LNGC Disha Machinery Operating Manual
-
Upload
hermit44535 -
Category
Documents
-
view
372 -
download
45
description
Transcript of LNGC Disha Machinery Operating Manual
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 1/302
PETRONET
Machinery Operating Manual
LNGC DISHA (H2210)
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 2/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 3/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 4/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 5/302
Part 1 : Ship Particulars
1.1 Principal Particulars......... ............ ............. ............ ............ ............ .... 1 - 1
1.1.1 Principal Particulars of the Ship ............ ............ ............ ........ 1 - 1
1.2 G/A Plan ........................................................................................... 1 - 3
1.3 Engine Room Arrangement .............................................................. 1 - 4
Part 1
Ship Particulars
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 6/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 7/302
LNGC DISHA Machinery Operating Manual
1 - 2 Part 1 Ship Particulars
Air capstan
Maker Yong Nam Marine Mach.
Type Pneumatic type
No. of Set 4Capacity 0.5 Tons X 25 m/min.
Rope reel winch
Type Manual type
No. of Set 2
Stowage capacity 38 mm Dia. X 90 m
Accommodation ladder
Maker Sam Gong Co., Ltd
Type Vertical self stowing type
No. of Set 2
Hawsers
Type 6 X 36 IWRC Galv’d
No of Set 22
Size 42 mm Dia. X 275 m
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 8/302
LNGC DISHA Machinery Operating Manual
1 - 3 Part 1 Ship Particulars
1.2 G/A Plan
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 9/302
LNGC DISHA Machinery Operating Manual
1 - 4 Part 1 Ship Particulars
1.3 Engine Room Arrangement
Casing A Deck
D U C T
E X H .
G A S
P I P E
T R U N
P A I N T
S T O R
E S W
I M M I N G
P O O L
T A N K
D U C T
D U C T
D U C T
D U C T
UP
UP
BOIL-OFF GAS
EXTRACTION FAN
NO.1
NO.2
VOID SPACE
E M / C Y
G E N E R A
T O R R O
O M
I-BEAM
1 TON
DN
UPDN
Casing B Deck
S W I M M
I N G P O
O L
D U C T
D U C T
D U C T
D U C T
D U C T
UP
UP
ELECTRIC HORN
& SIREN
UP
UP
DN
DN
DN
VOID SPACE
E M ' C Y
S W I T C
H B O A R
D R O O
M
DN
DN
DEAERATOR
F.W EXP. TK
Casing C Deck
UP
DN
DN
UP
NO.4 E/R SUP. FAN ROOM
DEAERATOR
NO.2 E/R SUP. FAN ROOM
I-BEAM 1TON
H Y D . P
O W E R
P A C K R O O M
NO.2 E/R EXH. FAN
NO.1 E/R EXH. FAN
NO.3 E/R SUP. FAN ROOM NO.1 E/R SUP. FAN ROOM
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 10/302
LNGC DISHA Machinery Operating Manual
1 - 5 Part 1 Ship Particulars
Casing Upper Deck
UP
DN
DN UP
UP
UP
DN
G A S H O O D
R O O M
DN
DN
DN
SEAL AIR FAM
C O 2 /
H I G H E
X P. F O
A M R O
O M
D U C T
D U C T
D U C T
E N G . R O O M
H A T C H
H A T C
H
D U C T
I N C I N E R
A T O R
R O O
M
D E C
K / L A M P S T
O R E
F I R E
S T A T I O N
G A R B
A G E
S T O R
E
A I R L O
C K
A C
R O O M
O X R O O M
NO.1 STEAM
AIR HEATER
NO.2 STEAM
AIR HEATER
NO.1 ECONOMIZER
INCINERATOR
NO.2 ECONOMIZER
NO.1
F.D FAN
NO.2
F.D FAN
NO.1
NO.2
E/R 1st Platform
DN
D . O
T K F O
R I . G
. G E N
E R A T O
R
D . O
S E R
V . T K
E/ R W A T E R B A
L L AS T T K
N O. 2 H. F
. O S E T T
. T K
N2 GENERATORNO.1 NO.2
N2 BUFFER TANK
N2 FEED AIR COMP.
NO.1
NO.2UP
NO.2 MAIN BOILER
NO.1 MAIN BOILER
CONDENSING UNIT FOR
ACCOM. AIR CON SYSTEM
NO.1
I.G.GEN.
TOP SPACE
PROV. REF. PLANT
NO.2
GALLEY/LAUNDRY
NO.2LV TR
NO.1LV TR
DN
UP
DN
UP
DN
STEP-UPTR
GALLEY/PANTRY
NO.2 E/R H.F.O TK
N O . 2 S W I T C
H B O A R D
R O O M
T O I L E
T
E L E V
A T O R
E N G I N E C O N T R
O L R O O M
N O . 1 S W
I T C H B O
A R D R O O M
N O
. 1 E / R H . F . O
T K
N O. 1 H. F. O
S E T T. T K
E/ R W A T E R B A
L L AS T T K
D G L . O
S T O R .
T K
D G L . O
S E T
T . T K
M A I N
L. O S E
T T. T K
T G L. O S T
O R. T K
T G L . O
S E T
T . T K
LOW SULPHUP STOR. TK
AIR CON. FOR SWBD ROOM
AIR CON. FOR SWBD ROOM
D U C
T
D U C T
D U C T
D U C T
D U C T
D U C T
GREASETRAP
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 11/302
LNGC DISHA Machinery Operating Manual
1 - 6 Part 1 Ship Particulars
E/R 2nd Platform
D . O S T
O R
. T K
E/R W A TER B A L L
AS T T K
NO.2 E/R H.F.O TK
WORK BENCH
DIESEL GENERATOR ENGINE
CARGO MACH. COOL.
F.W. BOOST. P/P
NO.2
NO.1
I-BEAM 5 TON
I-BEAM 2 TON
NO.2 TURBO GENERATOR
I-BEAM 5 TON
I-BEAM 5 TON
HYD. CONT.V/V CABINET
SEWAGE UNIT
SEWAGETREAT PLANT
I.G DRYER UNIT
N O. 1 H.
F. O S E T
T. T K
N O
. 1 E / R H
. F . O
T K
L . S .
S E T
T . T K
DRAIN COOLER
D U C
T
DE-OILER
I.G COOLING UNITI.G.G F.O P/P
I.G GENERATOR SCUBBER
NO.1 MAIN BOILER
NO.2 MAIN BOILER
CHEMICAL F. TK
(AMINE)
CHEMICAL F. TK(HYDRAZINE)
I-BEAM 2 TON
ELEC. HOIST (L.P 15 TON X 2SETS)
D/G START AIR COMP.
EM'CY D.O P/P
D/G D.O P/P
ELEC. HOIST (L.P 10 TON X 2SETS)
NO.2
NO.1
D U C T
D I S T I L L
E D W A T E R
T K ( S )
D I S T I L L E D
W A T E R
T K ( P )
M A I N L. O
S E T T
. T K
M A I N L. O
G R A V I T Y
T K
NO.1
NO.2
NO.1 TURBO GENERATOR
L.P FEED W. HEATER
CLEAN OIL
GEN. SERV. TK
TURBINE OIL
GEN. SERV. TK E L E V
A T O R
D U C
T
N O. 2 H. F
. O S E T T.
T K
LOW SULPHUR STOR. TK
E/ R W A T E R B A L
L AS T T K
UP
UP
UP UP
UP
UP
DN
DN
L A N D
G A R E A
DN
UP
E M ' C Y E
X I T
I-BEAM 2 TON
D/G START AIR RESERVOIR
W/S AIR-CON.
COOLING WATER PRE-HEATER
E/R 3rd Platform
S I D E
R E C
E S S
S I D E R E C E S S
UP
E M ' C Y
E X I T
E M ' C Y E X
I T
SOOT COLL. TANK
HOT W. CALORIFIER
U.V STERILIZER
FRESH W. HYD. UNIT
REH. FILTER
HOT W.CIRC. P/P
NO.2
NO.1
MAIN FEED W. P/P
GEN. SERV. TK
MAIN L.O COOLER
MAIN L.O AUTO.W/BYPASS FILTER
DRAIN INSP. TK
MAIN FEED W. P/P
L.OPURIFIER
M/B F.O SERV. P/P
MAKE-UP VALVE UNIT
D-S
STEAM V/V
NO.2
NO.2
NO.1
NO.1
NO.2
NO.2
NO.2
ION EXCHANGER UNIT
MAIN COND.
LEVEL CONT. V/V
GLAND CONDENSER EXH. FAN
CENT. F.W.
COOLER
CENT. COOL. F.W. P/PDUMP. STEAM CON. V/V, SILENCER & EXT. DSHTR
GREASE EXTRACTOR
D . O S T O
R . T K
E/ R W A T E R B A
L L AS T T K
N O. 2 E/ R
H. F. O T K
DEHUMIDIFIER
DOMESTIC F.W.
COOL. PLANT
DOMESTIC F.W. COOL.
PLANT CIRC. P/P
EM'CY FEED W. P/P
NO.2 NO.1
NO.2
E L E V
A T O R
NO.2
NO.1
NO.1
NO.1
NO.2
NO.1
NO.2
NO.1
NO.1
NO.1
SERV. AIR RESERVOIR
CONT. AIR DRYER(REPRIGERATED)
L O W S U L
P H U R S T
O R. T K
P U R I F I E R R O O M
E/ R W A T E R B A
L L AS T T K
N O . 1 E / R
H . F . O
T K
CONT. AIR DRYER(REGENERATIVE)
GEN. SERV. TK
SERV. AIR COMP.
F.W GENERATOR
MAIN COND. VACUUM PUMP
D U C T
L . O S L U D G E T K
F . O S L U D G E T K
D.O
PURIFIER
I-BEAM
1 TONWORK BENCH
NO.1
NO.2
T/G EXH. PIPE
DN
DN
DN
DN
UP
UPNO.1 NO.2
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 12/302
LNGC DISHA Machinery Operating Manual
1 - 7 Part 1 Ship Particulars
E/R Floor Deck
H I G H S E
A C H E S
T
FIRE & G/S P/PJOCKEY P/P
I.G SCUBBER P/P
BALLAST P/P
S.W STRAINER
S.W STRAINER
NO.2
NO.2
NO.2
NO.1 F.W. GENEJEC. P/P
NO.1NO.1
NO.1
NO.2
NO.1
NO.1
NO.1
NO.2
NO.2
NO.2
AUX. L.O P/PI-BEAM 30 TON
E M ' C Y E X
I T
S/T L.O P/P
L.O PURI. FEED P/P
L.O TRANS. P/P
SLUDGE P/P
S/T L.O COOLER
E/R BILGE P/P
B.W SEP. P/P
B.W SEPARATOR
S/T TK
NO.2
MAIN COND. P/P
L.P TURBINE
H.P TURBINE
UP
UP
UP
REDUCTION GEAR
L.D COND. P/P
NAV. DRAIN P/PDRAIN P/P
I-BEAN 1 TON
ATMOSCONDESER
NO.1
NO.1
H I G H
S E A
C H E S
T
L O W S U
L P H U R
S T O R
. T K
I-BEAM3 TON
H.F.O TRANS. P/PD.O TRANS.P/P
UP
F E E D
W . D R A I N T K
L A N D
I N G
A R E A
NO.2
NO.2
MAIN S.WCIRC. P/P
NO.3
NO.1
STAND-BY
MAIN COOL. S.W P/P E L E V
A T O R
NO.1
NO.2 F.W. GENEJEC. P/P
NO.2 BILGE& G.S. P/P
NO.1 BILGE& G.S. P/P
NO.1NO.2W/SPRAY P/P
NO. 2 M .G .P .S . NO. 1 M .G .P .S .
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 13/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 14/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 15/302
LNGC DISHA Machinery Operating Manual
2 - 2 Part 2 Ship System
Part 2 : Ship System
2.1 Steam Systems
2.1.1 Superheated Steam System
Boiler Details
Maker : Mitsubishi Heavy Industries Ltd.
No. of Sets : 2
Model : MB-4B-NS
Maximum Evaporation : 63,000 kg/h
Normal Evaporation : 54,600 kg/h
Steam Condition : 6.03MPag superheated steam at 515°C
Safety Valve Settings
Drum High Set : 7.65 MPag
Drum Low Set : 7.60 MPag
Superheater : 6.34 MPag
All the steam requirements for the vessel are generated within the two main
boilers. Steam from the steam drum is led to the primary superheater section
through an orifice where the drop in pressure is measured and converted to a
signal for steam flow. The steam, then, flows through the primary section of
the superheater and on to the secondary superheater section.
Taking steam from the primary superheater and leading it through the
temperature control desuperheater, which is located in the water drum that
regulates the outlet temperature of the steam. The control valve, then, regulatesthe outlet from the desuperheater to the secondary superheater, depending on
the outlet temperature on the steam leaving the boiler. To ensure that there is
always a steam flow through the secondary superheater, a line fitted with an
orifice bypasses the temperature control desuperheater and the control valve.
The temperature control valve also has a bypass orifice.
The main turbine main stop valves MS001 and MS014 interconnect both
boilers. A common line supplies the main turbine. Each boiler has an auxiliary
machinery stop valve, which supplies a manifold line, and in turn supplies the
three main boiler feed water pumps and both turbo generators. The circuit is
designed to supply the auxiliary machinery from either side of the manifold,
giving greater flexibility for maintenance. Warming through bypass valves are provided at all the principal stop valves.
Steam from the superheater outlet is led to the internal desuperheater which is
distributed to the various steam service.
Control and Alarm Settings
BLR STM DRUM H/L PRESS. 7.50 / 5.10 MPag
BLR SHTR STM H/H-H 525 / 530 °C
BLR SHTR PRESS. H/L 6.25 / 5.3 MPag
BLR DSHTR STM PRESS. H 6.25 MPag
BLR DSHTR TEMP H 400 °C
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 16/302
LNGC DISHA Machinery Operating Manual
2 - 3 Part 2 Ship System
Illustration 2.1.2i Desuperheated Steam
DS016
TI
Steam Drum
Water Drum
No.2 Main Boiler (PORT)
To Feed W.Drain Tank
To General service & heating steam
To Main Boiler Soot Blower
To HP Exh. Make-up Steam
To LPT Solo Run
No.1 Main Boiler (STBD)
Water Drum
Steam Drum
5.88/0.76MPag PRV
M S 0 3 5
M S 0 5 2
5.88/0.24MPag PRV
To Atmos.
5.88MPag Soot Blower Steam
To Main Boiler Atomizer
To Atmos.
To GlandSteam System
To M/T Warming up
Silencer
Silencer
Main Condenser
Atmos.Condenser
From M/C W P/P
And Drain P/P
SB008
SB009
S B 0 1 0
NO.1 Dump SteamCont. v/v (STBD)
NO.2 Dump SteamCont. v/v (Port)
DS006
DS007
DS020 DS021 D S041
DS024
DS023
NO.2 DUMP STEAMEXT. DSHTR (PORT)
DS001
DS011
DS010
5.88/1.57MPag PRV
4 6 6 B
1 4 5 B
1 4 5 B
1 4 6 B
SB091SB050
S B 0 6 9 S B 0 6 8
ES080 ES082ES081
ES078
330B
332B
331B
335B
SB001 SB003
SB004
SB002
GS003GS001 GS002
GS004
GS015
GS012 GS014GS013
G S 1 9
G S 1 6
G S 1 8
S B 5 4
S B 5 3
ES24-D2C-125A MS37-7LB-125A
MS35-7LB-50A
Atomizer Air
MS38-7LB-150A
333B
333B
PCPICTC TIC
PC PIC
PC PIC
MS34-7LB-80A
G S 1 9 - E I X - 1 5 A
GS12-BIX-150A
GS11-F3B-100A
GS03-F3B-150A
HP BLEED
GS005
GS16-EIX-15A
DS18-EIX-400A
DS022DS042
TT
NO.1 DUMP STEAMEXT. DSHTR (STBD)
334B
SB011
WSWS
Key
Condensate Line
DesuperheaterL ine
Drain Line
Air Line
WS
WS
D S 0 2 7
D S 0 2 6
D S 0 2 8
D S 0 2 5
4 6 3 B
4 6 3 B
DS017
DS018
DS019
G S 0 1 0
G S 1 7
GS008
GS007
1.57/0.78MPagGS006
SB005
GS011
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 17/302
LNGC DISHA Machinery Operating Manual
2 - 4 Part 2 Ship System
2.1.2 Desuperheated Steam Systems
Desuperheated Steam System
Superheated steam from each boiler’s outlet is led to an internal
desuperheater that is fitted in each boiler’s steam drum.
These desuperheaters discharge to a common line and supply the following
services to the :
LP turbine solo running operation
Main dump external desuperheaters
Main boilers soot blowers
General service and heating steam
5.88/1.57 MPag reducing valve (SB002) which supplies:
Main turbine warming up steam
Boiler atomizing steam
Turbines gland packing steam
The 5.88/0.24 MPag reducing valve (ES081) supplies the HP exhaust make-
up steam to heat up the deaerator, steam air heaters, fresh water generators,
along with the IP bleed steam.
Control and Alarm Settings
BLR STM DRUM H/L PRESS. 7.50 / 5.10 MPag
BLR SHTR STM H/H-H 525 / 530 °C
BLR SHTR PRESS. H/L 6.25 / 5.3 MPag
BLR DSHTR STM PRESS. H 6.25 MPag
BLR DSHTR TEMP H 400 °C
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 18/302
LNGC DISHA Machinery Operating Manual
2 - 5 Part 2 Ship System
Illustration 2.1.3i Generator Steam System
Gland SteamReceiver
Near Scupper
Steam Strainer
Main Stop V/V
No.2 Turbine
Generator
Gland SteamReceiver
Near Scupper
Steam Strainer
Main Stop V/V
From HPExhaust Steam
Atmos. Condenser
To Gland Condenser
AES196
ES197
ES198ES203
ES200 ES201 ES205
ES193
ES192 ES204
From FW Gen.FD W. Heater Drain
No.1 Turbine
Generator
MS088
MS087
Main Condenser
FS23-EIX-50A
B I X - 1 0 0 0 A
B I X - 1 0 0 0 A
B I C - 2 0 0
A
ESF6-BIC-350A
ES206
ES207
ES208
E S 2 5 - B I C - 2 0 0 A
ESF9-BIC-125AESE1-BIC-200A
E S 1 9 4
E S 1 9
9
ESG1-BIC-1000A
Gland SteamReceiver Spill
Contr. V/V
Gland SteamReceiver Spill
Contr. V/V
Gland Steam PressureMake-up V/V
Gland Steam PressureMake-up V/V
PS011 PS010
Superheated Steam
MS07-4MB-150A
MSB3-4MB-125A
MSB4-4MB-125A
1 5 A
15A 15A
1 5 A
P S 0 7 - E 2 X - 5 0 A
P S 1 3 - F 3 B - 2 5 A
SBB7-E3B-50A PS12-F3B-40A
P S 2 1 - E I C - 6 5 A
PS09-E2X-65A PS08-E2X-50A
P S 0 8 - E 2 X - 5 0 A
P S 2 1 - E I C - 6 5 A
WS
WS
WS
WS
Key
Steam Line
Exhaust Steam Line
FW Line
Drain Line
[Emergency Use]
A
[Emergency Use]
[Emergency Use]
From 1.57MPag steam
POS
V29
V27 V28V2
V 5
POS
V1V25V24
V26
POS
V1V25V24
V26
POS
V29
V27 V28V2
V 5
H
ES191
H
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 19/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 20/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 21/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 22/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 23/302
LNGC DISHA Machinery Operating Manual
2 - 10 Part 2 Ship System
2.1.5 General Service Steam System
The low pressure steam service system is supplied from the external
desuperheater & HP bleed steam at an initial pressure of 0.78 MPag.
The services supplied at this pressure include :
Inert gas dryer and generator
Boiler fuel oil heaters
Air conditioning plant
E/R H.F.O. tank (P), (S)
H.F.O. sett. tank (P), (S)
Low sulphur tank
Low sulpher FO settling tank
HFO overflow tank
Turbine generator LO settling tank
Diesel generator LO settling tank
Main LO settling tank
No.1 & 2 Calorifier
Boiler smothering steam
Incinerator waste oil tank
Bilge holding tank
Waste oil tankLO sludge tank
FO sludge tank
Deck services, including the forward HFO deep tank heating
De-oiler back washing
Boiler sprayer cleaning device
Sea chest blowing steam
Steam trace heating lines
Steam to hose connections
Cargo Machinery Room
L/D and H/D gas heater
LNG vaporiserForcing vaporiser
Glycol heating system
LO heater for compressors
General Service Steam Temperature Control
A temperature control external desuperheater is provided to regulate the
temperature of the general service steam at 175ºC.
