

D/GNo.2 T/G No.1 T/G

T2 D2 D1 T1

Page 106: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 106/302

2 - 93  Part 2 Ship System

No.2 T/GPanel

No.1 T/GPanel

No.2 D/GPanel

No.1 D/GPanel

SynchPanel

SynchPanel

No.2 BusPanel

No.1 BusPanel

M M

HM16600 Volt 6600 Volt

M M MM

LM2440 Volt

M

ESB

ESBD

440 Volt

440 Volt

3000KVA AC6600/440V 3000KVA AC6600/440V

440VFeed Panel

E/G

Shore PowerAC440V, 3P, 60Hz

E

E/G

Incomming Panel

SC

BT2TRM2

No.2 MSBD

BT1 TRM1 BTMC1BTMC2

No.1 MSBD

BT-LE1BTLM1

TM1

No.1 MSBDNo.2 MSBD

BT-LM2BTLE2

TM2

BT-EL1BT-EL2

EBT-EC

No. 2Battery

No. 1Battery

Battery Charger & 24V Distribution Board

Em' cy 220V

Feed Panel

440/220V

No.2 CSBDNo.1 CSBD

  E1

 

Page 107: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 107/302

Page 108: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 108/302

LNGC DISHA  Machinery Operating Manual

Illustration 2.12.5i Diesel Generator  

Stator  Rotor 

Exciter 

Diesel

Generator 

Page 109: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 109/302

2 - 96  Part 2 Ship System

No.2 T/GPanel

No.1 T/GPanel

No.2 D/GPanel

No.1 D/GPanel

SynchPanel

SynchPanel

No.2 BusPanel

No.1 BusPanel

No.1 T/GNo.2 T/G

M M

6600 Volt 6600 Volt

T2 D2 D1 T1

BT2BT-MC2TRM2

No.2 MSBD

BT1 BT-MC1 TRM1

No.1 MSBD

 Av

 A

kW

Hz

Close Contactor Signal

 AVR

 Auto

Synchroniser 

Power 

Management

D/G

 Auto

Local

Em'cy Stop

Local Start

SwitchboardPanel

No Voltage Signal

Overload Signal

High Load Request

Diesel

Engine

 Abnormal

Initiate

Start

 

Page 110: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 110/302

LNGC DISHA  Machinery Operating Manual

Illustration 2.12.7i Battery Charging and 24V Distribution

No.1

Battery

No.2

Battery Em’cy 220V

Feeder Panel

Em’cy D/G

Panel

Em’cy 440V

Feeder Panel

Em’cy 440V

Distribution

Page 111: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 111/302

2 - 98  Part 2 Ship System

Battery Charger & 24V Discharge Board 440/220V

Transformer 

Interlock

No.1&2 440V MSBD

GAC Panel

PSU for M/T R.C.S

ECR Console (For back-up)

BD - 1 (No.1 W/H Group panel)

Cargo consol room console

BD – 3 (No.2 SWBD room)

RP for DC light (Cargo consol room)

W/H SURV. Console

RP for DC light (NAV. EQ. room)

Gyro compass PSU (No.1 source)

No.1&2 6.6kV MSBD)

Speed log multi distributor 

H.E Foam control panel

MF/HF Radio EQ.

EM’CY D/G

SP

Shore Power 

No.1&2 440V CSBD

BD - 2 (E/E ROOM)

PSU for GAS detection panel (Cargo consol room)

No.1&2 6.6kV CSBD)

Gyro compass PSU (No.2 source)

GAC Panel (black out signal)

Transient lights refer to W/D of lighting system

 

LNGC DISHA  Machinery Operating Manual

2.12.6 Un-Interruptible Power Supplies

The un-interruptible power supply (UPS) units are fed from the 440V feeder

 panel on the main switchboard and the emergency switchboard 440V feeder

 panel.

The UPS provides battery at DC 240V, 30kVA for at least 30 minutes. The

UPS units supply power to essential navigation and safety equipment.

Essential services in the cargo control room and engine control room are alsosupplied.

2.12.7 Batteries, Transformers, Rectifiers and Chargers

(2) Amp. Meter

The current of the rectifier/battery/load normally divided by the selector

switch and the set position of the load.

The battery means full charged in case of “O” Amp, and it means it is in

discharging condition “-BBB” Amp is indicated.

Transformers 

No 1/2 L V Main Transformer (3PH 350kVA): 440V/225V

Page 112: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 112/302

2 - 99  Part 2 Ship System

Batteries, Rectifiers and Chargers

(1) Auto Function

•  Floating and Equalizing

In case AC input source or the source 440V is put first, or source is put

again after the source fails (turns to ”Off”), it switches to the equalizing

status, and reverted to floating charging after equalizing charging.

(2) Manual Function

There are 3 operation of Floating 26.5V

Equalizing 28.5V

Boosting 30.0V

The Operations can be manually selected with each push button switch.

The selective function (Equalizing and Boosting) is automatically reverted

to floating charging status after time progresses with each timer.

(3) Timer Adjustable

•  Equalizing Time : 0~100 Hour Adj. (Normal 30/Min)

•  Boosting Time : 0~100 Hour Adj. (Normal 10/Min)

(4) Voltage Adjust (± 20%)

Equalizing/Floating/Boosting are used in the change of each charging

voltage. The voltmeter selector switch is put in the position of the battery,

the desired function is selected with the manual push button switch, and

when the voltage is adjusted at this time, the battery makes switches “off”

(Fuse of NFB).

Meter

(1) Volt Meter

Rectifier/Battery Charging/Load voltage normally divided by the selector

switch and the set position of the battery.

  No.1/2 L.V Main Transformer (3PH, 350kVA): 440V/225V

  Em’cy Transformer (120Kva, 1PH X 4SETS): 440V/225V

  F’cle Transformer (3PH, 30kVA): 440V/225V

  Gally/Pantry Transformer (120kVA, 1PH x 3Sets): 440V/440V

  Gally/Pantry Transformer (60kVA, 1PH x 3Sets): 220V/220V

  No.1/2 H.V Main Transformer(3PH,3000kVA): 6,600V/450V

  No.1/2 H.V Cargo Transformer(3PH,700kVA): 6,600V/450V

  Step-up Transformer(3PH,700kVA): 440V/6,600V

LNGC DISHA  Machinery Operating Manual

Illustration 2.12.8i(1) Bow Thruster

G G

ELECTRONICCABINET

ENGINE ROOM BRIDGE

CONTROL

PANEL

Illustration 2.12.8i(2) Bow Thruster  

Page 113: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 113/302

2 - 100  Part 2 Ship System

STAR / DELTASTARTER

E

 A

L

S

S

GRAVITY

TANK

SERVO

PUMP UNIT

STARTER

CABINET

SERVO

ELECTRICMOTOR

ELASTIC

COUPLING

MOTOR

FRAME

THRUSTER

THRUSTER ROOM

 

Page 114: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 114/302

LNGC DISHA  Machinery Operating Manual

Procedure for Operating the Thruster Units

Note

The main motor must not be restarted after stopping until the transformer has

had a chance to cool; a period of about 30 minutes is required for cooling. 

Sequential start

(1) Operation mode switch "Control power ON"

※YESNO

Individual start

Control power lamp ON Alarm lamp ON ※

(5) Stop(reset) switch ON

YES

YESNO

NO

NO

(1) Operation mode switch "Control power ON"

(2) Oil pump start/run switch ON

Stopping thruster

(1) Zero the blade angle by

control dial.

(2) Stop(reset) switch ON

Page 115: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 115/302

2 - 102  Part 2 Ship System

Control power lamp ON Alarm lamp ON

(1)' Thruster request switch ON

Thruster request lamp ON

Oil pump start/run

lamp FLICKERING

(2) Thruster start/run switch ON

Fan run signal

Fan motor RUN

Fan run lamp on

Ready to start lamp ON

Thruster RUN

Thruster start/run lamp ON

(4) Start the pitch control by control dial

Thruster start/runlamp FLICKERING

Oil pump RUN

(3) Stop(reset) switch ON

Oil pump start/run lamp ON

Whether the startinterlock condition are

satisfied

YES

YES

S

YES

YES

YES

YES

YES

NO

NO

NO

NO

NO

NONO

NO

 

(3) Thruster request switch ON

Thruster request lamp ON

Oil pump start/runlamp FLICKERING

(4) Thruster start/run switch ON

Fan run signal

Fan motor RUN

Fan run lamp on

Ready to start lamp ON

Thruster start/run lamp FLICKERING

Thruster RUN

Thruster start/run lamp ON

(5) Start the pitch control by control dial

Oil pump RUN

Oil pump start/run lamp ON

Whether the startinterlock condition are

satisfied

YES

YES

YES

YES

YES

YES

NO

NO

NONO

NO

 

Thruster stopOil pump stop

Fan stop

Thruster start/run lamp OFF

Oil pump start/run lamp OFFFan run lamp OFF

(3) Control power switch OFF 

LNGC DISHA  Machinery Operating Manual

Illustration 2.13.1i Domestic Refrigeration System 

Meat Room Fish Room VegetableRoom Dairy Room

Page 116: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 116/302

2 - 103  Part 2 Ship System

Upper Deck

Fan Switch Board

Refrigerating

Comp.

Central CoolingFW System

Condenser 

No 1 No 2

Condenser 

LiquidChange Valve

Refrigerating

Comp.

 

Page 117: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 117/302

LNGC DISHA  Machinery Operating Manual

Illustration 2.13.2i Accommodation Air Conditioning Plant 

Page 118: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 118/302

2 - 105  Part 2 Ship System

Condenser 

From/To CentralCooling System

Charging

Connection

Filter & Dryer 

NO.1

Compressor

Condenser 

From/To CentralCooling System

Charging

Connection

Filter & Dryer 

NO.1

Compressor

Page 119: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 119/302

LNGC DISHA  Machinery Operating Manual

2.13.2.2 Package Air-Con for Galley

Specification

No.1 Cooling unit

Maker HI-PRESS

Cooling capacity 8.6kW

Weight 25kg

No.2 Indoor unit

Package Air-Con for Galley Diagram

INDOOR UNITNO.2 COOLER

SUPPLY AIR

NO.1COOLER

W/N

1/2" CU7/8" CU1/4" CU 5/8" CU

Page 120: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 120/302

2 - 107  Part 2 Ship System

Maker SANYO

Type SPW-U253G56

Power source 220V 60Hz/1phase

Cooling capacity 8.6 kW

Air volume 780 m3/h

Weight 50 kg

No.3 Outdoor unit

Maker DANFOSS

Type HGZ-050

Power source 220V 69Hz/1phase

Cooling capacity 10.9 kW

Air volume 4650 m3/h

Weight 96 kg

Refrigerant R-404A

Low press. side High press. sideModel Refrigerant Cut in

(MPag)

Cut in

(MPag)

Cut in

(MPag)

Cut in

(MPag)

HGZ R-404A 0.12 0.05 2.4 2.8

CEILING PANEL

DRAIN

NO.1 OUTDOOR UNIT

1/2" CU

SIGHT GLASS

FILTER DRIER

7/8" CU

NO.2 OUTDOOR UNIT

LIQUID LINE

KEY

SUCTION LINE

1/2" CU

SIGHT GLASS

FILTER DRIER

7/8" CU

 

LNGC DISHA  Machinery Operating Manual

Illustration 2.13.3i Package Air Conditioner  

Engine Control Room and No.2 MSBR Work Shop and No.1 MSBR

Page 121: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 121/302

2 - 108  Part 2 Ship System

EVAPORATOR

LP LPDPS

COMPRESSOR

COOLING WATER IN

COOLING WATER OUTCONDENSER

TI

TI

 

LP LPDPS LP LPDPS

CONDENSATE DRAIN

(JIS 5K 25A FLANGE)

COOLING WATER IN

COOLING WATER OUT COOLING WATER OUT

COOLING WATER IN

SAFETY VALVE OUTLET

JIS 5K 15A FLANGE

EVAPORATOR

No. 1COMPRESSOR

(STBD)

No. 2COMPRESSOR

(Port)

No . 2Condense r (P)No . 1Condenser ( S)

 

Page 122: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 122/302

Page 123: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 123/302

Page 124: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 124/302

LNGC DISHA  Machinery Operating Manual

Illustration 2.14.3i Sanitary Discharge System 

T o  B i l g e  W e l l 

B

DE/R Pub. T/S

1ST PLATFORM21,262 A/B

STANDARD FLG FOR SHORE CONN.F H B DRAIN IN ACCOMM

Dia. 170

Dia. 61.118

Dia. 210

16

F.H.B

F.H.B

F.H.B

F.H.B

D-DK

E/R PLATFORM

C-DK

B-DK

 A-DK

UPP.DK

40 A

W/T W/B

40 A 40 A40 A

50 A

50 A

S S

TYP. OF DRAIN PIPE SIZE

Page 125: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 125/302

2 - 112  Part 2 Ship System

1110987

D

654321

SN10VSN09V

SN05V

NC

Port STB'D

'C'

Upper Deck

(DETAIL 'C')F.H.B DRAIN IN ACCOMM.

SN84-C1X-25A

Sewage Collecting Tank(NET. 10.0 m3)

SN23V

SN26V

To Bilge Hold'g Tank

E/R 2nd Platform

(14,686 A/B)E/R 2nd Platform

(14,686 A/B)

From Coolint S.W System

SN19V

SN32V

SN17V

SN16V

SN20VSN18V

SN02V

SN03V

S.L.W.L S.T.P

(40 Persons)

SN12V

SN07V

SN08V

Discharge Pump

Discharge Pump

SN11VN.C N.C N.C

SN13V

Blower 

 Air Vent

M

M

SN25V

SN24V

L.S.H

H.S.L

L.S.L

L.S.L

SN15V

Over Flow

Dilution Water 

Flowmeater 

W/Check V/V

SN14V

Manifold

SN21V SN22V

SN01V

SN04V

 A

SN06V

Hoisptal

Gray Water Drain

From Sea

Overboard

Main Line

 Air Vent To Funnel Top

E

FM

B

SN29V

 

Page 126: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 126/302

LNGC DISHA  Machinery Operating Manual

2.15 E/R General Piping Diagram

Illustration 2.15.1i Piping Diagram for Boiler Sealing system

FR FD FAN FR FD FAN

PS

F/E SEAL AIR FAIL

ECONOMZER

SMOKE INDICATOR

ECONOMZER

SMOKE INDICATOR

SA007SA030

Page 127: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 127/302

2 - 114  Part 2 Ship System

NO.2MAIN BOILER

80/40

100/50

150/125

80/65

PEEPHOLE

SH DOOR(REAR)

   S   A   0   4   2

NEAR SCUPPER

SHTUBEWITHDRAWL HOLE ACCESS HOLE

UV, CDS FLAME EYE

NO.2 SEAL AIR FAN

   S   A   0   4   4

   S   A   0   4   3

NO.1MAIN BOILER

80/40

100/50

150/125

65/80

PEEPHOLE

SH DOOR(REAR)

   S   A   0   2   3

NEAR SCUPPER

SHTUBEWITHDRAWL HOLE ACCESS HOLE

UV, CDS FLAME EYE

NO.1 SEAL AIR FAN

   S   A   0   2   1

   S   A   0   2   2

SA020

TO BILGE

HOLDING TK

   S   A   0   4   9

SOOT COLLECTING TANK(1.0 m3)

BITE TYPE CONNECTIONBITE TYPE CONNECTION

   E   C   O   N   O   M   I   Z   E   R

   E   C   O   N   O   M   I   Z   E   R

465B 465B

   S   A   0   0   5

   S   A   0   2   7

308B 308B

PSSA051

NO.1 FAN AUTOST-BY START

PS

LNGC DISHA  Machinery Operating Manual

Illustration 2.15.2i Piping Diagram for Waste Steam System

 S I  L 

E N C E R

 S I  L 

E N C E R

UPPER DECK

WS008 FUNNELWS007

 

Page 128: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 128/302

2 - 115  Part 2 Ship System

Steam Drum

Water Drum

No.2 Main Boiler 

(Port)

Super Heater 

Steam Drum

Water Drum

No.1 Main Boiler 

(STBD)

Super Heater 

   W   S   0   0   1

NEAR SCUPPER

NEAR SCUPPER

SUPER HEATEROUTLET LINE

   W   S   0   0   3

NEARSCUPPER

NO.2 M/B START UPVENT VALVE

NO.2 M/B START UPVENT VALVE

NO.1 M/B START UPVENT VALVE

NO.1 M/B START UPVENT VALVE

   F   R   R   E   L   I   E   F

   V   /   V   O   F   H   P .   E   X   H .   S   T   E   A   M   L   I   N   E

   F   R   R   E   L   I   E   F

   V   /   V   O   F   D   E   A   E   R   A   T   O   R

   F   R   R   E   L   I   E   F

   V   /   V   O   F

   0 .   7   9   M   P   A   S

   T   E   A   M   S   E   R   V .   S   Y   S .

   F   R   R   E   L   I   E   F

   V   /   V   O   F   0 .   1   5   6   M   P  a  g   S   T   E   A   M

   P   R   E   S   S   C   O

   N   T .   V   /   V   F   O   R   A   T   O   M   I   Z   I   N   G

NEAR

SCUPPER

   W   S   0   0   6

 ATMOS.

CONDENSER

FD W. DRAINTANK

   W   S   0   0   5

SET6.34 MPag

NEAR SCUPPER

SUPER HEATEROUTLET LINE

SET7.65 MPag

NEAR SCUPPER

FM S/B STM SYS. FM S/B STM SYS.

NEARSCUPPER

ECO INLETHEADER

SET9.71 MPag

NEAR SCUPPER

ECO INLETHEADER

NEAR SCUPPER

37B

38B

SET7.6 MPag

38B

21B

SET9.71MPag

21B

SET6.34 MPag

37B

SET7.6 MPag

38B

SET7.65 MPag

38B

LNGC DISHA  Machinery Operating Manual

Illustration 2.15.3i Piping Diagram for LO Drain System

MAIN LO

GRAVITY TK

MAIN LO

SETT. TK

T/G LO

STOR. TK

T/G LO

SETT. TK

MAIN LO

STOR. TK D/G LO STOR.TK D/G LO SETT. TKLD001 LD002 LD004 LD005 LD006 LD007 LD008

“A”POWER PACK POWER PACK

FROM OIL MIST

CHAMBER

Page 129: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 129/302

2 - 116  Part 2 Ship System

“A”POWER PACKFOR CARGO

POWER PACKFOR BALLAST

LO PURIFIERNO.1

TI

PI

FI

LO PURIFIERNO.2

TI

PI

FI

T/G SUMPTANK

GENERAL SERVICE TKNEAROIL

CLEANOIL

LO PURI. PREHEATER

NO.2 T/G

FOR VRC SYSTEM

GENERAL SERVICE TK

(NEAR NFWP)

TI

TI

TI

TI

(NEAR AIR COMP’)

M/T LO COOLER

LO TRANS PUMP S/T LO PUMPLO PURI. FEED PUMP

S/T LO COOLER

125A PIPE

40A PIPE

DK

DETAIL “A”

FR M/TOIL MIST

LO STRAINER LO MIST VENT LINEDRAIN

NO.1 T/G

LO STRAINER LO MIST VENT LINEDRAIN

FR M/T LO FILTER

GENERAL SERVICE TK

TO WASTE

OIL TANK

TO WASTE

OIL TANK

TO WASTE

OIL TANK

TO WASTEOIL TANK

TO WASTE

OIL TANK

FR M/T MAIN

LO PUMP

TO WASTE

OIL TANK

 

LNGC DISHA  Machinery Operating Manual

Illustration 2.15.4i Piping Diagram for FO Drain System

EM’CY D/GLDO TK INCINERATOR

M

WASTE OIL TKFOR INCI.

OD003

EM’CY DIESEL GENERATOR

 O

EM’CY DIESEL GENERATOR ROOM

OD001

LDO SERV TKFOR INCI.

DO STOR.TK OD009

DO SERV TKFOR IGG

OD005DO SERV TK

OD006 OD007HFO SETT.TK (P)

D/G ENGINEDO SERV. P/P

EM’CY DO P/P

FI

Page 130: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 130/302

2 - 117  Part 2 Ship System

NO.1

NO.2

OD 0  0 4  OI012

INCINERATOR ROOM

DO PURIFIER

TI

PI

FI

PURIFIERW. BENCH

“A”

M/B BURNERCOAMING NO.1

M/B BURNERCOAMING NO.2

M/B FO V/VCOAMING

IGG FO SUPPLY P/PM/B FO STRAINER

MB FO HEATER

FO & DO TRANS. PUMP E/R BILGE PUMP BILGE WATER SEP. PP

BILGE W.SEPARATOR

   T   O   B   I   L   G   E   H   O   L   D   I   N   G

   T   A   N   K

125A PIPE

40A PIPE

DK

DETAIL “A”

M/B GUNCLEAN’G DEVICE

OD015   O   I   L   S   P   R   A   Y   E   R

   C   L   E   A   N   ’   G   C   A   R   R   I   E   R

   F   R   L   O   P   U   R   I .   C   O   A   M   I   N   G

   &   L   O   P   U   R   I .   H   T   R   A   I   R   V   E   N   T

   D   R   A   I   N   &   S   A   F   E   T   Y   R   E   L   I   E   F   V   /   V

M/B FO SUPPLY P/P

FI

   F   R   L   O   T   K   D   R   N   &   E   T   C

   F   R   D   E  -   O   I   L   E   R

   O   I   L   D   R   A   I   N

HFO SETT.TK (S)   O

   D   0   0   8

SLUDGE PUMP

OD012

   T   O   W   A   S   T   E   O   I   L   T   K

   T   O   W   A   S   T   E   O   I   L   T   K

FR M/T LO CLR DRNM/T LO FILTER

FR LO P’PS COAM’G DRN

OD013

   T   O   F   O   O   V   E   R   F   L   O   W

   T   K

OD014

LOW SULPHURFO SETT. TK   O

   D   0   1   1

FR OIL MIST CHAMBER& ETC

FROM L.O. DRAIN SYS.

 

LNGC DISHA  Machinery Operating Manual

Illustration 2.16i Hydraulic Power System for Deck Machinery

UL

382-015M6

7

UL382-021

M7

8

 AFT. SYSTEM FORWARD. SYSTEM

UL

382-018M4

4

UL

379-029

W2

2

Page 131: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 131/302

2 - 118  Part 2 Ship System

PU4

1

2

P4

3

4

PU3

1

2

P3

3

4

1

2

3

4

PU2

P2

PU1

1

2 4

P1

P6 T2 T1

E1

E2E3

3

12

1013,1

E

TANK

DEHUMIDIFIED AND CLEAN AIRSUPPLY MIN. 0.2 MPag MAX. 10 MPag

ISO 8573.1 CLASS 4.4.6

DRAIN/FILLING

TANK

13,413,3

UL

M5

382-019

6

UL

M3

382-017

5

PU4 PU3 PU2 PU1

12

3

P6 T2 T1

E1

E3 E2P4 P3 P2 P1

4

1

23

4

1

23

4

1

23

4

E

TANK

UL

UL

UL

 AL

 AL

M2382-017

5 M1382-005

3

W1

379-028

1

DEHUMIDIFIED AND CLEAN AIRSUPPLY MIN. 2 MPag MAX. 1 MPag

ISO 8573.1 CLASS 4.4.6

13,1

13,4

 ABOVE LINE SPOOLINGUNDER LINE SPOOLING

13,3

11

9

DRAIN/

FILLING

TANK

 

Page 132: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 132/302

Part 3 : Integrated Automation System (IAS) 

3.1 General ............................................................................................. 3 - 4 

3.2 IAS Overview................................................................................... 3 - 5 

3.3 IAS Function Operation......... ............ ............. ............ ............ .......... 3 - 7 

3.4 IAS Mimics....................................................................................... 3 - 9 

Page 133: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 133/302

Part 3Integrated Automation System (IAS)

LNGC DISHA  Machinery Operating Manual

Illustration 3.1.1a IAS Overview

 ALARMPRINTER

LOGGINGPRINTER

COLOR HARDCOPIER

WHEEL HOUSE

EXTENSION VDUSYSTEM

EXT.