The general service steam is supplied from the HP bleed steam or from
internal desuperheater of main boilers, and is connected to the externaldesuperheater, where the steam temperature is reduced up to the saturation
point of that pressure to be stated, and then fed to the consumers throughout
the engine room, cargo, and accommodation areas.
Spray water for the external desuperheater is supplied from the outlet of the
HP feed water system. The IAS controls the flow of the spray water
according to the temperature variation at the outlet of the external
desuperheater.
A PID temperature controller is used to reduce steam temperature from
290ºC to 174ºC.
The set point for the external de-superheater can be adjusted in the IAS
whilst it is operating in Auto Mode.
Direct operation of the control valve can be achieved by changing the
controller to Manual Mode.
If the controller fails, the control valve position of the external desuperheater
will be maintained at its last position.
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 24/302
LNGC DISHA Machinery Operating Manual
2 - 11 Part 2 Ship System
Illustration 2.1.6i Gland Packing and Leak Off System
LP Turbine
HP Turbine
Constant Level Pot
ManeuveringV/V Astern Guard
V/V
Gland Condenser
Deaerator
(0.23 MPag, 136˚C, 21 m3
)
No.2 T/G
Turbine
No.1 T/GTurbine
From 1.59 MPag Steam System
To Main Condenser
FAN
To Feed Water Drain Tank
To T/G Exh.Steam Line
No.1No.2
Air Vent
V/V
PS013
Gland Steam Receive
PS010
PS011
PS23-EIC-15A
P S 2 1 - E I C - 6 5 A
P S 1 3 - E 3 B - 2 5 A
P S 7 0 - E 2 X - 5 0 A
PS22-EIC-15A
P S 2 0 - E I C - 6 5 A
Gland Steam Receiver
P S 1 2 - F 3 B - 4 0 A
SBB7-E3B-50A
To T/G Exh.Steam Line
To Main Condenser
PS015
PS020PS021
PS019
P S 2 9 - E I X - 1 5 A
To FW Drain TK
P S 0 1 6
P S 0 1 7
P S 0 1 8
PS15-F3B-15A
PS05-E2X-100A
P S 0 3 - E 2 X - 4 0 A
P S 0 4 - E 2 X - 2 5 A
PS09-E2X-65A
P S 1 9 - E I X - 2 5 A
P S 0 1 - E 2 X - 4 0 A
P S 0 2 - E 2 X - 4 0 A
PS002 PS001
Turbine of Main FD W. Pump
P S 0 0 6
P S 2 6 - B I X - 1 5 A
GlandLeak Off
Gland Leak Off Reservoir
Packing Steam Reservoir
P S 3 3 - E 2 C - 1 5
A
M/T Internal PipeWS
WS
M/T Internal Pipe
Air Vent
(Above Top Side of Deaerator)
GlandLeak Off
Key
Steam Line
Drain Line
Make-up V/V Spill V/V
V2
V28V27
V29
V1
V25V24
V26
Make-up V/V Spill V/V
V2
V28V27
V29
V1V25V24
V26
T-29
T-27 T-28
T-303
T-26
T-25
T-302
T-24
T-71A
O
- 3 0
O
- 3 1
O - 3 5
O - 3 2
O - 3 3
V 5
V 5
Near Scupper
Near Scupper
T - 7 1
PI
PT
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 25/302
LNGC DISHA Machinery Operating Manual
2 - 12 Part 2 Ship System
2.1.6 Gland Packing and Leak Off System
Steam for the gland sealing for both turbine generators and the main turbine is
supplied from the 1.57 MPag system, which is supplied from the 5.88/1.57
MPag desuperheated steam system.
Main Turbine
Two air-operated control valves normally control the packing steam. In case of
low packing steam pressure, the make up valve opens and supplies the packing
steam to the glands. In case of high packing steam pressure, the spill valve
opens and the packing steam is dumped to the main condenser.
In order to prevent hunting or cycling, the packing steam controller should be
adjusted with a small dead band between the opening of the spill and make up
valves. The steam pressure is maintained at about 19.6 kPag.
The packing steam reservoir is permanently drained to the condenser via an
orifice. Leak off from the gland packing is collected in the gland leak off
reservoir where it is drawn to the gland condenser, and goes to the drain tank.
The gland exhaust can be directed to the gland condenser. Exhaust from the
deaerator and leak off from the feed pumps are also drawn into the gland
condenser.
Turbine Generators
The turbine generator gland sealing is supplied in a similar manner, with
pressure maintained in the gland packing steam reservoir by the make up and
spill valve. Excess pressure is dumped to the respective turbine exhaust line.
The reservoir is constantly drained to the exhaust line via an orifice. The leak
off from the glands is drawn to the gland condenser.
Control and Alarm Settings
M/T AST STEAM CHEST TEMP. HIGH 350 °C
T/G GLAND STM PRESS. H/L 20/3 kPag
M/T GLAND PACK STM PRESS. H/L 50/5 kPag
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 26/302
LNGC DISHA Machinery Operating Manual
2 - 13 Part 2 Ship System
Illustration 2.1.7i Soot Blower Panel
L2
L1
R2
R1
R6
R5
R4
R3
L2
L1
R2
R1
R6
R5
R4
R3
S B 0 6 4
S B 0 6 5
S B 0 6 0 S
B 0 5 8
NO.2
MAIN BOILER
NO.1
MAIN BOILER
SB061 SB056
SB050
SB068
SB069
SB091
S B 0 5
3 S B 0 5 4
S B 0 5 7
S B 0 5 5
S B 0 6 2
LONGSOOTBLOWER
LOCALLOCAL ECR
CONT POSITION
LOCALNO.2BLR
BOTHBLR
NO.1BLR
CONT MODE
LOCALSEQ
STARTECO
START
PT
PI
PSPS
NEAR
SCUPPER
FR M/B DSHTR
For SB AutoStart Intl.
284B
SB063
285B 285B
SB058
SB092SB093
NEAR
SCUPPER
TO OUTLET LINEOF THE STARTUP VENT V/V
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 27/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 28/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 29/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 30/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 31/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 32/302
LNGC DISHA Machinery Operating Manual
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 33/302
LNGC DISHA Machinery Operating Manual
2 - 20 Part 2 Ship System
Blank Page
LNGC DISHA Machinery Operating Manual
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 34/302
y p g
2 - 21 Part 2 Ship System
Illustration 2.2.2i(3) Clean Steam Drain System
TT SD
S D 2 0 1
SD202
FROM DECK DRAININSPECTION TK
FROM E/R DRAININSPECTION TK
NO.1 M.FD W. P/P TURB.STOP V/V INLET DRAIN
NO.2 M.FD W. P/P TURB.STOP V/V INLET DRAIN
0.24 MPag PRESS. CONT. V/VOUTLET DRAIN LINE
0.24 MPag PRESS. CONT. V/VOUTLET DRAIN LINE
FROM M/T WARM UP LINE
S D A 9 - B I X - 5 0 A
SDA1-EIX-50A
SDA3-EIX-40A
SD66-EIX-50A
SD67-EIX-80A MSB9-EIX-15A
MSC1-EIX-15A
NO.2 M. FD W. P/P TURB.
STEAM CHEST DRAIN
MSD1-EIX-15A
DUMP STEAM PISTONV/V OUTLET DRAIN
DS26-EIX-15A
0.79MPag STM PRESS. CONT. V/V
GS16-EIX-15A
FROM SLCC-ADOSING TK(100 LTR)
BT24-EIX-15A
F.W GEN HEATING STEAMSUPPLY LINE CONDENSATE DRAIN
FS27-EIX-15A
NO.1 M. FD W. P/P TURB.CASING DRAIN
MSC6-EIX-15A
NO.2 M. FD W. P/P TURB.CASING DRAIN
MSD0-EIX-15A
FROM NO.1 M/B STM
DRAIN SEPA.
SB75-EIX-15A
FROM AUX. EXTERNAL DESUPERHEATER INLET LINE DRAIN
GS19-EIX-15A
HP BLEED LINE DRAIN
ESDZ-EIX-15A
ES07-EIX-15A
ES09-EIX-15A
HP EXHAUST STEAM LINE DRAIN
ES32-EIX-15A
M/T PACKING STEAMMAKE UP LINE
PS29-EIX-15A
TS21-EIX-15A
S D A 2 - E I X - 4 0 A
TI
ESC7-EIX-125A
FROM LP FD.W.HEATER
M/T LPT SOLO RUNSTOP V/V INLET DRN
TS12-EIX-15A
NO.1 M. FD W. P/P TURB.STWAM CHEST DRAIN
MSC7-EIX-15AFROM NO.2 M/B STMDRAIN SEPA.
SB77-EIX-15A
CP
Atmos.Condenser
S D A 5 - E I X - 2 5 0 A
SDB2-LIX-5A
FROM F.W.GEN EVAPORATORCONDENSATE PUMP
FS24-EIX-50A
FROM GLANDCONDENSER
PS19-EIX-25A
FROM F.W.GEN EVAPORATORCONDENSATE PUMP
FSA2-EIX-25A
S D A 4 - E I X - 2 5 A
FD W. DRAIN TK.
(10 m3)
S D 6 8 - E
I X - 8 0 A
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 35/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 36/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 37/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 38/302
LNGC DISHA Machinery Operating Manual
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 39/302
2 - 26 Part 2 Ship System
Illustration 2.2.3.1i Main Feed Water Pump & Turbine Governor Section
Drain Valve
Bowl Valve
Hex Nut
Main Control Lever (X77)
Cotter Pin
Linkage Pin
Vent & Fill Cap
Vent & Fill Pipe
45 Street Elbow
Bolt
Oil Batonet
Oil Batonet Shield
Pipe Plug
Worm Gear Bearing Bracket Oil Sump
Cover Gasket
Stud
Hex Nut
Oil Sump Cover
Pipe Plug
(Oil Drain Location)
"A"
"A"
"B"
Gasket
Nipple & Flange Welding Assembly
Steam Chest Bracket
& Oil Relay Cylinder
Linkage Pin
Main Control Lever & Rod Connector
Main Control Lever Rod (X118)Governor Spindle Bearing Upper Cover
Section "C - C"
View In Direction of Arrows "B - B"
(Oil Fill Location)
Limiting Speed Governor
& Governor Housing
Governor Gear Box
& Oil Pump
Hex Nut
Bolt
Reducing Street Elbow
Turbine Sentinal Relief Valve
TeeNipple Bolt
Nipple & Flange Weld Assembly
Gasket
Cotter Pin
Hex Nut
Casing Alignment Stud
Stud
Back Pressure Trip
Key
Worm Gear Key
Worm Gear
Lube Overflow& Gear Lube Nozzle
Worm
Gover Driver Shaft
Worm Key
Main Shaft
Governor Drive
Shaft Bearing
Allen
Set Screw
R.H. Spiral Mitre Gear
Governor Drive Shaft Bearing
Worm Gear Bearing Bracket
(Gov. Side)
"B"
LNGC DISHA Machinery Operating Manual
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 40/302
2 - 27 Part 2 Ship System
Illustration 2.2.3.1i Main Feed Water Pump & Turbine Centrifugal Speed Governor
Main Control Lever
"A"
"A"
Main Control Lever & Rod Connector
Bolt
Main Control Lever Rod Guide
Governor Spindle Bearing Body
Linkage Pin
Linkage Pin
Heavy Hex Nut
Cotter Pin
Trip Latch Plate
Linkage Pin
Governor Spindle Bearing
Upper Cover
Governor Spindle Bearing
Lower Cover
Governor Weight Thrust Button
Bolt
Heavy Hex Nut
Linkage Pin
Hex Jam Nut
Rivet
Governor Spindle
Upper Guide
Governor Spring
Alignment Bearing
Lock Washer
Governor Spindle
Self-alignmentBearing
Governor Spring
Alignment Bearing
Lock Nut
Lubricating Oil
Inlet
Part Section "A - A"
Governor Spindle Bearing
Body
Governor Weight
Governor
Weight Bearing
Governor Housing
Resetting Spring Pin
Back Pressure Trip
Resetting Lever (x117)
Trip Latch Spring
Back Pressure
Trip Latch Pin
Back Pressure
Trip Latch
Governor Spring
Cotter Pin
Governor Weight Shaft Pin
Governor Frame
Governor
Frame Key
Gov. Thrust Brg.
Lower Retainer
Governor Thrust Bearing
Gov. Thrust Brg. Upper Retainer
& Gov. Spindle Ass'y
Bolt
Set Screw
Hex Jam Nut
Overspeed Trip Bracket
Linkage Pin
Governor Spindle
Lower Guide
Governor Frame
& Gov. Spindle Lower Guide Ass'y
Overspeed Trip Action
Governor Resetting Link
LNGC DISHA Machinery Operating Manual
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 41/302
2 - 28 Part 2 Ship System
2.2.3.1 Main Feed Water Pump & Turbine
Capacity Normal: 136 m3 / HR(HVC), Maximum: 160 m3 / HR(HVO)
Total Developed Head 855 / M.
NPSH Req’d 11.7 / M.(max.)Steam Inlet 5.88 MPag
Initial Temp. 510°C
Exhaust 0.29 MPag
Type “DEB-16”
HP/KW 724/540
rpm 7,210
Rated Design rpm 10,000
Overspeed Trip Set 7,900 rpm
Turbine Sentinel Valve Set 0.34 MPag
Back Pressure Trip Set 0.41 MPag
Remote Start Pressure Switch Set 0.20 MPag
High Oil Temperature (Alarm) Set 80 °C
Low Oil Pressure Switch (Trip) Set 0.17 MPag
Deaerator Level Low-Low (Trip) Set -1100 mm
Aux. L.O. pump remote stop switch Set 0.22 MPag
Aux. L.O. pump start fail switch (alarm) Set 0.20 MPag
Turbine Rotor Vibration Alarm : 7.1 mm/sec RMS
Trip : 11.2 mm/sec RMS
Mechanical seal flush line flow meter
Maker : BAILEY FICHER PORTER
Type : SI-6788/1
Pressure : 1.21 MPag @ 121°C
Performance Curves
Minimum
Flow 28.4 m3/h
at 855 m TDH
5025 125 150 175
50
45
40
35
30
25
20
15
10
5
0
10075
1000
900
800
700
600
500
400
300
200
100
0
0
EXPECTED CHARACTERISTIC CURVE
COFFIN TYPE "DEB" TURBO PUMP
Total Head = 855m; Suction Temperature = 136.13C; NPSHA = 13m;Steam Inlet Pressure = 5.88 MPag at Temperature = 510C, Exhaust Pressure = 294 KPag
NPSHR
TDH
760
750
740
730
720
710
700
690
680
670
660
Feed Water Flow Rate (m3 / h)
7000
8000
6000
5000
4000
3000
50
2000
25 125 150 175100750
7600
7400
7200
7000
6800
6600
6
5
4
3
2
<<<< Hand Valve Closed
BOWL PRESSURE
rpm
EXHAUST ENTHALPY
STEAM FLOW
Hand Valve Open >>>>
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 42/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 43/302
LNGC DISHA Machinery Operating Manual
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 44/302
2 - 31 Part 2 Ship System
Illustration 2.3.1i Main Sea Water Circulating System
CW026
65A
Saw Dust
Box(0.5 m3)
Main Condenser
From SW. Cooling
Service System
No.1 Main SWC Pump
(9,500/4,700 m3
/h x 5/8 mth)
TO Bilge P/P SUC.
CW027
CW041
CW037
C W 0 2 8
CW006
CW009CW007
CW003
CW023
C W 0 2 1
C W 0 2 2
CW036
CW005CW004
CW008CW010
C W 0 9 - B I X - 1 6 0 0 A
CW24-BIX-400A
C W
0 1 6
C W 0 1 7
CW15-BIX-50A
5 0 A
25A
CW02-BIX-1000A
CW04-BIX-1000A
TI
TI
C W 1 3 - B I X - 7 0 0 A
TI
CW018
PT
CW024
PI
CW08-BIX-1600A
DRAINTO BILGE
CW013CW011CW012
CW014
CW06-BIX-1000A
C W 0 1 5
C W 0 2 0
No.2 Main SWC Pump(9,500/4,700 m3/h x 5/8 mth)
No.3 Main SWC Pump
(9,500/4,700 m3/h x 5/8 mth)
C W 0 2 5
Low Sea Chest (STBD)
From MGPS
DIAPHRAGM
VALVE
C W 9 2 - B I X - 1 2 5 A
DRAIN HOLE 100mm
High Sea Chest (STBD)
From MGPS
CW93-CIX-125A
AIR VENT HOLE 100mm
DRAIN HOLE 100mm
C W 0 1 - B I X - 1 6 0 0 A
TT
TI
DIAPHRAGMVALVE
AtmosphericCondenser
Key
Sea Water Line
MGPS Line
C W 0 4 4
CW28-BIX-400A
C W 1 2 - B I X - 7 0 0 A
CW25-BIX-450ACW042
DRAIN
TO BILGE
FR Ballast Pump
CW019CW27-BIX-400A
TT
B.WCW038
HH
H
H
H
H
H
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 45/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 46/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 47/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 48/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 49/302
LNGC DISHA Machinery Operating Manual
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 50/302
2 - 37 Part 2 Ship System
Illustration 2.3.2.2i Marine Growth Preventing System (MGPS)
MAIN CSW PUMP
MAIN SW
CIRC. PUMP
MAIN
CONDENSER
ATMOS
CONDENSER
HIGH SEA CHEST
LOW SEA CHEST
CW52-C1X-1000A
CW12-P1X-700A
C W 0 8 - C 1 X - 9 0 0 A
H
CW09-C1X-1500A
HIGH SEA CHEST LOW SEA CHEST
NO.1&2 MainCSW PP
NO. 1&2 Aux.CSW PP
A
A
CW092No.1
MGPS
Unit
CW096No.2
MGPSUnit
F22
F4
F3
F2
B
To Bilge Well
B
CW68-BIX-100A
CW67-BIX-100A
C W 8 9 - B I X - 1 2 5 A
CW92-BIX-125ACW93-CIX-125A
Flow Switch(F21)
F1
Flow Switch (F21)
F2
HH
CW025CW026
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 51/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 52/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 53/302
LNGC DISHA Machinery Operating Manual
Illustration 2.5i Boiler Water Sampling and Treatment System
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 54/302
2 - 41 Part 2 Ship System
p g y
PIChemical Feed Tank (Amine)
Pump
No.2
(PORT)
No.1
(STBD)
To FWCooling System
From MFW. P/PSuction Line
To Bilge WellTo Bilge Well
No.2 Main Boiler (PORT)
Water Drum
Steam Drum
Bottom WW. HDR
From Main Cond. P/P
BT004
B T 0 0 6
B T 0 0 9
BT001 BT002
To Bilge
Well
NO.2 BLR W.Sample CLR
SinkWater Analysis Unit
BT005
FWSample CLR
NO.1 BLR W.Sample CLR
1 5 A
CD07-E3X-25A
2 5 A
2 5 A
2 5 A
2 5 A
2 5 A
FD04-E2X-15A
BT10-FMB-15A BT09-FMB-15A
B T 1 4 - F M B - 1 5 A
B T 1 3 - F M B - 1 5 A
PI PI
PI
SURFACE BLOW OFF
CHEMICAL FEED
BLOW OFF
B T 0 5 - Z M B - 4 0 A
25A
BLOW OFF
CHEMICAL FEED
Chemical Feed Tank(Hydrazine N
2H
4)
B T 0 2 2
B T 3 3 - B I X - 4 0 A
B T 2 9 - B I X - 4 0 A
64B 65B
61B 62B
65B 64B
KeyFW Line
Steam Line
Drain Line
Chemical Feed Line
B T 0 2 8
To FD WDrain Tank
From Main Cond.P/P
SLCC-ADosing
Tank
B T 0 1 6
B T 0 1 2
CDB0-E3X-15A
BT24-E3X-15A
To Bilge Well To M FD P/P Suct.
To Scupper Sys.
25A
16B 15B
67B
15B 16B
67B 68B
No.1 Main Boiler (STBD)
Water Drum
Steam Drum
Bottom WW. HDR
62B 61B
68B
B T 0 0 3
B T 0 1 9
CFA3-BIX-25AFrom FW
Cooling System
2 5 A
B T 1 7 - E 3 X - 1 5 A
B T 3 4 - B I X - 1 5 A
B T
1 6 - E 3 X - 1 5 A
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 55/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 56/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 57/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 58/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 59/302
LNGC DISHA Machinery Operating Manual
Illustration 2.6.2i DO Purifying and G/E Fuel System
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 60/302
2 - 47 Part 2 Ship System
Diesel Oil Purifier System
LM
To Sludge Pump
FO SLUDGE TK(3.1 m3)
OP005
OP061
OP007
O P 0 0 8
Near Scupper
DO ServiceTank (37.7 m3)
DO Purifier (2,000 L/H)
OP06-BIX-25A
CP
O P 0 7 - B I X - 2 5 A
OP08-BIX-125A
O P 5 1 - B I X - 1 0 0 A
O P 5 2 - B I X - 5 0 A
LS
PI
OP62-BIX-65A
1 2 5 A
Fr DO Tk
For IGG
O P 0 0 4
OP003OP002
OP006
PI
OP01-BIX-40A
O P 0 1 3
OP011
OP02-BIX-25A
OP03-BIX-25A
OP 0 5 1
OP05-BIX-25A
Fr Incinerator DO Serv. Tk
DO Tkfor IGGEmpty
DO Serv. TkEmpty
5 0 A
O F B 3 - B I X - 4 0 A
O F B 4 - B I X - 4 0 A
Key
Sludge Line
DO Line
LEAKAGE
MONITOR
P
O P 0 0 1
P
DO Storage
Tank (332.7 m3)
Diesel Generator Fuel Oil System
PIPI FMOG006OG007
OG008
O G 0 1 - B I X - 4 0 A
OG001
O G
0 3 - B I X - 4 0 A
OG04-BIX-40A
R e t u r n C h a m b e r
OG11-BIX-25A
150A PIPE
O G 1 8 - B I X - 2 5 A
O G0 21 O G0 12
DPS
DPI
PTOG024
16K
OG011LS
Leakage Tank
OG10-BIX-15ATo FO Overflow Tank
OG010 OG009
PI
O G 0 8 - B I X - 4 0 A
Em’cy DO Serv.P/P Unit(0.8 m3/h X 0.59 MPag)
D/G Eng. DO Serv. P/P
(1.1 m3/h X 0.39 MPag)
O G 0 6 - B I X - 4 0 A
O G 0 5 - B I X - 4 0 A
Diesel Gen. Engine
(4,950 BHP)
2ND DK (P)
Sett.0.39 MPag
OG003
PI
A Air
Motor
From Serv. Air System
DO Service
Tk (37.7 m3)
P
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 61/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 62/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 63/302
LNGC DISHA Machinery Operating Manual
Illustration 2.6.4i Boiler Fuel Gas Service System
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 64/302
2 - 51 Part 2 Ship System
Base No.3No.2
Base No.3No.2
Burner N2
Purge V/V
Burner N2
Purge V/V
Master N2
Purge V/V
Gas Header
N2 Vent V/V
No.2 Main Boiler (PORT)
No.1 Main Boiler (STBD)
FG FlowCont. V/ V
FG FlowCont. V/V
To Vent Riser
FR N2 BUFFER TK
N o . 2 F G H e a d e r
N o . 1 F G H e a d e r
NO.1(STBD)
NO.2(PORT)
Motor Motor
Boil-Off Leak GasExtraction Fan
Gas HeaderN2 Vent V/V
GF010
G F 2 0 - B 2 X - 5 0 A
GF23-B2X-15A
GF035
GF037
GF036
GF22-B2X-15A
GF21-B2X-15A
GF038
G F 2 4 - B 2 X - 1 5 A
G F
2 5 - B 2 X - 5 0 A
250A
250A
GF01-E2C-300A
GF40-B2X-65A
GF26-B2X-50A
125A
125A
125A
125A
125A
125A
GF16-B2X-15A
GF15-B2X-15A
GF14-B2X-15A
GF031
GF032
GF033
G F 1 7 - B 2 X - 1 5 A
GF034
GF19-B2X-50A
G F 1 8 - B 2 X - 5 0 A
G F 1 3 - B 2 X - 5 0 A
GF11-B2X-15A
G F 1 2 - B 2 X - 3 2 A
2 1 2 B
208B
208B
3 8 0 B
217B
217B
217B
214B214B
218B
211B
2 0 7 B
213B
213B
213B
2 1 2 B
2 0 7 B
211B
218B
213B
213B
213B
G a s
D e t e c t or
Gas Detector
G a s D e t e c t or
214B214B
214B214B
214B214B
214B214B
214B214B
217B
217B
217B
H
CG405F.G.MasterV/V
LNG Vapour Line
N2 Line
Key
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 65/302
LNGC DISHA Machinery Operating Manual
Illustration 2.6.5i Normal Boil-Off Gas Burning
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 66/302
2 - 53 Part 2 Ship System
FM
FM
FM
FM
FM
FM
FM
FM
KEY
IG021 IG020
CG405
IG022 CG527
CG525
CG524
CG523
CG522
CG516
CG512
CG508
CG507
CG503
CG504
CG515
CG511
CG514
CG513CG002
CG509
CG505
CG501
CN683
CG528
CS003
CS002 CS001
CG510
CG506
CG502
NO.2 HIGH DUTY COMP.
NO.1 HIGH DUTY COMP.
NO.2 LOW DUTY COMP.
NO.1 LOW DUTY COMP.
TO INS.PRESS.
CG519
C G5 18 C G5 17
CG532
CG530
CG521
CS506
CS505
CS504
CS501
CF101
CF102
CF201
CF202CF302
CF301
CF402
NO.4 CARGO TANK NO.3 CARGO TANK NO.2 CARGO TANK NO.1 CARGO TANK
CF401
CS502
CS503
CG526
CG520
GAS MAIN
LNG VAPOUR LINE
VAPOUR MAIN
STRIPPING/SPRAY MAIN
LIQUID MAIN
CS004
CG533
DEMISTER
FORCINGVAPORIZER
LNGVAPORIZER
HIGH DUTYHEATER
LOW DUTYHEATER
FUEL GAS
TO BOILERS
FROM IGG
SP502
SP401 SP301 SP201
SP101
SP102
SP601
SP501
BUTTERFLY VALVE REMOTE HYD. CONTROL
GLOBE VALVE AUTOMATIC CONTROL
LIFT CHECK VALVE MANUAL CONTROL
SWING CHECK VALVE REDUCER
SAFETY RELIEF VALVE SPOOL PIECE
STRAINER
SYMBOL SYMBOLDESCRIPTION DESCRIPTION
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 67/302
LNGC DISHA Machinery Operating Manual
Illustration 2.6.6i Forced Boil-Off Gas Burning
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 68/302
2 - 55 Part 2 Ship System
FM
FM
FM
FM
FM
FM
FM
KEY
IG021 IG020
CG405
I G0 22 C G5 27
CG525
CG524
CG523
CG522
CG516
CG512
CG508
CG507
CG503
CG504
CG515
CG511
CG514
CG513CG002
CG509
CG505
CG501
CN683
CG528
CS003
CS002 CS001
CG510
CG506
CG502
NO.2 HIGH DUTY COMP.
NO.1 HIGH DUTY COMP.
NO.2 LOW DUTY COMP.
NO.1 LOW DUTY COMP.
TO INS.PRESS.
CG519
C G5 18 C G5 17
CG532
CG530
CG521
CS506
CS505
CS504
CS501
CF101
CF102
CF201
CF202CF302
CF301
CF402
NO.4 CARGO TANK NO.3 CARGO TANK NO.2 CARGO TANK NO.1 CARGO TANK
CF401
CS502
CS503
CG526
CG520
GAS MAIN
LNG VAPOUR LINE
LNG LIQUID LINE
VAPOUR MAIN
STRIPPING/SPRAY MAIN
LIQUID MAIN
CS004
CG533
FM
DEMISTER
FORCINGVAPORIZER
LNGVAPORIZER
HIGH DUTYHEATER
LOW DUTYHEATER
FUEL GASTO BOILERS
FROM IGG
SP502
SP401 SP301 SP201
SP101
SP102
SP601
SP501
BUTTERFLY VALVE REMOTE HYD. CONTROL
GLOBE VALVE AUTOMATIC CONTROL
LIFT CHECK VALVE MANUAL CONTROL
SWING CHECK VALVE REDUCER
SAFETY RELIEF VALVE SPOOL PIECE
STRAINER
SYMBOL SYMBOLDESCRIPTION DESCRIPTION
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 69/302
LNGC DISHA Machinery Operating Manual
Illustration 2.6.7i Incinerator Fuel Oil and Sludge transfer System
OI008
OI013 OI012
OI009
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 70/302
2 - 57 Part 2 Ship System
Waste Oil Tank
For Incinerator (2.0 m3)
Sludge Pump(10 m3/h X 0.39 MPag)
From FW
System
Upper Dk
OI008
“A” DECK
Incinerator (700,000 kcal/Hr)
M
O
I 0 3 7
O I 0 3 7
O I 0
3 4
DO Pump
OI032
DO Tank For
Incinerator (0.6 M3)
WO Pump
CIRC. P/P
P
OI017 P
O I 0 1 6
OI023
OI022
OI033
To Waste
Oil Tk
From Waste Oil Tk
OI006
OI005
OI007
O I 0 1 0
OI011
To HFO Sett. Tk(S)
O I 1 0 - B
I C - 2 5 A
O I 1 1 - B I C - 2 5 A
OI34-CIX-50A
OF41-BIX-40AFrom DO Trans. P/p
T o D O S t o r . T k
O I 3 2 - B I X - 1 5 A
O I 3 3 - B I X - 5 0 A
O I 0 3 5
O I 3 1 - B I X - 1 5 A
O I 0 3 - B I X - 5 0 A
OI04-BIX-50A
OI07-BIX-50A
BG50-BIX-50A
From E/R Bilge Pump
F r o m F O S l u d g e T k
F r o m L O S l u d g e T k
OI004
OI003
OI002OI02-BIX-65A
O I 0 1 - B I X - 6 5 A
O I 0 8 - B I X - 5 0 A O
I 1 5 - B I X - 6 5 A
O I 1 6 - B I X - 6 5 A
OI015
OI009
S E T
0 . 4 4 M P a g
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 71/302
LNGC DISHA Machinery Operating Manual
Illustration 2.7.1i Main Turbine Lubricating Oil System
TO W t Oil T k
Dehumidifier
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 72/302
2 - 59 Part 2 Ship System
A
B
C
A
B
C
D
E
Oil Servo for
Maneuv. V/V
F
F
Main LO Cooler
No.1 No.2
Oil MistTank
Auto Filter (20 Micron)
D
E
Aux. LO P/P(180 m3/h X 0.44MPag)No.2 No.1
Main LO P/P(210 m3 /h x 0.44 MPag)
TIC
TC
HP Turbine
LP Turbine
IntermediateShaft Bearing
TO Oil Mist Chamber
(In Funnel)
TO Waste Oil Tank
L M 0 1 9
L M 0 2 0
L M 0 2 1
L M 0 2 2
LM023
L M 0 2 6
L M 0 2 7
L M 0 2 4
LM052
LM014 LM010
LM013 LM011
LM015 LM017
LM016
LM018
L M 0 0 3
L M 0 0 1
L M 0 0 7
L M 0 3 5
L M 0 3 6Main LO Sump Tank
(68.1 m3)
L M 0 3 7
L M 0 3 4
L M 6 2 - B I X - 1 5 0 A
LM36-BIX-125A
8 0 A
5 0 A
L M 0 2 8
L M 0 2 5
LM14-B8X-200A
LM16-B8X-200A
LM15-B8X-200A
LM030
2
5 A
1 5 A
TO INTERM
SHAFT BRG L M 2 2 - B 8 X - 2 0 0 A
L M 0 6 - B 8 X - 2 0 0 A
250ALM004LM005
L M 1 0 - B 8 X - 1 5 0 A
L M 5 0 - B I X - 5 0 A
L M 4 6 - B 8 X - 8 0 A
SOL.V/V FORTRIP DEVICE
LM42-B8X-125A
LM43-B8X-200A
LM71-B8X-100A
LM006
L M 0 3 3
L M 0 4 7
LM44-B8X-65A
L M 0 5 3
Near
B.W.
L M 4 1 - B 8 X - 1 0 0 A
P
Main LO
Gravity Tank(33.6 m3)
L M 0 2 9 ( N . O . )
S L U D G E
C H E C K E R
L M 0 0 2
1,000 mm
IntermediateShaft Bearing
T - 1 4 4 T-141With Stopper
(Locked Shut)
W i t h S t o p p e r
( L o c k e d S h u t )
O-40
With Stopper (Locked Open)
Control and Alarm Settings
M/T HP THR BRG TEMP. HIGH 75 °C
M/T HP FORE BRG TEMP. HIGH 75 °C
M/T HP AFT BRG TEMP. HIGH 75 °C
M/T LP THR BRG TEMP. HIGH 75 °C
M/T LP FORE BR TEMP. HIGH 75 °C
M/T LP AFT BRG TEMP. HIGH 75 °C
M/T HP 1P FORE BRG TEMP. HIGH 75 °C
M/T HP 1P AFT BRG TEMP. HIGH 75 °C
M/T HP 1W FORE BRG TEMP. HIGH 75 °C
M/T HP 1W AFT BRG TEMP. HIGH 75 °C
M/T HP 2P FORE BRG TEMP. HIGH 75 °C
M/T HP 2P AFT BRG TEMP. HIGH 75 °C
M/T LP 1P FORE BRG TEMP. HIGH 75 °C
M/T LP 1P AFT BRG TEMP. HIGH 75 °C
M/T LP 1W FORE BRG TEMP. HIGH 75 °C
M/T LP 1W AFT BRG TEMP. HIGH 75 °C
M/T LP 2P FORE BRG TEMP. HIGH 75 °C
M/T LP 2P AFT BRG TEMP. HIGH 75 °C
M/T MAIN WHEEL FWD BRG TEMP. HIGH 55 °C
M/T THRUSTER BRG TEMP. HIGH 55 °C
M/T MAIN WHEEL AFT BRG TEMP. HIGH 55 °C
M/T MAIN THR PAD TEMP. HIGH 100 °CM/T MAIN THR PAD TEMP. H-H (M/T SLD) 110 °C
INTERMEDIATE SHAFT FWD BRG TEMP. HIGH 65 °C
INTERMEDIATE SHAFT AFT BRG TEMP. HIGH 65 °C
M/T MAIN GEAR LO INL. PRESS. LOW 70 kPag
M/T MAIN BRG LO INL. PRESS. LOW 70 kPag
MAIN LO PRESS. LOW 350 kPag
M/T AUX. LO P/P PRESS. LOW 320 kPag
M/T LO SUMP TK LVL H/L 1.58 / 0.87 m
MAIN LO GRAVITY TK LVL LOW 3.56 m
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 73/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 74/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 75/302
LNGC DISHA Machinery Operating Manual
Illustration 2.7.3i Lubricating Oil Purifying Systems
PIPI
LP016
E T T . T K
U M P T K
M P T A N K
T . T K &
T T . &
LP017
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 76/302
2 - 63 Part 2 Ship System
NO. 1 LO PURIFIER(2,100 L/H)
TI
PI
FI
NO. 2 LO PURIFIER(2,100 L/H)
TI
PI
FI
LP033 LP035
L P 0 2 3
LP019TT
NO. 1 LO PURIFIERHEATER
LP015TI
TI
L P 0 8 - B I X - 4 0 A
L P 1 0 - B I X - 2 5 A
L P 2 4 - B I X - 5 0 A
L P 0 2 4
LP018
PI
LP014TI
TI
L P 0 7 - B I X - 4 0 A
CONTROL
AIR SYSTEM
L P 2 6 - B I X - 2 5 A
PI
CP
L P 0 1 0
L P 0 0 8
L P 0 3 - B I X - 4 0 A
PI
CP
LP011
L P 0 0 9
L P 0 0 7
L P 0 2 - B I X - 4 0 A
LP013
LP04-BIX-40A
L P 0 6 - B I X - 4 0 A
L P 0 5 - B I X - 4 0 A
L O P U R I . F E E
D P U M P
( 2 . 1 m 3 / h x 0 . 2
5 M P a g )
NO.1NO.2
OP006
L P 0 0 1
L F 3 6 - B I X - 4 0 A
F R S / T L O
D R A I N T K
L P 0 0 2
L F 1 2 - B I X - 4 0 A
F R M A I N L O
S U M P T K
L P 0 3 9
L F 7 0 - B I X - 4 0 A
F R M A I N L O
S E T T . T K
L P 0 0 5
L F 3 8 - B I X - 4 0 A
F R D / G L O
S E T T . T K &
S U M P T K
LP025
L P 1 8 - B I X - 4 0 A
LP026
L P 3 0 - B I X - 4 0 A
LP027
L P 1 9 - B I X - 4 0 A
LP036
LP028
L P 2 0 - B I X - 4 0 A
LP029
L P 2 1 - B I X - 4 0 A
L P 0 2 1
L P 1 1 - B I X - 4 0 A
LP13-BIX-40A
LP14-BIX-40A
LP17-BIX-40A
T O M A I N
L O S E
T O M A I N
L O S U
T O S / T L O
S U M
T O T / G L O
S E T T
S U M P T K
T O D / G L O S E T
S U M P T K
LO SLUDGE TANK(5.0 m3)
LP31-BIX-50A
LP038
LP16-BIX-40A
LP012
L P 0 2 0
TI
LPA1-C2X-25A
LP001
DIAL
TO SLUDGE PUMP
NO. 2 LO PURIFIERHEATER
PI CONTROL
AIR SYSTEM
TT
L P 0 4 1
L P 0 4 2
P
L P 0 0 4
L F 3 7 - B I X - 4 0 A
F R T / G L O
S E T T . T K &
S U M P T K
FMFM
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 77/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 78/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 79/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 80/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 81/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 82/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 83/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 84/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 85/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 86/302
LNGC DISHA Machinery Operating Manual
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 87/302
2 - 74 Part 2 Ship System
Blank Page
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 88/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 89/302
LNGC DISHA Machinery Operating Manual
Illustration 2.10i Steering Gear Flow Lines
No.4 Cylinder No.3 Cylinder Air Breather
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 90/302
2 - 77 Part 2 Ship System
No.2 Cylinder No.1 Cylinder
SafetyValve
SafetyValve
PilotRelief ValveBoost
Relief Valve
M
Orifice
No.2 Hyd.
By-pass V/VNo.2 Oil Tank
L
No.2 Transfer Valve
N o.2 M ai n c i r c ui t
B y - p a s s v al v e
Wi t h l i mi t s wi t c h
No.2 Valve Block
No.2 Servo.Controller
No.1
JanneyPump
No.2 AuxiliaryPump
No.2 Pump Unit
Hyd. Oil TankFor Steering Gear
(1,240 L)
SafetyValve
SafetyValve
PilotRelief ValveBoost
Relief Valve
M
Orifice
No.1 Hyd.By-pass V/V
No.1 Transfer Valve
No.1 Valve Block
No.1 Servo.Controller
No.1
JanneyPump
No.1 AuxiliaryPump
No.1 Pump Unit
No.2 Oil Tank
L
H S 0 0 4
H S 0 0 5
SV2SV1
N o . 1 M a i n c i r c u i t
B y - p a s s v a l v e
W i t h l i m i t s w i t c h
Motor pump Hand pump
L.LL.L
L/L level switch for
auto isolation controlL/L level switch for
auto isolation control
B A
LNGC DISHA Machinery Operating Manual
2.10 Steering Gear
General Description
YOOWON – MITSUBISHI Electro – hydraulic steering gear is compact in
construction and high in reliability and practical application.
This steering gear is 2-Ram, 4-Cylinders, Rapson-slide type. Two variable
Operating procedure
Remote steering
a) Supply the remote steering gear control system and power units with
electrical power.
b) Operate the mode selection switch of the remote steering gear control
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 91/302
2 - 78 Part 2 Ship System
g g y p ypdisplacement pumps operate the steering rudder angle.
This steering gear operates as auto. pilot, follow-up control and non follow-up
control.
The maximum rudder angle is designed so that the ram stop at 47.5° for
maximum rudder angle of 45° to each side.
Particulars
Max working press. 21.7 MPagRudderstock diameter 588.16 mm
Maximum rudder angle 45 degrees
Relief valve setting 27.0 MPag
Design torque 3,334 kNm
Pump Unit
Type 3V-FH2B-MK X 2
Design tilting angle 97 %Theoretical delivery of oil quantity 386 l/min
Oil Capacity Total oil quantity abt 3,000 ltr.Storage tank capacity abt. 1,500 ltr.
Motor Unit
Output 90 Kw X 2
Revolution 1,200 rpmPower source 440V, 3φ, 60HzRating 25% Cont.
100% 1 hr.
200% 60 sec.
Alarm Function
Pump motor overloadPower failure
Low oil level
) p g g
system.
c) Operate the power units by means of E/M start switch.
Mechanical lever steering(S/G compartment)
a) Put the selector switch of the auto pilot control box(rudder servo unit)
to local or off position.
b) Select which janney pump will be used for manual steering.
c) With the mechanical control lever in mid-position, operate the selected
janney pump.
d) Operate the manual control lever in accordance with the steeringcommand.
e) Return the mechanical control lever its neutral position upon reaching
the ordered rudder angle.
Note !
1. The changing of the power units should be done with the electric motor
start/stop switches.
2. When an alarm should off due to for failure in any power unit ;
Stop the concerned power unit, and then start another power unit. In this
case, investigate the defective part.