VDUODRM

CARGO SYSTEM MACHINERY SYSTEM

COLOR HARDCOPIER

 ALARMPRINTER

LOGGINGPRINTER

DOSS DOSS DOSS DOSSDOSS DOSS DOSS DOSS

INMARSAT-BVIA SHIPS MODEM

CCR ECR

Page 134: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 134/302

3 - 1  Part 3 Integrated Automation System

DOHS

DOHSPERSONNEL

 ALARM SYSTEM

EXT. VDU NET

(ETHERNET)

DOGS

MACHINERYEXT. VDU

SERVER

DOGS

CARGOEXT. VDU

SERVER

DOPC II DOPC II

8 SETS

DOHS

DEO-NET (ETHERNET)

TOTAL 12 RECEPTACLESFOR ACCOMMODATION AREA

- CAPT. DAY RM- C/E DAY RM- 2/E DAY RM- 3/E RM- 4/E RM- 5/E RM- E/E RM- C/O DAY RM- 2/O RM- 3/O RM- NWK/O RM- G/E DAY RM

SERIAL I/F  F OR CARGO SYSTEM  - CUSTODY TRANSFER SYSTEM (DUAL)  - LOADING COMPUTER (DUAL)  - FLOAT TYPE LEVEL GAUGE SYSTEM  - SHIPBOARD MANAGEMENT SYSTEM  - GAS DETECTION SYSTEM

  FOR MACHINERY SYSTEM  - SHIPBOARD MANAGEMENT SYSTEM  - SHIP PERFORMANCE MONITORING SYSTEM

  - NO. 1 BOILER (DUAL)  - NO. 2 BOILER (DUAL)  - MAIN TURBINE (DUAL)

DOHSCARGO MIMIC

PANEL DOHSPERSONNEL

 ALARM SYSTEM DOHSEXTENSION

 ALARM PANEL

16 PANELS

LEGEND

DOSS : DEO OPEN SUPERVISORY STATIONDOHS : DEO OPEN HISTORY STATIONDOPC II : DEO PROCESS CONTROLLER IIODRM : OPEN DCS REMOTE MANAGERDOGS : DEO OPEN GATEWAY STATION

PORTABLEEXTENSION VDU

2 SETS

 

LNGC DISHA  Machinery Operating Manual

Illustration 3.1.1b IAS Overview

CCR

DOSS DOSS DOSS DOSS

OPT.

CONV.

WHEEL HOUSE

DOSS DOSS

OPT.

CONV.

EXT. VDU NET

(ETHERNET)

PORTABLE EXTENSION VDUS

Page 135: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 135/302

3 - 2  Part 3 Integrated Automation System

DOPC II

OPT

(2 FIBERS)

OPT

(2 FIBERS)

ECR

DOSS DOSS DOSS DOSS

OPT

(2 FIBERS)

(FOR CARGO)

DOPC II

(FOR CARGO)

DOPC II

(FOR CARGO)

DOPC II

(FOR CARGO)

DOHS

OPT

(2 FIBERS)

OPT

(2 FIBERS)

DEO-NET

(ETHERNET)

DOGS DOGS

ELECTRIC

EQUIPMENT ROOM

OPT

(2 FIBERS)

OPT

(2 FIBERS)

OPT

(2 FIBERS)

OPT

(2 FIBERS)

OPT

(2 FIBERS)

OPT

(2 FIBERS)

CCR

CARGO

MIMIC PANEL

DOPC II

I/O

(FOR MACHINERY)

DOPC II

I/O I/O

DOPC II DOPC II

I/O I/O

(FOR MACHINERY) (FOR MACHINERY) (FOR MACHINERY)

DOHSPERSONNEL

 ALARM SYSTEM

DOHSDOHS

PERSONNEL

 ALARM SYSTEMDOHSEXTENSION

 ALARM PANEL

ECR

LEGEND

DOSS : DEO OPEN SUPERVISORY STATION

DOHS : DEO OPEN HISTORY STATION

DOPC II : DEO PROCESS CONTROLLER II

ODRM : OPEN DCS REMOTE MANAGER

DOGS : DEO OPEN GATEWAY STATION

OPT. CONV. : OPTICAL CONVERTOR

SIM : SERIAL INTERFACE MODULE

OPT

(2 FIBERS)

OPT.

CONV.

OPT.

CONV.

OPT.

CONV.

OPT.

CONV.

OPT.

CONV.

OPT.CONV.

I/O I/O I/O

I/O I/O I/O I/O I/O I/O I/O

I/O I/O I/O I/O I/O I/O

I/O

SIM

OPT(2 FIBERS)

OPT

(2 FIBERS)

 

LNGC DISHA  Machinery Operating Manual

Illustration 3.1.1c IAS Overview

COLOR HARDCOPIER  ALARM

PRINTER

CCR

DOSS2 DOSS1

DOSS DOSS

UPS1

LOGGING

PRINTER

DOSS4 DOSS3

DOSS DOSSODRMEXT.

VDU

UPS

W/H

PORTABLE EXTENSION VDUS

AC220V

 A

CCC

POWER SUPPLY CONCEPT

UPS2

Page 136: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 136/302

3 - 3  Part 3 Integrated Automation System

DOHS

DOHS

PERSONNEL

 ALARM SYSTEM

DOGS

DOHS

CARGO MIMIC

PANEL

DOHS

PERSONNEL

 ALARM SYSTEMDOHS

EXTENSION

 ALARM PANEL

LEGEND

DOSS : DEO OPEN SUPERVISORY STATION

DOHS : DEO OPEN HISTORY STATION

DOPC II : DEO PROCESS CONTROLLER II

ODRM : OPEN DCS REMOTE MANAGER

DOGS : DEO OPEN GATEWAY STATION

CB

 ALARM

PRINTER

ECR

DOSS1 DOSS2

DOSS DOSS

D

COLOR HARD

COPIERLOGGING

PRINTER

DOSS3 DOSS4

DOSS DOSS

UPS2

E

 A

ECR UPS CABINET

ECR

CABINETUPS1

UPS2

PS

I/O

DOPC IIDOPC II

I/O

PS PS

I/O

DOPC IIDOPC II

I/O

PS

I

J

DOGSDOHS

UPS

UPS1

UPS2

PS

I/O

DOPC IIDOPC II

I/O

PS PS

I/O

DOPC IIDOPC II

I/O

PS

F

G

ELECTRICEQUIPMENT ROOM

CABINET

H

EQ ROMUPS CABINET

B

C

D

E

F

G

H

I

J

AC220V(NORMAL)

AC220V

(EMERG.)

UPS1

c/o

Page 137: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 137/302

Page 138: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 138/302

LNGC DISHA  Machinery Operating Manual

DOCM(DOPC Control Module)

DOCM Configuration shows the DOCM system. The DOCM is composed of the

following modules.

Control Module(MSC)

Ethernet Module(ETM)

X-BUS Module(XBM)

Three sets of control module (MSC) have redundant configuration, and execute

same processing synchronised each other. The ethernet module (ETM) and the

X-BUS module (XBM) compare outputs of three (3) MSCs, and get data by

“logic of majority”, i.e., 2 out of 3. Even though one of MSC outputs incorrect

data, the remaining two (2) data are correct and used for the control and

monitoring.

DOSS DOHS

DEO-NET A

DEO-NET B

ETM

E-1 E-2 E-3

ETM

E-1 E-2 E-3

Page 139: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 139/302

3 - 6  Part 3 Integrated Automation System

monitoring.

MSC

I-A I-B

E-A E-B

MSC

I-A I-B

E-A E-B

MSC

I-A I-B

E-A E-B

XBM

I-1 I-2 I-3

XBM

I-1 I-2 I-3

I/O I/O

X-BUS A

X-BUS B

DOCM

DOCM Configuration

Page 140: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 140/302

LNGC DISHA  Machinery Operating Manual

  E/R call from E/R

Duty Engineer/Officer Selector

One set of the duty engineer /officer selector by lighting the push button for each

cargo and machinery systems are furnished on the CCR and the ECR console as

follows. When one of the button is lit, that indicates the UMS mode.

For the cargo system:

C/O 2/O 3/O NWK/O G/E

For the machinery system

C/E 2/E 3/E 4/E 5/E E/E

KEY TOOLBAR ASSOCIATE

Graphic Display

Process Monitoring Alarm MonitoringPumps, Valves, Controllers,etc. Manipulating

From Other Graphic Displays

KEY TOOLBAR

Graphic Display

Pumps, Valves, Controllers,etc. Manipulating

KEY TOOLBAR

 ASSOCIATE ASSOCIATE

Trend Display

Trend Trace Monitoring

Page 141: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 141/302

3 - 8  Part 3 Integrated Automation System

Personnel Alarm System

The following lamps and push buttons are supplied for the personnel alarm

system.

-  Start/Stop buttons with buzzer on master panel furnished on ECR

console : 1 set

-  Start/Stop push buttons on engine room entrance : 1 set

-  Reset push buttons in engine room : 9 sets

“System ON” Lamp on W/H extension alarm panel.

The Personnel Alarm System’s first setting time when activate the system is 27

min. After setting time, the system occur pre-warning to E/R column light. Then

can activate the second setting time which is set 3 min.

Display Function Assignment

The DOSS provides the following major displays.

Graphic Display

Group Display

Trend Display

Alarm Summary Display

The Graphic Displays take the initiative in operation basically.

The function assignment and the relationship among displays are as follows.

KEY TOOLBAR

KEY

TOOLBAR

SELECT

SELECT

 ASSOCIATE

: By Keyboard

: By Toolbar 

: By select a desired  alarm point

: By Associated display  call-u p button

Trend Display

 Alarm Monitoring

 Alarm Acknowledgment(Flicker Stop)

 

LNGC DISHA  Machinery Operating Manual

3.4 IAS Mimics

 NO. DISPLAY TITLE ASSOCIATED DISPLAY CODE

1 STEAM DUSTRIBUTION SYSTEM G001 G131 G136 M07 M10 M09 - -

2 MAIN TURBINE STEAM SYSTEM G011 G041 M25 M07 M10 M21 M20 -

4 STEAM DUMP. SYSTEM G131 M02 M28 M01 - M08 - -

5 BNR ATOMISING SYSTEM - - - - - - - -

6 HEATING STEAM SYSTEM G001 G002 - - - - - -

7 CONDENSATE WATER SYSTEM-1 G051 G053 G003 M08 M02 - - -

8 COMDENSATE WATER SYSTEM-2 G151 G152 G206 G207 M01 M07 M09 -

 NAME TITLE ASSOCIATED GRAPHIC

34 NO.2 TURBINE GENERATOR G171 G174 M35 M 31 M32 M23 M11 -

35 DIESEL GENERATOR G181 G183 M33 M34 M31 M32 M23 M11

36 EM’CY DIESEL GENERATOR G191 M33 M34 M35 M31 M32 M23 -

37 E/R VENT FAN G236 G237 G238 - - - - -

38 REFRIGERATION G221 G222 - - - - - -

40 MOTOR RUNNING HOUR 1 M40_1 M40_2 M40_3 M40_4 M40_5 - - -

40_1 MOTOR RUNNING HOUR 2 M40 M40_2 M40_3 M40_4 M40_5 - - -

Page 142: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 142/302

3 - 9  Part 3 Integrated Automation System

9 BOILER FEED WATER SYSTEM G141 G145 M07 M10 M01 M08 - -

10 BOILER AUX. SYSTEM G121 G128 M15 M29 - M01 M09 -

11 WATER COOLING SYSTEM G216 - - - - - - -

14 FRESH WATER SYSTEM - - - - - - - -

15 M/B FUEL SYPPLY SYSTEM G071 G075 M29 - - - M16 M40

16 FO FILL, TRANS & PURI. SYSTEM G224 G225 G226 G227 G228 G229 G230 M15

18 INCINERATOR FO SERVICE SYSTEM - - - - - - - -

19 LO FILL, TRANS & PURI. SYSTEM G231 G232 - M21 - - - -

20 M/T BEARING CONDITION G043 - M02 M21 - - - -

21 MAIN TURBINE & STERN TUBE LO SYS. G041 G048 - M02 M20 - - -

22 STEERING GEAR SYSTEM - - - - - - - -

23 COMPRESSED AIR SYSTEM G201 G202 M34 M35 M36 - - -

24 BILGE SYSTEM - - - - - - - -

25 M/T OVERVIEW G011 G013 M02 - - - - -

26 M/T SHUT DOWN/PRE-ALARM M25 - M07 M29 - M30 M09 -

27 M/T AUTO POWER REDUCTION - M07 M30 M10 M09 - - -

28 M/B ACC SYSTEM OVERVIEW G061 G064 M29 - M09 - - -

29 M/B BMS SYSTEM OVERVIEW G083 G093 M15 - M01 M09 - -

30 BLR TRIP/PRE ALARM M15 M29 - M10 M09 - - -

31 MAIN POWER DISTRIBUTION M33 M34 M35 - M32 M36 - -

32 POWER DISTRIBUTION CONT G195 M33 M34 M35 M36 M31 - -

33 NO.1 TURBINE GENERATOR G161 G164 M07 M10 M01 M32 M11 -

40_2 MOTOR RUNNING HOUR 3 M40 M40_1 M40_3 M40_4 M40_5 - - -

40_3 MOTOR RUNNING HOUR 4 M40 M40_1 M40_2 M40_4 M40_5 - - -

40_4 MOTOR RUNNING HOUR 5 M40 M40_1 M40_2 M40_3 M40_5 - - -

40_5 MOTOR RUNNING HOUR 6 M40 M40_1 M40_2 M40_3 M40_4 - - -

42 REPOSE GROUP - - - - - - - -

43 LOG SET - - - - - - - -

44 MACH OVERVIEW - - - - - - - -

45 WINDING TEMP - - - - - - - -

Part 4 : Main Boiler Control System 

4.1 Main Boiler....................................................................................... 4 - 1 

4.1.1 Performance Data .................................................................. 4 - 1 

4.1.2 Instruction of Main Boiler Operation.....................................4 – 6

4.2 Main Boiler Control System..... ............ ............ ............ ............ ...... 4 - 12

4.3 Burner Management System........... ............ ............ ........... ............ . 4 - 13 

4.4 Gas Management System (GMS)................................................... 4 - 28 

4.5 Automatic Boiler Control System.... ............ ............ ............ ........... 4 - 29 4.6 BMS and ACC Logic Diagram... ............ ............ ........... ............ ..... 4 - 35 

4.6.1 Burner Management System Logic Diagram............... ........ 4 - 35 

4.6.2 Automatic Boiler Control System Diagram ............ ............ . 4 - 51 

4.7 BLR Control Panel Drawing............. ............ ............ ........... ........... 4 - 59 

Page 143: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 143/302

 

Part 4Main Boiler Control System

LNGC DISHA  Machinery Operating Manual

Part 4 : Main Boiler Control System

4.1 Main Boiler

4.1.1 Performance Data

Boiler Type MB-4E-NSOil Firing

LOAD100%

NORMALMAX. 75% 50% 25%

SH STEAM kg/h 53,600 61,000 40,200 26,800 13,400

DSH STEAM kg/h 1,000 2,000 1,000 1,000 1,000EVAPOURATION

Main Boiler for

Boiler Type MB-4E-NS

Gas Firing

N2 : 0 Vol% CH4 : 100 Vol%

LOAD100%

NORMALMAX. 75% 50% 25%

SH STEAM kg/h 53,600 61,000 40,200 26,800 13,400

DSH STEAM kg/h 1,000 2,000 1,000 1,000 1,000EVAPOURATION

Page 144: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 144/302

4 - 1  Part 4 Main Boiler Control System

TOTAL kg/h 54,600 63,000 41,200 27,800 14,400

DRUM MPag 6.61 6.81 6.37 6.18 6.07

STEAM PRESS.SH OUTLET M Pag 6.03 6.03 6.03 6.03 6.03

ECO INLET °C 138.5 138.5 138.5 138.5 138.5

SH INLET °C 283 284.9 280.4 278.6 277.4

SH OUTLET °C 515 515 515 500.4 469.9

FEED WATERSTEAM TEMP.

DSH OUTLET °C 288.5 293.1 288.5 288.5 288.5

EFFICIENCY (HHV BASE) % 88.5 88.4 88.4 87.9 86.2

HHV kcal/kg 10,280 10,280 10,280 10,280 10,280

CALORIFIC VALUE

LHV kcal/kg 9,713 9,713 9,713 9,713 9,713

FUEL CONSUMPTION kg/h 3,962 4,561 2,987 1,995 1071

EXCESS AIR RATE % 10 10 12.5 19.2 36

O2 RATE % 1.9 1.9 2.3 3.4 5.6

COMBUSTION AIR FLOW kg/h 60,679 69,862 46,794 33,110 19,263

FLUE GAS FLOW kg/h 64,641 7,4423 49,781 35,105 20,280

ECO OUTLET GAS TEMP. °C 171 174 165 160 154

FDF OUTLET °C 38 38 38 38 38 AIR TEMP.

SAH OUTLET °C 120 120 120 120 120

TOTAL DRAFT LOSS kPag 3.57 4.74 2.12 1.05 0.35

 

TOTAL kg/h 54,600 63,000 41,200 27,800 14,400

DRUM MPag 6.61 6.81 6.37 6.18 6.07STEAM PRESS.

SH OUTLET M Pag 6.03 6.03 6.03 6.03 6.03

ECO INLET °C 138.5 138.5 138.5 138.5 138.5

SH INLET °C 283 284.9 280.4 278.6 277.4

SH OUTLET °C 515 515 515 515 506.8

FEED WATERSTEAM TEMP.

DSH OUTLET °C 288.5 293.1 288.5 288.5 288.5

EFFICIENCY (HHV BASE) % 84.0 83.9 84 83.6 82

HHV kcal/kg 13,270 13,270 13,270 13,270 13,270CALORIFIC VALUE

LHV kcal/kg 11,964 11,964 11,964 11,964 11,964

FUEL GAS CONSUMPTION kg/h 3,251 3,745 2,450 1,654 858

EXCESS AIR RATE % 10 10 12.5 19.2 36

O2 RATE % 1.9 1.9 2.3 3.4 5.6

COMBUSTION AIR FLOW kg/h 62,336 71,805 48,039 34,367 20,336

FLUE GAS FLOW kg/h 65,587 75,550 50,488 36,021 21,193

ECO OUTLET GAS TEMP. °C 173 178 166 159 153

FDF OUTLET °C 38 38 38 38 38 AIR TEMP.

SAH OUTLET °C 120 120 120 120 120

TOTAL DRAFT LOSS KPag 3.68 4.87 2.18 1.11 0.38

 

LNGC DISHA  Machinery Operating Manual

Boiler Water Content and Water Content Curves

Water Content at Filled Up State by Cold Water (Hydrostatic Test)

VOLUME(m3) WEIGHT(kg) REMARKS

BOILER TUBE 9.83 9,830 COLD WATER g = 1,000 kg/m3 

BOILER HEADER 0.67 670 COLD WATER g = 1,000 kg/m3 

WATER DRUM 4.16 4,160 COLD WATER g = 1,000 kg/m3 

WATER CHAMBER OF STEAM DRUM 4.63 4,630 COLD WATER g = 1,000 kg/m3 

STEAM CHAMBER OF STEAM DRUM 4.97 4,970 COLD WATER g = 1,000 kg/m3 

SATURATED STEAM PIPE 0.13 130 COLD WATER g = 1,000 kg/m3 

SUPERHEATER 2.12 2,120 COLD WATER g = 1,000 kg/m3 

CONTROL DESUPERHEATER 0.51 510 COLD WATER g = 1,000 kg/m3 

DESUPERHEATER INLET PIPE 0.05 50 COLD WATER g = 1,000 kg/m3 

DESUPERHEATER 0.07 70 COLD WATER g = 1,000 kg/m3 

3

Drum Water Level and Water Content

0.8

0.6

0.4

 

Page 145: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 145/302

4 - 2  Part 4 Main Boiler Control System

ECONOMIZER 2.97 2,970 COLD WATER g = 1,000 kg/m3 

TOTAL 30.11 30,110

Water Content at Normal Water Level by Cold Water (Before Boiler Ignition)

VOLUME(m3) WEIGHT(kg) REMARKS

BOILER TUBE 9.83 9,830 COLD WATER g = 1,000 kg/m3 

BOILER HEADER 0.67 670 COLD WATER g = 1,000 kg/m3 

WATER DRUM 4.16 4,160 COLD WATER g = 1,000 kg/m3 

WATER CHAMBER OF STEAM DRUM 4.63 4,630 COLD WATER g = 1,000 kg/m3 

STEAM CHAMBER OF STEAM DRUM - - -

SATURATED STEAM PIPE - - -

SUPERHEATER - - -

CONTROL DESUPERHEATER - - -

DESUPERHEATER INLET PIPE - - -

DESUPERHEATER - - -

ECONOMIZER 2.97 2,970 COLD WATER g = 1,000 kg/m3 

TOTAL 22.26 22,260 -

Water Content at Boiler Operation

VOLUME(m3) WEIGHT(kg) REMARKS

BOILER TUBE 9.83 7,323 SAT. WATER g = 745 kg/m3 

BOILER HEADER 0.67 499 SAT. WATER g = 745 kg/m3 

WATER DRUM 4.16 3,099 SAT. WATER g = 745 kg/m3 

WATER CHAMBER OF STEAM DRUM 4.63 3,449 SAT. WATER g = 745 kg/m3 

STEAM CHAMBER OF STEAM DRUM - - -

SATURATED STEAM PIPE - - -

SUPERHEATER - - -

CONTROL DESUPERHEATER - - -

DESUPERHEATER INLET PIPE - - -

DESUPERHEATER - - -

ECONOMIZER 2.97 2,213 Comp. Water g = 930 kg/m3 

TOTAL 22.26 16,583 -

Drum Water Level (m)

0.2

0

0

-0.8

-0.6

-0.4

-0.2

-5 5-4 4-3 3-2 2-1 1

   W  a

   t  e  r

   C  o  n

   t  e  n

   t   (  m   3   )

6

LNGC DISHA  Machinery Operating Manual

Steam, Air & Electric Consumption

Air Consumption (per boiler)

EQUIPMENT NAME SUPPLY AIR CONSUMPTION OPERATING CONDITION

 ACC (ACTUATOR) 0.9 MPag 120 Nl/min CONTINUOUS

FWR. (ACTUATOR) 0.9 MPag 50 Nl/min CONTINUOUS

BURNER FLAME EYE

SEALING750 mmAq 150 x 6 = 900 Nl/min CONTINUOUS

SOOT BLOWER

SCAVENGING550 mmAq 78 x 8 = 624 Nl/min CONTINUOUS

Alarm & Trip List

SET POINT

NO. DESCRIPTION

 ALARM TRIP NOR

TIMER

157B DRUM LEVEL HIGH-HIGH - + 240 mm ± 0 mm 0 sec

157BDRUM LEVEL VERY HIGH FW MOTORVALVE CLOSE

+220 mm - ± 0 mm 10 sec

157B DRUM LEVEL VERY HIGH TURBINE TRIP +220mm - ± 0 mm 10 sec

157BDRUM LEVEL VERY HIGH TURBINE AUTO SLOW DOWN

+180 mm - ± 0 mm 10 sec

Page 146: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 146/302

4 - 3  Part 4 Main Boiler Control System

SOOT BLOWER SEALING 550 mmAq 220 x 8 =1,760 Nl/min CONTINUOUS

Steam Consumption (per boiler)

EQUIPMENT NAME SUPPLY STEAM CONSUMPTION OPERATING CONDITION

SOOT BLOWER 6.03 MPag 110 Nl/min CONTINUOUS

BURNER 0.79 MPag 375 Nl/min CONTINUOUS

STEAM AIR HEATER 0.23 MPag 2700 Nl/min CONTINUOUS

Electric Consumption (per ship)

EQUIPMENT NAME ELECTRIC POWER CONSUMPTION OPERATING CONDITION

BOILER CONTROL PANEL 220V 30A CONTINUOUS

FORCED DRAFT FAN 440V

524A (HIGH)

240A (LOW) CONTINUOUS

FUEL OIL PUMP 440V 38A CONTINUOUS

157B DRUM LEVEL HIGH +130 mm - ± 0 mm 10 sec

157B DRUM LEVEL LOW -130 mm - ± 0 mm 10 sec

157BDRUM LEVEL LOW-LOW TURBINE AUTO SLOW DOWN

-180 mm - ± 0 mm 10 sec

157B DRUM LEVEL EX-LOW - -240 mm - 0 sec

158B DRUM LEVEL EX-LOW - -240 mm - 0 sec

- DRUM PRUSSURE HIGH 7.50 MPag - - 4 sec

- DRUM PRESSURE LOW 5.10 MPag - - 4 sec

- FEED WATER PRESS LOW 7.65 MPag - - 10 sec

- FEED WATER SALINITY HIGH 10 ppm - 0 ppm 10 sec

- SUPERHEATER STEAM PRESS HIGH 6.25 MPag - 6.03 MPag 4 sec

- SUPERHEATER STEAM PRESS LOW 5.30 MPag - 6.03 MPag 4 sec

126B SUPERHEATER STEAM TEMP HIGH-HIGH - 530°C 515°C 0 sec

146B SUPERHEATER STEAM TEMP HIGH 525°C - 515°C 10 sec

- DSH STEAM PRESS HIGH 6.25 MPag -5.19 ~ 6.03

MPag4 sec

- DSH STEAM TEMP HIGH 400 °C - 285 ~ 400 °C 10 sec

LNGC DISHA  Machinery Operating Manual

SET POINT

NO. DESCRIPTION

 ALARM TRIP NOR

TIMER

229B FLAME FAILURE ONE OF TWO - - 2 sec

229B FLAME FAILURE - TWO OF TWO - 2 sec

- FO HEADER PRESS LOW 0.15 MPag - 1.6-2.0 MPag 4 sec

259B FO HEADER PRESS LOW-LOW - 0.10 MPag 1.6-2.0 MPag 0 sec

- FO HEADER TEMP. HIGH RW#1 50 - - 10 sec

- FO HEADER TEMP. LOW RW#1 150 - - 10 sec

234B FO HEADER TEMP. LOW-LOW - RW#1 200 - 0 sec

SET POINT

NO. DESCRIPTION

 ALARM TRIP NOR

TIMER

- FO HEATER OUTLET TEMP LOW RW#1 145 - - 10 sec

-FO HEATER OUTLET STRAINER PRESSLOSS HIGH

0.02 MPag - - 4 sec

250BFO PUMP OUTLET PRESS LOW AUTO- CHANGE

1.0 MPag - - 4 sec

349BSEAL AIR FAN OUTLET PRESS LOWFAN AUTO-CHANGE

4.50 kPag - - 4 sec

- ECO OUTLET GAS TEMP HIGH - 250 °C 160~190°C 10 sec

397B CONTROL AIR PRESS LOW - 0.4 MPag - 0 sec

Page 147: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 147/302

4 - 4  Part 4 Main Boiler Control System

- ATM. STEAM PRESS LOW 0.40 MPag - 1.0-1.6 MPag 4 sec

243B ATM. STEAM PRESS LOW-LOW - 0.30 MPag 1.0-1.6 MPag 0 sec

205B GAS HEADER PRESS HIGH-HIGH - 75 kPag - 0 sec

- GAS HEADER PRESS HIGH 70 kPag - - 4 sec

- GAS HEADER PRESS LOW 1 kPag - - 4 sec

- GAS HEADER PRESS LOW-LOW - 0.7 kPag - 0 sec

- GAS HEADER TEMP HIGH 80°C - 30°C 10 sec

- GAS HEADER TEMP LOW 15°C - 30°C 10 sec

234B GAS HEADER TEMP LOW-LOW - 5°C 30°C 0 sec

- PURGE N2 PRESS LOW 0.05 MPag - 100 kPag 4 sec

288B SOOT BLOWER STEAM PRESS LOW 4.0 MPag - - 4 sec

276B EXH GAS SMOKE HIGH 4 deg - 1~3 deg 10 sec

277B O2 CONTENT LOW 1% - - 10 sec

246B FD FAN VIBRATION HIGH 6.0 mm/s - - 4 sec

- FD FAN TRIP - STOP - 0 sec

- FO HEATER OUTLET TEMP HIGH RW#1 45 - - 10 sec

Page 148: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 148/302

Page 149: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 149/302

Page 150: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 150/302

Page 151: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 151/302

Page 152: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 152/302

Page 153: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 153/302

LNGC DISHA  Machinery Operating Manual

4.1.2.6 One-Boiler Operation

When an unexpected problem occurs and it becomes necessary to run the shipwith only one boiler, follow these instructiuon.

1. Allowable Maximum Continuous Evaporation for One-boiler Operation

Allowable maximum continuous evaporation is 63.0 t/h. Whether the

maximum continuous evaporation is reached or not, it should be judged bythe burner oil pressure of the ACC oil flow meter. At the maximum

continuous evaporation, oil pressure is 1.57 MPag while oil flow is about4.551 kg/h with three burners in use.

2. One Boiler Operation at Maximum Evaporation

(1) Pay attention to the condition of combustion and adjust the airflow

 properly. The fan should operate in near maximum load. Take additional

caution so that smoke is not emitted during load change.

(2) Change boiler load as slowly as possible

Page 154: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 154/302

4 - 11  Part 4 Main Boiler Control System

(2) Change boiler load as slowly as possible.

(3) When cleaning burner tips, reduce boiler load beforehand. When onlyone burner is in service, the boiler’s maximum evaporation is 21 t/h, so

reduce the boiler load below this load before cleaning burner tips. If the boiler load is not reduced, the steam pressure decreases.

(4) Pay attention to the increase in steam temperature. If steam temperatureis 515°C or higher with STC control valve fully opened, reduce the boilerload.

3. Boiler Out of Operation

(1) Completely isolate the boiler out of operation from the boiler in operation.Particularly when making repairs, check the main steam stop valve, the

feed water valve, the ACC steam pressure detecting foot valve, theauxiliary steam desuperheater steam outlet valve drain valve, the

chemical dosing valve, and other lines which are connected to the other boiler.

(2) When the boiler will be shut down for a long time, the boiler should be

 preserved by the wet lay-up method.

Page 155: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 155/302

Page 156: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 156/302

Page 157: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 157/302

LNGC DISHA  Machinery Operating Manual

(5) - a) Initial start of Base FO burner

(With other burner off)

Fuel Mode “FO”→ “FO”

No. Symbol Action Indication

(1) Securing Start condition of boiler (FO burner)

Boiler FO shut valve open : FO SHUT V/V “OPEN” lamp on

(2) Base FO burner start

“ON” PB on : Base FO burner “ON” lamp flicker

Base FO burnerstarting

sequence start

(3) Furnace purge start

Furnace purge command to ACC : “FURNACE PURGE” lamp flicker

(7) Base burner ignition

Base burner ignitor insert : Base burner “ IGNIT” lamp flicker

Confirming ignitor insert position : Base burner “IGNIT” lamp on

Ignitor spark start

Base FO burner valve open: Base burner “FO BNR V/V-1”, “FO BNR

V/V-2” lamp on

Detect faulty operation of flame scanner→ Trip interlock considering flame scanner

signal off as correct change to interlock

considering flame scanner on as correct. 

Page 158: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 158/302

4 - 15  Part 4 Main Boiler Control System

Furnace purge command to ACC : FURNACE PURGE lamp flicker

All burner air reg. fully open : All burner “AIR REG” lamp on

Base burner atomizing steam valve fully open : Base burner “ATM STM V/V” lamp on

(4) Securing furnace purge condition

Furnace purge condition established signalfrom ACC

: “FURNACE PURGE” lamp on

(90 sec.)

Hold furnace purge condition for not less than

90 seconds.<Furnace purge completed>

(5) Setting up base FO burner ignition

Base burner ignition condition setting signal toACC

: FO CONT V/V “IGN. RATE” lampflicker “IGN AIR” lamp flicker

: “IGN AIR” lamp flicker

 No. 2, No. 3 burner air reg. fully close : No. 2, No. 3 burner “AIR REG” lamp off

(6) Securing base burner ignition condition

Ignition condition established signal fromACC

: FO CONT. V/V “IGN RATE” lamp onIGN air lamp on

FO temp normal(or “FO TEMP. BYPASS” selected)

FO burning pump running

Base burner atomizing steam valve fully open

FO recirc. valve close : “FO Rec. V/V” lamp off

Ignition validity term over trip interlock

canceling

→  It will be cancelled when ignition is

conducted within 5 minutes after burnerstart.

(8) Confirmation of burner ignition (FE detection flame within 10 seconds after FO BNR V/V open)

Confirmation of on from FE : Base burner “BASE BNR” lamp on

: FO CONT. V/V “IGN” Lamp off “IGNAIR” lamp off

: No.2, No.3 burner “BNR PURGE V/V”

lamp on

Base FO burner starting

sequence complete

LNGC DISHA  Machinery Operating Manual

(5) - b) Increasing number of No.2 or No.3 FO burner

(Start with other FO burner under burning)

Fuel Mode “FO”→ “FO”

No. Symbol Action Indication

(1) Securing start condition of boiler (FO burner)

Base burner under burning : Base FO burner “ON” lamp on

: No.2 (No. 3) FO burner “OFF” lamp on

(2) No.2 (No.3) FO burner start

“ON” PB on : No.2 (No.3) FO burner “ON” lamp flicker

 No.2 (No.3) FO burnerstarting sequence starts

(3) No 2 (No 3) FO burner ignition

(6) Extinguish of No.3 (or No.2 Base) FO Burner

Depressing No.3 (or No.2 Base) FO burner OFF PB, starts the following extinguish

sequence to stop the FO burner.

(6) - a) Extinguish of No.3 FO burner

(With other FO burner under burning)

Fuel Mode “FO”→ “FO”

No. Symbol Action Indication

(1) Securing burner extinguish condition

Other burners under burning

FO burner manual mode

(2) No.3 FO burner extinguish

“OFF” PB N 3 FO b “OFF” l fli k

Page 159: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 159/302

4 - 16  Part 4 Main Boiler Control System

(3) No.2 (No.3) FO burner ignition

 No.2 (No.3) burner purge valve fullyclose

: No.2 (No.3) burner “BNR PURGE V/V” lampoff

 No.2 (No.3) burner atomizing steamvalve fully open

: No.2 (No.3) burner “ATM STM V/V” lamp on

 

 No.2 (No.3) FO burner valve fully open: No.2 (No.3) “FO BNR V/V-1”, “FO BNR

V/V-2” lamp on

 No.2 (No.3) burner air reg. fully open : No.2 (No.3) burner “AIR REG” lamp on

(4) Confirmation of burner ignition (FE detecting flame within 10 seconds after FO BNR V/V open)

Confirmation of on from FE

: No.2 (No.3) burner “No.2 (No.3) BNR” lamp

on

 No.2 (No.3) FO burner Starting

sequence complete

“OFF” PB on : No.3 FO burner “OFF” lamp flicker

 No.3 FO burner extinguish

sequence starts

(3) No.3 FO burner extinguish

 No.3 FO burner valve close: No.3 :FO BNR V/V-1”, “FO BNR V/V-2”

lamp off

 No.3 burner purge valve fully open : No.3 :burner “BNR PURGE V/V” lamp on

: No.3 burner “No.3 BNR” lamp off

(5 sec.)

 No.3 burner air reg. close

: No.3 burner “AIR REG” lamp off

(This process will be cancelled when No.3 gas

 burner is under operation.)

(10 sec.)

 No.3 FO burner atomizing steam valve

close: No.3 burner “ATM STM V/V” lamp off

 No.3 FO burner extinguish

sequence complete

Page 160: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 160/302

LNGC DISHA  Machinery Operating Manual

(7) - a) Increasing Number of Base (or No.2, No.3) Gas Burner

(With other Gas burner off)

Fuel Mode “FO”→ “DUAL”

No. Symbol Action Indication

(1) Securing start condition of GAS burner

Base FO burner under burning : Base burner “FO ON” lamp on

Other gas burner inoperative : No.2 and No.3 “GAS OFF” lamp on

Master & Boiler gas valve open : Master gas v/v “OPEN” lamp on

: BLR gas v/v “OPEN” lamp on

Gas ignition set command to ACC : Gas Cont V/V “IGN POSIT” lamp flicker

Gas ignition setting condition

established signal from ACC: Gas Cont V/V “IGN POSIT” lamp on

(7) - b) Increasing Number of No.2, No.3 Gas Burner

(With other gas burner under burning)

Fuel Mode “DUAL”→ “DUAL”

No. Symbol Action Indication

(1) Securing start condition of gas burner

 No.2 FO burner under burning : No.2 burner “FO ON” lamp on

Other gas burner under burning : Base “GAS ON” lamp on

(2) Increase number of No.2 gas burner

“ON” PB on : No.2 GAS burner “ON” lamp flicker

 No.2 gas burner number

increasing sequence starts

(3) Gas burner ignition

Page 161: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 161/302

4 - 18  Part 4 Main Boiler Control System

(2) Increase number of base gas burner

“ON” PB on : Base GAS burner “ON” lamp flicker

Base GAS burner number

increasing sequence starts

(3) Base GAS burner ignition

Base GAS burner valve open: Base “GAS BNR V/V-1” “GAS BNR V/V-2”

lamp on

: BASE BNR GAS “ON” lamp on

: FUEL MODE “DUAL” lamp on

: GAS CONT V/V “IGN POSIT” lamp off

Base gas burner number

increasing sequence completed

(3) Gas burner ignition

 No.2 GAS burner valve open: No.2 “GAS BNR V/V-1” “GAS BNR V/V-2”

lamp on

: No.2 BNR GAS “ON” lamp on

 No.2 gas burner number

increasing sequence completed 

LNGC DISHA  Machinery Operating Manual

(8) Extinguishing of Gas Burner

Depressing gas burner OFF PB, starts the following extinguish sequence to stop the

gas burner. When the gas burner is extinguished, N2  purge will be automatically

conducted.

(8) - a) Extinguish of No.3 (or No.2, Base) Gas Burner

(With FO burner and gas burner in “DUAL” mode, i.e. both under burning,

and with other gas burner under burning)

Fuel Mode “DUAL”→ “DUAL”

No. Symbol Action Indication

(1) Securing burner extinguish condition

All FO burners under burning : Base No.2 and No.3 FO burner “ON” lamp on 

Other gas burners under burning : Base No.2 and No.3 gas burner “ON” lamp on 

(2) No.3 GAS burner extinguish

(8) – b) Extinguish of base (or No.2, No.3) Gas Burner

(With FO burner and gas burner in “DUAL” mode, i.e. both under burning,

and with other gas burner under inoperative)

Fuel Mode “DUAL”→ “FO”

No. Symbol Action Indication

(1) Securing burner extinguish condition

All FO burners under burning : Base No.2 and No.3 FO burner “ON” lamp on

Other gas burners under inoperative : Base GAS burner “ON” lamp on

(2) Base GAS burner extinguish

“OFF” PB on : Base GAS burner “OFF” lamp flicker

Base gas burner extinguish

sequence starts

Page 162: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 162/302

4 - 19  Part 4 Main Boiler Control System

“OFF” PB on : No.3 GAS burner “OFF” lamp flicker

 No.3 GAS burner extinguish

sequence starts

(3) No.3 gas burner extinguish

 No.3 GAS burner valve close: No.3 “GAS BNR V/V-1” “GAS BNR V/V-2”

lamp off

 No.3 GAS burner N2 purge valve fully

open: No.3 gas burner “BNR N2 V/V” lamp on

(15 sec.)

 No.3 GAS burner N2 purge complete : No.3 gas burner “BNR N2 V/V” lamp off

: No.3 gas burner “OFF” lamp on

 No.3 gas burner extinguish

sequence completed

(3) Base gas burner extinguish

Base GAS burner valve close: Base “GAS BNR V/V-1” “GAS BNR V/V-2”

lamp off

: Gas Cont V/V “IGN POSIT” lamp on

Base GAS burner N2 purge valve fully

open: Base GAS burner “BNR N2 V/V” lamp on

(15 sec.)

Base GAS burner N2 purge complete : Base burner “BNR N2 V/V” lamp off

: Base GAS burner “OFF” lamp on

 No.3 Gas burner extinguish

sequence completed

LNGC DISHA  Machinery Operating Manual

(8) - c) Extinguish of No.3 Gas Burner

(With other gas burner in “GAS” mode)

Fuel Mode “GAS”→ “GAS”

No. Symbol Action Indication

(1) Securing burner extinguish condition

All GAS burners under burning : Base No.2 and No.3 GAS burner “ON” lampon

All FO burners under inoperative: Base No.2 and No.3 FO burner “OFF” lamp

on

(2) No.3 GAS burner extinguish

“OFF” PB on : No.3 GAS burner “OFF” lamp flicker

 No.3 gas burner extinguish

sequence starts

(8) - d) Extinguish of Base Gas Burner

(With other gas or FO burner inoperative in “GAS” mode)

Fuel Mode “GAS”→ “FO”

No. Symbol Action Indication

(1) Securing burner extinguish condition

Other gas burners under inoperative : No.2 and No.3 GAS burner “OFF” lampon

All FO burners under inoperative: Base, No.2 and No.3 FO burner “OFF”

lamp on

(2) Base GAS burner extinguish

“OFF” PB on : Base GAS burner “OFF” lamp flicker

Base GAS burner extinguish

sequence starts

Page 163: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 163/302

4 - 20  Part 4 Main Boiler Control System

(3) No.3 GAS burner extinguish

 No.3 GAS burner valve close: No.3 “GAS BNR V/V-1” “GAS BNR V/V-2”

lamp off

 No.3 GAS burner N2 purge valve fully

open: No.3 GAS burner “BNR N2 V/V” lamp on

(15 sec.)

 No.3 GAS burner N2 purge complete : No.3 burner “BNR N2 V/V” lamp off

: No.3 GAS burner “OFF” lamp on

 No.3 burner air reg. fully close : No.3 burner “AIR REG” lamp off

 No.3 gas burner extinguish

sequence completed

(3) Base gas burner extinguish

Base GAS burner valve close

: Base “GAS BNR V/V-1” “GAS BNR

V/V-2”

lamp off

: GAS CONT. V/V “IGN POSIT” lamp on

Furnace purge command to ACC

All air reg. fully open :”FURNACE PURGE” lamp flicker

Furnace purge condition established

signal from ACC: “FURNACE PURGE” lamp on

Base GAS burner N2 purge complete : Base burner “BNR N2 V/V” lamp off

(4) Start N2 purge

(15 sec.)   Base GAS burner N2 purge completed  : Base burner “BNR N2 V/V” lamp off

(5) Start Furnace purge

(30 sec.) 

Hold furnace purge condition for not

less than 30 sec.: Furnace purge completed

(6) Furnace purge completed

All burner air reg. close : All burner “AIR REG” lamp off

: “FURNACE PURGE” lamp off

: Base GAS burner “OFF” lamp on

Base Gas burner extinguish

sequence completed

Page 164: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 164/302

Page 165: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 165/302

Page 166: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 166/302

Page 167: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 167/302

Page 168: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 168/302

Page 169: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 169/302

LNGC DISHA  Machinery Operating Manual

Illustration 4.4i Gas Management System

TANKPRESS

CONT

PID

TANKPRESS

PRO-TECT

PID-3PID-2

SP

TANKPRESS

PRO-TECT

TANKPRESS

CONT

PID

SPTANK

PRESS

CONT

PID

SET

LADEN

BALLAST

LADENBALLAST OPEN

PRESS

CLOSE

SP

 ABS

GAUGE

ESTIMATEDB.O.B.

ESTIMATEDB.O.B.

ESTIMATEDB.O.G.

BOILER GASFLOW

+ -LS

HS

START THECONTROL FUNCTION AFTER CONFIRM

MIN TANKPRESSSET

PREFEREDGAS FLOWCONTPOSITION SET

 ABS PRESS

RECOMMENDEDBOILER LOAD FOR

EXCESS B.O.G.

BOILERF G FLOW

NO.2 BOILERF G CONTROL

VALVEPOSITION

NO.2 BOILERF G CONTROL

VALVEPOSITION

GAUGE PRESS

SETOPEN

PRESS

CLOSE

23 kPa

OPEN

21 kPa

CLOSEPID-1

L/D

COMPCONT

CONTROL FUNCTIONS IAS

Page 170: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 170/302

4 - 27  Part 4 Main Boiler Control System

SP

FORC-INGVAPO-RIZERCONT

PID

PID

SP

GAS FLOW

T

P PT

B.O.B.TEMPCONT

LADENBALLAST

 ABSOLUTEGAUGE

GAUGE

STEAM

VENT MODEFROM CCR(VENT : ON)

VENT MODECONT.

 ABS

GAUGE

INHIBIT

 ASTERN

FROMCARGO TANK AT LADEN MODE

FROMCARGO TANK AT LADEN MODE

DUMP MODEFROM CCR(DUMP : ON)

FROMCARGO TANK AT LADEN MODE

HS

I/P

FORCINGVAPORIZER

B.O.G.FLOW(ORIFICE)

B.O.G.FLOW(ORIFICE)

LNG FLOWCONTROLVALVE

MIN GASFLOWSET

FO BURNERIGNITION

SPLIT RANGECONTROL

INLET GUIDEVANE CONTROL

IGVPOSI-TIONER

MOTOR SPEEDCONTROL

100

OUT

0 25 100IN

STRIPPUMPDISCHPRESSCONT

VENTMASTVALVE

TO ATMOS

CARGO TANKSTRIP PUMP

VENT CONTROL

VAPOUR HEADER

SPRAY

NOZZLE

SMALL

LARGE

SPSTRIPPUMPLOADCONT

SET

PROTECTVENT

PP

P

P

P

TT

DP

PP

I/P

CUR.RENT

MOTOR

100

OUT

0 15 100IN

INVERTER

PID

PID

SP

SP

L/D HEATER

HEATERINLETVALVE

SURGECONTROLVALVE

RECIRCULATION LINEOF LOW DUTYGAS COMPRESSOR DEMISTER

HEATERBYPASSVALVE

GAS TOENGINE ROOM

STEAM

SURGECONT

B.O.G.TEMP.CONT

SURGEZONESETTER

I/P

I/P

I/P

T DP

PTPT

TANK PRESS CONTROLFORCING VAPORIZER CONTROLLOW DUTY COMPRESSOR CONTROLL/D HEATER CONTROL 

Page 171: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 171/302

Page 172: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 172/302

Page 173: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 173/302

Page 174: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 174/302

LNGC DISHA  Machinery Operating Manual

(4) Air Flow Station

This station indicates the status of the Air Gas Control Loop and transfer it to Auto/Manual.

a) Fuel/Air Ratio Adjuster

Fuel/Air ratio is set.

(1)

(2)

 

► Control Position

: Operation is done at the ABC control position.

(5) FWC Flow Station

This station indicates the status of the FWC Control Loop and transfer it to Auto/Manual.

a) Drum Level Set Station

This station sets SETPOINT of FWC Control Loop.