3. In case of any failure in the hydraulic circuit, operate the power unit and
the valves in accordance with the operating instruction mounted in the
steering gear compartment.
Operating Mode Valve Positions
By-pass
valve
Stop
valveCaseWorking
pump
Working
cylinderA B SV1 SV2
Notices
1 1 1,2 X X O OO-V/V to be
opened
2 2 3,4 X X O O
X-V/V to be
closed
LNGC DISHA Machinery Operating Manual
Illustration 2.11i Turbine Generator
MS087
MS07-4MB-150A
MSB3-4MB-125A
MSB4-4MB-125A
5A
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 92/302
2 - 79 Part 2 Ship System
Gland SteamReceiver
Near
Scupper
Steam Strainer
Main Stop V/V
No.2 TurbineGenerator
Gland SteamReceiver
Near
Scupper
Steam Strainer
Main Stop V/V
From HPExhaust Steam
Atmos. Condenser
To Gland Condenser
AES196
ES197
ES198ES203
ES200 ES201 ES205
ES193
ES192 ES204
From FW Gen.FD W. Heater Drain
No.1 TurbineGenerator
MS088
Main Condenser
FS23-EIX-50A
B I X - 1 0 0 0 A
B I X - 1 0 0 0 A
B I C - 2 0 0 A
ESF6-BIC-350A
ES206
ES207
ES208
E S 2 5 - B I C - 2 0 0 A
ESF9-BIC-125AESE1-BIC-200A
E S 1 9 4
E S 1 9 9
ESG1-BIC-1000A
Gland Steam
Receiver SpillContr. V/V
Gland SteamReceiver Spill
Contr. V/V
Gland Steam Pressure
Make-up V/V
Gland Steam PressureMake-up V/V
PS011 PS010
Super Heated Steam
1 5 A
15A 15A
1 5 A
P S 0 7 - E 2 X - 5 0 A
P S 1 3 - F 3 B - 2 5 A
SBB7-E3B-50A PS12-F3B-40A
P S 2 1 - E I C - 6 5 A
PS09-E2X-65A PS08-E2X-50A
P S 0 8 - E 2 X - 5 0 A
P S 2 1 - E I C - 6 5 A
WS
WS
WS
WS
Key
Steam Line
Exhaust Steam Line
FW Line
Drain Line
[Emergency Use]
A
[Emergency Use]
[Emergency Use]
From 1.57MPag steam
POS
V29
V27 V28V2
V 5
POS
V1V25V24
V26
POS
V1V25V24
V26
POS
V29
V27 V28V2
V 5
H
ES191
H
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 93/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 94/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 95/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 96/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 97/302
LNGC DISHA Machinery Operating Manual
Illustration 2.11.2i Diesel Generator Engine
b e rD/G Starting
Air Compressor
PIALTA048 D.O Service
Tank (37 7 m3)
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 98/302
2 - 85 Part 2 Ship System
D/G Eng. D.O Service P/P
1.1 m3/hX 0.39 MPag
Em’cy D.O Service P/P0.8 m3/h X0.59 MPag
FMOG010 OG009 OG007 OG006
OG008
R e t u r n C h a m
P
OG001
OG003
From Service Air System
A
Alternator
Cylinder L.O
Pump UnitDPI
DPS
DT
To MainL.O Rail
OG024
OG021
Engine
Driven
L.O P/P
Pre L.O
P/P Hand
P/PCentrifugal
Filter To L.O
Trans. P/P
Alternator
Bearing L.O Cooler
CF075
L/T Air Cooler
From Cent.
Cooling F.W. P/P
CF026
L.O Cooler
C F 0 2 9
Jacket C.F.W P/P
To C.F.W.
Cooling System
J.C.W Preheater P/P
Electric J.C.W Preheater
D/G Starting
Air Reservoir
Oil/Water
Separator
No.1
No.2
T A0 43 T A0 44
TA046
TA050
T A 0 6 0
To F.W. Expansion Tank
T A 0 5 2
T A 0 5 3
Fresh Water Line
L.O Line
D.O Line
Air Line
Key
C F 0 2 7
To Expansion Tank OG012
CF025
HT Cooler
From Cent.
Cooling F.W. P/P
Tank (37.7 m3)
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 99/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 100/302
LNGC DISHA Machinery Operating Manual
Operating Procedure
1) Starting
The engine should normally be standing idle and ready for use. To start, the
only action required is to switch to local control in the engine control room,
and press the engine start button. The unit should then run up to speed, put
itself on the switchboard after synchronizing with the generator in use,
parallel and sharing the load.
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 101/302
2 - 88 Part 2 Ship System
The engine can be started manually by depressing the air start solenoid on
the air system to the engine. Always make sure that the hand lub oil pump
has been operated to ensure initial lubrication of the unit.
This engine has a turning device. By allowing the starting air to flow through
a needle valve to each cylinder, in turn, the flow being too small to turn the
engine fast enough to raise the cylinder compression level, the engine can be
rotated to turn freely. Once this sequence is completed, the needle valve will
close, and the full pressure starting air allowed into the cylinders will begine
to rotate and run the engine.
2) Stopping
After shedding the electric load from the unit, the engine should always be
allowed to run with no load for a few minutes to allow the unit to cool down
slowly. Once this has been done, the stop switch in the engine control room
can be pressed operating a solenoid valve in the fuel line, and stopping the
engine. The unit should then come to a standstill, with the solenoid valve
reset ready for the next start.
Safety and Alarm System
1) Shut Down Function
Over Speed Trip rpm 828
Lub. Oil low-low MPag 0.25
H.T.C.F.W Temp. High-High. °C 93
2) Alarm
Lub. Oil Pressure Low MPag 0.28
Lub. Oil Temp. High °C 70
Lub. Oil Diff. Press. Filter High MPag 0.12
Oil Mist Conc. High % 2.5
Fuel Oil Press. Low MPag 0.15
Fuel Oil Filter Diff. Press. High MPag 0.12Cylinder 1~9 Exhaust Temp High. °C 575
T/C Turbine Exhaust Inlet High Temp °C 575
T/C Turbine Exhaust Outlet High Temp °C 500
Wind R/S/T Temp. High °C 140
Fwd / Aft Bearing Temp. High °C 90
Power Failure - -
rpm Pick Failure - -
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 102/302
LNGC DISHA Machinery Operating Manual
Illustration 2.12.1i Distribution and Loading
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 103/302
2 - 90 Part 2 Ship System
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 104/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 105/302
LNGC DISHA Machinery Operating Manual
Illustration 2.12.2i Shore Power
D/GNo.2 T/G No.1 T/G
T2 D2 D1 T1
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 106/302
2 - 93 Part 2 Ship System
No.2 T/GPanel
No.1 T/GPanel
No.2 D/GPanel
No.1 D/GPanel
SynchPanel
SynchPanel
No.2 BusPanel
No.1 BusPanel
M M
HM16600 Volt 6600 Volt
M M MM
LM2440 Volt
M
ESB
ESBD
440 Volt
440 Volt
3000KVA AC6600/440V 3000KVA AC6600/440V
440VFeed Panel
E/G
Shore PowerAC440V, 3P, 60Hz
E
E/G
Incomming Panel
SC
BT2TRM2
No.2 MSBD
BT1 TRM1 BTMC1BTMC2
No.1 MSBD
BT-LE1BTLM1
TM1
No.1 MSBDNo.2 MSBD
BT-LM2BTLE2
TM2
BT-EL1BT-EL2
EBT-EC
No. 2Battery
No. 1Battery
Battery Charger & 24V Distribution Board
Em' cy 220V
Feed Panel
440/220V
No.2 CSBDNo.1 CSBD
E1
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 107/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 108/302
LNGC DISHA Machinery Operating Manual
Illustration 2.12.5i Diesel Generator
Stator Rotor
Exciter
Diesel
Generator
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 109/302
2 - 96 Part 2 Ship System
No.2 T/GPanel
No.1 T/GPanel
No.2 D/GPanel
No.1 D/GPanel
SynchPanel
SynchPanel
No.2 BusPanel
No.1 BusPanel
No.1 T/GNo.2 T/G
M M
6600 Volt 6600 Volt
T2 D2 D1 T1
BT2BT-MC2TRM2
No.2 MSBD
BT1 BT-MC1 TRM1
No.1 MSBD
Av
A
kW
Hz
Close Contactor Signal
AVR
Auto
Synchroniser
Power
Management
D/G
Auto
Local
Em'cy Stop
Local Start
SwitchboardPanel
No Voltage Signal
Overload Signal
High Load Request
Diesel
Engine
Abnormal
Initiate
Start
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 110/302
LNGC DISHA Machinery Operating Manual
Illustration 2.12.7i Battery Charging and 24V Distribution
No.1
Battery
No.2
Battery Em’cy 220V
Feeder Panel
Em’cy D/G
Panel
Em’cy 440V
Feeder Panel
Em’cy 440V
Distribution
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 111/302
2 - 98 Part 2 Ship System
Battery Charger & 24V Discharge Board 440/220V
Transformer
Interlock
No.1&2 440V MSBD
GAC Panel
PSU for M/T R.C.S
ECR Console (For back-up)
BD - 1 (No.1 W/H Group panel)
Cargo consol room console
BD – 3 (No.2 SWBD room)
RP for DC light (Cargo consol room)
W/H SURV. Console
RP for DC light (NAV. EQ. room)
Gyro compass PSU (No.1 source)
No.1&2 6.6kV MSBD)
Speed log multi distributor
H.E Foam control panel
MF/HF Radio EQ.
EM’CY D/G
SP
Shore Power
No.1&2 440V CSBD
BD - 2 (E/E ROOM)
PSU for GAS detection panel (Cargo consol room)
No.1&2 6.6kV CSBD)
Gyro compass PSU (No.2 source)
GAC Panel (black out signal)
Transient lights refer to W/D of lighting system
LNGC DISHA Machinery Operating Manual
2.12.6 Un-Interruptible Power Supplies
The un-interruptible power supply (UPS) units are fed from the 440V feeder
panel on the main switchboard and the emergency switchboard 440V feeder
panel.
The UPS provides battery at DC 240V, 30kVA for at least 30 minutes. The
UPS units supply power to essential navigation and safety equipment.
Essential services in the cargo control room and engine control room are alsosupplied.
2.12.7 Batteries, Transformers, Rectifiers and Chargers
(2) Amp. Meter
The current of the rectifier/battery/load normally divided by the selector
switch and the set position of the load.
The battery means full charged in case of “O” Amp, and it means it is in
discharging condition “-BBB” Amp is indicated.
Transformers
No 1/2 L V Main Transformer (3PH 350kVA): 440V/225V
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 112/302
2 - 99 Part 2 Ship System
Batteries, Rectifiers and Chargers
(1) Auto Function
• Floating and Equalizing
In case AC input source or the source 440V is put first, or source is put
again after the source fails (turns to ”Off”), it switches to the equalizing
status, and reverted to floating charging after equalizing charging.
(2) Manual Function
There are 3 operation of Floating 26.5V
Equalizing 28.5V
Boosting 30.0V
The Operations can be manually selected with each push button switch.
The selective function (Equalizing and Boosting) is automatically reverted
to floating charging status after time progresses with each timer.
(3) Timer Adjustable
• Equalizing Time : 0~100 Hour Adj. (Normal 30/Min)
• Boosting Time : 0~100 Hour Adj. (Normal 10/Min)
(4) Voltage Adjust (± 20%)
Equalizing/Floating/Boosting are used in the change of each charging
voltage. The voltmeter selector switch is put in the position of the battery,
the desired function is selected with the manual push button switch, and
when the voltage is adjusted at this time, the battery makes switches “off”
(Fuse of NFB).
Meter
(1) Volt Meter
Rectifier/Battery Charging/Load voltage normally divided by the selector
switch and the set position of the battery.
No.1/2 L.V Main Transformer (3PH, 350kVA): 440V/225V
Em’cy Transformer (120Kva, 1PH X 4SETS): 440V/225V
F’cle Transformer (3PH, 30kVA): 440V/225V
Gally/Pantry Transformer (120kVA, 1PH x 3Sets): 440V/440V
Gally/Pantry Transformer (60kVA, 1PH x 3Sets): 220V/220V
No.1/2 H.V Main Transformer(3PH,3000kVA): 6,600V/450V
No.1/2 H.V Cargo Transformer(3PH,700kVA): 6,600V/450V
Step-up Transformer(3PH,700kVA): 440V/6,600V
LNGC DISHA Machinery Operating Manual
Illustration 2.12.8i(1) Bow Thruster
G G
ELECTRONICCABINET
ENGINE ROOM BRIDGE
CONTROL
PANEL
Illustration 2.12.8i(2) Bow Thruster
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 113/302
2 - 100 Part 2 Ship System
STAR / DELTASTARTER
E
A
L
S
S
GRAVITY
TANK
SERVO
PUMP UNIT
STARTER
CABINET
SERVO
ELECTRICMOTOR
ELASTIC
COUPLING
MOTOR
FRAME
THRUSTER
THRUSTER ROOM
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 114/302
LNGC DISHA Machinery Operating Manual
Procedure for Operating the Thruster Units
Note
The main motor must not be restarted after stopping until the transformer has
had a chance to cool; a period of about 30 minutes is required for cooling.
Sequential start
(1) Operation mode switch "Control power ON"
※YESNO
Individual start
Control power lamp ON Alarm lamp ON ※
(5) Stop(reset) switch ON
YES
YESNO
NO
NO
(1) Operation mode switch "Control power ON"
(2) Oil pump start/run switch ON
Stopping thruster
(1) Zero the blade angle by
control dial.
(2) Stop(reset) switch ON
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 115/302
2 - 102 Part 2 Ship System
Control power lamp ON Alarm lamp ON
(1)' Thruster request switch ON
Thruster request lamp ON
Oil pump start/run
lamp FLICKERING
(2) Thruster start/run switch ON
Fan run signal
Fan motor RUN
Fan run lamp on
Ready to start lamp ON
Thruster RUN
Thruster start/run lamp ON
(4) Start the pitch control by control dial
※
※
※
Thruster start/runlamp FLICKERING
Oil pump RUN
(3) Stop(reset) switch ON
Oil pump start/run lamp ON
Whether the startinterlock condition are
satisfied
YES
YES
S
YES
YES
YES
YES
YES
NO
NO
NO
NO
NO
NONO
NO
(3) Thruster request switch ON
Thruster request lamp ON
Oil pump start/runlamp FLICKERING
(4) Thruster start/run switch ON
Fan run signal
Fan motor RUN
Fan run lamp on
Ready to start lamp ON
Thruster start/run lamp FLICKERING
Thruster RUN
Thruster start/run lamp ON
(5) Start the pitch control by control dial
※
※
Oil pump RUN
Oil pump start/run lamp ON
Whether the startinterlock condition are
satisfied
YES
YES
YES
YES
YES
YES
NO
NO
NONO
NO
Thruster stopOil pump stop
Fan stop
Thruster start/run lamp OFF
Oil pump start/run lamp OFFFan run lamp OFF
(3) Control power switch OFF
LNGC DISHA Machinery Operating Manual
Illustration 2.13.1i Domestic Refrigeration System
Meat Room Fish Room VegetableRoom Dairy Room
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 116/302
2 - 103 Part 2 Ship System
Upper Deck
Fan Switch Board
Refrigerating
Comp.
Central CoolingFW System
Condenser
No 1 No 2
Condenser
LiquidChange Valve
Refrigerating
Comp.
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 117/302
LNGC DISHA Machinery Operating Manual
Illustration 2.13.2i Accommodation Air Conditioning Plant
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 118/302
2 - 105 Part 2 Ship System
Condenser
From/To CentralCooling System
Charging
Connection
Filter & Dryer
NO.1
Compressor
Condenser
From/To CentralCooling System
Charging
Connection
Filter & Dryer
NO.1
Compressor
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 119/302
LNGC DISHA Machinery Operating Manual
2.13.2.2 Package Air-Con for Galley
Specification
No.1 Cooling unit
Maker HI-PRESS
Cooling capacity 8.6kW
Weight 25kg
No.2 Indoor unit
Package Air-Con for Galley Diagram
INDOOR UNITNO.2 COOLER
SUPPLY AIR
NO.1COOLER
W/N
1/2" CU7/8" CU1/4" CU 5/8" CU
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 120/302
2 - 107 Part 2 Ship System
Maker SANYO
Type SPW-U253G56
Power source 220V 60Hz/1phase
Cooling capacity 8.6 kW
Air volume 780 m3/h
Weight 50 kg
No.3 Outdoor unit
Maker DANFOSS
Type HGZ-050
Power source 220V 69Hz/1phase
Cooling capacity 10.9 kW
Air volume 4650 m3/h
Weight 96 kg
Refrigerant R-404A
Low press. side High press. sideModel Refrigerant Cut in
(MPag)
Cut in
(MPag)
Cut in
(MPag)
Cut in
(MPag)
HGZ R-404A 0.12 0.05 2.4 2.8
CEILING PANEL
DRAIN
NO.1 OUTDOOR UNIT
1/2" CU
SIGHT GLASS
FILTER DRIER
7/8" CU
NO.2 OUTDOOR UNIT
LIQUID LINE
KEY
SUCTION LINE
1/2" CU
SIGHT GLASS
FILTER DRIER
7/8" CU
LNGC DISHA Machinery Operating Manual
Illustration 2.13.3i Package Air Conditioner
Engine Control Room and No.2 MSBR Work Shop and No.1 MSBR
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 121/302
2 - 108 Part 2 Ship System
EVAPORATOR
LP LPDPS
COMPRESSOR
COOLING WATER IN
COOLING WATER OUTCONDENSER
TI
TI
LP LPDPS LP LPDPS
CONDENSATE DRAIN
(JIS 5K 25A FLANGE)
COOLING WATER IN
COOLING WATER OUT COOLING WATER OUT
COOLING WATER IN
SAFETY VALVE OUTLET
JIS 5K 15A FLANGE
EVAPORATOR
No. 1COMPRESSOR
(STBD)
No. 2COMPRESSOR
(Port)
No . 2Condense r (P)No . 1Condenser ( S)
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 122/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 123/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 124/302
LNGC DISHA Machinery Operating Manual
Illustration 2.14.3i Sanitary Discharge System
T o B i l g e W e l l
B
DE/R Pub. T/S
1ST PLATFORM21,262 A/B
STANDARD FLG FOR SHORE CONN.F H B DRAIN IN ACCOMM
Dia. 170
Dia. 61.118
Dia. 210
16
F.H.B
F.H.B
F.H.B
F.H.B
D-DK
E/R PLATFORM
C-DK
B-DK
A-DK
UPP.DK
40 A
W/T W/B
40 A 40 A40 A
50 A
50 A
S S
TYP. OF DRAIN PIPE SIZE
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 125/302
2 - 112 Part 2 Ship System
1110987
D
654321
SN10VSN09V
SN05V
NC
Port STB'D
'C'
Upper Deck
(DETAIL 'C')F.H.B DRAIN IN ACCOMM.
SN84-C1X-25A
Sewage Collecting Tank(NET. 10.0 m3)
SN23V
SN26V
To Bilge Hold'g Tank
E/R 2nd Platform
(14,686 A/B)E/R 2nd Platform
(14,686 A/B)
From Coolint S.W System
SN19V
SN32V
SN17V
SN16V
SN20VSN18V
SN02V
SN03V
S.L.W.L S.T.P
(40 Persons)
SN12V
SN07V
SN08V
Discharge Pump
Discharge Pump
SN11VN.C N.C N.C
SN13V
Blower
Air Vent
M
M
SN25V
SN24V
L.S.H
H.S.L
L.S.L
L.S.L
SN15V
Over Flow
Dilution Water
Flowmeater
W/Check V/V
SN14V
Manifold
SN21V SN22V
SN01V
SN04V
A
SN06V
Hoisptal
Gray Water Drain
From Sea
Overboard
Main Line
Air Vent To Funnel Top
E
FM
B
SN29V
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 126/302
LNGC DISHA Machinery Operating Manual
2.15 E/R General Piping Diagram
Illustration 2.15.1i Piping Diagram for Boiler Sealing system
FR FD FAN FR FD FAN
PS
F/E SEAL AIR FAIL
ECONOMZER
SMOKE INDICATOR
ECONOMZER
SMOKE INDICATOR
SA007SA030
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 127/302
2 - 114 Part 2 Ship System
NO.2MAIN BOILER
80/40
100/50
150/125
80/65
PEEPHOLE
SH DOOR(REAR)
S A 0 4 2
NEAR SCUPPER
SHTUBEWITHDRAWL HOLE ACCESS HOLE
UV, CDS FLAME EYE
NO.2 SEAL AIR FAN
S A 0 4 4
S A 0 4 3
NO.1MAIN BOILER
80/40
100/50
150/125
65/80
PEEPHOLE
SH DOOR(REAR)
S A 0 2 3
NEAR SCUPPER
SHTUBEWITHDRAWL HOLE ACCESS HOLE
UV, CDS FLAME EYE
NO.1 SEAL AIR FAN
S A 0 2 1
S A 0 2 2
SA020
TO BILGE
HOLDING TK
S A 0 4 9
SOOT COLLECTING TANK(1.0 m3)
BITE TYPE CONNECTIONBITE TYPE CONNECTION
E C O N O M I Z E R
E C O N O M I Z E R
465B 465B
S A 0 0 5
S A 0 2 7
308B 308B
PSSA051
NO.1 FAN AUTOST-BY START
PS
LNGC DISHA Machinery Operating Manual
Illustration 2.15.2i Piping Diagram for Waste Steam System
S I L
E N C E R
S I L
E N C E R
UPPER DECK
WS008 FUNNELWS007
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 128/302
2 - 115 Part 2 Ship System
Steam Drum
Water Drum
No.2 Main Boiler
(Port)
Super Heater
Steam Drum
Water Drum
No.1 Main Boiler
(STBD)
Super Heater
W S 0 0 1
NEAR SCUPPER
NEAR SCUPPER
SUPER HEATEROUTLET LINE
W S 0 0 3
NEARSCUPPER
NO.2 M/B START UPVENT VALVE
NO.2 M/B START UPVENT VALVE
NO.1 M/B START UPVENT VALVE
NO.1 M/B START UPVENT VALVE
F R R E L I E F
V / V O F H P . E X H . S T E A M L I N E
F R R E L I E F
V / V O F D E A E R A T O R
F R R E L I E F
V / V O F
0 . 7 9 M P A S
T E A M S E R V . S Y S .