(1) Indicator

Left (No. 1 Boiler) : Set Point (SP)

Right (No. 2 Boiler) : Set Point (SP)-300 ~ 0 ~ +300 mm

Right (No. 2 Boiler) : Drum Water Level (PV)

Left (No. 1 Boiler) : Drum Water Level (PV)

-300 ~ 0 ~ +300 mm

(2) Raise & Lower Switch

This switch is used to set the Drum Level SP in Fix mode.

► Control Position

: Operation is done at the ABC control position.ECRBGB

ECRBGB

(1) Indicator

Fuel/Air Ratio

0.5 ~ 1.0 ~ 1.5 %

(2) Increase & Decrease PB

Fuel/Air Ratio is set

1.0 : Standard fuel/air ratio

(Standard air rate)

1.0→ 1.5 : Increases fuel/air ratio

(Increase combustion air above standard rate.)

0.5← 1.0 : Decreases fuel/air ratio

(Decrease combustion air above standard rate.)

(1)(2)

Page 175: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 175/302

4 - 32  Part 4 Main Boiler Control System

 b) “AIR FLOW” Auto/Manual Station

This station transfers the Auto/Manual mode of the FD Fan inlet vane control drive unit.

(1) Indicator

Upper : Burner Draft Loss (PV)

(Green) 0~5.0 kPag

Lower : Output signal for FD Fan inlet vane control drive unit

(Red) 0~100%

(2) Auto/Manual Station

Auto/Manual Station transfers control mode of FD Fan inlet vane control driveto the Auto or Manual and indicates its status.

In Manual mode, FD Fan inlet vane control drive unit is manually operated.

► Control Position

: Operation is done at the ABC control position.

p p

 b) “FWC” Flow Auto/Manual Station

This station transfers the Auto/Manual of the FWC Control V/V.

(1) Indicator

Upper : Feed Water Flow (PV)

(Green) 0~56 T/H

Lower : Output signal for FW Control V/V

(Red) 0~100%

(2) Auto/Manual Station

This station transfers the control mode of the FW control V/V to Auto/Manual

and indicates its status.

In Manual mode, the FW Control V/V is manually operated.

► Control Position

: Operation is done at ABC control position.ECRBGBECRBGB

M A

(1)

(2)

M A

(1)

(2)

LNGC DISHA  Machinery Operating Manual

(6) STC Station

This station indicates the status of the STC Control Loop and transfer it to Auto/Manual.

a) STC Set Station

This station sets SETPOINT of STC Control Loop.

(1) Indicator

Left (No. 1 Boiler) : Set Point (SP)

Right (No. 2 Boiler) : Set Point (SP)0 ~ 600˚C

Right (No. 2 Boiler) : Steam temp (PV)

Left (No. 1 Boiler) : Steam temp (PV)

0 ~ 600˚C

(2) Raise and Lower Switch

This switch is used to set the Steam Temp SP.

► Control Position

: Operation is done at the ABC control position.

(7) ATM Press Station

This station indicates status of the Atomize Press Control Loop and transfers it to Auto/Manual.

a) “ATM” Auto/Manual Station

This station transfers the Auto/Manual of the ATM Press. Control V/V.

M A

(1)

(2)

 

(1) Indicator

Upper : Atomize pressure (PV)

(Green) 0 ~ 1.5 MPagLower : Output signal for Atomize Press. Control V/V

(Red) 0 ~ 100%

(2) Auto/Manual Station

The Auto/Manual Station transfers the control mode of the Atomize

Control V/V to the Auto/Manual and indicates its status. In Manual mode,

the Atomize Control V/V is manually operated.

► Control Position

: Operation is done at the ABC control position.

ECRBGB

ECRBGB

(1)(2)

Page 176: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 176/302

4 - 33  Part 4 Main Boiler Control System

 b) “STC” Auto/Manual Station

This station transfers the Auto/Manual of the STC Control V/V.

(1) Indicator

Upper : Steam Flow (PV)

(Green) 0~56 T/H

Lower : Output signal for steam temp control V/V

(Red) 0~100%

(2) Auto/Manual Station

This station transfers the control mode of the steam control V/V to Auto/Manual

and indicates its status.

In Manual mode, the steam temp control V/V is manually operated.

► Control Position

: Operation is done at the ABC control position.ECRBGB

M A

(1)

(2)

LNGC DISHA  Machinery Operating Manual

(8) FO Recalculation Control Station

a) “FO REC” Auto/Manual Station

This station indicates the FO Rec. Control Loop and transfers the Auto/Manual of the FO Rec. (FO Pump

Discharge Press. Control) control V/V.

(1) Indicator

Upper : FO recirculation set press (SP)

(Green) 0 ~ 4.0 MPagLower : FO recirculation press value (PV)

(Red) 0 ~ 100%

(2) Increase/Decrease switch for SP

The set press of FO recirculation can be changed by this switch.

(3) Indicator

Indication of output signal for FO Rec. Control V/V.

(4) Auto/Man Station

This station transfers the control mode of the FO Rec. Control V/V to Auto/Manual

and indicates its status.

In Manual mode, the FO Rec. Control V/V is manually operated.

M A

(1)

(3)

(4)

(2)

Page 177: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 177/302

4 - 34  Part 4 Main Boiler Control System

► Control Position

: Operation is done at the ABC control position.ECRBGB

LNGC DISHA  Machinery Operating Manual

4.6 BMS and ACC Logic Diagram

4.6.1 Burner Management System Logic Diagram

BMS MAN-AUTO CHANGE

FUEL

GAS

X

F.O.

DESCRIPTION OF

BMS AUTO. CONTROL

F.O. TRIP GAS TRIP F.O./DUAL/GAS

AT FUEL TRIP *4

OPERATE OF

SW AT BMS AUTO."FUEL MODE"

OBASE

NO.21

2 NO.2

BASE

3 NO.2

BASE

BASE

NO.26

BASE

NO.25

4 NO.2

BASE

OK

OK

F.O.

ONLY

ONLYGAS

NO.3

NO.3

NO.3

NO.3

NO.3

NO 3

NOT(MAN) -

X   X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

O

O

X

O

O

O

O

X

O

O

X

O

O

O

Page 178: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 178/302

4 - 35  Part 4 Main Boiler Control System

MAN-AUTO. CHANGE &AUTO. CONTROLS OF BMS

BASE

NO.27

OK8 NO.2

BASE

9 NO.2

BASE

NO.2

BASE

* 1 ; BURNER AUTO NUMBERS CONTROL

; F.O. BACK-UP CONTROL(FROM ACC SIGNAL)* 2

; F.O. BOOST-UP CONTROL(BY GAS TRIP)* 3

; IN CASE OF BOTH FUEL TRIP CONDITION,* 4

; IGN. F.O. RATE HAS BEEN ESTABLISHED* 5

; IGN. GAS RATE HAS BEEN ESTABLISHED* 6

; F.O. EXTINGUISH HAS BEEN ESTABLISHED AND NOT * 2* 7

; BMS CONTROL MODE "MAN"* MAN

; BMS CONTROL MODE "AUTO"* AUTO

BLR IS MADE "TRIP" & BMS IS SET TO "MAN"

NO.3

NO.3

NO.3

NO.3

NO.3

F.O.DUALGAS

-

- -

--

--

(MAN)NOT

DUAL

* 8 ; GAS EXTINGUISH HAS BEEN ESTABLISHED

X O

O O

X   X

X   X

O O

O O

X   X

O

O

O

O

O O

LNGC DISHA  Machinery Operating Manual

Sh 3 BUR NER BU RN IN GBURNER

CONT.

POSITION

SELECT

MANU. MODE

Sh 2 BURNER AUTO. MODEESTABLISH

CONT. MODEMANU.

 AUTO

 AUTO MODE

S

R

REMOTE

BOP

LOCAL

BGB

BGB

BOP

ECC

BMS

BOP MODE. ESTA.

F.O. BNR SEQ Sh 3,6,7,8,9GAS BNR SEQ Sh 3,12,13

F.O. BNR SEQ Sh 6,7,8,9GAS BNR SEQ Sh 12,13

Sh 6,7,8,

3,9,12,13

Sh 6,7,8,

9,12,13

Page 179: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 179/302

4 - 36  Part 4 Main Boiler Control System

GAS SUPPLY

OPERATION

CONT. SIGNAL

MANU. MODE GAS SUPPLY SEQ

BLREMERG. MODE

EMERG. MODE

Sh 11

 ACC

BLOCK DIAGRAM OF BMSCONTROL POSITION SELECT

S

R

(1-1) SELECTION OF CONTROL POSITION

SELECT "BGB" OR "BOP" MODE BY OPERATING THE CONTROL

POSITION SELECTOR SWITCH ON THE LOCAL PANEL.

 AT "BGB", THE "MAN" MODE ONLY CAN BE SELECTED AND AT

"BOP", THE "MAN" OR "AUTO" MODE CAN BE SELECTED.

WHEN THE INITIAL START OF THE BURNER OR WHEN IT HAS

BEEN STOPPED FROM "BGB" POSITION, IT IS MANDATORY

TO RE-START THE BURNER FROM "BGB" POSITION.

(ONLY REMOTE OPERATION)MASTER GAS V/V OPEN/CLOSE

EACH BOILER GAS V/V OPEN/CLOSE

ON

OFF

Sh 5,15

BMS-1

Sh. No. 1 

LNGC DISHA  Machinery Operating Manual

(2-2) SEE TABLE 1(BMS-17) FOR CONDITIONS PERMITTING THE SWITCH FROM THE "MANUAL" MODE TO

  "AUTO" MODE AND FOR WHAT KINDS OF CONTROL ARE PERFORMED IN THE "AUTO" MODE.

(2-1) AFTER THE FIRING OF BASE F.O. BURNER HAS BEEN ESTABLISHED,

  THE BURNER "AUTO" MODE CAN BE SELECTED AT "BOP" POSITION.

Page 180: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 180/302

4 - 37  Part 4 Main Boiler Control System

BLOCK DIAGRAM OF

F.O & GAS BURNER

AUTO/MANU. MODE SELECT

 

LNGC DISHA  Machinery Operating Manual

REMOTE

BOP

GAS

F.O.

DUAL

(3) -1

Sh 2

Sh 10F.O. BOOST-UP ORD.

F.O. BOOST-UPORD.

F.O. BNRINC. ORDER

Sh 6,7,8

 ALL GAS BNRSTOP

GAS BNRDEC. ORDER

Sh13

Sh 6

Sh 12

BASE F.O. BNR BURNING

BNR GAS STAND-BY

S

R# 000

12GAS BNRINC. ORDER

Sh

(GAS TRIP)

MODE ESTABURNER AUTO.

(3) -2

Sh 6,7,8F.O. BNRINC. ORDER

 ACC

ECC

BMS

(3) -1

(3) -1

 AC

C

 AC

C

F.O. BURNING MODE

BURNER FUEL MODE

GAS BNR EXTING. OK

Page 181: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 181/302

4 - 38  Part 4 Main Boiler Control System

BLOCK DIAGRAM OFF.O./DUAL/GASBURNING MODE SELECT

MANU. MODESh 1

Sh 6BASE F.O. BNR

Sh 7

F .O . BUR NI NG M OD E Sh 4

 ACC F.O. BNR EXTING. OK

Sh 6,7,8,9

 ALL F.O. BNRDEC. ORD

S

R

F.O. IGN. OK ACC

S

R

BURNING

BURNINGNO.2 F.O. BNR

BASE GAS BNRBURNING

NO.2 GAS BNRBURNING

F.O. BOOST-UP ORD.

(GAS TRIP)

(3)-2

NO.3 F.O. BNRBURNING

Sh 8

Sh 12

Sh 12

Sh 12BURNINGNO.3 GAS BNR

 ACC

IASF.O. BACK-UPORDER

F.O. BACK-UPORDER

F.O. BACK-UPORDER

CARGO TK PRESS. L

MANEUVERING

MTRP

Sh 12

DUAL BURNING MODE

NO.3 BURNER DECREASE

(3)-2

(3)-2

(3)-2

(3) -1

BURNERBURNING

Sh 1

DUAL BURNING MODE Sh 4

GAS BURNING MODE

G AS BUR NI NG M OD E Sh 4

BMS-3

Sh. No. 3

 

LNGC DISHA  Machinery Operating Manual

Sh 2F.O. BNR

GAS

F.O.

DUAL

Sh 3

F.O. BURNING AUTO

 AUTO RUN MODE

Sh 3

REMOTE

C A

C

C

 AC

C

 AC

C

 AC

C

 AC

C A

C

C A

C

 A

C

C

 A

CC

ECC

NO.2 F.O. BNRINC. ORDER

9ShNO.2 F.O. BNR

DEC. ORDERNO.2 F.O. BNRDEC. ORDER(4-1)

DEC. ORDERNO.2 BNR

NO.2 BNRINC. ORDER

OKIGN.F.O. Sh

7 12ShYES

NO

SET ORDERNO.2 IGN.

BY ACC

9NO.2 F.O. BNRDEC. ORD

Sh

NO.3 F.O. BNRDEC. ORDER

NO.3 F.O. BNRDEC. ORDER

Sh9

NO.3 F.O. BNRINC. ORDER

F.O.IGN.OK

YES

NO

7Sh

SET ORDER

BY ACC

NO.2 IGN. NO

IGN.OK

F.O. YES8Sh

BY ACC

SET ORDERNO.3 IGN.

BOP BMS

F.O. BURNING MODE

NO.2 F.O. BNRINC. ORD

NO.3 F.O. BNRINC. ORD

NO.3 GAS BNRINC. ORD

NO.2 F.O. BNRINC. ORD

DUAL BURNING MODEBNR FUEL MODE

Page 182: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 182/302

4 - 39  Part 4 Main Boiler Control System

Sh 3

GAS

Sh 2GAS BNR

 AUTO RUN MODE

GAS BURNING AUTO

DUAL BURNING AUTO

BLOCK DIAGRAM OF BURNER NUMBER

 AUTO. CONTROL

C

 AC

C A

C

C A

C

C

 AC

GAS FIRING ONLY AUTO CONTROLIN THE "AUTO" MODE, GAS BURNER OF NO.3 BURNER

CAN BE AUTOMATICALLY EXTINGUISHED.IN THIS CASE, THE FUEL MODE TO BE CHANGED TO DUAL BURNING MODEFROM ACC F.O. BACK-UP SIGNAL.

(4-3)

(4-2)

STOPPED IN ACCORDANCE WITH THE COMMAND FROM THE ACC.

OF NO.2 AND NO.3 BURNER CAN BE AUTOMATICALLY STARTED OR

IN THE BURNER "AUTO" MODE, F.O. BURNER AND GAS BURNERDUAL BURNER AUTO NUMBERS CONTROL

F.O. BURNER AUTO NUMBERS CONTROLIN THE BURNER "AUTO" MODE AT THE "BOP" POSITION.USING THE BURNER "AUTO" MODE, AUTOMATICALLY START OR

STOP NO.2 AND NO.3 BURNER IN ACCORDANCE WITH THE COMMAND

(4-1)

FROM THE ACC.

NO.3 GAS BNRDEC. ORDER

NO.3 GAS BNRDEC. ORD

Sh13

13NO.2 GAS BNRDEC. ORD

NO.3 F.O. BNR

INC. ORD

NO.3 GAS BNR

INC. ORD

Sh

F.O.BACK-UP REFER TO Sh 3

FROM ACCOR OTHER

(Sh 10)

MASTER GAS SHUT-OFF COND.

BOOSTF.O.

-UP

NO

YES

YESREFER TO Sh 3

(4-3)NO

(4-2)

Sh13

ShNO. 2 F.O. BNRDEC. ORD

NO. 2 GAS BNRDEC. ORD

9

BY ACC

NO.3 IGN.SET ORDER

NO

YES Sh128

ShF.O.IGN.OK

INC. ORDERNO.3 BNR

NO.3 BNRDEC. ORDER

GAS BURNING MODE

BMS-4

Sh. No. 4 

LNGC DISHA  Machinery Operating Manual

BOILER TRIP OR BOILER F.O. SHUT-OFF V/V CLOSEWHEN CONDITIONS PROHIBITING THE F.O. BURNER OPERATION ARE ESTABLISHED,

THE BOILER F.O. SHUT-OFF VALVE AND EACH F.O. BURNER VALVE ARE AUTOMATICALLY CLOSED.(IN THE BURNER FUEL MODE "DUAL OR GAS", THE BOILER IS NOT TRIPPEDEVEN IF BOILER F.O. SHUT-OFF CONDITION IS ACTIVATED.)

(5 - 1)

(1) CHECK AND ELIMINATE THE CAUSE OF THE SHUT-DOWN(2) AFTER THE CAUSE HAS BEEN ELIMINATED, PUSH THE

  "OFF" SWITCH OF BOILER F.O. SHUT-OFF VALVE TO  CANCEL THE SELF-HOLDING CIRCUIT FOR THE BOILER TRIP.(3) RE-START THE BOILER IN ACCORDANCE WITH THE OPERATING

  PROCEDURE IN (Sh. 6, 7,8)

(5 - 2) RE-START OPERATION AFTER BOILER SHUT-DOWN  RE-START THE BURNER IN ACCORDANCE WITH THE  FOLLOWING PROCEDURE.

NO. 1 BOILER

BLR F.O. SHUT-OFFCONDITION

BMS CONTROLLER ABNORMAL

 ATOM. STEAM PRESS. LOW/LOW

F.O. TEMP. LOW/LOW

F.O. PRESS. LOW/LOW

F.O. PUMP STOP

LOCAL(BGB)

LOCAL

F.O. TEMP.

BY-PASS

ON

OFF

Sh 6,7,8BASE NO.2, OR NO.3F.O. BNR BURNING

Page 183: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 183/302

4 - 40  Part 4 Main Boiler Control System

EMERGENCY MANU. TRIP

MAIN STEAM TEMP. HIGH

 ALL BURNER FLAME FAIL

BOILER TRIPCONDITION

NOTE : NO.1 BOILR SHOWN.  NO.2 BOILER TO BE SAME.

(BY FLAME MONITORING SYSTEM)

BLACK OUT

EMERG. MODE

BASE F.O. BNRV/V CLOSE

NO. 2 F.O. BNRV/V CLOSE

NO. 3 F.O. BNRV/V CLOSE

S

R

(5 - 1)

(5 - 1)

Sh 1

BLR F.O.SHUT-OFF V/VCLOSE

BLR TRIP

CONDITION

LOCAL

(BGB)

LOCAL(BGB)

DEAREATOR LEVEL LOW/LOW

DRUM WATER LEVEL HIGH/HIGH

DRUM WATER LEVEL LOW/LOW

ELECTRIC POWER FAILURE

NO.1 F.D. FAN RUN

STAND-BY F.D.FAN RUN

STAND-BY F.D. FAN

 AIR DMPR OPEN (NO.1 BLR SIDE)

STAND-BY F.D. FANUSED SELECT

NO.1

NO.2

STAND-BY F.D. FAN USED SET

BLR F.O.SHUT-OFF VALVECLOSE PB

 ALM. SEQBLR F.O.SHUT-OFF V/VCLOSE

Sh 10

BMS-5

Sh. No. 5

BLOCK DIAGRAM OF BOILER F.O.

SHUT-OFF CONDITION

 

LNGC DISHA  Machinery Operating Manual

Page 184: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 184/302

4 - 41  Part 4 Main Boiler Control System

LNGC DISHA  Machinery Operating Manual

Page 185: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 185/302

4 - 42  Part 4 Main Boiler Control System

LNGC DISHA  Machinery Operating Manual

Sh 1

OP

IGN. READY

SG

P

IGN.

SET

YES

NO

YES

NO

C

 AIGN. SET C

BY ACC

YES

NO

YES

NO

YESYES

NO

NO

BY ACC

S

RSh 5

* 1

S

R

S

R* 2

LOCAL

BGB

REMOTE

BOP

ECC

BMS

LS

 ATOMIZ. AIR SUPPLYV/V OPEN

 ATOMIZ. STM SUPPLY

V/V OPEN

TS F.O. TE MP . N OR.

BLR F.O. STAND-BY Sh 2

BLR F.O. SHUTV/V OPEN

LS

F.O. RECIRC.V/V CLOSE

F.O. PUMP RUN

BLR F.O.SHUT V/V CL

CPBLR F.O.SHUT V/V CL

PORTABLEIGNITER SET

MANU. MODE

F.O. TEMP.

BY-PASS

ON

OFF

 ALL

F.O. V/V

CLOSE(LS)

F.O.

SHUT V/VCONDITION

NOR.

 ALLBNROFF

 ALL F.O. BNR STOP

FURNACE

PURGE AIR

RATE

#060IGN. AIR

RATE

Page 186: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 186/302

4 - 43  Part 4 Main Boiler Control System

ON

Sh 1

Sh 6

SEC

BY ACC

BY ACC

YES

YES

Sh 14

S

LS

R

* 2

S

L

L

S

S

L* 1

NO

TO Sh 12

S

L

Sh 12BASE GAS

BNR BURNING

Sh 12NO.2 GASBNR BURNING

Sh 12NO.3 GAS

BNR BURNING

NO.3 F.O. BNROFF

ON

OFFNO.3 F.O. BNR

 AUTO MODE

NO.3 F.O.BNR INC. ORD

Sh3,4

NO.3 F.O.BNR DEC. ORD

Sh3,4

BASE F.O. BNRBURNING

Sh 7NO.2 F.O. BNR

BURNING

Sh 14NO.3 BNRFLAME FAIL

Sh 12 NO.3 GAS BNR BURNING

 ATOM. V/VOPEN

F.O. RECIRC.

V/V CLOSE

 ALL F.O. BNRNOT RUNNING

NORMAL CASE

F / EON

BASE / NO.2

BNR

BURNING

CASE OF PORTABLEIGNITER USE

PORTABLE IGNITERSPARK START

Sh 12

"NO.3 GAS BNR BURNING"

NO.3 AIR REG.OPEN

NO.3 F.O. BNRV/V OPEN

PORTABLE IGNITERSPARK STOP

NO.3 F.O. BNR BURNING Sh 2,3,5,6,7

9,12,13,14

10 SEC

IGNITIONPERIOD

BMS-8

Sh. No. 8

BLOCK DIAGRAM OF NO.3 F.O. BURNER

IGNITION SEQUENCE

RATE

BASE AIRREG. OPEN

LS

NO.2 AIRREG. OPEN

LS

NO.3 AIRREG. OPEN

LS

BASE AIRREG. CLOSE

LS

NO.2 AIRREG. CLOSE

LS

NO.3 AIRREG. CLOSE

LS

FURNACE PURGE ACC

 ACC

IGN. AIR SET

 

LNGC DISHA  Machinery Operating Manual

Page 187: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 187/302

4 - 44  Part 4 Main Boiler Control System

〔7〕-2

 

LNGC DISHA  Machinery Operating Manual

NO.1 BLRGAS VALVE TRIP

B.O.G. PRESS. LOW

B.O.G. PRESS. HIGH

NO.1,NO.2 OR NO.3 GAS

BNR BURNING(GAS V/V OP)

#010

Sh 5 BOIER TRIP CONDITION

ECRBOILER GAS V/VMANUAL TRIP

BOTH BOILER TRIP

BMS CONTROLLER ABNORMAL

BOILER GAS V/V TRIP S

R

(10)-2

NO.2 BOILER GAS SUPPLY

SHUT-OFF CONDITION(SAME TO NO.1 BLR)

 ALM. SEQ.

NO.2 BLR N2 VENTV/V OPEN

NO.2 BLR GASV/V CLOSE

NO.1 BLR N2 VENT

V/V OPEN

NO.1 BLR GASV/V CLOSE

NO.1 BLR GASV/V TRIP

NO.1 BLR GASV/V CLOSE PB

Page 188: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 188/302

4 - 45  Part 4 Main Boiler Control System

MASTER

GAS VALVE TRIP

BOTH BOILER TRIP

S

R

(10)-2

 ALM. SEQ.

 ALM. SEQ.

#015

E.S.D.S. ACTIVATED

GAS DUCT EXH. FAN STOP

GAS LEAK DETECTED

FIRE DETECT

B.O.G. TEMP. LOW/LOW

ECRMATER GAS V/VMANUAL TRIP

CARGO TANK PRESS. LOW/LOW

BOG HEATER ABNOR.

(10)-3

TO F.O. BOOST-UP ORD. Sh 3,4

MASTER GAS V/V TRIPMASTER GAS V/VCLOSE ORD.

MASTER N2 VENTV/V OPEN

TO E.S.D.S. PANEL

MASTER GAS V/VCLOSE PB

BOTH GAS

V/V CLOSE

MASTER GAS

TRIP

NOTE : NO. 1 BOILER SHOWN.

NO. 2 BOILER TO BE SAME.

BLOCK DIAGRAM OF MASTER GAS &

BOILER GAS SUPPLY SHUT-OFF CONDITION

BMS-10

Sh. No. 10 

LNGC DISHA  Machinery Operating Manual

S

R

#060

#030

Sh 12BLR GAS V/VOPEN

A

SL

L

S

RS

L

S

L

L

SS

R

L

S

S

LL

S

SL L

S

REMOTE

BOP

MASTERGAS V/V

OP

CL

NO.1 BLRGAS V/V

OP

CL

Sh 10

MASTERGAS

VALVEINTERLOCK

NO.1BLRGAS VALVE

INTERLOCK

Y

N

Sh 10

Y

N

MATER N2 VENTV/V OPEN

MATER N2 VENTV/V CLOSE

MATER GASV/V OPEN

MATER GASV/V CLOSE

#010

#015

#005

(11) - 1

NO.1 BLR GAS

V/V OPEN

NO.1 BLR N2VENT V/V CLOSE

(11) - 1

(11) - 2

MASTER N2 PURGE ON

BLR N2 PURGE ON

BOILER GAS V/V CLOSE

MASTER N2 PURGEV/V OPEN

BLR N2 PURGEV/V OPEN

BLR N2 PURGEV/V CLOSE

MASTER N2 PURGEV/V CLOSE

FURNACE PURGEORD.

ALL BNR AIR

BNR N2 PURGESTART

FURNACE PURGE

Page 189: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 189/302

4 - 46  Part 4 Main Boiler Control System

NO.2 BLRGAS V/V

OP

CL

#030

#030

#030

#030#015

#005

Sh 12

#090

L

S

C A

L

S

S

LLS

S

L

S

L

S

L

LS

S

L

S

L

L

S

S

LL

S S

L

S

L

* 1 : FURNACE PURGE  ESTABLISH

S

RS

L

S

L

L

S

L

S S

L

C

C

 AC

LS

S

L

NOTE* 1

NO.1 BLR GASV/V CLOSE

(11 - 2)

F.O.

BNR.

BURNING

F.O.

BNR START

SEQ

F.D.FRUN

N

Y

N

NY

Y

N

Y

 ALL BNR AIR

REGISTER OPEN

 ALL GASV.V OPEN

BLR N2 PURGEV/V OPEN

BLR N2 VENTV/V OPEN

GAS BNR V/V OPEN

OF FIRING BNR

BLR N2 PURGEV/V OPEN

BLR N2 PURGEV/V CLOSE

BLR N2 PURGEV/V OPEN

BLR N2 PURGEV/V OPEN

BLR N2 VENTV/V OPEN

BLR N2 PURGEV/V CLOSE

BLR N2 PURGEV/V CLOSE

 ALL BNR GASV/V CLOSE

 ALL BNR GASV/V CLOSE

FURNACE PURGE

STOP

 ALL BNR AIRREGISTER CLOSE

BLR N2 VENTV/V OPEN

BLR N2 PURGE

V/V CLOSE

 ALL BNR AIRREGISTER CLOSE

FURNACE PURGESTOP

NO.2BLR GAS VALVE

INTERLOCK

Y

NSh 10

NO.2 BLR GASV/V OPEN

NO.2 BLR GASV/V CLOSE

NO.2 BLR N2VENT V/V CLOSE

BLR GAS V/VOPEN

SAME AS NO.1 BOILER N2 PURGE SEQUENCE

NOTE

BLOCK DIAGRAM OF MASTER &

BOILER GAS V/V OPEN / CLOSE SEQUENCE

BMS-11

Sh No. 11

#035

#035

#025

 

LNGC DISHA 

Machinery Operating Manual

LOCAL

BGB

REMOTE

BOP

ECC

BMS

BASE GASBNR

ON

OFF

ON

BASE GASBNR

ON

OFF

 AUTO MODE

MANU. MODE

Sh 1

Sh 1

Sh 11BLR GAS

V/V OPEN GAS STAND-BY

IGN. SET

GAS CONT. V/V ISCONFIRMED BY ACC

NO

YES

BY ACC

IGN. SET ORD A

C

C

BLR GASSTAND-BY

Sh 2,3

IGN. READY

Sh3

BASE GASBNR INC. ORD

Sh 14BASE BNR FLAMEFAIL

Sh 6 BASE F.O. BNRBURNING

S

R

Sh 6

Sh 6 "BASE GAS BURNER BURNING"

BASE GAS BNR START Sh 13,14

BASE GAS BNRV/V OPEN

LS

BASE AIRREG. OPEN

LS

BASE GASBNR BURNING

Sh 2,3,67,8,9,13

Page 190: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 190/302

4 - 47  Part 4 Main Boiler Control System

NO.2 GASBNR

ON

OFFNO.2 GASBNR

ON

OFF

Sh

3,4

NO.2 GAS

BNR INC. ORD

Sh 14NO.2 BNR FLAMEFAIL

Sh3,4

Sh9

BLR GAS V/VCLOSE

NO.3 GASBNR INC. ORD

Sh 14NO.3 BNR FLAMEFAIL

Sh 7 NO.2 F.O. BNRBURNING

Sh 8NO.3 F.O. BNRBURNING

S

R

S

R

Sh 7

Sh 8

Sh 7 "NO.2 GAS BURNER BURNING"

NO.2 GAS BNR START Sh 13,14

NO.2 GAS BNRV/V OPEN

LS

NO.2 AIRREG. OPEN

LS

NO.2 GASBNR BURNING

Sh 3,67,8,9,13

Sh 8 "NO.3 GAS BURNER BURNING"

NO.3 GAS BNR START Sh 13,14

NO.3 GAS BNRV/V OPEN

NO.3 AIRREG. OPEN

LS

LS

NO.3 GASBNR BURNING

Sh 3,6,7,8,9,13

BNS-12

Sh. No. 12

BLOCK DIAGRAM OF GAS BURNER

IGNITION SEQUENCE

 

LNGC DISHA  Machinery Operating Manual

Page 191: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 191/302

4 - 48  Part 4 Main Boiler Control System

LNGC DISHA  Machinery Operating Manual

Page 192: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 192/302

4 - 49  Part 4 Main Boiler Control System

LNGC DISHA  Machinery Operating Manual

 AIR FLOWCONTROL

F.O. FLOW

CONTROL

BLR H.F.OSHUT V/V

LOCAL

BGB

EMERGENCYSWITCH

NOR

PURGE

BURN

 ALL BNR AIR REG. OPEN

 ALL BNR AIR REG. CLOSE

 AUTO

MAN

 AUTO

MAN

CLOSE

OPEN

3 min

PURGE FINISH

SET F.D.F. INLET VANEOPENING ANGLE FORFURNACE PURGE

SET F.O. FLOW CONT.V/V OPENING ANGLE

FOR IGNITION

SET F.D.F. INLET VANEOPENING ANGLE FORIGNITION

BLR HFO SHUT V/V OPEN

HFO RECIRC. V/V CLOSE

LS

BMS EMERGENCY OPERATION

THE F.O. BURNER CAN START OR STOP BY USING "EMERGENCYOPERATION PANEL" AT LOCAL (BGB) POSITION, WHEN THE BMS

CONTROLLER CANNOT OPERATE.IN THIS CASE, OPERATOR MUST WATCH AND CONFIRM TO ALLINTERLOCK CONDITIONS DIRECTORY.WHEN THE ABC CONTROLLER IS RUNNING NORMALLY,OPERATOR CAN SELECT THE MODE(AUTO/MAN) OF ABC CONTROL(AIR FLOW AND FO FLOW) AFTER BURNER IGNITION.

(15 - 1)

Page 193: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 193/302

4 - 50  Part 4 Main Boiler Control System

BASE BNRIGNITER

BASE F.O.BNR V/V

R

S

F / EON

YES

NO

: SAME AS BASE F.O. BURNER

: SAME AS BASE F.O. BURNER

OFF

ON

CLOSE

OPEN

IGNITER FORWARD & SPARK

L

SBASE F.O. V/V OPEN

LS

BASE ATOMIZ. STEAM V/V OPEN

NO.2 F.O.BNR V/V

NO.3 F.O.BNR V/V

CLOSE

OPEN

CLOSE

OPEN

BASE BNR AIR REG. OPENLS

BMS-15

Sh. No. 15

BLOCK DIAGRAM OF BMS

EMERGENCY MODE

 

LNGC DISHA  Machinery Operating Manual

4.6.2 Automatic Boiler Control System Diagram

 DIAGRAM OF AUTOMATIC BOILER

CONTROL SYSTEM 

 BACK-UP UNIT 

 ACC   MASTER CONTROL LOOP 

 STEAM DUMP CONTROL LOOP 

FO FLOW CONTROL LOOP 

Page 194: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 194/302

4 - 51  Part 4 Main Boiler Control System

 BACK-UP UNIT 

 BACK-UP UNIT 

 BACK-UP UNIT 

 BACK-UP UNIT 

 BACK-UP UNIT 

OTHER

 ATOMIZING STEAM PRESSURE CONTROL LOOP 

GAS FLOW CONTROL LOOP 

 AIR FLOW CONTROL LOOP 

FEED WATER FLOW CONTROL LOOP 

 STEAM TEMPERATURE CONTROL LOOP 

FO PUMP DISCHARGE PRESSURE CONTROL LOOP 

LNGC DISHA  Machinery Operating Manual

Master Control

S.H. OUTLET STEAMPRESS. TRANSMITTER

0~8 Mpa

165B-Sa

165B-Pa

165B-Sb

165B-Pb

TO OTHER BOILER

S.H. STEAM PRESS

FROM OTHER BOILER

S.H. STEAM PRESS

FROM OTHER BOILER

MASTER SIGNAL

TO OTHER BOILER

MASTER SP

FROM OTHER BOILER

MASTER SP

MASTER SP

SP

SW

SFT

0 BIAS (0.1 Mpa)

 AUTO

SET DOWN PARA-RUN

 AND

ON/OFF ON/OFF

NO.1 BOILER

HOT START V/V

CLOSE

NO.2 BOILER

HOT START V/V

CLOSE

LOCAL OR

OTHER

(INPUT)

 ABC

CONTROL

PANEL

 AUTO-RUNHMS

SW

 _ 

SLAVEINIT.

6.03

Mpa

TO OTHER BOILER

MASTER SIGNAL

4~20 mA4~20 mA

MASTERCONTROL

MST

FWC DMP

S.H. STEAM

PRESS HSE +

LAG

HSE SW

0

2 BOILER

PARA-RUN

2 BOILER

PARA-RUN

& SLAVE

TRACKING

PV

SP

+

PI

MST

STEAM FLOW

+L/L SFT

BIAS SP

6 - a 1 - b

FO3 - c

FO5 - a

GAS

FO FLOW

GAS FLOW

 AIR FLOW

STEAMING

UP RATE

4 - d

33.3% 66.6%

100%

SFT

SFT

2 BNRS

3 BNRS

Page 195: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 195/302

4 - 52  Part 4 Main Boiler Control System

GRAPHIC

OPERATION

PANEL

BOP

GRAPHIC

OPERATION

PANEL

LOCAL OR

OTHER

(OUTPUT)

BGB

+BIAS SP

SP

INIT.

100% X

FO

GAS

 AIRMASTER

SIGNAL

1 - a DMP

MIN

SFT

PRESS

MAS LOAD

SFT

BIAS

X

+

LSE

LOAD LIMIT

BOILER LOAD

BIAS

BOILER

"BIAS"

LOADER

1 - d DMP

MASTER SET

POINT

FROM OTHER BOILER

SPDMP

0~8Mpa

0~8 Mpa

MASTER SET

STATION

MST

SPDMPMST

PVNO.1 NO.2

PVNO.1 NO.2

0~8Mpa

1 - c

 

LNGC DISHA  Machinery Operating Manual

Steam Dump Control

STEAM DUMP PISTON

VALVE (330B) CLOSE

SIGNAL

RECOMMENDED BOILER LOAD

FOR EXCESS BOG DUMP

SIGNAL BY YARD

BOG DUMP

MODE

BY YARD

STEAM DUMP

 AVAILABLE

BY YARD

FROM OTHER BOILER

ON/OFF

S.H. STEAM PRESS

STEAM DUMPCONTROL

DMP

MST

S.H. STEAM

PRESS

HSE

LAG

PV

SPPIDMP

HSE

PV

PI

100%

SFT

LSE LOAD LIMIT

+

+

4 t/h GAS BNR

RUNNING

HSEBIAS

(0.1 Mpa)

MASTER

SET POINT

LMS

0

LSE

SP

1 - b FWC

STEAM FLOW

STEAM FLOW

FROM OTHER BOILER

FO FLOW

4~20 mA ON/OFF

FROM OTHER BOILER

GAS CONT. V/V OPENING

FROM OTHER BOILER

STEAM FLOW

LOCAL OR

OTHER

(INPUT)

 ABC

CONTROL

PANEL

FROM OTHER BOILER

6 - a

FO

FO FLOWLSE

3 - c

MST1 - c

MST

 AND HSE

NOT

1 - d

GAS CONT. V/V OPENING

HMS

ORPV

SP

FROM BMS

(M/T REMO-CON

SIGNAL)

0.05

Mpa _ 

GAS4 - a

Page 196: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 196/302

4 - 53  Part 4 Main Boiler Control System

HSE

SFT

0.0

 A/M

 A/M

 A/M

4~20 mA4~20 mA

STEAM

DUMP

CONTROL

V/V (1)

331B

 ASI/PSTEAMDUMP

CONTROL

CONTROL V/V OPENING

SIGNAL FOR SPRAY

WATER CONTROL

4~20 mA

STEAMDUMP

CONTROL

V/V (2)

332B

I/P  AS

DUMP A/M

STATION

ON/OFF ON/OFF

BURNER RUN

 ANDHMS

1.0

LSE

EXC

TRACKING

MASTER SET

STATION

SPMST DMP

SPMST DMP

0~8 Mpa

0~8 Mpa

HOT START PISTONVALVE OPEN ORDER

STEAM DUMP PISTONVALVE OPEN ORDER

M

GRAPHIC

OPERATION

PANEL

BOP

GRAPHIC

OPERATION

PANEL

LOCAL OR

OTHER

(OUTPUT)

BGB

 AND

MAX GAS

CONT. V/V

OPENING

SET

PI

FOE

SP SIGNAL)

 

LNGC DISHA  Machinery Operating Manual

FO Flow Control

FO PRESSURETRANSMITTER

FO FLOWCONTROL

FO

0~3 Mpa

 ATOMIZING PRESS.TRANSMITTER

0~1.5 Mpa227B-P

227B-S

4~20 mA

LAG

FO PRESS

 ATM SP

TRACKING

PV

SPPI

 ATM

 ABCCONTROL

PANEL

LOCAL

(INPUT)

DO PRESS

 ATM SP

X36

X37

DO USED

IGNITIONSW

SW

SW

4~20 mA

HSE

LAG SFT

33.3%

66.7%

2 BNRS

SFT

SFT

100%

3 BNRS

FO BNR

STOP

FO PRESS

FO FLOW

(BLR LOAD)

03 - a

 AIR

 ATM

FO PUMP

231B-Sa

231B-Pa

231B-Sb

231B-Pb

4~20 mA

MASTERGAS

FO PUMP

DMP

3 - cHSE

MASTER

GAS FLOW

FO BNR HI LIMIT

2 BNRS

BNR INCREASE AT DUAL MODE

LSE

SW

SW

SFT

X34 X35

 _ 

1 - a

GAS

FO BOOST-UP

ORDER

GAS FLOW

FO BOOST-UPRATE

X31

X32

X33

X36

X35

X342 BNRS

2 BNRS 3 BNRS

0

FO SHUT-OFF

V/V CLOSE

3 BNRS

SW

SW

SW

SW SFT

4 - d

FO3 - a

TRACKING

PV

SP

PI

FO

X

 ATOMIZINGPRESSURECONTROL

 ATM

Page 197: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 197/302

4 - 54  Part 4 Main Boiler Control System

M

M

CONTROLPOSITION

SELECTOR

ECR

GRAPHICOPERATION

PANEL

BGB

GRAPHIC

OPERATION

PANEL

LOCAL(OUTPUT)

EM-M

 A/M

 A/M ATM A/MSTATION

4~20 mA

 ATOMIZINGPRESS.

CONTROL

V/V

226B-P

226B-S

I/P  AS

 A/M

GASMIN FO FLOW

3 - dFO BOOST-UP

ORDER

FO CV SET

 A/M

M

M

EM-M

SFT

SFT

FO CONTROL

V/V I/P  AS

4~20 mA

FO FLOW A/M

STATION

 A/M

CONTROL

POSITION

SELECTOR

 A/M

220B-S

220B-P

 

LNGC DISHA  Machinery Operating Manual

F.G. Flow Control

GAS FLOWTRANSMITTER

0~100 kpa

249B-P

249B-S

4~20 mA

LAG

GAS PRESS

GAS FLOW

CONDITION MONITOR

CARORIE SET X

X

SFT GAS BNRSTOP

0

GAS FLOW

GAS FLOW

(BLR LOAD)

SFT

33.3%

66.7%

2 BNRS

3 BNRS

SFT

X

 _ FO BNR

MAN

FO

MIN

FLOW

MASTER

SW SW

X41

X42

X43

0

SW2 BNRS

3 BNRS

BLR GAS V/V CLOSE

LOCAL

& OTHER

(INPUT)

CONTROL

PANEL

UNITSFT

SFT

GAS CV SET

FO

BOOST

-UP

FO FLOW

GAS MIN

100%

SFT

X

GAS PRESS

GAS PRESS

 AIR 4 - c

1 - MSTa

3 - FOa

3 - FOd

BOG TEMPERATURE

SENSOR0~100 C

238B

238B

230B-P

230B-S

R/I

4~20 mA

LAG

T1

LAG

P1 P0

TO : DESIGN 3- DEG.C

T0/T1

P0/P1

4~20 mACONVERTER

R/mA

O

BOG PRESS.

TRANSMITTER0~0.1 Mpa

Page 198: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 198/302

4 - 55  Part 4 Main Boiler Control System

PV

SPPI

GCV

PV

SP

MIN SFT

GAS BNR

HI LIMITBNR INCREASE

 AT DUAL MODE

SW2 BNRS

MAN

ECR

GRAPHIC

OPERATION

PANEL

BGB

GRAPHIC

OPERATION

PANEL

LOCAL

& OTHER

(OUTPUT)

100%

X44 X45

GAS MIN.

PRESS.

SETPI

MIN.

TRACKING

HSE

GAS FLOW

4 -DMP

 A/M

 A/M

CONTROL

POSITION

SELECTOR

 A/MGAS FLOW A/M

STATION

4~20 mA

I/P  AS

208B-P

208B-S

F.G. FLOW

CONTROL V/V

CONTROL V/V OPENING

SIGNAL FOR L/D COMP.

M

M

EM-M

a

MST

FO4 - d

 

LNGC DISHA  Machinery Operating Manual

Air Flow Control

COMBUSTION AIR FLOW

(BNR DRAFT LOSS)0~5 kpa

EXH. GASO2 CONTENTS

MONITOR0~10 %

4~20 mA

LAG

SPPI

O2

> <

100~110 %

PV

277B-P

277B-S

TO OTHER BOILER

 AIR SP

FROM OTHER BOILER

 AIR SP

100

1 FAN 2 BLR

TRACKING

PV

SP

IGNITIONSET

FURNACE PURGESET

FURNACEPURGE

PI

 AIR

0

1 FAN 2 BLR

BNR DRAFTLOSS

BLRLOAD

STEAMFLOW

MST 5 -

FWC 6 - 70 %

HMS

AND

3 BNRRUN

SW

HSE

SW

XBNR LOAD

BNR LOAD

EXCESS AIRRATIO

GAS PRESS

BURNERLOAD

GAS PRESS

GAS PRESSGAS 4 -

BLR LOAD

FO PRESS

FO PRESS3 - FO

LOCAL(INPUT)

 ABCCONTROL

PANEL

BLR LOAD FO PRESS

BURNERLOAD

+

+

SW

LSE

LAG

TO OTHER BOILER

 AIR PV

FROM OTHER BOILER

 AIR SP

4~20 mA

247B-P

247B-S

a

a

a a

Page 199: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 199/302

4 - 56  Part 4 Main Boiler Control System

100

SFT

INLETVANESET

(IGNITION)

MST 1 -

 AND

MASTERSIGNAL

+ L/L

REQUIRE AIR

BNR DRAFTLOSS

SFT

M

M

 A/M

 A/M AIR FLOW A/M

STATION

 AIR LOCK V/V

FD FAN INLET VANECONTROL DRIVE UNIT

FUEL/AIRRATIO

 ADJUSTOR

X

X

X

M

X

100 105

SFTSOOT BLOWER

RUN

O2 RATE

ECR

BGB

GRAPHICOPERATION

PANEL

GRAPHIC

OPERATIONPANEL

LOCAL(OUTPUT)

0.5~1.0~1.5

248B-S

248B-P

 ASI/P

4~20 mA

 A/M

EM-M

a

 

LNGC DISHA  Machinery Operating Manual

Feed Water Flow Control & S.H. Steam Temp. Control

DRUM WATERLEVEL TRANSMITTER

FEEDWATER FLOW

CONTROL

FWC

SUPERHEATERSTEAM

TEMPERATURECONTROL

STC

300 mm

STEAM FLOWTRANSMITTER

0~68.645 kpa

FEED WATER FLOWTRANSMITTER

0~68.645 kpa

S.H. OUTLETSTEAM TEMPERATURE

0~600 C/CAO

S.H. 5 PASS INLETSTEAM TEMPERATURE

0~600 C/CA

129B-Sb

129B-Pb

119B-Sb

119B-Pb

O

O

4~20 mA

LAG

CONDITION MONITOR

VARIABLE MODE

SW

SP

SP

SP

STEAM

FLOW

RATIO

X

TRACKING

PV

SPPI

FWC

N.W.L.

PV

PI

DWL

4~20 mA 4~20 mA

HSE

LAG

LAG

X

RATIO

SP

4~20 mA

166B-P

166B-S

167B-Sa

166B-Pa

167B-Sb

166B-Pb

30B-P

30B-S

4~20 mA

CONVERTERCA C/mA

129B-Sa

129B-Pa

O

4~20 mA

MV/I

HSE

LAG

LAG

STEAM FLOWMIST

 AIR

DMP

LOCAL

(INPUT)

CONTROLPANEL

UNIT

STEAM

TEMP.