F R R E L I E F
V / V O F 0 . 1 5 6 M P a g S T E A M
P R E S S C O
N T . V / V F O R A T O M I Z I N G
NEAR
SCUPPER
W S 0 0 6
ATMOS.
CONDENSER
FD W. DRAINTANK
W S 0 0 5
SET6.34 MPag
NEAR SCUPPER
SUPER HEATEROUTLET LINE
SET7.65 MPag
NEAR SCUPPER
FM S/B STM SYS. FM S/B STM SYS.
NEARSCUPPER
ECO INLETHEADER
SET9.71 MPag
NEAR SCUPPER
ECO INLETHEADER
NEAR SCUPPER
37B
38B
SET7.6 MPag
38B
21B
SET9.71MPag
21B
SET6.34 MPag
37B
SET7.6 MPag
38B
SET7.65 MPag
38B
LNGC DISHA Machinery Operating Manual
Illustration 2.15.3i Piping Diagram for LO Drain System
MAIN LO
GRAVITY TK
MAIN LO
SETT. TK
T/G LO
STOR. TK
T/G LO
SETT. TK
MAIN LO
STOR. TK D/G LO STOR.TK D/G LO SETT. TKLD001 LD002 LD004 LD005 LD006 LD007 LD008
“A”POWER PACK POWER PACK
FROM OIL MIST
CHAMBER
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 129/302
2 - 116 Part 2 Ship System
“A”POWER PACKFOR CARGO
POWER PACKFOR BALLAST
LO PURIFIERNO.1
TI
PI
FI
LO PURIFIERNO.2
TI
PI
FI
T/G SUMPTANK
GENERAL SERVICE TKNEAROIL
CLEANOIL
LO PURI. PREHEATER
NO.2 T/G
FOR VRC SYSTEM
GENERAL SERVICE TK
(NEAR NFWP)
TI
TI
TI
TI
(NEAR AIR COMP’)
M/T LO COOLER
LO TRANS PUMP S/T LO PUMPLO PURI. FEED PUMP
S/T LO COOLER
125A PIPE
40A PIPE
DK
DETAIL “A”
FR M/TOIL MIST
LO STRAINER LO MIST VENT LINEDRAIN
NO.1 T/G
LO STRAINER LO MIST VENT LINEDRAIN
FR M/T LO FILTER
GENERAL SERVICE TK
TO WASTE
OIL TANK
TO WASTE
OIL TANK
TO WASTE
OIL TANK
TO WASTEOIL TANK
TO WASTE
OIL TANK
FR M/T MAIN
LO PUMP
TO WASTE
OIL TANK
LNGC DISHA Machinery Operating Manual
Illustration 2.15.4i Piping Diagram for FO Drain System
EM’CY D/GLDO TK INCINERATOR
M
WASTE OIL TKFOR INCI.
OD003
EM’CY DIESEL GENERATOR
O
EM’CY DIESEL GENERATOR ROOM
OD001
LDO SERV TKFOR INCI.
DO STOR.TK OD009
DO SERV TKFOR IGG
OD005DO SERV TK
OD006 OD007HFO SETT.TK (P)
D/G ENGINEDO SERV. P/P
EM’CY DO P/P
FI
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 130/302
2 - 117 Part 2 Ship System
NO.1
NO.2
OD 0 0 4 OI012
INCINERATOR ROOM
DO PURIFIER
TI
PI
FI
PURIFIERW. BENCH
“A”
M/B BURNERCOAMING NO.1
M/B BURNERCOAMING NO.2
M/B FO V/VCOAMING
IGG FO SUPPLY P/PM/B FO STRAINER
MB FO HEATER
FO & DO TRANS. PUMP E/R BILGE PUMP BILGE WATER SEP. PP
BILGE W.SEPARATOR
T O B I L G E H O L D I N G
T A N K
125A PIPE
40A PIPE
DK
DETAIL “A”
M/B GUNCLEAN’G DEVICE
OD015 O I L S P R A Y E R
C L E A N ’ G C A R R I E R
F R L O P U R I . C O A M I N G
& L O P U R I . H T R A I R V E N T
D R A I N & S A F E T Y R E L I E F V / V
M/B FO SUPPLY P/P
FI
F R L O T K D R N & E T C
F R D E - O I L E R
O I L D R A I N
HFO SETT.TK (S) O
D 0 0 8
SLUDGE PUMP
OD012
T O W A S T E O I L T K
T O W A S T E O I L T K
FR M/T LO CLR DRNM/T LO FILTER
FR LO P’PS COAM’G DRN
OD013
T O F O O V E R F L O W
T K
OD014
LOW SULPHURFO SETT. TK O
D 0 1 1
FR OIL MIST CHAMBER& ETC
FROM L.O. DRAIN SYS.
LNGC DISHA Machinery Operating Manual
Illustration 2.16i Hydraulic Power System for Deck Machinery
UL
382-015M6
7
UL382-021
M7
8
AFT. SYSTEM FORWARD. SYSTEM
UL
382-018M4
4
UL
379-029
W2
2
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 131/302
2 - 118 Part 2 Ship System
PU4
1
2
P4
3
4
PU3
1
2
P3
3
4
1
2
3
4
PU2
P2
PU1
1
2 4
P1
P6 T2 T1
E1
E2E3
3
12
1013,1
E
TANK
DEHUMIDIFIED AND CLEAN AIRSUPPLY MIN. 0.2 MPag MAX. 10 MPag
ISO 8573.1 CLASS 4.4.6
DRAIN/FILLING
TANK
13,413,3
UL
M5
382-019
6
UL
M3
382-017
5
PU4 PU3 PU2 PU1
12
3
P6 T2 T1
E1
E3 E2P4 P3 P2 P1
4
1
23
4
1
23
4
1
23
4
E
TANK
UL
UL
UL
AL
AL
M2382-017
5 M1382-005
3
W1
379-028
1
DEHUMIDIFIED AND CLEAN AIRSUPPLY MIN. 2 MPag MAX. 1 MPag
ISO 8573.1 CLASS 4.4.6
13,1
13,4
ABOVE LINE SPOOLINGUNDER LINE SPOOLING
13,3
11
9
DRAIN/
FILLING
TANK
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 132/302
Part 3 : Integrated Automation System (IAS)
3.1 General ............................................................................................. 3 - 4
3.2 IAS Overview................................................................................... 3 - 5
3.3 IAS Function Operation......... ............ ............. ............ ............ .......... 3 - 7
3.4 IAS Mimics....................................................................................... 3 - 9
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 133/302
Part 3Integrated Automation System (IAS)
LNGC DISHA Machinery Operating Manual
Illustration 3.1.1a IAS Overview
ALARMPRINTER
LOGGINGPRINTER
COLOR HARDCOPIER
WHEEL HOUSE
EXTENSION VDUSYSTEM
EXT.
VDUODRM
CARGO SYSTEM MACHINERY SYSTEM
COLOR HARDCOPIER
ALARMPRINTER
LOGGINGPRINTER
DOSS DOSS DOSS DOSSDOSS DOSS DOSS DOSS
INMARSAT-BVIA SHIPS MODEM
CCR ECR
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 134/302
3 - 1 Part 3 Integrated Automation System
DOHS
DOHSPERSONNEL
ALARM SYSTEM
EXT. VDU NET
(ETHERNET)
DOGS
MACHINERYEXT. VDU
SERVER
DOGS
CARGOEXT. VDU
SERVER
DOPC II DOPC II
8 SETS
DOHS
DEO-NET (ETHERNET)
TOTAL 12 RECEPTACLESFOR ACCOMMODATION AREA
- CAPT. DAY RM- C/E DAY RM- 2/E DAY RM- 3/E RM- 4/E RM- 5/E RM- E/E RM- C/O DAY RM- 2/O RM- 3/O RM- NWK/O RM- G/E DAY RM
SERIAL I/F F OR CARGO SYSTEM - CUSTODY TRANSFER SYSTEM (DUAL) - LOADING COMPUTER (DUAL) - FLOAT TYPE LEVEL GAUGE SYSTEM - SHIPBOARD MANAGEMENT SYSTEM - GAS DETECTION SYSTEM
FOR MACHINERY SYSTEM - SHIPBOARD MANAGEMENT SYSTEM - SHIP PERFORMANCE MONITORING SYSTEM
- NO. 1 BOILER (DUAL) - NO. 2 BOILER (DUAL) - MAIN TURBINE (DUAL)
DOHSCARGO MIMIC
PANEL DOHSPERSONNEL
ALARM SYSTEM DOHSEXTENSION
ALARM PANEL
16 PANELS
LEGEND
DOSS : DEO OPEN SUPERVISORY STATIONDOHS : DEO OPEN HISTORY STATIONDOPC II : DEO PROCESS CONTROLLER IIODRM : OPEN DCS REMOTE MANAGERDOGS : DEO OPEN GATEWAY STATION
PORTABLEEXTENSION VDU
2 SETS
LNGC DISHA Machinery Operating Manual
Illustration 3.1.1b IAS Overview
CCR
DOSS DOSS DOSS DOSS
OPT.
CONV.
WHEEL HOUSE
DOSS DOSS
OPT.
CONV.
EXT. VDU NET
(ETHERNET)
PORTABLE EXTENSION VDUS
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 135/302
3 - 2 Part 3 Integrated Automation System
DOPC II
OPT
(2 FIBERS)
OPT
(2 FIBERS)
ECR
DOSS DOSS DOSS DOSS
OPT
(2 FIBERS)
(FOR CARGO)
DOPC II
(FOR CARGO)
DOPC II
(FOR CARGO)
DOPC II
(FOR CARGO)
DOHS
OPT
(2 FIBERS)
OPT
(2 FIBERS)
DEO-NET
(ETHERNET)
DOGS DOGS
ELECTRIC
EQUIPMENT ROOM
OPT
(2 FIBERS)
OPT
(2 FIBERS)
OPT
(2 FIBERS)
OPT
(2 FIBERS)
OPT
(2 FIBERS)
OPT
(2 FIBERS)
CCR
CARGO
MIMIC PANEL
DOPC II
I/O
(FOR MACHINERY)
DOPC II
I/O I/O
DOPC II DOPC II
I/O I/O
(FOR MACHINERY) (FOR MACHINERY) (FOR MACHINERY)
DOHSPERSONNEL
ALARM SYSTEM
DOHSDOHS
PERSONNEL
ALARM SYSTEMDOHSEXTENSION
ALARM PANEL
ECR
LEGEND
DOSS : DEO OPEN SUPERVISORY STATION
DOHS : DEO OPEN HISTORY STATION
DOPC II : DEO PROCESS CONTROLLER II
ODRM : OPEN DCS REMOTE MANAGER
DOGS : DEO OPEN GATEWAY STATION
OPT. CONV. : OPTICAL CONVERTOR
SIM : SERIAL INTERFACE MODULE
OPT
(2 FIBERS)
OPT.
CONV.
OPT.
CONV.
OPT.
CONV.
OPT.
CONV.
OPT.
CONV.
OPT.CONV.
I/O I/O I/O
I/O I/O I/O I/O I/O I/O I/O
I/O I/O I/O I/O I/O I/O
I/O
SIM
OPT(2 FIBERS)
OPT
(2 FIBERS)
LNGC DISHA Machinery Operating Manual
Illustration 3.1.1c IAS Overview
COLOR HARDCOPIER ALARM
PRINTER
CCR
DOSS2 DOSS1
DOSS DOSS
UPS1
LOGGING
PRINTER
DOSS4 DOSS3
DOSS DOSSODRMEXT.
VDU
UPS
W/H
PORTABLE EXTENSION VDUS
AC220V
A
CCC
POWER SUPPLY CONCEPT
UPS2
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 136/302
3 - 3 Part 3 Integrated Automation System
DOHS
DOHS
PERSONNEL
ALARM SYSTEM
DOGS
DOHS
CARGO MIMIC
PANEL
DOHS
PERSONNEL
ALARM SYSTEMDOHS
EXTENSION
ALARM PANEL
LEGEND
DOSS : DEO OPEN SUPERVISORY STATION
DOHS : DEO OPEN HISTORY STATION
DOPC II : DEO PROCESS CONTROLLER II
ODRM : OPEN DCS REMOTE MANAGER
DOGS : DEO OPEN GATEWAY STATION
CB
ALARM
PRINTER
ECR
DOSS1 DOSS2
DOSS DOSS
D
COLOR HARD
COPIERLOGGING
PRINTER
DOSS3 DOSS4
DOSS DOSS
UPS2
E
A
ECR UPS CABINET
ECR
CABINETUPS1
UPS2
PS
I/O
DOPC IIDOPC II
I/O
PS PS
I/O
DOPC IIDOPC II
I/O
PS
I
J
DOGSDOHS
UPS
UPS1
UPS2
PS
I/O
DOPC IIDOPC II
I/O
PS PS
I/O
DOPC IIDOPC II
I/O
PS
F
G
ELECTRICEQUIPMENT ROOM
CABINET
H
EQ ROMUPS CABINET
B
C
D
E
F
G
H
I
J
AC220V(NORMAL)
AC220V
(EMERG.)
UPS1
c/o
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 137/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 138/302
LNGC DISHA Machinery Operating Manual
DOCM(DOPC Control Module)
DOCM Configuration shows the DOCM system. The DOCM is composed of the
following modules.
Control Module(MSC)
Ethernet Module(ETM)
X-BUS Module(XBM)
Three sets of control module (MSC) have redundant configuration, and execute
same processing synchronised each other. The ethernet module (ETM) and the
X-BUS module (XBM) compare outputs of three (3) MSCs, and get data by
“logic of majority”, i.e., 2 out of 3. Even though one of MSC outputs incorrect
data, the remaining two (2) data are correct and used for the control and
monitoring.
DOSS DOHS
DEO-NET A
DEO-NET B
ETM
E-1 E-2 E-3
ETM
E-1 E-2 E-3
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 139/302
3 - 6 Part 3 Integrated Automation System
monitoring.
MSC
I-A I-B
E-A E-B
MSC
I-A I-B
E-A E-B
MSC
I-A I-B
E-A E-B
XBM
I-1 I-2 I-3
XBM
I-1 I-2 I-3
I/O I/O
X-BUS A
X-BUS B
DOCM
~
DOCM Configuration
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 140/302
LNGC DISHA Machinery Operating Manual
E/R call from E/R
Duty Engineer/Officer Selector
One set of the duty engineer /officer selector by lighting the push button for each
cargo and machinery systems are furnished on the CCR and the ECR console as
follows. When one of the button is lit, that indicates the UMS mode.
For the cargo system:
C/O 2/O 3/O NWK/O G/E
For the machinery system
C/E 2/E 3/E 4/E 5/E E/E
KEY TOOLBAR ASSOCIATE
Graphic Display
Process Monitoring Alarm MonitoringPumps, Valves, Controllers,etc. Manipulating
From Other Graphic Displays
KEY TOOLBAR
Graphic Display
Pumps, Valves, Controllers,etc. Manipulating
KEY TOOLBAR
ASSOCIATE ASSOCIATE
Trend Display
Trend Trace Monitoring
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 141/302
3 - 8 Part 3 Integrated Automation System
Personnel Alarm System
The following lamps and push buttons are supplied for the personnel alarm
system.
- Start/Stop buttons with buzzer on master panel furnished on ECR
console : 1 set
- Start/Stop push buttons on engine room entrance : 1 set
- Reset push buttons in engine room : 9 sets
“System ON” Lamp on W/H extension alarm panel.
The Personnel Alarm System’s first setting time when activate the system is 27
min. After setting time, the system occur pre-warning to E/R column light. Then
can activate the second setting time which is set 3 min.
Display Function Assignment
The DOSS provides the following major displays.
Graphic Display
Group Display
Trend Display
Alarm Summary Display
The Graphic Displays take the initiative in operation basically.
The function assignment and the relationship among displays are as follows.
KEY TOOLBAR
KEY
TOOLBAR
SELECT
SELECT
ASSOCIATE
: By Keyboard
: By Toolbar
: By select a desired alarm point
: By Associated display call-u p button
Trend Display
Alarm Monitoring
Alarm Acknowledgment(Flicker Stop)
LNGC DISHA Machinery Operating Manual
3.4 IAS Mimics
NO. DISPLAY TITLE ASSOCIATED DISPLAY CODE
1 STEAM DUSTRIBUTION SYSTEM G001 G131 G136 M07 M10 M09 - -
2 MAIN TURBINE STEAM SYSTEM G011 G041 M25 M07 M10 M21 M20 -
4 STEAM DUMP. SYSTEM G131 M02 M28 M01 - M08 - -
5 BNR ATOMISING SYSTEM - - - - - - - -
6 HEATING STEAM SYSTEM G001 G002 - - - - - -
7 CONDENSATE WATER SYSTEM-1 G051 G053 G003 M08 M02 - - -
8 COMDENSATE WATER SYSTEM-2 G151 G152 G206 G207 M01 M07 M09 -
NAME TITLE ASSOCIATED GRAPHIC
34 NO.2 TURBINE GENERATOR G171 G174 M35 M 31 M32 M23 M11 -
35 DIESEL GENERATOR G181 G183 M33 M34 M31 M32 M23 M11
36 EM’CY DIESEL GENERATOR G191 M33 M34 M35 M31 M32 M23 -
37 E/R VENT FAN G236 G237 G238 - - - - -
38 REFRIGERATION G221 G222 - - - - - -
40 MOTOR RUNNING HOUR 1 M40_1 M40_2 M40_3 M40_4 M40_5 - - -
40_1 MOTOR RUNNING HOUR 2 M40 M40_2 M40_3 M40_4 M40_5 - - -
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 142/302
3 - 9 Part 3 Integrated Automation System
9 BOILER FEED WATER SYSTEM G141 G145 M07 M10 M01 M08 - -
10 BOILER AUX. SYSTEM G121 G128 M15 M29 - M01 M09 -
11 WATER COOLING SYSTEM G216 - - - - - - -
14 FRESH WATER SYSTEM - - - - - - - -
15 M/B FUEL SYPPLY SYSTEM G071 G075 M29 - - - M16 M40
16 FO FILL, TRANS & PURI. SYSTEM G224 G225 G226 G227 G228 G229 G230 M15
18 INCINERATOR FO SERVICE SYSTEM - - - - - - - -
19 LO FILL, TRANS & PURI. SYSTEM G231 G232 - M21 - - - -
20 M/T BEARING CONDITION G043 - M02 M21 - - - -
21 MAIN TURBINE & STERN TUBE LO SYS. G041 G048 - M02 M20 - - -
22 STEERING GEAR SYSTEM - - - - - - - -
23 COMPRESSED AIR SYSTEM G201 G202 M34 M35 M36 - - -
24 BILGE SYSTEM - - - - - - - -
25 M/T OVERVIEW G011 G013 M02 - - - - -
26 M/T SHUT DOWN/PRE-ALARM M25 - M07 M29 - M30 M09 -
27 M/T AUTO POWER REDUCTION - M07 M30 M10 M09 - - -
28 M/B ACC SYSTEM OVERVIEW G061 G064 M29 - M09 - - -
29 M/B BMS SYSTEM OVERVIEW G083 G093 M15 - M01 M09 - -
30 BLR TRIP/PRE ALARM M15 M29 - M10 M09 - - -
31 MAIN POWER DISTRIBUTION M33 M34 M35 - M32 M36 - -
32 POWER DISTRIBUTION CONT G195 M33 M34 M35 M36 M31 - -
33 NO.1 TURBINE GENERATOR G161 G164 M07 M10 M01 M32 M11 -
40_2 MOTOR RUNNING HOUR 3 M40 M40_1 M40_3 M40_4 M40_5 - - -
40_3 MOTOR RUNNING HOUR 4 M40 M40_1 M40_2 M40_4 M40_5 - - -
40_4 MOTOR RUNNING HOUR 5 M40 M40_1 M40_2 M40_3 M40_5 - - -
40_5 MOTOR RUNNING HOUR 6 M40 M40_1 M40_2 M40_3 M40_4 - - -
42 REPOSE GROUP - - - - - - - -
43 LOG SET - - - - - - - -
44 MACH OVERVIEW - - - - - - - -
45 WINDING TEMP - - - - - - - -
Part 4 : Main Boiler Control System
4.1 Main Boiler....................................................................................... 4 - 1
4.1.1 Performance Data .................................................................. 4 - 1
4.1.2 Instruction of Main Boiler Operation.....................................4 – 6
4.2 Main Boiler Control System..... ............ ............ ............ ............ ...... 4 - 12
4.3 Burner Management System........... ............ ............ ........... ............ . 4 - 13
4.4 Gas Management System (GMS)................................................... 4 - 28
4.5 Automatic Boiler Control System.... ............ ............ ............ ........... 4 - 29 4.6 BMS and ACC Logic Diagram... ............ ............ ........... ............ ..... 4 - 35
4.6.1 Burner Management System Logic Diagram............... ........ 4 - 35
4.6.2 Automatic Boiler Control System Diagram ............ ............ . 4 - 51
4.7 BLR Control Panel Drawing............. ............ ............ ........... ........... 4 - 59
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 143/302
Part 4Main Boiler Control System
LNGC DISHA Machinery Operating Manual
Part 4 : Main Boiler Control System
4.1 Main Boiler
4.1.1 Performance Data
Boiler Type MB-4E-NSOil Firing
LOAD100%
NORMALMAX. 75% 50% 25%
SH STEAM kg/h 53,600 61,000 40,200 26,800 13,400
DSH STEAM kg/h 1,000 2,000 1,000 1,000 1,000EVAPOURATION
Main Boiler for
Boiler Type MB-4E-NS
Gas Firing
N2 : 0 Vol% CH4 : 100 Vol%
LOAD100%
NORMALMAX. 75% 50% 25%
SH STEAM kg/h 53,600 61,000 40,200 26,800 13,400
DSH STEAM kg/h 1,000 2,000 1,000 1,000 1,000EVAPOURATION
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 144/302
4 - 1 Part 4 Main Boiler Control System
TOTAL kg/h 54,600 63,000 41,200 27,800 14,400
DRUM MPag 6.61 6.81 6.37 6.18 6.07
STEAM PRESS.SH OUTLET M Pag 6.03 6.03 6.03 6.03 6.03
ECO INLET °C 138.5 138.5 138.5 138.5 138.5
SH INLET °C 283 284.9 280.4 278.6 277.4
SH OUTLET °C 515 515 515 500.4 469.9
FEED WATERSTEAM TEMP.
DSH OUTLET °C 288.5 293.1 288.5 288.5 288.5
EFFICIENCY (HHV BASE) % 88.5 88.4 88.4 87.9 86.2
HHV kcal/kg 10,280 10,280 10,280 10,280 10,280
CALORIFIC VALUE
LHV kcal/kg 9,713 9,713 9,713 9,713 9,713
FUEL CONSUMPTION kg/h 3,962 4,561 2,987 1,995 1071
EXCESS AIR RATE % 10 10 12.5 19.2 36
O2 RATE % 1.9 1.9 2.3 3.4 5.6
COMBUSTION AIR FLOW kg/h 60,679 69,862 46,794 33,110 19,263
FLUE GAS FLOW kg/h 64,641 7,4423 49,781 35,105 20,280
ECO OUTLET GAS TEMP. °C 171 174 165 160 154
FDF OUTLET °C 38 38 38 38 38 AIR TEMP.
SAH OUTLET °C 120 120 120 120 120
TOTAL DRAFT LOSS kPag 3.57 4.74 2.12 1.05 0.35
TOTAL kg/h 54,600 63,000 41,200 27,800 14,400
DRUM MPag 6.61 6.81 6.37 6.18 6.07STEAM PRESS.
SH OUTLET M Pag 6.03 6.03 6.03 6.03 6.03
ECO INLET °C 138.5 138.5 138.5 138.5 138.5
SH INLET °C 283 284.9 280.4 278.6 277.4
SH OUTLET °C 515 515 515 515 506.8
FEED WATERSTEAM TEMP.
DSH OUTLET °C 288.5 293.1 288.5 288.5 288.5
EFFICIENCY (HHV BASE) % 84.0 83.9 84 83.6 82
HHV kcal/kg 13,270 13,270 13,270 13,270 13,270CALORIFIC VALUE
LHV kcal/kg 11,964 11,964 11,964 11,964 11,964
FUEL GAS CONSUMPTION kg/h 3,251 3,745 2,450 1,654 858
EXCESS AIR RATE % 10 10 12.5 19.2 36
O2 RATE % 1.9 1.9 2.3 3.4 5.6
COMBUSTION AIR FLOW kg/h 62,336 71,805 48,039 34,367 20,336
FLUE GAS FLOW kg/h 65,587 75,550 50,488 36,021 21,193
ECO OUTLET GAS TEMP. °C 173 178 166 159 153
FDF OUTLET °C 38 38 38 38 38 AIR TEMP.
SAH OUTLET °C 120 120 120 120 120
TOTAL DRAFT LOSS KPag 3.68 4.87 2.18 1.11 0.38
LNGC DISHA Machinery Operating Manual
Boiler Water Content and Water Content Curves
Water Content at Filled Up State by Cold Water (Hydrostatic Test)
VOLUME(m3) WEIGHT(kg) REMARKS
BOILER TUBE 9.83 9,830 COLD WATER g = 1,000 kg/m3
BOILER HEADER 0.67 670 COLD WATER g = 1,000 kg/m3
WATER DRUM 4.16 4,160 COLD WATER g = 1,000 kg/m3
WATER CHAMBER OF STEAM DRUM 4.63 4,630 COLD WATER g = 1,000 kg/m3
STEAM CHAMBER OF STEAM DRUM 4.97 4,970 COLD WATER g = 1,000 kg/m3
SATURATED STEAM PIPE 0.13 130 COLD WATER g = 1,000 kg/m3
SUPERHEATER 2.12 2,120 COLD WATER g = 1,000 kg/m3
CONTROL DESUPERHEATER 0.51 510 COLD WATER g = 1,000 kg/m3
DESUPERHEATER INLET PIPE 0.05 50 COLD WATER g = 1,000 kg/m3
DESUPERHEATER 0.07 70 COLD WATER g = 1,000 kg/m3
3
Drum Water Level and Water Content
0.8
0.6
0.4
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 145/302
4 - 2 Part 4 Main Boiler Control System
ECONOMIZER 2.97 2,970 COLD WATER g = 1,000 kg/m3
TOTAL 30.11 30,110
Water Content at Normal Water Level by Cold Water (Before Boiler Ignition)
VOLUME(m3) WEIGHT(kg) REMARKS
BOILER TUBE 9.83 9,830 COLD WATER g = 1,000 kg/m3
BOILER HEADER 0.67 670 COLD WATER g = 1,000 kg/m3
WATER DRUM 4.16 4,160 COLD WATER g = 1,000 kg/m3
WATER CHAMBER OF STEAM DRUM 4.63 4,630 COLD WATER g = 1,000 kg/m3
STEAM CHAMBER OF STEAM DRUM - - -
SATURATED STEAM PIPE - - -
SUPERHEATER - - -
CONTROL DESUPERHEATER - - -
DESUPERHEATER INLET PIPE - - -
DESUPERHEATER - - -
ECONOMIZER 2.97 2,970 COLD WATER g = 1,000 kg/m3
TOTAL 22.26 22,260 -
Water Content at Boiler Operation
VOLUME(m3) WEIGHT(kg) REMARKS
BOILER TUBE 9.83 7,323 SAT. WATER g = 745 kg/m3
BOILER HEADER 0.67 499 SAT. WATER g = 745 kg/m3
WATER DRUM 4.16 3,099 SAT. WATER g = 745 kg/m3
WATER CHAMBER OF STEAM DRUM 4.63 3,449 SAT. WATER g = 745 kg/m3
STEAM CHAMBER OF STEAM DRUM - - -
SATURATED STEAM PIPE - - -
SUPERHEATER - - -
CONTROL DESUPERHEATER - - -
DESUPERHEATER INLET PIPE - - -
DESUPERHEATER - - -
ECONOMIZER 2.97 2,213 Comp. Water g = 930 kg/m3
TOTAL 22.26 16,583 -
Drum Water Level (m)
0.2
0
0
-0.8
-0.6
-0.4
-0.2
-5 5-4 4-3 3-2 2-1 1
W a
t e r
C o n
t e n
t ( m 3 )
6
LNGC DISHA Machinery Operating Manual
Steam, Air & Electric Consumption
Air Consumption (per boiler)
EQUIPMENT NAME SUPPLY AIR CONSUMPTION OPERATING CONDITION
ACC (ACTUATOR) 0.9 MPag 120 Nl/min CONTINUOUS
FWR. (ACTUATOR) 0.9 MPag 50 Nl/min CONTINUOUS
BURNER FLAME EYE
SEALING750 mmAq 150 x 6 = 900 Nl/min CONTINUOUS
SOOT BLOWER
SCAVENGING550 mmAq 78 x 8 = 624 Nl/min CONTINUOUS
Alarm & Trip List
SET POINT
NO. DESCRIPTION
ALARM TRIP NOR
TIMER
157B DRUM LEVEL HIGH-HIGH - + 240 mm ± 0 mm 0 sec
157BDRUM LEVEL VERY HIGH FW MOTORVALVE CLOSE
+220 mm - ± 0 mm 10 sec
157B DRUM LEVEL VERY HIGH TURBINE TRIP +220mm - ± 0 mm 10 sec
157BDRUM LEVEL VERY HIGH TURBINE AUTO SLOW DOWN
+180 mm - ± 0 mm 10 sec
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 146/302
4 - 3 Part 4 Main Boiler Control System
SOOT BLOWER SEALING 550 mmAq 220 x 8 =1,760 Nl/min CONTINUOUS
Steam Consumption (per boiler)
EQUIPMENT NAME SUPPLY STEAM CONSUMPTION OPERATING CONDITION
SOOT BLOWER 6.03 MPag 110 Nl/min CONTINUOUS
BURNER 0.79 MPag 375 Nl/min CONTINUOUS
STEAM AIR HEATER 0.23 MPag 2700 Nl/min CONTINUOUS
Electric Consumption (per ship)
EQUIPMENT NAME ELECTRIC POWER CONSUMPTION OPERATING CONDITION
BOILER CONTROL PANEL 220V 30A CONTINUOUS
FORCED DRAFT FAN 440V
524A (HIGH)
240A (LOW) CONTINUOUS
FUEL OIL PUMP 440V 38A CONTINUOUS
157B DRUM LEVEL HIGH +130 mm - ± 0 mm 10 sec
157B DRUM LEVEL LOW -130 mm - ± 0 mm 10 sec
157BDRUM LEVEL LOW-LOW TURBINE AUTO SLOW DOWN
-180 mm - ± 0 mm 10 sec
157B DRUM LEVEL EX-LOW - -240 mm - 0 sec
158B DRUM LEVEL EX-LOW - -240 mm - 0 sec
- DRUM PRUSSURE HIGH 7.50 MPag - - 4 sec
- DRUM PRESSURE LOW 5.10 MPag - - 4 sec
- FEED WATER PRESS LOW 7.65 MPag - - 10 sec
- FEED WATER SALINITY HIGH 10 ppm - 0 ppm 10 sec
- SUPERHEATER STEAM PRESS HIGH 6.25 MPag - 6.03 MPag 4 sec
- SUPERHEATER STEAM PRESS LOW 5.30 MPag - 6.03 MPag 4 sec
126B SUPERHEATER STEAM TEMP HIGH-HIGH - 530°C 515°C 0 sec
146B SUPERHEATER STEAM TEMP HIGH 525°C - 515°C 10 sec
- DSH STEAM PRESS HIGH 6.25 MPag -5.19 ~ 6.03
MPag4 sec
- DSH STEAM TEMP HIGH 400 °C - 285 ~ 400 °C 10 sec
LNGC DISHA Machinery Operating Manual
SET POINT
NO. DESCRIPTION
ALARM TRIP NOR
TIMER
229B FLAME FAILURE ONE OF TWO - - 2 sec
229B FLAME FAILURE - TWO OF TWO - 2 sec
- FO HEADER PRESS LOW 0.15 MPag - 1.6-2.0 MPag 4 sec
259B FO HEADER PRESS LOW-LOW - 0.10 MPag 1.6-2.0 MPag 0 sec
- FO HEADER TEMP. HIGH RW#1 50 - - 10 sec
- FO HEADER TEMP. LOW RW#1 150 - - 10 sec
234B FO HEADER TEMP. LOW-LOW - RW#1 200 - 0 sec
SET POINT
NO. DESCRIPTION
ALARM TRIP NOR
TIMER
- FO HEATER OUTLET TEMP LOW RW#1 145 - - 10 sec
-FO HEATER OUTLET STRAINER PRESSLOSS HIGH
0.02 MPag - - 4 sec
250BFO PUMP OUTLET PRESS LOW AUTO- CHANGE
1.0 MPag - - 4 sec
349BSEAL AIR FAN OUTLET PRESS LOWFAN AUTO-CHANGE
4.50 kPag - - 4 sec
- ECO OUTLET GAS TEMP HIGH - 250 °C 160~190°C 10 sec
397B CONTROL AIR PRESS LOW - 0.4 MPag - 0 sec
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 147/302
4 - 4 Part 4 Main Boiler Control System
- ATM. STEAM PRESS LOW 0.40 MPag - 1.0-1.6 MPag 4 sec
243B ATM. STEAM PRESS LOW-LOW - 0.30 MPag 1.0-1.6 MPag 0 sec
205B GAS HEADER PRESS HIGH-HIGH - 75 kPag - 0 sec
- GAS HEADER PRESS HIGH 70 kPag - - 4 sec
- GAS HEADER PRESS LOW 1 kPag - - 4 sec
- GAS HEADER PRESS LOW-LOW - 0.7 kPag - 0 sec
- GAS HEADER TEMP HIGH 80°C - 30°C 10 sec
- GAS HEADER TEMP LOW 15°C - 30°C 10 sec
234B GAS HEADER TEMP LOW-LOW - 5°C 30°C 0 sec
- PURGE N2 PRESS LOW 0.05 MPag - 100 kPag 4 sec
288B SOOT BLOWER STEAM PRESS LOW 4.0 MPag - - 4 sec
276B EXH GAS SMOKE HIGH 4 deg - 1~3 deg 10 sec
277B O2 CONTENT LOW 1% - - 10 sec
246B FD FAN VIBRATION HIGH 6.0 mm/s - - 4 sec
- FD FAN TRIP - STOP - 0 sec
- FO HEATER OUTLET TEMP HIGH RW#1 45 - - 10 sec
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 148/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 149/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 150/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 151/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 152/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 153/302
LNGC DISHA Machinery Operating Manual
4.1.2.6 One-Boiler Operation
When an unexpected problem occurs and it becomes necessary to run the shipwith only one boiler, follow these instructiuon.
1. Allowable Maximum Continuous Evaporation for One-boiler Operation
Allowable maximum continuous evaporation is 63.0 t/h. Whether the
maximum continuous evaporation is reached or not, it should be judged bythe burner oil pressure of the ACC oil flow meter. At the maximum
continuous evaporation, oil pressure is 1.57 MPag while oil flow is about4.551 kg/h with three burners in use.
2. One Boiler Operation at Maximum Evaporation
(1) Pay attention to the condition of combustion and adjust the airflow
properly. The fan should operate in near maximum load. Take additional
caution so that smoke is not emitted during load change.
(2) Change boiler load as slowly as possible
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 154/302
4 - 11 Part 4 Main Boiler Control System
(2) Change boiler load as slowly as possible.
(3) When cleaning burner tips, reduce boiler load beforehand. When onlyone burner is in service, the boiler’s maximum evaporation is 21 t/h, so
reduce the boiler load below this load before cleaning burner tips. If the boiler load is not reduced, the steam pressure decreases.
(4) Pay attention to the increase in steam temperature. If steam temperatureis 515°C or higher with STC control valve fully opened, reduce the boilerload.
3. Boiler Out of Operation
(1) Completely isolate the boiler out of operation from the boiler in operation.Particularly when making repairs, check the main steam stop valve, the
feed water valve, the ACC steam pressure detecting foot valve, theauxiliary steam desuperheater steam outlet valve drain valve, the
chemical dosing valve, and other lines which are connected to the other boiler.
(2) When the boiler will be shut down for a long time, the boiler should be
preserved by the wet lay-up method.
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 155/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 156/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 157/302
LNGC DISHA Machinery Operating Manual
(5) - a) Initial start of Base FO burner
(With other burner off)
Fuel Mode “FO”→ “FO”
No. Symbol Action Indication
(1) Securing Start condition of boiler (FO burner)
Boiler FO shut valve open : FO SHUT V/V “OPEN” lamp on
(2) Base FO burner start
“ON” PB on : Base FO burner “ON” lamp flicker
Base FO burnerstarting
sequence start
(3) Furnace purge start
Furnace purge command to ACC : “FURNACE PURGE” lamp flicker
(7) Base burner ignition
Base burner ignitor insert : Base burner “ IGNIT” lamp flicker
Confirming ignitor insert position : Base burner “IGNIT” lamp on
Ignitor spark start
Base FO burner valve open: Base burner “FO BNR V/V-1”, “FO BNR
V/V-2” lamp on
Detect faulty operation of flame scanner→ Trip interlock considering flame scanner
signal off as correct change to interlock
considering flame scanner on as correct.
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 158/302
4 - 15 Part 4 Main Boiler Control System
Furnace purge command to ACC : FURNACE PURGE lamp flicker
All burner air reg. fully open : All burner “AIR REG” lamp on
Base burner atomizing steam valve fully open : Base burner “ATM STM V/V” lamp on
(4) Securing furnace purge condition
Furnace purge condition established signalfrom ACC
: “FURNACE PURGE” lamp on
(90 sec.)
Hold furnace purge condition for not less than
90 seconds.<Furnace purge completed>
(5) Setting up base FO burner ignition
Base burner ignition condition setting signal toACC
: FO CONT V/V “IGN. RATE” lampflicker “IGN AIR” lamp flicker
: “IGN AIR” lamp flicker
No. 2, No. 3 burner air reg. fully close : No. 2, No. 3 burner “AIR REG” lamp off
(6) Securing base burner ignition condition
Ignition condition established signal fromACC
: FO CONT. V/V “IGN RATE” lamp onIGN air lamp on
FO temp normal(or “FO TEMP. BYPASS” selected)
FO burning pump running
Base burner atomizing steam valve fully open
FO recirc. valve close : “FO Rec. V/V” lamp off
Ignition validity term over trip interlock
canceling
→ It will be cancelled when ignition is
conducted within 5 minutes after burnerstart.
(8) Confirmation of burner ignition (FE detection flame within 10 seconds after FO BNR V/V open)
Confirmation of on from FE : Base burner “BASE BNR” lamp on
: FO CONT. V/V “IGN” Lamp off “IGNAIR” lamp off
: No.2, No.3 burner “BNR PURGE V/V”
lamp on
Base FO burner starting
sequence complete
LNGC DISHA Machinery Operating Manual
(5) - b) Increasing number of No.2 or No.3 FO burner
(Start with other FO burner under burning)
Fuel Mode “FO”→ “FO”
No. Symbol Action Indication
(1) Securing start condition of boiler (FO burner)
Base burner under burning : Base FO burner “ON” lamp on
: No.2 (No. 3) FO burner “OFF” lamp on
(2) No.2 (No.3) FO burner start
“ON” PB on : No.2 (No.3) FO burner “ON” lamp flicker
No.2 (No.3) FO burnerstarting sequence starts
(3) No 2 (No 3) FO burner ignition
(6) Extinguish of No.3 (or No.2 Base) FO Burner
Depressing No.3 (or No.2 Base) FO burner OFF PB, starts the following extinguish
sequence to stop the FO burner.