STC V/V

OPENING

HSE

PV

SPPI

STC

+

STEAM

FLOW

STC V/V

OPENING

MV/I MV/ICONVERTERCA C/mA

O

4~20 mA

CONVERTERCA C/mA

6 - a

Page 200: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 200/302

4 - 57  Part 4 Main Boiler Control System

0~600 CO

+

SW

 A/M

 A/M

 A/M

M

M

EM-M

SP PV

-300~0~+300 mm

-300~0~+300 mm FWC A/M STATION

 AIR LOCK V/V

4~20 mA

 ASI/P

FEED

WATER

FLOW

CONTROL

V/V

26B-P

26B-S

DRUM LEVEL A/MSTATION

FEED WATER FLOW

TRANS. NORMAL

GRAPHICOPERATION

PANEL

ECR

GRAPHICOPERATION

PANEL

LOCAL

(OUTPUT)

BGB

CONTROL

POSITIONSELECTOR

STC A/M STATION

 AIR LOCK V/V

4~20 mA

 ASI/P

SP PV

PVSPSTC SET A/M

STATION

 A/M

 A/M

M

M

 A/M

EM-M

0~600 CO

SH STEAM

TEMP.

CONTROL

V/V

130B-P

130B-S

 

LNGC DISHA  Machinery Operating Manual

FO Pump Discharge Pressure Control

3 - FO

 ABC

CONTROL

PANEL

LOCAL OR

OTHER

(INPUT)

c

FO PUMPDISCHARGE

PRESS. CONTROL

FO PUMP

4~20 mA

LAG

PV

PI

FOP

OTHER

SP

FO PUMP DIS.

PRESS. TRANSMITTER0~4 Mpa

200B

3 -FO

OTHER

BOILER

HSE

SFT

90

FO BNR

STOPFO

PRESS

SP

a

Page 201: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 201/302

4 - 58  Part 4 Main Boiler Control System

GRAPHIC

OPERATION

PANEL

ECR

GRAPHIC

OPERATION

PANEL

LOCAL OROTHER

(OUTPUT)

BGB

TRACKING  A/M

 A/M

 A/M

OTHER

BOILER

LMS

ON/OFF

FO HEATER RECIR. PISTONPISTON V/V OPEN ORDER

30

+M

FO PUMP A/M

STATION

4~20 mA

215B

FO PUMPDIS. PRESS.

CONTROL ASI/P

 

Page 202: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 202/302

LNGC DISHA  Machinery Operating Manual

Boiler Gauge Board Emergency Control Panel

NO1 BOILER

 ABC EMERG MODE

NOR EMERG

BMS EMERG MODE

54A

69A

NOR BURN

PURGE

IGNITER

NO2 BURNER

OFF ON

F O SHUT V/V

C LOS E OPEN

F O V/V

C LOS E OPEN

F O V/V

C LOS E O PEN

F O V/V

C LOSE OP EN

IGNITER

OFF ON

IGNITER

OFF ON

60A

59A53A

52A

58A

64A

EMERGENCY OPERATION

BASE BURNER

57A

56A

55A

NO3 BURNER

63A

62A

61A

PURGE FINISH

68A

Page 203: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 203/302

4 - 60  Part 4 Main Boiler Control System

NO2 BOILER

 ABC EMERG MODE

NOR EMERG

BMS EMERG MODE

54B

69B

NOR BURN

PURGE

IGNITER

NO2 BURNER

OFF ON

F O SHUT V/V

C LOSE OP EN

F O V/V

CL OSE O PEN

F O V/V

C LOSE OP EN

F O V/V

C LOS E OPEN

IGNITER

OFF ON

IGNITER

OFF ON

60B

59B 53B

52B

58B

64B

EMERGENCY OPERATION

BASE BURNER

57B

56B

55B

NO3 BURNER

63B

62B

61B

PURGE FINISH

68B

 

LNGC DISHA  Machinery Operating Manual

Boiler Monitor Panel of ECR

NO1CPUFAIL

221A

GAS HDR

VENT V/V

GAS HDR

VENT V/V

N2

GASBNRV/V

BNRN2V/V

BMS

CONTROLLER

NO2CPUFAIL

222A

NO1CPUFAIL

223A

NO2CPUFAIL

224A

EMERGMODE

235A 236A

V&REG ABNOR

187A

B GASMANUTRIP

188A

BLRTRIP

189A 193A

EMERGMODE

MANUTRIP

GAS T

 ABC BMS ABC

CONT AIRP L/L

239

FOBACK-UP

220

MANUTRIP

193B

BLRTRIP

189B

B GASMANUTRIP

188B 187B

EMERGMODE

236B

EMERGMODE

235B

UPS ABNOR

237 238

V&REG ABNOR

POWER

SUPPLY

FAIL

BMS ABC

NO1CPUFAIL

223B

 ABC

CONTROLLER

NO2CPUFAIL

224B

NO1CPUFAIL

221B

NO2CPUFAIL

222B

BMS

FIREDETECT

213

MASTER GAS V/V TRIP CONDITION

HOODFAN

STOP

218

GASLEAK

217

ESDS ACT

216

GAST L/L

215 214

VAPORHDRP L/L

219

BOGHTR

 ABNOR

211

MANUTRIP

212

BLRGASTRIP

171ABLRGASTRIP

171B158A 158B

GAS VENT V/V

161A 162A

202

226

201

BOTHBLRTRIP

1FAN 2BLR MODE

NO1BLRUSE

242

COMDMPROPEN

169

NO2BLRUSE

243

FUEL GAS AUX MACH

1 LDCOMP

207

2 LDCOMP

208

NO1HOOD

RM FAN

209

NO2HOOD

RM FAN

210

159A

134A

135A

136A

N2

GASBNRV/V

BNRN2V/V

159B

134B

135B

136BGASBNRV/V

BNRN2V/V

BNRN2V/V

123A

19 9A 20 0A

HIGH LOW

GAS P

1 85A 18 6A

H/H L/L

GAS P

1 86 B 18 5B

L/L H/H

GAS T

2 00 B 19 9B

LOW HIGH

124A

125ABNRN2V/V

123B

124B

125BGASBNRV/V

BNR

GAS V/V

GASCONT V/V

IGNPOSIT

MASTERN2V/V

HDR N2 V/V

145A

160A

161B

BNR

GAS V/V

GAS TL/L

MASTER146A

147ABNRN2V/V

GASBNRV/V

GASBNRV/V

HDR N2 V/V

145B

160B

146B

147B

162B

GASCONT V/V

IGNPOSIT

BOILER MONITOR PANEL

 

Page 204: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 204/302

4 - 61  Part 4 Main Boiler Control System

V/V

IGNIT

FO BNRV/V

BNRPURGE

V/V

FO REC V/V

 ATMSTMV/V

 AIRREG

FL1

FAIL

176A

FL2

FAIL

177A

BNRFAIL 175A

142A

141A

156A

BLRFO

TRIP

GAS SUPPLY

201

225

139A

140A

143A

137A144ANO2 BNR BASE BNR

138A

FO REC V/V

156B

V/V

IGNIT

FO BNRV/V

BNRPURGE

V/V

 ATMSTMV/V

 AIRREG

FL1

FAIL

176B

FL2

FAIL

177B

BNRFAIL 175B

142B

141B

139B

140B

143B

137B144BNO2 BNR

138B

V/V

IGNIT

FO BNRV/V

BNRPURGE

V/V

 ATMSTMV/V

 AIRREG

FL1

FAIL

173A

FL2

FAIL

174A

BNRFAIL

BNRFAIL172A

FL1

FAIL

179B

FL2

FAIL

180B

BNRFAIL 178B

131A

130A

182A

240A

128A

129A

132A

126A133A

127ABASE BNR

IGNIT

FO BNRV/V

BNRPURGE

V/V

 ATMSTMV/V

 AIRREG

FL1

FAIL

173B

FL2

FAIL

174B

BNRFAIL 172B

131B

130B

128B

129B

132B

126B133B

127BNO3 BNR

V/V

IGNIT

FO BNRV/V

BNRPURGE

V/V

 ATM SUPPLY

STM STM

312A 312B

 ATMCONT V/V

L/L

FO PL/L

FO P L/L181A

BY-PASS

163A

 ATMCONT V/V

 ATMSTMV/V

 AIRREG

FL1

FAIL

179A

FL2

FAIL

180A

MASTGASTRIP

178A

153A

152A

GAS V/V

150A

151A

154A

148A155A

149ANO3 BNR

V/V V/V

IGNIT

FO BNRV/V

BNRPURGE

V/V

 ATMSTMV/V

 AIRREG

153B

152B

150B

151B

154B

148B155B

149B

230A

194A

FOSHUT V/V

FOCONT V/V

IGNRATE157A

BLRFO

TRIP

230B

194B

FOSHUT V/V

FOCONT V/V

IGNRATE157B

183A

233 234

 AIR AIR

313A 313B

HFO DO

182B

FO PL/L

L/L

203 204

183B

RUNFO PUMP

TRIP

FO P L/L181B

BY-PASS

163B

F/E

BY-PASS240B

F/E

BY-PASS

241BXXXX

241AXXXX

Page 205: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 205/302

Part 5 : Main Turbine System 

5.1 Main Turbine.................................................................................... 5 - 1 

5.1.1 Manufacturing Specification............ ............ ............ ............ .. 5 - 3 

5.1.2 Instruction of Main Turbine Operation ........... ............ ........... 5 - 6 

5.2 Main Turbine Control System............. ............ ............ ............. ....... 5 - 10 

5.3 Function of the Remote Control System........... ............ ............ ...... 5 - 12 

5.3.1 W/H Manoeuvring ............................................................... 5 - 13 

5.3.2 ECR Manoeuvring............................................................... 5 - 17 

5.3.3 Machine Side Manoeuvring....... ............ ............ ............ ...... 5 - 17 

5.3.4 Automatic Slow Down...... ............ ............ ............ ............. .. 5 - 17 

5.3.5 Program Interlock................................................................ 5 - 19 

5.3.6 Control System Monitoring Function ............ ............ .......... 5 - 19 

5.3.7 Safety System ...................................................................... 5 - 20 

5.3.8 Safety System Monitoring Function ........... ............ ............ . 5 - 21 

Page 206: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 206/302

 

Part 5Main Turbine System

LNGC DISHA  Machinery Operating Manual

Part 5 : Main Turbine System

5.1 Main Turbine

Main Particulars :

Type : KAWASAKI UA-360 Cross compound, impulse, double reduction geared marine turbine.

MCR NCR

Output PS 36,000 32,400

HP Turbine rpm 4,962 4,793

LP Turbine rpm 3,275 3,163Revolution

Propeller rpm 88 85

Steam Pressure(at maneuv. valve inlet)

5.88 MPag

Steam Temperature(at manoeuv. valve inlet)

510°C

Condenser vacuum

(at normal & maximum output with 27°Csea water inlet temperature)

722 mmHg (-96.3 kPag)at cond. top

 Astern max. torque80% of the MCR ahead torque at main shaft revolution

of 50% rpm of MCR rpm

 Astern allowable max. continuous rpm70% of the MCR ahead rpm

not exceed more than two (2) hours

Manoeuvring Valve : One (1) Unit

Type Single lid diffuser type

Dia. throttle/pilot mm 185 / 80Valve

Lift ahead/astern mm 71 / 45

Piston dia. mm 600

Stoke ahead/astern mm 160 / 100Oil Cylinder

Oil Pressure MPag

Kgf/cm2G

0.29

3.0

Reduction Gear : One (1) Unit

Type : Tandem articulated, double reduction, double helical type

Item P.C.D. mm No. of teeth

HP 291.0 361st red. pinion

LP 396.1 49

HP 2,626.9 325

1st red. gearLP 2,360.2 292

HP 658.2 572nd red. pinion

LP 658.2 57

Main gear - 4 110 7 356

Page 207: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 207/302

5 - 1  Part 5 Main Turbine System

not exceed more than two (2) hours

 Ahead rotating direction Clockwise looking from after

Main shaft speed at torsional vibration 28.56 rpm & 58.47 rpm

HP Turbine abt. 63.0 rpmCritical speed of turbine rotor(converting into main shaft)

LP Turbine 117.9 rpm

Turbine : One (1) Unit

HP Turbine LP Turbine

No. of stages 108 (Ahead)2 (Astern)

Main steam inlet nominal dia. 175 mm x 2 175 mm (Astern)

Cross-under pipe nominal dia. 420 mm -

HP 65 mm at HP turbine 5th stage

IP 200 mm at cross over pipeBleeding pipe nominal dia.LP 300 mm at LP turbine 3rd stage

Main gear 4,110.7 356

1st. Red. HP 510 mm / LP 510 mmEffective face width

(at P.C.D.)2

nd Red. 1,168 mm

Main Condenser : One (1) Unit

Type Reheating, surface type

Vacuum mmHg (kPag) 722 (-96.3)

Cooling surface m2  3,300

Quantity of condensed steam kg/h 83,600

Cooling water inlet temperature °C 27

Quantity of cooling water m3/h 19,000

Number of flow - 1

Velocity of cooling water m/s 1.88

Distance between tube sheets mm 5,000

Dia. / Thickness mm 19.0/0.7

Length mm 5,079Cooling tubes

Number - 11,057

Page 208: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 208/302

Page 209: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 209/302

Page 210: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 210/302

Page 211: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 211/302

Page 212: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 212/302

Page 213: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 213/302

Page 214: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 214/302

Page 215: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 215/302

Page 216: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 216/302

LNGC DISHA  Machinery Operating Manual

VALVE NAME SETTINGEMERGENCY

CASE(AIR FAILURE)

REMARKS

HP BLEEDEROPEN AT 0.98 MPagCLOSE AT 0.88 MPagBLEEDER

VALVEIP BLEEDERLP BLEEDER

OPEN AT 0.304 MPag OF IP BLEED PRESS.CLOSE AT 0.255 MPag OF IP BLEED PRESS.

CLOSEWITH MANUALOPERATING HANDLE

GUARDIAN (T-3) OPENWITH MANUALOPERATING HANDLE

MANEUV. VALVE DRAIN(T-51)

HP STEAM CHESTDRAIN (T-52)

HP TURBINE 2NDSTAGE DRAIN(T-53)

HP CASING DRAIN(T-54)

OPEN .. BELOW AHEAD abt. 72 rpm (MV lift)CLOSE.. ABOVE AHEAD abt. 75 rpm (MV lift)

DRAINVALVE

HP BLEEDER DRAIN

(T-55)

OPEN AT HP BLEED VALVE CLOSECLOSE AT HP BLEED VALVE OPEN

OPENWITH MANUALOPERATING HANDLE

MAIN CONDENSER LEVELCONTROL (T-42)

OPEN

COND. WATER RECIRCULATION(T-43)

NORMAL LEVEL

 AUTOMATICALLY CONTROL BYSIGNAL OF MAIN CONDENSER HOT WELLLEVEL TRANSMITTER CLOSE

WITH MANUALOPERATING HANDLE

MAKE-UP (T-302) OPENPACKINGSTEAM

SPILL (T-303)19.6 kPag

CLOSE

WITH MANUALOPERATING HANDLE

LUB. OIL TEMP. CONTROL (T-145) 45°CCOOLERSIDE OPEN

WITH MANUALOPERATING HANDLE

(10) Main Turbine Auto Slow Down

Main turbine auto slow down circuit is operated in the following

instances.

Main steam pressure low low

Main boiler steam drum level high high

Main boiler steam drum level low low

Main condenser hotwell water level high high

Stern tube bearing temperature high high

One boiler trip

Main condenser vacuum low low

Main thrust pad temperature high high

The function of the automatic slow down can be bypassed by AUTO

SLOW DOWN BYPASS provided on the N/C(Navigation Console)

and the ECC(Engine Control Console).

Automatic slow down (II)

Automatic slow down (III)

Page 217: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 217/302

5 - 11  Part 5 Main Turbine System

LUB. OIL PRESS. CONTROL 0.39 MPag CLOSEWITH MANUALOPERATING HANDLE

SPRAY WATER FOR STEAM DUMP.(T-56)

OPEN .. NOT FULLY CLOSE OF STEAM DUMPVALVE

CLOSE .. NOT FULLY CLOSE OF STEAM DUMPVALVE AND TIMER(ABOUT 5 MINUTES)

CLOSEWITH MANUALOPERATING HANDLE

SPRAY WATER FOR ASTERNOPERATION(T-57)

OPEN .. AST MV OPEN AND NOT AUTOSPINNING CONDITION

CLOSE .. AST MV CLOSE AND TIMER(ABT. 5 MINUTES)

CLOSEWITH MANUALOPERATING HANDLE

 

Page 218: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 218/302

Page 219: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 219/302

Page 220: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 220/302

Page 221: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 221/302

LNGC DISHA  Machinery Operating Manual

TELEGRAPH

"STOP"

POSITION

MANEUV. DUTY

"W/H"

MANEUV. DUTY

"ECR"

TELEGRAPH

"STOP"

POSITION

 AUTO SPINNING

ON

 AUTO SPINNING

OVER SPEEDTURBINE TRIP

 AUTO SPINNING

OFF

 ASTERN MANEUV. V.

OPENNING ORDER

 ASTERN MANEUV. V.

IS CLOSED

 ASTERN MANEUV. V. IS

OPENED TO PRESET LIFT.

 AHEAD MANEUV. V/V IS

OPENED TO PRESET LIFT.

PROPELLER REVOIL UTION

EXCEEDS AST. "F" (G) RPM.

PROPELLER REVOLUTION

EXCEEDS AH. "F" (G) RPM.

PROPELLER REVOLUTION

EXCEEDS AH. "F" (G) RPM. AHEAD MANEUV.V.

IS CLOSED

 AHEAD MANEUV.V.

OPENNING ORDER

<W/H> <ECR> <ECR>

"YES"

"NO"

MAIN TURUINE TRIP-RESET

CONDITION

TURNING GEAR DISENGAGED

OFF ON

DIR LEV

NOT

3 MINUTES

(8) Rough Sea Control

When the selector switch of ROUGH SEA (ROUGH/CALM) is set at the

ROUGH position, rough sea control to prevent overspeed is effected as

described below;

- Once the propeller revolution exceeds the racing trip level (105% of

MCR) due to some cause, the RPM feedback controller starts for its set

 point at a racing trip reset level.

- The shaft revolution is reduced to the racing trip reset level.

- When the revolution reaches at the reset level, rough sea control is

canceled, and the shaft revolution returns to the lever position according

to the time program.

Unexpected revolution

raise-up occurs due torough sea condition

such as racing.

RPM feedback

control operateswith set point at

reset level.

Set point returns

to lever position

according to time

program.

Time

Time

Set point of 

RPM/valve lift

Lever position

Reset level

 Actual revolution

Racing trip level

Reset level

Rough sea control

 

Figure 1-11 Control Pattern of Rough Sea Control 

Page 222: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 222/302

5 - 16  Part 5 Main Turbine System

 AUTO SPINNING

FAILURE

<W/H><ECR>

(MCB) (MCB)

(MCB)

"YES"

<ECR>

PROPELLER REVOLUTION IS

W ITH IN " G" (1 ) R PM

2.5 MINUTES

SPIN ZONE

SHAFT STOP

 AUTO SPINNING CANCEL

TELEGRAPH IS OPEATED

TO OTHER DIVISION

PROPELLER REVOLUTION

NOT EXCEEDS "F" (G) RPM

PROPELLER REVOLUTION

NOT EXCEEDS "G" (1) RPM

PROPELLER REVOLUTION

EXCEEDS “H" (12) RPM

 

Figure 1-10 Block Diagram for Auto Spinning 

Telegraph lever control

Shaft revolution exceeds the

racing trip Level (105% of MCR)

Shaft revolution reaches

at reset level.

Shaft revolution/ valve lift returns tolever position according to time

program.

A

N

D

RPM controller starts operating

With set point at r eset level.

ROUGH CALM

ROUGH SEA CONTROL

ROUGH SEA

Normal operation By

telegraph is available.

W/H

Lamp on

IndicationLamp (W/H)

Lamp off 

 

Figure 1-12 Control Pattern of Rough Sea Control 

Page 223: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 223/302

Page 224: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 224/302

Page 225: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 225/302

Page 226: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 226/302

LNGC DISHA  Machinery Operating Manual

5.3.8 Safety System Monitoring Function

Main Turbine Safety System Failure

The M/T SAFETY SYSTEM FAIL alarm is annunciated in the W/H and the

ECR, and individual cause is indicated on the cause indicator panel, in case of

the following conditions;

(1) Trip solenoid valve circuit disconnection

(2) Trip sensor circuit disconnection

(3) Manual trip switch circuit disconnection

(4) M/T trip override switch circuit disconnection

Main Turbine Safety System Power Failure

In case of trip electric source failures, the SAFETY SYSTEM FAIL alarm is

annunciated in the W/H and the ECR.

Page 227: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 227/302

5 - 21  Part 5 Main Turbine System

Figure 1-19 Block Diagram for the Safety System 

 

Part 6 : Steam Plant Heat Balance System 

6.1 100% MCR FO Burning................................................................... 6 - 1 

6.2 100% MCR GAS Burning ................................................................ 6 - 2 

6.3 100% MCR Dual Burning ................................................................ 6 - 3 

6.4 90% MCR FO Burning..................................................................... 6 - 4 

6.5 90% MCR GAS Burning.................................................................. 6 - 5 

6.6 90% MCR DUAL Burning............................................................... 6 - 6 

6.7 80% MCR FO Burning..................................................................... 6 - 7 

6.8 80% MCR GAS Burning.................................................................. 6 - 8 

6.9 80% MCR DUAL Burning............................................................... 6 - 9 

6.10 50% MCR FO Burning................................................................. 6 - 10 

6.11 50% MCR GAS Burning .......... ............ ............ ............ ............ .....6 - 11 

6.12 50% MCR DUAL Burning........................................................... 6 - 12 

6.13 30% MCR FO Burning................................................................. 6 - 13 

6.14 30% MCR GAS Burning.............................................................. 6 - 14 

6.15 30% MCR DUAL Burning........................................................... 6 - 15 

6.16 Cargo Loading (FO)............. ............ ............ ............ ............ ......... 6 - 16 

6.17 Cargo Unloading (FO) .................................................................. 6 - 17 

6.18 Anchoring (FO)......... ............ ............ ............ ............ ........... ......... 6 - 18 

6.19 Anchoring Loaded (Dumping, BOG) ........... ............ ............ ........ 6 - 19 

6.20 Guarantee (FO, SNAME3-11)..... ............ ............ ............. ............ 6 - 20 

6.21 90% MCR FO Burning(32°

C S.W)............................................. 6 - 21 

6.22 100% MCR FO Burning (Electric load of 2,100 Kw) ........... ....... 6 - 22 

6.23 100% MCR DUAL Burning (Electric load of 2,360 Kw) .......... .. 6 - 23 

6.24 90% MCR FO Burning (Electric load of 2,100 Kw). ........... ........ 6 - 24 

6.25 90% MCR DUAL Burning (Electric load of 2,360 Kw) .......... .... 6 - 25 

Page 228: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 228/302

Part 6

Steam Plant Heat Balance

Page 229: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 229/302

Page 230: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 230/302

Page 231: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 231/302

Page 232: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 232/302

Page 233: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 233/302

Page 234: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 234/302

Page 235: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 235/302

Page 236: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 236/302

Page 237: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 237/302

Page 238: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 238/302

Page 239: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 239/302

Page 240: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 240/302

Page 241: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 241/302

Page 242: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 242/302

Page 243: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 243/302

Page 244: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 244/302

Page 245: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 245/302

Page 246: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 246/302

Page 247: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 247/302

Page 248: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 248/302

Page 249: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 249/302

Page 250: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 250/302

Page 251: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 251/302

Page 252: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 252/302

Page 253: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 253/302

Part 7 : Description of Emergency Operation 

7.1 Flooding in the Engine Room... ............ ............ ........... ............ ......... 7 - 1

7.2 Main Boiler Emergency Operation.. ............ ............ ............ ............ . 7 - 3

7.2.1 Main Boiler Initial Ignition by Portable Igniter....... ............. . 7 - 3

7.2.2 One Boiler Operation............................................................. 7 - 4

7.2.3 Operation of 1-FAN 2-BOILER .......... ............ ............ .......... 7 - 5

7.2.4 Main Boiler Emergency Operation With Both CPU Failure.. 7 - 5

7.3 HP and LP Turbine Solo Running Operation............. ............ ........... 7 - 6

7.4 Restore Engine Room Plant after Black Out ........... ............ ............ . 7 - 7

7.5 Generator Manual Synchronizing Procedure...... ............ ............ ...... 7 - 9

7.5.1 Parallel Operation.................................................................. 7 - 9

7.5.2 Stopping a Generator Engine ........... ............ ........... ............ . 7 - 10

7.6 Procedure of Steering Gear Emergency Operation ........... ............ .. 7 - 13

Page 254: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 254/302

 

Part 7Description of Emergency Operation

Page 255: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 255/302

LNGC DISHA  Machinery Operating Manual

Floodable time, control position and method for valve operation

NO

Start reciprocating bilge pump, taking suction

from its bilge main and any of the associated

bilge wells, and ensure that it is pumping.

If it does not pump immediately, investigate

in particular that no additional suction valves are

open.

Procedure

YES

Is reciprocating bilge pump pumping ?

NO

Check reason why pump is

not pumping.Check the position of all valves,

particularly that extra suction

valves are not open.

YES

LEVEL STILL RISING

Is reciprocating bilge pump running ?

LEVEL NOT RISING

Find and isolate the source

of ingress of water.

Restrict the rate of entry by

any means available, such as

shoring, bandaging, caulking,

if the source of water cannot

be isolated by valves.

LEVEL STILL RISING

Start No.1 bilge G/S pump, taking

suction from the direct bilge

suction (stb’d fwd) & dischargingdirectly overboard.

LEVEL NOT RISING

Find and isolate the source of ingress of water.

Restrict the rate of entry by anymeans available, such as shoring,bandaging, caulking, if the sourceof water cannot be isolated byvalves.

LEVEL NOT RISING

LEVEL STILL RISING

Start No.2 bilge G/S pump taking

suction direct from bilge main,

discharging direct overboard. Find and isolate the source of 

ingress of water.

Restrict the rate of entry by any

means available, such as shoring,bandaging, caulking, if the source

of water cannot be isolted by

valves.

 Advise bridge.

Stop the main engine and secure

it aganist the ingress of water.

Isolate equipment from the main

switchboard before the equipment

is flooded.

Before the sea water pumps are

flooded, it will be necessary to shut

down the boilers, stop the turbo

Generators, and start the

emergency diesel.

Secure the boilers against the

ingress of water. Secure the main

Feed pumps turbo generators and

LAH or bilge pump long run

alarm occur 

Page 256: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 256/302

7 - 2  Part 7 Description of Emergency Operation

Be prepared to abandon ship

Feed pumps, turbo generators andmain diesel generator aganist the

ingress of wate

Start S/by Ballast pump for 

Discharging for emergency bilge

suction.

Summon assistance using

the engineer's call bell.

The inflow of water is exeeding

the capacity of the reciprocating

bilge pump.

 

Page 257: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 257/302

Page 258: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 258/302

Page 259: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 259/302

Page 260: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 260/302

Page 261: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 261/302

Page 262: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 262/302

Page 263: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 263/302

Page 264: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 264/302

LNGC DISHA  Machinery Operating Manual

ENG CONT

“STOP”

ENG CONT

“STOP”

ENG CONT

“OPEN”

ENG CONT

“OPEN”

ENG CONT

“STOP”

ENG CONT

“STOP”

ENG CONT

“STOP”

ENG CONT

“STOP”

POWERSUPPLY

POWERSUPPLY

CONT POSIMSB1(2)

CONT POSIMSB1(2)

GOV CONT“RAISE/LOWER”

GOV CONT“RAISE/LOWER”

LOADSHIFT

LOADSHIFT

LOAD SHIFT

FINISH

LOAD SHIFTFINISH

VCB CONT“OPEN”

VCB CONT

“OPEN”

(MSB1(2))

TO BE CHECKED

BY KWMBCS(MSB1(2))

DG VCB OPEN

COMMAND

DG VCB OPENCOMMAND

DG VCB

OPNED

DG VCB

OPNED

REMAINING

SUPPLY

GEN POWER

(MSB1(2))

(MSB1(2))

GCS(MSB1(2))

REF TO FC11

PB (MSB1)STP (M/S)

PB (IAS)

(MSB1)

(MSB2)

(IAS)

(MSB1(2))

PB (MSB2)

VCB CONT

“CLOSE”

VCB CONT

“CLOSE”

CHECK SYNCHRO

”OFF”

CHECK SYNCHRO

”OFF”

CHECK

SYNCHRO

CHECK

SYNCHRO

CONT POSI

MSB1(2)

CONT POSI

MSB1(2)

CHECK SYNCHROOPERATE

CHECK SYNCHRO

OPERATE

SYNCHRO

POINT

SYNCHROPOINT

EAS-101

(MSB1(2))

REF TO FC11

(MSB1)

(MSB2)

(IAS)

VOLT EST

(CASE 2)

VOLT EST

(CASE 2)

REF TO FC12

GOV CONT“RAISE/LOWER”

GOV CONT

“RAISE/LOWER”

GCS

(MSB1(2))

EAS-101

(MSB1(2))

BCS

(MSB1(2))

SYNCH’ZED

SYNCH’ZED

(MSB1(2))

SYNC

“SET”

SYNC“SET”

SYS

(MSB1(2))

COS-CH

(MSB1(2))

BY SY or SYL

OFF

ONCOS-CH

(MSB1(2))

Page 265: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 265/302

7 - 11  Part 7 Description of Emergency Operation

ENG STOP

COMMAND

ENG STOP

COMMAND

ENG

STOPPED

ENG

STOPPED

(MSB)

 

Refer to Inst. Manual for 6.6kV main switchboard & Generator automatic control panel FC15

GOV CONT

“RAISE/LOWER”

GOV CONT

“RAISE/LOWER”

DG VCB CLOSE

COMMAND

DG VCB CLOSE

COMMAND

DG VCB CLOSEDDG VCB CLOSED

POWER

SUPPLY

POWER

SUPPLY

(MSB1(2))

(MSB1(2))

POWER

CONTROL

POWER

CONTROL

 AUTO LOAD

BALANCE

 AUTO LOAD

BALANCEMANUAL LOAD

BALANCE

MANUAL LOAD

BALANCE

GCS

(MSB1(2))

COS-P1(2)

(MSB1(2)

“MANU”

“AUTO”

 

Refer to Inst. Manual for 6.6kV main switchboard & Generator automatic control panel FC14  

LNGC DISHA  Machinery Operating Manual

Illustration 7.6i Procedure of Steering Gear Emergency Operation

No.4 Cylinder 

No.2 Cylinder No.1 Cylinder 

No.3 Cylinder 

SafetyValve

SafetyValve

PilotRelief ValveBoost

Relief Valve

No.2 Transfer Valve

N o.2 M ai  n c i  r  c  ui   t  

B  y - p a s  s v  al  v  e

Wi   t  h l  i  mi   t   s wi   t   c h 

No.2 Valve Block

No.2

Janney

Pump

No.2 Pump Unit

Hyd. Oil TankFor Steering Gear 

(1,240 L)

SafetyValve

SafetyValve

PilotRelief ValveBoost

Relief Valve

No.1 Transfer Valve

No.1 Valve Block

No.1

Janney

Pump

No.1 Pump Unit

 Air Breather 

SV2SV1

   N  o .   1   M  a   i  n  c   i  r  c  u   i   t

   B  y  -  p  a  s  s  v  a   l  v  e

   W   i   t   h   l   i  m   i   t  s  w   i   t  c   h

Motor pump Hand pump

B A

Page 266: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 266/302

7 - 12  Part 7 Description of Emergency Operation

M

Orifice

No.2 Hyd.

By-pass V/VNo.2 Oil Tank

L

No.2 Servo.Controller 

Pump

No.2 Auxiliary

Pump

M

Orifice

No.1 Hyd.

By-pass V/V

No.1 Servo.Controller 

Pump

No.1 Auxiliary

Pump

No.2 Oil Tank

L

   H   S

   0   0   4

   H   S

   0   0   5

L.LL.L

L/L level switch for 

auto isolation controlL/L level switch for 

auto isolation control

 

Page 267: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 267/302

Part 8 : Fire Fighting Systems 

8.1 Fire and Deck Wash System ............ ............ ............ ............ ............ . 8 - 2 

8.2 Water Spray System...... ............ ............ ............ ............ ............ ........ 8 - 4 

8.3 Dry Powder System .......................................................................... 8 - 6 

8.4 Fire Detection System.............. ............ ............ ............ ............. ........ 8 - 9 

8.5 High Expansion Foam Fire Extinguishing System........... ............ .. 8 - 13 

8.6 CO2 System..................................................................................... 8 - 16 

8.7 Hyper-Mist System......................................................................... 8 - 18 

Page 268: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 268/302

Part 8Fire Fighting Systems

LNGC DISHA  Machinery Operating Manual

Illustration 8.1i Fire and Deck Wash System

CARGOSTORE

PI

PI

SWIMMINGPOOL

MOOR'G DECK

HIGH EXP.

FOAM SYS.

WD360

WD359 WD356

WD355

WD351

WD350

WD319 WD397

WD349W D3 48 W 38 7

WD385 WD383 WD399

WD380WD398WD382WD384WD316

WD392

WD389

WD381

WD388

WD401

WD393

WD343

WD314

WD315WD396

WD344

WD342

WD313

WD338

WD311WD394

WD337

WD336 WD332

WD334

WD309 WD390

WD328

WD326

WD324

WD307

 W D 3 2 2

WD320

WD305

WD306

 T O  B I L G E

  E D U C T O R

 F O R  P A S

 S A G E W A Y

C/ L

C/ L

WD301

WD302

WD303

WD304

WD321

W D 3 2 3 

WD325

TO BILGE EDUCTORFOR PASSAGEWAY

WD308

WD027

WD310 WD391

WD329

WD312

WD339

WD335WD340

WD333WD341

INTERNATIONAL SHORE CONNECTION

TO BILGE EDUCTORFOR PASSAGEWAY

TO BILGE EDUCTORFOR PASSAGEWAY

WD346

WD345

DRAIN V/V TO BELOCATED AT WEATHER DK

WD352

WD318

LIQUIDDOME

NEARF.C.RM

WD358

WD357

FROME/R

 ACCOM. LADDER

 ACCOM. LADDER

WD516

UP 80A

UP 80A

WD519

FROM FIRE MAIN

WD515 WD513

WD514

WD512

WD502

WD501

WD508

WD507

WD506

WD511

WD510 WD509

TRUNK DECK

TRUNK DECK

TO WATER SPRAY MAIN

FOR SILTY WATER

200A (P) FWD

WD219WD240

1ST DK

(10K)

WD206 S.L.W.L.

WD208 WD2 07

WD211 WD210

WD209

WD212

WD205

WD358 WD203

WD518

WD202

WD201

W D2 32 W D5 17

OUTSIDE ENG. CASING

FROM RM

WD360

WD362

S.G RM

NAV.-DK

WD502 WD501

WD508WD507WD506

WD509

WD512

WD519

WD511

WD514

WD516

WD513

WD515

WD510

D-DK

C-DK

B-DK

 A-DKWD357

WD356

WD355(P) WD352(S)W D3 54 W D3 53

EM/CY FILL TO TRUNK DK. SPACE

 A-DECK

C-DECK D-DECK

B-DECK

NAV. DK

WD395

FROM FRESH WATER FROM FRESH WATER

INTERVAL 300mm

10mm x 74 HOLES

 ABT. 22.6 m

CU-NI 90/10 80A

Page 269: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 269/302

8 - 1  Part 8 Fire Fighting System

(1100KPA)

WD367

WD004

WD002

WD303

WD003

WD001 WD402

WD008

WD009

WD366

WD368 WD369

WD304

FWDP/P RM

SEA

CHEST

UPPER DECK

BOSUN STORE

NO.1 CARGO TK.

BILGE EDUCTOR FOR

BOWTHRUSTER RM.

F.P TK

B.T. RM

PIPE DUCTPIPE DUCT

WD007

WD010

BILGE EDUCTORFOR BOSUN STORE

BILGE EDUCTOR

FOR FWD. P/P RM.

FR69

WD229

WD228

S.W. MAININE/R

WD226 (1100 KPA)(1100KPA)(1100KPA)NO.2 FIRE

PUMP

NO.1 FIRE

PUMP

WD225

WD222WD223WD224

WD230

WD220

WD221

WD239

WD227

JOCKEY

PUMP

EM'CYFIRE

PUMP

WD234WD235 WD236

F.WTK(S)

F.WTK(P)

CORROSIONPIECE OF ZINCANODE SHALLBE FITTEDONINLET ANDOUTLET OF EACHFIRE PUMP.

TO BIL EJECTOR FOR

PIPE DUCT/COFFERDAMS

ENGINE ROOM

TO WATER SPRY MAIN

FOR RINSING

D.L.W.L.WD241WD231

2NDDK

3DDK

FLOOR

WD214 WD213

WD217 WD216

WD242

WD215

WD218

 A.P TK

 

LNGC DISHA  Machinery Operating Manual

Part 8 : Fire Fighting Systems

8.1 Fire and Deck Wash Systems

The fire main system is supplied from the engine room, by the two Fire pumps.

They are single speed centrifugal pumps, with a delivery capacity of 150 m3/h at

1MPag.

The emergency fire pump is located in the forward pump room in a well. This

 pump is a self-priming centrifugal pump with its own direct sea suction. The

 pump is rated at 340 m3/h and is supplied from the emergency switchboard.

The fire main is kept pressurized by a jockey topping up pump rated at 10 m3/h

at 1 MPag. This pump has an automatic pressure cut-in/out switch and is kept

topped up and under pressure at all times.

(Auto. start : 0.5 MPag, Auto. stop : 0.75 MPag)

The deck fire main has a main isolator valve WD353 before the port and

starboard main ring main isolator valves. The ring main is fitted with a further

four section isolator valves on each side at regular intervals along the deck to

allow any part of the system to be supplied from either side of the ship.

The fire main also serves the water curtain below the port and starboard manifoldareas during loading and unloading conditions.

The fire main supplies the driving water for the bilge eductors in the side passage

way, duct keel pipe duct, forward pump room, bow thrust room and boson store.

It also supplies anchor washing water filling.

There are 24 fire hydrants situated along the cargo space, each with its fire hose

mounted adjacent.

The emergency fire pump can be started locally, from the bridge or the fire

control center (FCC).

Under normal operating conditions the fire main will be under pressure during

Page 270: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 270/302

8 - 2  Part 8 Fire Fighting System

 port time, supplying the manifold water curtain and with hoses run out as a fire

 precaution.

LNGC DISHA  Machinery Operating Manual

Illustration8.2i Water Spray System

W/H-TOP

SATCOME DOME

NAV.-DK

D-DK

C-DK

B-DK

 A-DK

TO LIFE BOAT AREA (P&S)

W W0 01 W W0 02

WW075

WW003

WW004 WW006

NO.1 W/S PUMP

FROM FIRE MAIN (150A)FOR FRESH WATERRINSING

TO BALLAST STRIP.EJECTOR

ENGINE ROOM

NO.4 CARGO TANK NO.3 CARGO TANK

MOTOR

RM

MOTOR

CARGO COMP.

RM

GROUP 1 FOR CARGO MANIFOLD AREA (P&S) SERVICE

GROUP 2 FOR LIQUID / GAS DOME & V/VS SERVICE

GROUP 3 FOR ACCOMM. & CARGO MACH. RM & LIFE BOAT

 AREA SERVICE

  N  O. 4   W

.  B.   T  K

 (   P  &  S  )

  N O.  3   W

.  B.   T  K

 (   P &  S  )

INCLINDED HATCHING AREA SHOWS

THE AREA PROTECTED BY RUNDOWN

OF HIGHER SPRAY NOZZLES.

W/H-TOPFOR SATCOME DOME

NAV.-DK

D-DK 22 SPRAY NOZZLES38 SPRAY NOZZLES

18 SPRAY NOZZLES

1 SPRAY NOZZLE

22 SPRAY NOZZLES

ELEV. VIEW

FOR LIFE BOAT/EMBAR. LAD.

(P & S)

TO FIRE MAIN (200A)FOR SILTY WATER

S.CROSS MAININ E/R

WW075 WW005

WD239

BA213

WD219

NO.2 W/S PUMP

Page 271: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 271/302

8 - 3  Part 8 Fire Fighting System

MOTOR

RM

C-DK

B-DK

13 SPRAY NOZZLES 13 SPRAY NOZZLES38 SPRAY NOZZLES

FRONT VIEW

LOOKING AFT

SECT. VIEW

LOOKING FWD

TRUNK DECK SPACE TRUNK DECK SPACE

WW067WW066

WW016

WW011

WW015WW071WW007

 

Page 272: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 272/302

LNGC DISHA  Machinery Operating Manual

Illustration 8.3.1i Dry Powder System

No.3

No.2

  3  3   m

  3  3   m

  3  3   m

  3  3   m

  3  3   m

  3  3   m

  3  3   m

  3  3   m

  3  3   m

  3  3   m

  3  3   m

  3  3   m

  3  3   m  3  3

   m

 A Type Hand Hose Cabinet (5 Sets)

 A Type B Type

No.4 Tank Deck House

(4 Sets Hand Hose Line)No.2 Tank Deck House

(Monitor)

No.3 Tank Deck House(Monitor)

No.1 Tank Deck House

(4 Sets Hand House Line)

B Type Hand Hose Cabinet (3 Sets)

8 7 6 54 3 2 1

House

Cabinet

House

Cabinet

House

Cabinet

House

Cabinet

House

Cabinet

House

Cabinet

House

Cabinet

House

CabinetDry Power Room

Dry Power Room

Dry Power Room

Dry Power Room

No.4 No.1

TO OPERATE DRY POWDER

1 Open door

MONITOR RELEASE CABINET

3 - 2

 AFTER USE OF SYSTEM

1. Set No.3 control valve to "close" position.M i l i l d

Monitor 

Monitor 

8 - 1

5 - 1

V/VCLEANING

EXHAUST V/V

NO.3 CONT. V/V

15A CLEANING LINE

DIA.6 COPPER TUBE

15A EXHAUST

LINE

80A25A

UPPER INLET

N2 GAS LINE

RELEASE CONTROL CABINET

DRY POWDER TANK ROOM

TO THE OTHER DRY POWER TANK

TO DRY POWER HOSE CABINET

(NO. 1, NO. 4)

TO DRY POWER MONITOR CABINET

(NO 2 NO 3)

Page 273: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 273/302

8 - 5  Part 8 Fire Fighting System

1. Open door.

2. Open one cylinder valve.

3. Open ball valve.

4. System Should Operate.

5. If system fails to operated go to

  dry powder tank room and follow  emergency operation procedure.

EMERGENCY OPERATING

1. Open valve 3 - 2 and 10 - 2

8 - 1

5 - 1

  Main valve is closed.2. Set No.1 control valve to "N2 STOP" position.  Stop pressurizing dry powder tank.3. Set exhaust valve to "OPEN" position

  Dissipate remaining gas in dry powder tank.4. Set exhaust valve to "CLOSE" position.

5. Set No.3 ball valve to "OPEN" position.6. Set No.2 control valve to "N2 RELEASE" position.  (For about 5 seconds.)7. Set No.2 control valve "NORMAL" position.  (slowly changeover)

8. Set No.3 ball valve to "CLOSE" position.9. Set cleaning valve to "CLEANING" position.

10. Set No.2 control valve "N2 RELEASE" position.

11. Set exhaust valve to "OPEN" position.12. Return valve to normal positions after all  nitrogen gas has been dissipated.13. Recharge N2 cylinders.

14. Refill dry chemical agents to dry chemical container.

10 - 2NO.3 BALL V/V

25A

15A CLEANING LINE

LOWER INLET

N2 GAS LINENITROGEN CYLINDER

(NO. 2, NO. 3)

 

Page 274: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 274/302

LNGC DISHA  Machinery Operating Manual

Illustration 8.3.2i Dry Powder System 

Page 275: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 275/302

8 - 7  Part 8 Fire Fighting System

Page 276: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 276/302

LNGC DISHA  Machinery Operating Manual

8.4 Fire Detection System

Illustration 8.4i(1) Block Diagram for Fire Detection and Alarm System

 ABNORMAL

(INTERNAL)

SDR B

(INTERNAL)

POWER LINE

(INTERNAL)

C LOOP CABLE

(INTERNAL)

E LOOP CABLE(INTERNAL)

ZONE 1 : ACCO. NAV. DKZONE 2 : ACCO. D-DK

ZONE 3 : ACCO. C-DK

TO MAGNETIC DOOR HOLDER

  - ACCO. D-DK (5 EA)

  - ACCO. C-DK (6 EA)

TO MAGNETIC DOOR HOLDER

  - ACCO. B-DK (5 EA)  - ACCO. A-DK (6 EA)

  - ACCO. UPP. DK (2 EA)

TOP D LOOP IN

TOP C LOOP IN

TOP B LOOP IN

TOP E LOOP IN

TOP A LOOP IN

FO121

DH2

TO I.A.S

1. FIRE ALARM (N/C)

2. POWER FAILURE (N/C)

3. ABNORMAL (N/C)

TO FIRE DAMPERS (M-HB-A)

1. ACCO. C-DK FIRE (N/C)2. ACCO. C-DK FIRE (N/C)3. ACCO. B-DK FIRE (N/C)

4. ACCO. A-DK FIRE (N/C)

5. ACCO. A-DK FIRE (N/C)

6. ACCO. A-CK FIRE (N/C)

7. ACCO. FIRE (N/C)

FROM / TO P.A

1. FIRE ALARM (N/O) TO P.A2. GEN. ALARM FOR FIRE ALARM SOUNDER

  MUTE FROM P.A

EM'CY AC 220VFDH2

(A15203) MH7

(F0187) FMH12

FAN STOP SIGNAL (N/O CONTACT) TO W/H CONSOLE

(F0109) FMH4

TO W/H FIRE DAMPER (ACCO. W/H FIRE, N/C)

(F0186) FMH2

TO BOILER CONT. PANEL (FIRE IN E/R, N/O)(A1004) FMH4

(F0101) FMH4

FO134

DH2

 A LOOP CABLE

(INTERNAL)

B LOOP CABLE

(INTERNAL)

MAIN AC 220V

DH2

NO.2 W/H GROUP PANEL

LOOP A

ZONE 4 : ACCO. B-DK

(INSIDE OF PANEL)

POWER SUPPLY& RELAY UNIT

FLUSH MTG TYPE (N.W.T)

T890CONTROL UNIT

(4 LOOPS)

T290REPEATER UNIT

FLUSH MTG TYPE(IN C.C.C)

Page 277: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 277/302

8 - 9  Part 8 Fire Fighting System

ZONE 5 : ACCO. A-DK

ZONE 6 : ACCO. UPP. DKLOOP E

ZONE 7 : ENGINE CASING

ZONE 8 : E/R 1 ST DKLOOP B

ZONE 9 :E/R 2ND DK

ZONE 10 : E/R 3RD DK

ZONE 11 : E/R FLOORLOOP C

ZONE 12 : EM'CY SWBD RMZONE 13 : EM'CY D/G RM

ZONE 14 : S/G/R

ZONE 15 : ELEC. MOTOR RM

ZONE 16 : CARGO COMP. RMZONE 17 : BOSUN STORE

ZONE 18 : BOW TH. RM

ZONE 19 : FWD PUMP RM

LOOP D

EACH LOOP

T290

REPEATER UNIT

FLUSH MTG TYPE(IN E.C.C)

LOOP CABLEST290

REPEATER UNITWALL MTG TYPE

(IN F.C.S)

 

LNGC DISHA  Machinery Operating Manual

Illustration 8.4i(2) Block Diagram For Device Arrangement 

CONTROL UNIT

T890 (10 LOOPS, 80 ZONES) /T891 (2 LOOPS, 16 ZONES)

 A1

DET

 A2

DET

 A6

DET

 A7

DET

 A8

DET

 A13

DET

 A14

DET

H

902

 A18

DET

 A19

DET

 A20

DET

 A21

DET

 A23

DET

 A24

DET

 A25

DET

 A31

DET

 A32

DET

 A33

DET

 A34

DET

 A35

DET

 A17

DET

 A3

CP

LI

520

LI

520

LI

520

 A15CM

 A16DM

RI

500

MDHMDHMDH

MAXIMUM 25 MDHs ARE CONNECTED TO EACH RM520

DC 24V

N/O OR N/C FOR ZONE OUTPUT (FIRE OR FAULT)

I.S I.S

I.S

I.S

I.S

(MAX. 2 CP540EX)

(MTL788)

I.S I.S

(MTL788)

(ONLY HIGH TEMPERATURE AT 90 C)

E.L.O DEVICE

(4.7 Kohm)

O

I.S I.S

 ALL DEVICES WILL BE INTRINSICALLY SAFE (I.S) TYPE

IN A HAZARDOUS AREA.