(6) - a) Extinguish of No.3 FO burner
(With other FO burner under burning)
Fuel Mode “FO”→ “FO”
No. Symbol Action Indication
(1) Securing burner extinguish condition
Other burners under burning
FO burner manual mode
(2) No.3 FO burner extinguish
“OFF” PB N 3 FO b “OFF” l fli k
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 159/302
4 - 16 Part 4 Main Boiler Control System
(3) No.2 (No.3) FO burner ignition
No.2 (No.3) burner purge valve fullyclose
: No.2 (No.3) burner “BNR PURGE V/V” lampoff
No.2 (No.3) burner atomizing steamvalve fully open
: No.2 (No.3) burner “ATM STM V/V” lamp on
No.2 (No.3) FO burner valve fully open: No.2 (No.3) “FO BNR V/V-1”, “FO BNR
V/V-2” lamp on
No.2 (No.3) burner air reg. fully open : No.2 (No.3) burner “AIR REG” lamp on
(4) Confirmation of burner ignition (FE detecting flame within 10 seconds after FO BNR V/V open)
Confirmation of on from FE
: No.2 (No.3) burner “No.2 (No.3) BNR” lamp
on
No.2 (No.3) FO burner Starting
sequence complete
“OFF” PB on : No.3 FO burner “OFF” lamp flicker
No.3 FO burner extinguish
sequence starts
(3) No.3 FO burner extinguish
No.3 FO burner valve close: No.3 :FO BNR V/V-1”, “FO BNR V/V-2”
lamp off
No.3 burner purge valve fully open : No.3 :burner “BNR PURGE V/V” lamp on
: No.3 burner “No.3 BNR” lamp off
(5 sec.)
No.3 burner air reg. close
: No.3 burner “AIR REG” lamp off
(This process will be cancelled when No.3 gas
burner is under operation.)
(10 sec.)
No.3 FO burner atomizing steam valve
close: No.3 burner “ATM STM V/V” lamp off
No.3 FO burner extinguish
sequence complete
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 160/302
LNGC DISHA Machinery Operating Manual
(7) - a) Increasing Number of Base (or No.2, No.3) Gas Burner
(With other Gas burner off)
Fuel Mode “FO”→ “DUAL”
No. Symbol Action Indication
(1) Securing start condition of GAS burner
Base FO burner under burning : Base burner “FO ON” lamp on
Other gas burner inoperative : No.2 and No.3 “GAS OFF” lamp on
Master & Boiler gas valve open : Master gas v/v “OPEN” lamp on
: BLR gas v/v “OPEN” lamp on
Gas ignition set command to ACC : Gas Cont V/V “IGN POSIT” lamp flicker
Gas ignition setting condition
established signal from ACC: Gas Cont V/V “IGN POSIT” lamp on
(7) - b) Increasing Number of No.2, No.3 Gas Burner
(With other gas burner under burning)
Fuel Mode “DUAL”→ “DUAL”
No. Symbol Action Indication
(1) Securing start condition of gas burner
No.2 FO burner under burning : No.2 burner “FO ON” lamp on
Other gas burner under burning : Base “GAS ON” lamp on
(2) Increase number of No.2 gas burner
“ON” PB on : No.2 GAS burner “ON” lamp flicker
No.2 gas burner number
increasing sequence starts
(3) Gas burner ignition
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 161/302
4 - 18 Part 4 Main Boiler Control System
(2) Increase number of base gas burner
“ON” PB on : Base GAS burner “ON” lamp flicker
Base GAS burner number
increasing sequence starts
(3) Base GAS burner ignition
Base GAS burner valve open: Base “GAS BNR V/V-1” “GAS BNR V/V-2”
lamp on
: BASE BNR GAS “ON” lamp on
: FUEL MODE “DUAL” lamp on
: GAS CONT V/V “IGN POSIT” lamp off
Base gas burner number
increasing sequence completed
(3) Gas burner ignition
No.2 GAS burner valve open: No.2 “GAS BNR V/V-1” “GAS BNR V/V-2”
lamp on
: No.2 BNR GAS “ON” lamp on
No.2 gas burner number
increasing sequence completed
LNGC DISHA Machinery Operating Manual
(8) Extinguishing of Gas Burner
Depressing gas burner OFF PB, starts the following extinguish sequence to stop the
gas burner. When the gas burner is extinguished, N2 purge will be automatically
conducted.
(8) - a) Extinguish of No.3 (or No.2, Base) Gas Burner
(With FO burner and gas burner in “DUAL” mode, i.e. both under burning,
and with other gas burner under burning)
Fuel Mode “DUAL”→ “DUAL”
No. Symbol Action Indication
(1) Securing burner extinguish condition
All FO burners under burning : Base No.2 and No.3 FO burner “ON” lamp on
Other gas burners under burning : Base No.2 and No.3 gas burner “ON” lamp on
(2) No.3 GAS burner extinguish
(8) – b) Extinguish of base (or No.2, No.3) Gas Burner
(With FO burner and gas burner in “DUAL” mode, i.e. both under burning,
and with other gas burner under inoperative)
Fuel Mode “DUAL”→ “FO”
No. Symbol Action Indication
(1) Securing burner extinguish condition
All FO burners under burning : Base No.2 and No.3 FO burner “ON” lamp on
Other gas burners under inoperative : Base GAS burner “ON” lamp on
(2) Base GAS burner extinguish
“OFF” PB on : Base GAS burner “OFF” lamp flicker
Base gas burner extinguish
sequence starts
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 162/302
4 - 19 Part 4 Main Boiler Control System
“OFF” PB on : No.3 GAS burner “OFF” lamp flicker
No.3 GAS burner extinguish
sequence starts
(3) No.3 gas burner extinguish
No.3 GAS burner valve close: No.3 “GAS BNR V/V-1” “GAS BNR V/V-2”
lamp off
No.3 GAS burner N2 purge valve fully
open: No.3 gas burner “BNR N2 V/V” lamp on
(15 sec.)
No.3 GAS burner N2 purge complete : No.3 gas burner “BNR N2 V/V” lamp off
: No.3 gas burner “OFF” lamp on
No.3 gas burner extinguish
sequence completed
(3) Base gas burner extinguish
Base GAS burner valve close: Base “GAS BNR V/V-1” “GAS BNR V/V-2”
lamp off
: Gas Cont V/V “IGN POSIT” lamp on
Base GAS burner N2 purge valve fully
open: Base GAS burner “BNR N2 V/V” lamp on
(15 sec.)
Base GAS burner N2 purge complete : Base burner “BNR N2 V/V” lamp off
: Base GAS burner “OFF” lamp on
No.3 Gas burner extinguish
sequence completed
LNGC DISHA Machinery Operating Manual
(8) - c) Extinguish of No.3 Gas Burner
(With other gas burner in “GAS” mode)
Fuel Mode “GAS”→ “GAS”
No. Symbol Action Indication
(1) Securing burner extinguish condition
All GAS burners under burning : Base No.2 and No.3 GAS burner “ON” lampon
All FO burners under inoperative: Base No.2 and No.3 FO burner “OFF” lamp
on
(2) No.3 GAS burner extinguish
“OFF” PB on : No.3 GAS burner “OFF” lamp flicker
No.3 gas burner extinguish
sequence starts
(8) - d) Extinguish of Base Gas Burner
(With other gas or FO burner inoperative in “GAS” mode)
Fuel Mode “GAS”→ “FO”
No. Symbol Action Indication
(1) Securing burner extinguish condition
Other gas burners under inoperative : No.2 and No.3 GAS burner “OFF” lampon
All FO burners under inoperative: Base, No.2 and No.3 FO burner “OFF”
lamp on
(2) Base GAS burner extinguish
“OFF” PB on : Base GAS burner “OFF” lamp flicker
Base GAS burner extinguish
sequence starts
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 163/302
4 - 20 Part 4 Main Boiler Control System
(3) No.3 GAS burner extinguish
No.3 GAS burner valve close: No.3 “GAS BNR V/V-1” “GAS BNR V/V-2”
lamp off
No.3 GAS burner N2 purge valve fully
open: No.3 GAS burner “BNR N2 V/V” lamp on
(15 sec.)
No.3 GAS burner N2 purge complete : No.3 burner “BNR N2 V/V” lamp off
: No.3 GAS burner “OFF” lamp on
No.3 burner air reg. fully close : No.3 burner “AIR REG” lamp off
No.3 gas burner extinguish
sequence completed
(3) Base gas burner extinguish
Base GAS burner valve close
: Base “GAS BNR V/V-1” “GAS BNR
V/V-2”
lamp off
: GAS CONT. V/V “IGN POSIT” lamp on
Furnace purge command to ACC
All air reg. fully open :”FURNACE PURGE” lamp flicker
Furnace purge condition established
signal from ACC: “FURNACE PURGE” lamp on
Base GAS burner N2 purge complete : Base burner “BNR N2 V/V” lamp off
(4) Start N2 purge
(15 sec.) Base GAS burner N2 purge completed : Base burner “BNR N2 V/V” lamp off
(5) Start Furnace purge
(30 sec.)
Hold furnace purge condition for not
less than 30 sec.: Furnace purge completed
(6) Furnace purge completed
All burner air reg. close : All burner “AIR REG” lamp off
: “FURNACE PURGE” lamp off
: Base GAS burner “OFF” lamp on
Base Gas burner extinguish
sequence completed
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 164/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 165/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 166/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 167/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 168/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 169/302
LNGC DISHA Machinery Operating Manual
Illustration 4.4i Gas Management System
TANKPRESS
CONT
PID
TANKPRESS
PRO-TECT
PID-3PID-2
SP
TANKPRESS
PRO-TECT
TANKPRESS
CONT
PID
SPTANK
PRESS
CONT
PID
SET
LADEN
BALLAST
LADENBALLAST OPEN
PRESS
CLOSE
SP
ABS
GAUGE
ESTIMATEDB.O.B.
ESTIMATEDB.O.B.
ESTIMATEDB.O.G.
BOILER GASFLOW
+ -LS
HS
START THECONTROL FUNCTION AFTER CONFIRM
MIN TANKPRESSSET
PREFEREDGAS FLOWCONTPOSITION SET
ABS PRESS
RECOMMENDEDBOILER LOAD FOR
EXCESS B.O.G.
BOILERF G FLOW
NO.2 BOILERF G CONTROL
VALVEPOSITION
NO.2 BOILERF G CONTROL
VALVEPOSITION
GAUGE PRESS
SETOPEN
PRESS
CLOSE
23 kPa
OPEN
21 kPa
CLOSEPID-1
L/D
COMPCONT
CONTROL FUNCTIONS IAS
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 170/302
4 - 27 Part 4 Main Boiler Control System
SP
FORC-INGVAPO-RIZERCONT
PID
PID
SP
GAS FLOW
T
P PT
B.O.B.TEMPCONT
LADENBALLAST
ABSOLUTEGAUGE
GAUGE
STEAM
VENT MODEFROM CCR(VENT : ON)
VENT MODECONT.
ABS
GAUGE
INHIBIT
ASTERN
FROMCARGO TANK AT LADEN MODE
FROMCARGO TANK AT LADEN MODE
DUMP MODEFROM CCR(DUMP : ON)
FROMCARGO TANK AT LADEN MODE
HS
I/P
FORCINGVAPORIZER
B.O.G.FLOW(ORIFICE)
B.O.G.FLOW(ORIFICE)
LNG FLOWCONTROLVALVE
MIN GASFLOWSET
FO BURNERIGNITION
SPLIT RANGECONTROL
INLET GUIDEVANE CONTROL
IGVPOSI-TIONER
MOTOR SPEEDCONTROL
100
OUT
0 25 100IN
STRIPPUMPDISCHPRESSCONT
VENTMASTVALVE
TO ATMOS
CARGO TANKSTRIP PUMP
VENT CONTROL
VAPOUR HEADER
SPRAY
NOZZLE
SMALL
LARGE
SPSTRIPPUMPLOADCONT
SET
PROTECTVENT
PP
P
P
P
TT
DP
PP
I/P
CUR.RENT
MOTOR
100
OUT
0 15 100IN
INVERTER
PID
PID
SP
SP
L/D HEATER
HEATERINLETVALVE
SURGECONTROLVALVE
RECIRCULATION LINEOF LOW DUTYGAS COMPRESSOR DEMISTER
HEATERBYPASSVALVE
GAS TOENGINE ROOM
STEAM
SURGECONT
B.O.G.TEMP.CONT
SURGEZONESETTER
I/P
I/P
I/P
T DP
PTPT
TANK PRESS CONTROLFORCING VAPORIZER CONTROLLOW DUTY COMPRESSOR CONTROLL/D HEATER CONTROL
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 171/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 172/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 173/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 174/302
LNGC DISHA Machinery Operating Manual
(4) Air Flow Station
This station indicates the status of the Air Gas Control Loop and transfer it to Auto/Manual.
a) Fuel/Air Ratio Adjuster
Fuel/Air ratio is set.
(1)
(2)
► Control Position
: Operation is done at the ABC control position.
(5) FWC Flow Station
This station indicates the status of the FWC Control Loop and transfer it to Auto/Manual.
a) Drum Level Set Station
This station sets SETPOINT of FWC Control Loop.
(1) Indicator
Left (No. 1 Boiler) : Set Point (SP)
Right (No. 2 Boiler) : Set Point (SP)-300 ~ 0 ~ +300 mm
Right (No. 2 Boiler) : Drum Water Level (PV)
Left (No. 1 Boiler) : Drum Water Level (PV)
-300 ~ 0 ~ +300 mm
(2) Raise & Lower Switch
This switch is used to set the Drum Level SP in Fix mode.
► Control Position
: Operation is done at the ABC control position.ECRBGB
ECRBGB
(1) Indicator
Fuel/Air Ratio
0.5 ~ 1.0 ~ 1.5 %
(2) Increase & Decrease PB
Fuel/Air Ratio is set
1.0 : Standard fuel/air ratio
(Standard air rate)
1.0→ 1.5 : Increases fuel/air ratio
(Increase combustion air above standard rate.)
0.5← 1.0 : Decreases fuel/air ratio
(Decrease combustion air above standard rate.)
(1)(2)
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 175/302
4 - 32 Part 4 Main Boiler Control System
b) “AIR FLOW” Auto/Manual Station
This station transfers the Auto/Manual mode of the FD Fan inlet vane control drive unit.
(1) Indicator
Upper : Burner Draft Loss (PV)
(Green) 0~5.0 kPag
Lower : Output signal for FD Fan inlet vane control drive unit
(Red) 0~100%
(2) Auto/Manual Station
Auto/Manual Station transfers control mode of FD Fan inlet vane control driveto the Auto or Manual and indicates its status.
In Manual mode, FD Fan inlet vane control drive unit is manually operated.
► Control Position
: Operation is done at the ABC control position.
p p
b) “FWC” Flow Auto/Manual Station
This station transfers the Auto/Manual of the FWC Control V/V.
(1) Indicator
Upper : Feed Water Flow (PV)
(Green) 0~56 T/H
Lower : Output signal for FW Control V/V
(Red) 0~100%
(2) Auto/Manual Station
This station transfers the control mode of the FW control V/V to Auto/Manual
and indicates its status.
In Manual mode, the FW Control V/V is manually operated.
► Control Position
: Operation is done at ABC control position.ECRBGBECRBGB
M A
(1)
(2)
M A
(1)
(2)
LNGC DISHA Machinery Operating Manual
(6) STC Station
This station indicates the status of the STC Control Loop and transfer it to Auto/Manual.
a) STC Set Station
This station sets SETPOINT of STC Control Loop.
(1) Indicator
Left (No. 1 Boiler) : Set Point (SP)
Right (No. 2 Boiler) : Set Point (SP)0 ~ 600˚C
Right (No. 2 Boiler) : Steam temp (PV)
Left (No. 1 Boiler) : Steam temp (PV)
0 ~ 600˚C
(2) Raise and Lower Switch
This switch is used to set the Steam Temp SP.
► Control Position
: Operation is done at the ABC control position.
(7) ATM Press Station
This station indicates status of the Atomize Press Control Loop and transfers it to Auto/Manual.
a) “ATM” Auto/Manual Station
This station transfers the Auto/Manual of the ATM Press. Control V/V.
M A
(1)
(2)
(1) Indicator
Upper : Atomize pressure (PV)
(Green) 0 ~ 1.5 MPagLower : Output signal for Atomize Press. Control V/V
(Red) 0 ~ 100%
(2) Auto/Manual Station
The Auto/Manual Station transfers the control mode of the Atomize
Control V/V to the Auto/Manual and indicates its status. In Manual mode,
the Atomize Control V/V is manually operated.
► Control Position
: Operation is done at the ABC control position.
ECRBGB
ECRBGB
(1)(2)
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 176/302
4 - 33 Part 4 Main Boiler Control System
b) “STC” Auto/Manual Station
This station transfers the Auto/Manual of the STC Control V/V.
(1) Indicator
Upper : Steam Flow (PV)
(Green) 0~56 T/H
Lower : Output signal for steam temp control V/V
(Red) 0~100%
(2) Auto/Manual Station
This station transfers the control mode of the steam control V/V to Auto/Manual
and indicates its status.
In Manual mode, the steam temp control V/V is manually operated.
► Control Position
: Operation is done at the ABC control position.ECRBGB
M A
(1)
(2)
LNGC DISHA Machinery Operating Manual
(8) FO Recalculation Control Station
a) “FO REC” Auto/Manual Station
This station indicates the FO Rec. Control Loop and transfers the Auto/Manual of the FO Rec. (FO Pump
Discharge Press. Control) control V/V.
(1) Indicator
Upper : FO recirculation set press (SP)
(Green) 0 ~ 4.0 MPagLower : FO recirculation press value (PV)
(Red) 0 ~ 100%
(2) Increase/Decrease switch for SP
The set press of FO recirculation can be changed by this switch.
(3) Indicator
Indication of output signal for FO Rec. Control V/V.
(4) Auto/Man Station
This station transfers the control mode of the FO Rec. Control V/V to Auto/Manual
and indicates its status.
In Manual mode, the FO Rec. Control V/V is manually operated.
M A
(1)
(3)
(4)
(2)
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 177/302
4 - 34 Part 4 Main Boiler Control System
► Control Position
: Operation is done at the ABC control position.ECRBGB
LNGC DISHA Machinery Operating Manual
4.6 BMS and ACC Logic Diagram
4.6.1 Burner Management System Logic Diagram
BMS MAN-AUTO CHANGE
FUEL
GAS
X
F.O.
DESCRIPTION OF
BMS AUTO. CONTROL
F.O. TRIP GAS TRIP F.O./DUAL/GAS
AT FUEL TRIP *4
OPERATE OF
SW AT BMS AUTO."FUEL MODE"
OBASE
NO.21
2 NO.2
BASE
3 NO.2
BASE
BASE
NO.26
BASE
NO.25
4 NO.2
BASE
OK
OK
F.O.
ONLY
ONLYGAS
NO.3
NO.3
NO.3
NO.3
NO.3
NO 3
NOT(MAN) -
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
O
O
X
O
O
O
O
X
O
O
X
O
O
O
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 178/302
4 - 35 Part 4 Main Boiler Control System
MAN-AUTO. CHANGE &AUTO. CONTROLS OF BMS
BASE
NO.27
OK8 NO.2
BASE
9 NO.2
BASE
NO.2
BASE
* 1 ; BURNER AUTO NUMBERS CONTROL
; F.O. BACK-UP CONTROL(FROM ACC SIGNAL)* 2
; F.O. BOOST-UP CONTROL(BY GAS TRIP)* 3
; IN CASE OF BOTH FUEL TRIP CONDITION,* 4
; IGN. F.O. RATE HAS BEEN ESTABLISHED* 5
; IGN. GAS RATE HAS BEEN ESTABLISHED* 6
; F.O. EXTINGUISH HAS BEEN ESTABLISHED AND NOT * 2* 7
; BMS CONTROL MODE "MAN"* MAN
; BMS CONTROL MODE "AUTO"* AUTO
BLR IS MADE "TRIP" & BMS IS SET TO "MAN"
NO.3
NO.3
NO.3
NO.3
NO.3
F.O.DUALGAS
-
- -
--
--
(MAN)NOT
DUAL
* 8 ; GAS EXTINGUISH HAS BEEN ESTABLISHED
X O
O O
X X
X X
O O
O O
X X
O
O
O
O
O O
LNGC DISHA Machinery Operating Manual
Sh 3 BUR NER BU RN IN GBURNER
CONT.
POSITION
SELECT
MANU. MODE
Sh 2 BURNER AUTO. MODEESTABLISH
CONT. MODEMANU.
AUTO
AUTO MODE
S
R
REMOTE
BOP
LOCAL
BGB
BGB
BOP
ECC
BMS
BOP MODE. ESTA.
F.O. BNR SEQ Sh 3,6,7,8,9GAS BNR SEQ Sh 3,12,13
F.O. BNR SEQ Sh 6,7,8,9GAS BNR SEQ Sh 12,13
Sh 6,7,8,
3,9,12,13
Sh 6,7,8,
9,12,13
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 179/302
4 - 36 Part 4 Main Boiler Control System
GAS SUPPLY
OPERATION
CONT. SIGNAL
MANU. MODE GAS SUPPLY SEQ
BLREMERG. MODE
EMERG. MODE
Sh 11
ACC
BLOCK DIAGRAM OF BMSCONTROL POSITION SELECT
S
R
(1-1) SELECTION OF CONTROL POSITION
SELECT "BGB" OR "BOP" MODE BY OPERATING THE CONTROL
POSITION SELECTOR SWITCH ON THE LOCAL PANEL.