SHIELD CABLE TO BE USED IN A HAZARDOUS AREA.

I.SI.S

DC 24V

DC 24V

 ALL DEVICES WILL BE INTRINSICALLY SAFE (I.S) TYPEIN A HAZARDOUS AREA.

SHIELD CABLE TO BE USED IN A HAZARDOUS AREA.

 A4

RM

 A5

RMZB

 A10

DET

 A11

DET

 A9

DET

 A12

DET

ZB

MS

302

 A22CM

 A27

IF

TM

520 A30

DET

 A28

DET

 A29

DET

 A26

DET

CP CP

LI

520

LI

520

LI

520

ZONE 7

ZONE 1 ZONE 2 ZONE 3

ZONE 4

ZONE 6 ZONE 5(WORKSHOP)

HAZARDOUS AREA

HAZARDOUS AREA

Page 278: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 278/302

8 - 10  Part 8 Fire Fighting System

 A1~A35 : ADDRESS NUMBER

DET : DETECTOR

MS302 : MS302EX IS FLAM E DETECTOR (CONVENTIONAL TYPE)

CP : CALL POINT

LI520 : LINE ISOLATOR

TM520 : TIMER MODULE

RM : RM520 ADDRESSABLE RELAY MODULE

DM : DM520 CONVENTIONAL DETECTOR MODULE

CM : CM520 ADDRESSABLE CONTACT MONITORING MODULE

MDH : MAGNET DOOR HOLDER (40 mA, POWER CONSUMPTION)

IF : IF500EX INTRINSICALLY SAFE ADDRESSABLE INTERFACE MODULEZB : I.S ZENER SAFETY BARRIER

RI500 : REMOTE INDICATOR

LEGEND

 

LNGC DISHA  Machinery Operating Manual

Illustration 8.4i(3) Typical Schematic of Fire Detection & Alarm System

 J  U  N G  L  E   S

  P A  R  E

UPPER DECK

BOSUN STORE

TRUNK DECK SPACE

MACHINERY SPACE LOOP B

FORE MAST

E/R 3RD DECK

E/R 2ND DECK

E/R 1ST DECK

FUNNEL

SIGNAL LTG POST

NAV.-DK

D-DK

C-DK

B-DK

 A-DK

ECR

CONTROL UNIT

KEY

CALL POINT

DETECTOR

LINE ISOLATOR

REPEATER UNIT

Page 279: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 279/302

8 - 11  Part 8 Fire Fighting System

E/R FLOOR DECK

 

LNGC DISHA  Machinery Operating Manual

Illustration 8.4i(4) T891 MINERVA Marine Control Unit Front Panel Layout

'FIRE' LED 'FIRE' LED

'FAULT' LED

'DISABLE' LED

NO/DELETE KEY

SCROLL UP KEY YES/ENTER KEY

FAST ACCESS KEY'POWER ON'LED

QUIT KEY'POWER FAIL'LED

ZONE DISPLAY LAMP TEST KEY

SCROLL DOWN KEY

LARGE LAPHANUMERICDISPLAY

MINERVA MARINE FIRE CONTROL

NUMERIC KEYPAD

Page 280: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 280/302

8 - 12  Part 8 Fire Fighting System

RESET KEYFIRE ALARM KEY'FIRE' LEDS

SILENCE KEYKEY SWITCH  

Page 281: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 281/302

LNGC DISHA  Machinery Operating Manual

From above operation, the foam will be discharged in the fire protected areaand start extinguishing the fire.

Purifier room

As soon as the sea water pressure rises above 0.5MPag(5 kgf/cm2), the foam

liquid pump will start operating, and the sea water valve (AV2), foam liquidsuction valve (AV7), foam liquid discharge valve (AV4), and pilot valve(AV6) will be opened.

As soon as the foam liquid pressure rises above 0.5 MPag, the discharge

valve (AV13) will be opened.

Following the operation above, the foam will be discharged in the fire

 protected area, and start extinguishing the fire.

Engine control room

As soon as the sea water pressure rises above 0.5 MPag, the foam liquid

 pump will start operating, and the sea water valve (AV2), foam liquidsuction valve (AV7), foam liquid discharge valve (AV4), and pilot valve

(AV6) will be opened.

As soon as the foam liquid pressure rises above 0.5 MPag, the dischargevalve (AV14) will be opened.

Following the operation above, the foam will be discharged in the fire

 protected area, and start extinguishing the fire.

  To stop

a) Press the “STOP” button on the control panel.The foam liquid pump will stop operating, and each automatic valves will

 be closed.

 b) Stop the emergency fire pump manually on the control panel.

Caution

After the fire and cool down, the protected space must be well ventilated before

crew may enter.

Page 282: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 282/302

8 - 14  Part 8 Fire Fighting System

LNGC DISHA  Machinery Operating Manual

Illustration 8.6i CO2 System

I

 A

K

C

M

E

O

G

CO2 ROOM

FIRE CONTROL STATION

TO OPEN AIR

15 COPPER TUBE

FN

TD

P

DL

TD

P

HP

11 BTLS 8 BTLS

9 BTLS

9 BTLS

TD

P B

J

TDP

REQUIRED Q'TY OF CYLINDER

* TOTAL : 37 BOTTLES

- CARGO COMPRESSOR ROOM : 28 EA

- MAIN SWBD ROOM : 19 EA

- EM'CY GEN. ROOM/EM'CY SWBD ROOM : 11 EA

- ELECTRIC MOTOR ROOM : 9 EA

65A 40A 50A 40A

40A

MAKERSUPPLY

YARDSUPPLY

MAIN & EM'CY

POWER SUPPLY AC220V

CARGOCOMP. RM

 A B

E.G.S/E.S.R

E F

MAINSWBD RM

C D

ELEC.MOT. RM

G H

CARGO

COMP. ROOM

MAIN

SWBD ROOM

ELECTRIC

MOTOR ROOM

EM'CY GEN.RM

/EM'CY SWBD RM

R

ES

EH

B

 A

 A

PG

PS

PP PPP P

PP PPP

P P

TD

P

PIPE LINE

PILOT LINE

ELECTRIC LINE

THERMOMETER

UNIVERSAL DRAIN

3-WAY VALVE

TIME DELAY UNIT (PNEUMATIC)

BEACON LAMP

 AIR HORN

 ALARM BELL WITH LAMP

ROTATING LAMP

ELECTRIC HORN

ELECTRIC SIREN

 ALARM CONTROL PANEL

CO2 DISCHARGE NOZZLE

HOSE CONNECTION VALVE

PILOT END PLUG

PILOT VENT BLEED

BALL VALVE

LEVEL INDICATOR

BEAM SCALE

INSTRUCTION CHART

CAUTION PLATE

WARNING NOTICE

LIMIT SWITCH

CAP BOX

SPARE PARTS

KEY BOX

PRESSURE GAUGE WITH STOP VALVE

PRESSURE SWITCH WITH STOP VALVE

SAFETY OUTLET

PRESSURE RELIEF VALVE

Page 283: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 283/302

8 - 15  Part 8 Fire Fighting System

CARGOCOMP. RM

I J

E.G.R/E.S.R

M N

MAINSWBD RM

K L

ELEC.MOT. RM

O P

(3 EA)

7 Kg/cm2 Air Supply

(3 EA) (2 EA) (2 EA)

R

S

S

P

M

P

SYMBOL

R

S

R

S

R

 A

S

 A A A

PRESSURE RELIEF VALVE

CHECK VALVE (PILOT LINE)

SOLENOID VALVE

MAIN DISCHARGE VALVE

(PNEUMATIC & MANUAL CONTROLLED)

PILOT CYLINDER

(MANUAL CONTROLLED)

DISCHARGE CO2 CYLINDER

(PNEUMATIC & MANUAL CONTROLLED)

VALVE (NORMAL CLOSE)

VALVE (NORMAL OPEN)

DESCRIPTION

 

Page 284: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 284/302

LNGC DISHA  Machinery Operating Manual

Illustration 8.7i Hyper-Mist System

1

2

3M

M

M

M

M

M

M

PP

M

NOTE

1. PIPE MATERIAL :

  - HIGH PRESS. : SUS304TP SCH40 OR HIGHER  - LOW PRESS. : SUS304TP SCH20 OR HIGHER

2. LOCATION OF HIGH PRESSURE PUMP :

  - HIGH PRESSURE PUMP TO BE LOWER THAN

  FRESH WATER OUTLET LEVEL

20L1 x 1 set

TO FIRE ALARM PANEL

 ALARM SIGNALNORMAL SOURCE

FIRE

 ALARM

PANEL

FIRE CONTROL STATION

STEERING GEAR ROOM

       F       R       E      S       H

        W .        T       K

HYPER MIST

M. CONT. PANEL

POWER SOURCE

TO H.P. PUMP STATER

TO ALARM MONITOR SYSTEM

EAV6

15A

EAV4

15A

25A

LS

MVL2

ST40A 25A

MVL1

DRAIN

TEST LINE

HIGH PRESSURE PUMPCAP. 100L/min x 7 MPa(SETTING PRESSUREFOR REDUCING V/V 7 MPa)

15A

MVH1(AIR BLOWING TEST LINE)(0.5~0.9 MPag)

STARTER

H.P. PUMP

15A AV1

NO

EAV5

15A

EAV3

15A

EAV1

15A

EAV2

15A

20

INCINERATOR AREA

LCB

20L1 x 1 set

20

I.G.G AREA

LCB

20L1 x 2 sets

20 20

NO.1 MAIN BOILER AREA

LCB

20L1 x 2 sets

20 20

NO.2 MAIN BOILER AREA

LCB

20L1 x 3 sets

20 20

D/G ENG. AREA

LCB

20L1 x 2 sets

20 20

F.O HEATER AREA

LCB

Page 285: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 285/302

8 - 17  Part 8 Fire Fighting System

Pressure gauge

Fire detector 

Globe check valve (low press.)

Manual valve (low press.)

Manual valve (high press.)

Strainer (40 mesh)

 Alarm device (column light)

Level switch

P

M

M

P

FLEXIBLE HOSE

LOCAL CONTROL BOX

ELECT. TYPE AUTO. V. (LP)

ELECT. TYPE AUTO. V. (HP)

MOTOR FOR HIGH PRESS. P/P

12S1 WATER MIST NOZZLE

20L1 WATER MIST NOZZLE

SYMBOL NAME SYMBOL NAME TAGTAG

 AD

LS

ST

MVH

HIGH PRESS. P/P WITH REDUCING V.

FH

LCB

 AV

EAV

M

WMN

WMN

HPP

LCB

M

12

20

DRAIN

15A

MVH2

(0 5 0 9 ag)

POWER SOURCE

FROM CONTROL PANEL

 

Page 286: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 286/302

 

Part 9 : General Information 

9.1 Maker List......................................................................................... 9 - 1 

9.2 Tank Capacity Plan and List ........... ............ ............ ........... ............ ... 9 - 5 

9.3 Lubrication Oil Chart......... ............ ............ ............ ............ ............ ... 9 - 7 

9.4 List of Motors and Fans.................................................................. 9 - 14 

Page 287: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 287/302

Part 9General Information 

Page 288: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 288/302

Page 289: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 289/302

Page 290: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 290/302

Page 291: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 291/302

Page 292: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 292/302

LNGC DISHA  Machinery Operating Manual

Lubricating Oil Tanks  S.G.=0.900 

Capacities Center of Gravity

Compartment

Location

Frame

NumberVolume

100% (m3)

Weight 98%

(Tons)L.C.G. (m) V.C.G. (m)

Max.

F.S.M.

M4

Main LO. Grav. Tk(S)

Main LO. Sett. Tk(S)Main LO. Stor. Tk(S)

D/G LO. Stor. Tk(S)

D/G LO. Sett. Tk(S)

T/G LO. Stor. Tk(S)

T/G LO. Sett. Tk(S)

Main LO. Sump Tk(C)

32-36

36-4040-47

40-42

38-40

36-40

36-38

29-37

33.6

51.359.9

12.2

12.2

16.7

12.2

68.1

29.6

45.252.8

10.8

10.8

14.8

10.8

60.1

-105.80

-102.60-97.79

-100.20

-101.80

-102.60

-103.40

-106.34

17.97

17.9722.86

22.86

22.86

22.86

22.86

2.11

1

426

2

2

1

2

124

Total - 266.2 234.9 - - -

Miscellaneous Tanks  S.G.=1.000

Capacities Center of Gravity

Compartment

Location

Frame

NumberVolume

100% (m3)

Weight 100%

(Tons)L.C.G. (m) V.C.G. (m)

Max.

F.S.M.

M4

Bilge Holding Tk(C)

HFO. Overf. Tk(P)

S/T C.W. Tk(C)

Waste Oil Tk(C)

S/T LO. Drain Tk(C)

FO. Sludge Tk(S)

LO. Sludge Tk(S)

15-26

58-65

7-15

26-28

21-23

38-40

38-40

110.8

64.3

47.8

31.9

4.1

3.1

5.0

110.8

64.3

47.8

31.9

4.1

3.1

5.0

-115.86

-83.80

-122.97

-111.39

-115.40

-101.80

-101.79

1.77

1.20

3.70

1.82

2.80

10.17

10.17

124

52

8

65

4

1

7

Total - 267.0 267.0 - - -

Other Tanks  S.G.=1.025

Capacities Center of Gravity

Compartment

Location

Frame

NumberVolume

100% (m3)

Weight

100% (Tons)L.C.G. (m) V.C.G. (m)

Max.

F.S.M.

M4

No. 1 Cargo(Pri. Barrier)

No. 2 Cargo(Pri. Barrier)No. 3 Cargo(Pri. Barrier)

No. 4 Cargo(Pri. Barrier)

No. 1 Cargo(2nd Barrier)

No. 2 Cargo(2nd Barrier)

No. 3 Cargo(2nd Barrier)

No. 4 Cargo(2nd Barrier)

No.1 Cofferdam

No.2 Cofferdam

No.3 Cofferdam

No.4 Cofferdam

No.5 Cofferdam

No.1 Trunk Deck Space

No.2 Trunk Deck Space

No.3 Trunk Deck Space

No.4 Trunk Deck Space

PIPE DUCT(C)

121-133

104-12087-103

72-85

121-133

104-120

87-103

72-86

133-134

120-121

103-104

86-87

71-72

121-133

104-120

87-103

72-86

67-138

1083.4

1604.21604.2

1455.0

1463.9

2224.3

2224.3

2020.2

1240.9

2834.3

2834.3

2834.3

2774.2

738.2

1744.2

1744.2

1526.2

2842.7

1110.5

1644.31644.3

1491.4

1500.5

2279.9

2280.0

2070.7

1271.9

2905.1

2905.1

2905.1

2843.5

756.6

1787.9

1787.9

1564.4

2913.7

78.20

38.60-9.00

-53.80

78.07

38.60

-9.00

-53.80

98.78

62.40

14.80

-32.80

-74.78

76.19

38.60

-9.00

-53.80

12.19

16.16

16.3016.30

16.30

16.11

16.29

16.29

16.30

15.74

17.04

17.04

17.04

17.04

31.99

31.98

31.98

31.98

1.60

-

--

-

-

-

-

-

1715

13610

13610

13610

13606

7306

34397

34397

30097

1759

Total - 34793.0 35662.8 - - -

Page 293: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 293/302

9 - 6  Part 9 General Information

Page 294: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 294/302

Page 295: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 295/302

LNGC DISHA  Machinery Operating Manual

NO. EQUIPMENT (MAKER/TYPE) Q'TY APPLICATION POINT KIND OF LUB. OIL AMOUNT(PER SET)

UNIT REMARK OR CHANGE INTERVAL

24SPRAY PUMP(SHINKO / GVD300-3M)

1 PUMP COUPLING SIDE BEARING MOBIL GREASE XHP 222 *  0.05 KG -

25 AUX. COOL.S.W. PUMP(SHINKO / GVC125-2M)

2 PUMP COUPLING SIDE BEARING MOBIL GREASE XHP 222 *  0.02 KG -

26 AUX. COOL.F.W. PUMP(SHINKO / GVC100M)

2 PUMP COUPLING SIDE BEARING MOBIL GREASE XHP 222 *  0.01 KG -

27GLYCOL W.CIRC. PUMP(SHINKO / GVC100M)

2 PUMP COUPLING SIDE BEARING MOBIL GREASE XHP 222 *  0.01 KG -

2 ACTO 200 MOBIL DTE 11M 0.317 L -

6 ACTO 400 MOBIL DTE 11M 0.964 L -

2 ACTO 800 MOBIL DTE 11M 2.037 L -

3 ACTO 1600 MOBIL DTE 11M 4.246 L -

28REMOTE CONTROL SEA VALVE(AMRI / ACTO)

1 PIPE INSIDE MOBIL DTE 11M 183 L -

29CONTROL AIR DRYER(KEUMSUNG / KRD-300N)

1 REFRIGERANT COMPRESSOR MOBIL ELA ARCTIC 32 *  0.5 L -

1 OILER ON AIR UNIT MOBIL DTE 13M *  0.2 L MAKE UP 600 HOURS

3 GREASE NIPPLE MOBIL GREASE XHP 222 *  0.03 KG MAKE UP 250 HOURS30L.O AUTO FILTER(YOOWON / K8E)

1 BEARING BOX MOBIL DTE OIL HEAVY MEDIUM *  0.1 L MAKE UP TWO YEARS

1 HFO TRANSFER P/P MOBIL GREASE XHP 222 *  0.023 KG 5000 HOURS

2 FWD HFO TRANSFER P/P MOBIL GREASE XHP 222*

  0.015 KG 5000 HOURS

1 D.O. TRANSFER P/P MOBIL GREASE XHP 222 *  0.015 KG 5000 HOURS

1 SLUDGE P/P GREASE POINT MOBIL GREASE XHP 222 *  0.018 KG 5000 HOURS

31SCREW PUMP(IMO / SCREW)

1 SLUDGE P/P GEAR BOX MOBIL GREASE XHP 222 *  0.51 L 5000 HOURS

32B.W. SEP. FEED PUMP(HANYOUNG / PISTON)

1 CRANK CASE MOBIL DTE 13M *  2.6 L -

1 NO.1/2 POWER UNIT TANK INCL. CYL/PIPING MOBIL DTE 16M 2400 L EVERY SIX MONTHS

1 HYD. OIL STORAGE TANK MOBIL DTE 16M 1200 L -33STEERING GEAR(TONG MYUNG / FE21-350-T050)

1 GREASE PUMP FOR R/CARRIER MOBILUX EP 0 40 KG -

34PROPELLER(LIPS / F.P.P)

1 CAP INTERNAL MOBILUX EP 0 410 KG -

35INTER. SHAFT BEARING(KOBELCO / F-0287)

1 PIPE INTERNAL MOBIL DTE OIL HEAVY MEDIUM 23 L -

1 AFT SEAL TANK MOBIL DTE OIL HEAVY MEDIUM 35 L -

2 GRAVITY TANK MOBIL DTE OIL HEAVY MEDIUM 80 L 100 L x 80% = 80 L

1 SUMP TANK MOBIL DTE OIL HEAVY MEDIUM 3280 L 4100 L x 80% = 3280 L

1 S O O 1 0

36STERN TUBE SEAL,BEARING(KOBELCO / )

Page 296: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 296/302

9 - 9  Part 9 General Information

1 STERN TUBE INTERNAL MOBIL DTE OIL HEAVY MEDIUM 1550 L -

1 PIPE INTERNAL MOBIL DTE OIL HEAVY MEDIUM 62 L -

37 A/C PLANT(HI-PRES KOREA / MCU 108/323102V)

2 CRANKCASE MOBIL EAL ARCTIC 100 120 L 20,000 HOUR

38PROV. REF. PLANT(HI-PRES KOREA / MCU 4/271230 V)

2 CRANKCASE MOBIL EAL ARCTIC 68 12 L 30,000 HOUR

Page 297: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 297/302

Page 298: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 298/302

Page 299: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 299/302

LNGC DISHA  Machinery Operating Manual

NO. EQUIPMENT (MAKER/TYPE) Q'TY APPLICATION POINT KIND OF LUB. OIL AMOUNT(PER SET)

UNIT REMARK OR CHANGE INTERVAL

1 ENGINE MOBIL DELVAC 1 4.8 L 200 HOURS73

LIFE BOAT(HARDING / TOTALLY ENCLOSED)

1 STEERING PUMP MOBIL DTE 13M 4 L WHEN REQUIRED

74RESCUE BOAT(HARDING / OUTBOARD PETROL)

1 ENGINE MOBIL OUTBOARD PLUS 0.4 L WHEN REQUIRED

2 ENCLOSED GEARS MOBIL GEAR 630 18 L

2 WIRE ROPE MOBIL ARMA 798 5 L75LIFE BOAT DAVIT(DONGWOO MACHINERY / HINGEDGRAVITY TYPE)

2 BEARINGS(GREASE) MOBIL GREASE XHP 222 2 KG

76RESCUE BOAT DAVIT(HARDING / SINGLE ARM)

1 HYDRAULIC SYSTEM MOBIL DTE 13M 55 L 6-12 WEEKS

77FLOAT TYPE LEVEL GAUGINE SYSTEM(HENRI SYSTEM / 806 LEVEL GAUGE)

4 GAUGE HEADMOBIL DTE 13M orMOBIL DTE 11M

3.75 L

2 HYDRAULIC SYSTEM MOBIL DTE 13M 800 L EVERY YEAR

2 SLEW/WINCH/TRAVEL GEAR BOX MOBILFLUIED 424 2.5 L FIRST:200 R.H., SECOND:500 R.H./EYERY YEAR

2 GENERAL GREASE POINT MOBIL GREASE XHP 222 2.5 KG EVERY SECOND MONTHS

2 SPHERICAL BEARINGS IN POVIT, MAIN JIB/HYD. CYL. MOBIL GREASE XHP 222 2.5 KG ONE MONTH

2 OPEN GEAR:SLEW(PINION/RING), RACK AND PINION DRIVE MOBILTAC 375 NC 17 KG KEEP WELL GREASED AT ALL TIMES

2 STEEL WIRE MOBIL ARMA 798 2.5 KG KEEP WELL GREASED AT ALL TIMES

78PROVISION CRANE(HYDRALIFT / PORT:MCV-1800-12-18.5,STBD:MCV 1610-12-14)

2 TELESCOPIC JIB WITH NYLATRON SLIDING PADS MOBILTAC 375 NC 2.5 KG DO NOT USE GREASE WITH MOLYBDENUM ADDITIVES.

Page 300: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 300/302

9 - 13  Part 9 General Information

Page 301: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 301/302

Page 302: LNGC Disha Machinery Operating Manual

7/21/2019 LNGC Disha Machinery Operating Manual

http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 302/302