AT "BGB", THE "MAN" MODE ONLY CAN BE SELECTED AND AT
"BOP", THE "MAN" OR "AUTO" MODE CAN BE SELECTED.
WHEN THE INITIAL START OF THE BURNER OR WHEN IT HAS
BEEN STOPPED FROM "BGB" POSITION, IT IS MANDATORY
TO RE-START THE BURNER FROM "BGB" POSITION.
(ONLY REMOTE OPERATION)MASTER GAS V/V OPEN/CLOSE
EACH BOILER GAS V/V OPEN/CLOSE
ON
OFF
Sh 5,15
BMS-1
Sh. No. 1
LNGC DISHA Machinery Operating Manual
(2-2) SEE TABLE 1(BMS-17) FOR CONDITIONS PERMITTING THE SWITCH FROM THE "MANUAL" MODE TO
"AUTO" MODE AND FOR WHAT KINDS OF CONTROL ARE PERFORMED IN THE "AUTO" MODE.
(2-1) AFTER THE FIRING OF BASE F.O. BURNER HAS BEEN ESTABLISHED,
THE BURNER "AUTO" MODE CAN BE SELECTED AT "BOP" POSITION.
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 180/302
4 - 37 Part 4 Main Boiler Control System
BLOCK DIAGRAM OF
F.O & GAS BURNER
AUTO/MANU. MODE SELECT
LNGC DISHA Machinery Operating Manual
REMOTE
BOP
GAS
F.O.
DUAL
(3) -1
Sh 2
Sh 10F.O. BOOST-UP ORD.
F.O. BOOST-UPORD.
F.O. BNRINC. ORDER
Sh 6,7,8
ALL GAS BNRSTOP
GAS BNRDEC. ORDER
Sh13
Sh 6
Sh 12
BASE F.O. BNR BURNING
BNR GAS STAND-BY
S
R# 000
12GAS BNRINC. ORDER
Sh
(GAS TRIP)
MODE ESTABURNER AUTO.
(3) -2
Sh 6,7,8F.O. BNRINC. ORDER
ACC
ECC
BMS
(3) -1
(3) -1
AC
C
AC
C
F.O. BURNING MODE
BURNER FUEL MODE
GAS BNR EXTING. OK
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 181/302
4 - 38 Part 4 Main Boiler Control System
BLOCK DIAGRAM OFF.O./DUAL/GASBURNING MODE SELECT
MANU. MODESh 1
Sh 6BASE F.O. BNR
Sh 7
F .O . BUR NI NG M OD E Sh 4
ACC F.O. BNR EXTING. OK
Sh 6,7,8,9
ALL F.O. BNRDEC. ORD
S
R
F.O. IGN. OK ACC
S
R
BURNING
BURNINGNO.2 F.O. BNR
BASE GAS BNRBURNING
NO.2 GAS BNRBURNING
F.O. BOOST-UP ORD.
(GAS TRIP)
(3)-2
NO.3 F.O. BNRBURNING
Sh 8
Sh 12
Sh 12
Sh 12BURNINGNO.3 GAS BNR
ACC
IASF.O. BACK-UPORDER
F.O. BACK-UPORDER
F.O. BACK-UPORDER
CARGO TK PRESS. L
MANEUVERING
MTRP
Sh 12
DUAL BURNING MODE
NO.3 BURNER DECREASE
(3)-2
(3)-2
(3)-2
(3) -1
BURNERBURNING
Sh 1
DUAL BURNING MODE Sh 4
GAS BURNING MODE
G AS BUR NI NG M OD E Sh 4
BMS-3
Sh. No. 3
LNGC DISHA Machinery Operating Manual
Sh 2F.O. BNR
GAS
F.O.
DUAL
Sh 3
F.O. BURNING AUTO
AUTO RUN MODE
Sh 3
REMOTE
C A
C
C
AC
C
AC
C
AC
C
AC
C A
C
C A
C
A
C
C
A
CC
ECC
NO.2 F.O. BNRINC. ORDER
9ShNO.2 F.O. BNR
DEC. ORDERNO.2 F.O. BNRDEC. ORDER(4-1)
DEC. ORDERNO.2 BNR
NO.2 BNRINC. ORDER
OKIGN.F.O. Sh
7 12ShYES
NO
SET ORDERNO.2 IGN.
BY ACC
9NO.2 F.O. BNRDEC. ORD
Sh
NO.3 F.O. BNRDEC. ORDER
NO.3 F.O. BNRDEC. ORDER
Sh9
NO.3 F.O. BNRINC. ORDER
F.O.IGN.OK
YES
NO
7Sh
SET ORDER
BY ACC
NO.2 IGN. NO
IGN.OK
F.O. YES8Sh
BY ACC
SET ORDERNO.3 IGN.
BOP BMS
F.O. BURNING MODE
NO.2 F.O. BNRINC. ORD
NO.3 F.O. BNRINC. ORD
NO.3 GAS BNRINC. ORD
NO.2 F.O. BNRINC. ORD
DUAL BURNING MODEBNR FUEL MODE
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 182/302
4 - 39 Part 4 Main Boiler Control System
Sh 3
GAS
Sh 2GAS BNR
AUTO RUN MODE
GAS BURNING AUTO
DUAL BURNING AUTO
BLOCK DIAGRAM OF BURNER NUMBER
AUTO. CONTROL
C
AC
C A
C
C A
C
C
AC
GAS FIRING ONLY AUTO CONTROLIN THE "AUTO" MODE, GAS BURNER OF NO.3 BURNER
CAN BE AUTOMATICALLY EXTINGUISHED.IN THIS CASE, THE FUEL MODE TO BE CHANGED TO DUAL BURNING MODEFROM ACC F.O. BACK-UP SIGNAL.
(4-3)
(4-2)
STOPPED IN ACCORDANCE WITH THE COMMAND FROM THE ACC.
OF NO.2 AND NO.3 BURNER CAN BE AUTOMATICALLY STARTED OR
IN THE BURNER "AUTO" MODE, F.O. BURNER AND GAS BURNERDUAL BURNER AUTO NUMBERS CONTROL
F.O. BURNER AUTO NUMBERS CONTROLIN THE BURNER "AUTO" MODE AT THE "BOP" POSITION.USING THE BURNER "AUTO" MODE, AUTOMATICALLY START OR
STOP NO.2 AND NO.3 BURNER IN ACCORDANCE WITH THE COMMAND
(4-1)
FROM THE ACC.
NO.3 GAS BNRDEC. ORDER
NO.3 GAS BNRDEC. ORD
Sh13
13NO.2 GAS BNRDEC. ORD
NO.3 F.O. BNR
INC. ORD
NO.3 GAS BNR
INC. ORD
Sh
F.O.BACK-UP REFER TO Sh 3
FROM ACCOR OTHER
(Sh 10)
MASTER GAS SHUT-OFF COND.
BOOSTF.O.
-UP
NO
YES
YESREFER TO Sh 3
(4-3)NO
(4-2)
Sh13
ShNO. 2 F.O. BNRDEC. ORD
NO. 2 GAS BNRDEC. ORD
9
BY ACC
NO.3 IGN.SET ORDER
NO
YES Sh128
ShF.O.IGN.OK
INC. ORDERNO.3 BNR
NO.3 BNRDEC. ORDER
GAS BURNING MODE
BMS-4
Sh. No. 4
LNGC DISHA Machinery Operating Manual
BOILER TRIP OR BOILER F.O. SHUT-OFF V/V CLOSEWHEN CONDITIONS PROHIBITING THE F.O. BURNER OPERATION ARE ESTABLISHED,
THE BOILER F.O. SHUT-OFF VALVE AND EACH F.O. BURNER VALVE ARE AUTOMATICALLY CLOSED.(IN THE BURNER FUEL MODE "DUAL OR GAS", THE BOILER IS NOT TRIPPEDEVEN IF BOILER F.O. SHUT-OFF CONDITION IS ACTIVATED.)
(5 - 1)
(1) CHECK AND ELIMINATE THE CAUSE OF THE SHUT-DOWN(2) AFTER THE CAUSE HAS BEEN ELIMINATED, PUSH THE
"OFF" SWITCH OF BOILER F.O. SHUT-OFF VALVE TO CANCEL THE SELF-HOLDING CIRCUIT FOR THE BOILER TRIP.(3) RE-START THE BOILER IN ACCORDANCE WITH THE OPERATING
PROCEDURE IN (Sh. 6, 7,8)
(5 - 2) RE-START OPERATION AFTER BOILER SHUT-DOWN RE-START THE BURNER IN ACCORDANCE WITH THE FOLLOWING PROCEDURE.
NO. 1 BOILER
BLR F.O. SHUT-OFFCONDITION
BMS CONTROLLER ABNORMAL
ATOM. STEAM PRESS. LOW/LOW
F.O. TEMP. LOW/LOW
F.O. PRESS. LOW/LOW
F.O. PUMP STOP
LOCAL(BGB)
LOCAL
F.O. TEMP.
BY-PASS
ON
OFF
Sh 6,7,8BASE NO.2, OR NO.3F.O. BNR BURNING
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 183/302
4 - 40 Part 4 Main Boiler Control System
EMERGENCY MANU. TRIP
MAIN STEAM TEMP. HIGH
ALL BURNER FLAME FAIL
BOILER TRIPCONDITION
NOTE : NO.1 BOILR SHOWN. NO.2 BOILER TO BE SAME.
(BY FLAME MONITORING SYSTEM)
BLACK OUT
EMERG. MODE
BASE F.O. BNRV/V CLOSE
NO. 2 F.O. BNRV/V CLOSE
NO. 3 F.O. BNRV/V CLOSE
S
R
(5 - 1)
(5 - 1)
Sh 1
BLR F.O.SHUT-OFF V/VCLOSE
BLR TRIP
CONDITION
LOCAL
(BGB)
LOCAL(BGB)
DEAREATOR LEVEL LOW/LOW
DRUM WATER LEVEL HIGH/HIGH
DRUM WATER LEVEL LOW/LOW
ELECTRIC POWER FAILURE
NO.1 F.D. FAN RUN
STAND-BY F.D.FAN RUN
STAND-BY F.D. FAN
AIR DMPR OPEN (NO.1 BLR SIDE)
STAND-BY F.D. FANUSED SELECT
NO.1
NO.2
STAND-BY F.D. FAN USED SET
BLR F.O.SHUT-OFF VALVECLOSE PB
ALM. SEQBLR F.O.SHUT-OFF V/VCLOSE
Sh 10
BMS-5
Sh. No. 5
BLOCK DIAGRAM OF BOILER F.O.
SHUT-OFF CONDITION
LNGC DISHA Machinery Operating Manual
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 184/302
4 - 41 Part 4 Main Boiler Control System
LNGC DISHA Machinery Operating Manual
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 185/302
4 - 42 Part 4 Main Boiler Control System
LNGC DISHA Machinery Operating Manual
Sh 1
OP
IGN. READY
SG
P
IGN.
SET
YES
NO
YES
NO
C
AIGN. SET C
BY ACC
YES
NO
YES
NO
YESYES
NO
NO
BY ACC
S
RSh 5
* 1
S
R
S
R* 2
LOCAL
BGB
REMOTE
BOP
ECC
BMS
LS
ATOMIZ. AIR SUPPLYV/V OPEN
ATOMIZ. STM SUPPLY
V/V OPEN
TS F.O. TE MP . N OR.
BLR F.O. STAND-BY Sh 2
BLR F.O. SHUTV/V OPEN
LS
F.O. RECIRC.V/V CLOSE
F.O. PUMP RUN
BLR F.O.SHUT V/V CL
CPBLR F.O.SHUT V/V CL
PORTABLEIGNITER SET
MANU. MODE
F.O. TEMP.
BY-PASS
ON
OFF
ALL
F.O. V/V
CLOSE(LS)
F.O.
SHUT V/VCONDITION
NOR.
ALLBNROFF
ALL F.O. BNR STOP
FURNACE
PURGE AIR
RATE
#060IGN. AIR
RATE
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 186/302
4 - 43 Part 4 Main Boiler Control System
ON
Sh 1
Sh 6
SEC
BY ACC
BY ACC
YES
YES
Sh 14
S
LS
R
* 2
S
L
L
S
S
L* 1
NO
TO Sh 12
S
L
Sh 12BASE GAS
BNR BURNING
Sh 12NO.2 GASBNR BURNING
Sh 12NO.3 GAS
BNR BURNING
NO.3 F.O. BNROFF
ON
OFFNO.3 F.O. BNR
AUTO MODE
NO.3 F.O.BNR INC. ORD
Sh3,4
NO.3 F.O.BNR DEC. ORD
Sh3,4
BASE F.O. BNRBURNING
Sh 7NO.2 F.O. BNR
BURNING
Sh 14NO.3 BNRFLAME FAIL
Sh 12 NO.3 GAS BNR BURNING
ATOM. V/VOPEN
F.O. RECIRC.
V/V CLOSE
ALL F.O. BNRNOT RUNNING
NORMAL CASE
F / EON
BASE / NO.2
BNR
BURNING
CASE OF PORTABLEIGNITER USE
PORTABLE IGNITERSPARK START
Sh 12
"NO.3 GAS BNR BURNING"
NO.3 AIR REG.OPEN
NO.3 F.O. BNRV/V OPEN
PORTABLE IGNITERSPARK STOP
NO.3 F.O. BNR BURNING Sh 2,3,5,6,7
9,12,13,14
10 SEC
IGNITIONPERIOD
BMS-8
Sh. No. 8
BLOCK DIAGRAM OF NO.3 F.O. BURNER
IGNITION SEQUENCE
RATE
BASE AIRREG. OPEN
LS
NO.2 AIRREG. OPEN
LS
NO.3 AIRREG. OPEN
LS
BASE AIRREG. CLOSE
LS
NO.2 AIRREG. CLOSE
LS
NO.3 AIRREG. CLOSE
LS
FURNACE PURGE ACC
ACC
IGN. AIR SET
LNGC DISHA Machinery Operating Manual
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 187/302
4 - 44 Part 4 Main Boiler Control System
〔7〕-2
LNGC DISHA Machinery Operating Manual
NO.1 BLRGAS VALVE TRIP
B.O.G. PRESS. LOW
B.O.G. PRESS. HIGH
NO.1,NO.2 OR NO.3 GAS
BNR BURNING(GAS V/V OP)
#010
Sh 5 BOIER TRIP CONDITION
ECRBOILER GAS V/VMANUAL TRIP
BOTH BOILER TRIP
BMS CONTROLLER ABNORMAL
BOILER GAS V/V TRIP S
R
(10)-2
NO.2 BOILER GAS SUPPLY
SHUT-OFF CONDITION(SAME TO NO.1 BLR)
ALM. SEQ.
NO.2 BLR N2 VENTV/V OPEN
NO.2 BLR GASV/V CLOSE
NO.1 BLR N2 VENT
V/V OPEN
NO.1 BLR GASV/V CLOSE
NO.1 BLR GASV/V TRIP
NO.1 BLR GASV/V CLOSE PB
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 188/302
4 - 45 Part 4 Main Boiler Control System
MASTER
GAS VALVE TRIP
BOTH BOILER TRIP
S
R
(10)-2
ALM. SEQ.
ALM. SEQ.
#015
E.S.D.S. ACTIVATED
GAS DUCT EXH. FAN STOP
GAS LEAK DETECTED
FIRE DETECT
B.O.G. TEMP. LOW/LOW
ECRMATER GAS V/VMANUAL TRIP
CARGO TANK PRESS. LOW/LOW
BOG HEATER ABNOR.
(10)-3
TO F.O. BOOST-UP ORD. Sh 3,4
MASTER GAS V/V TRIPMASTER GAS V/VCLOSE ORD.
MASTER N2 VENTV/V OPEN
TO E.S.D.S. PANEL
MASTER GAS V/VCLOSE PB
BOTH GAS
V/V CLOSE
MASTER GAS
TRIP
NOTE : NO. 1 BOILER SHOWN.
NO. 2 BOILER TO BE SAME.
BLOCK DIAGRAM OF MASTER GAS &
BOILER GAS SUPPLY SHUT-OFF CONDITION
BMS-10
Sh. No. 10
LNGC DISHA Machinery Operating Manual
S
R
#060
#030
Sh 12BLR GAS V/VOPEN
A
SL
L
S
RS
L
S
L
L
SS
R
L
S
S
LL
S
SL L
S
REMOTE
BOP
MASTERGAS V/V
OP
CL
NO.1 BLRGAS V/V
OP
CL
Sh 10
MASTERGAS
VALVEINTERLOCK
NO.1BLRGAS VALVE
INTERLOCK
Y
N
Sh 10
Y
N
MATER N2 VENTV/V OPEN
MATER N2 VENTV/V CLOSE
MATER GASV/V OPEN
MATER GASV/V CLOSE
#010
#015
#005
(11) - 1
NO.1 BLR GAS
V/V OPEN
NO.1 BLR N2VENT V/V CLOSE
(11) - 1
(11) - 2
MASTER N2 PURGE ON
BLR N2 PURGE ON
BOILER GAS V/V CLOSE
MASTER N2 PURGEV/V OPEN
BLR N2 PURGEV/V OPEN
BLR N2 PURGEV/V CLOSE
MASTER N2 PURGEV/V CLOSE
FURNACE PURGEORD.
ALL BNR AIR
BNR N2 PURGESTART
FURNACE PURGE
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 189/302
4 - 46 Part 4 Main Boiler Control System
NO.2 BLRGAS V/V
OP
CL
#030
#030
#030
#030#015
#005
Sh 12
#090
L
S
C A
L
S
S
LLS
S
L
S
L
S
L
LS
S
L
S
L
L
S
S
LL
S S
L
S
L
* 1 : FURNACE PURGE ESTABLISH
S
RS
L
S
L
L
S
L
S S
L
C
C
AC
LS
S
L
NOTE* 1
NO.1 BLR GASV/V CLOSE
(11 - 2)
F.O.
BNR.
BURNING
F.O.
BNR START
SEQ
F.D.FRUN
N
Y
N
NY
Y
N
Y
ALL BNR AIR
REGISTER OPEN
ALL GASV.V OPEN
BLR N2 PURGEV/V OPEN
BLR N2 VENTV/V OPEN
GAS BNR V/V OPEN
OF FIRING BNR
BLR N2 PURGEV/V OPEN
BLR N2 PURGEV/V CLOSE
BLR N2 PURGEV/V OPEN
BLR N2 PURGEV/V OPEN
BLR N2 VENTV/V OPEN
BLR N2 PURGEV/V CLOSE
BLR N2 PURGEV/V CLOSE
ALL BNR GASV/V CLOSE
ALL BNR GASV/V CLOSE
FURNACE PURGE
STOP
ALL BNR AIRREGISTER CLOSE
BLR N2 VENTV/V OPEN
BLR N2 PURGE
V/V CLOSE
ALL BNR AIRREGISTER CLOSE
FURNACE PURGESTOP
NO.2BLR GAS VALVE
INTERLOCK
Y
NSh 10
NO.2 BLR GASV/V OPEN
NO.2 BLR GASV/V CLOSE
NO.2 BLR N2VENT V/V CLOSE
BLR GAS V/VOPEN
SAME AS NO.1 BOILER N2 PURGE SEQUENCE
NOTE
BLOCK DIAGRAM OF MASTER &
BOILER GAS V/V OPEN / CLOSE SEQUENCE
BMS-11
Sh No. 11
#035
#035
#025
LNGC DISHA
Machinery Operating Manual
LOCAL
BGB
REMOTE
BOP
ECC
BMS
BASE GASBNR
ON
OFF
ON
BASE GASBNR
ON
OFF
AUTO MODE
MANU. MODE
Sh 1
Sh 1
Sh 11BLR GAS
V/V OPEN GAS STAND-BY
IGN. SET
GAS CONT. V/V ISCONFIRMED BY ACC
NO
YES
BY ACC
IGN. SET ORD A
C
C
BLR GASSTAND-BY
Sh 2,3
IGN. READY
Sh3
BASE GASBNR INC. ORD
Sh 14BASE BNR FLAMEFAIL
Sh 6 BASE F.O. BNRBURNING
S
R
Sh 6
Sh 6 "BASE GAS BURNER BURNING"
BASE GAS BNR START Sh 13,14
BASE GAS BNRV/V OPEN
LS
BASE AIRREG. OPEN
LS
BASE GASBNR BURNING
Sh 2,3,67,8,9,13
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 190/302
4 - 47 Part 4 Main Boiler Control System
NO.2 GASBNR
ON
OFFNO.2 GASBNR
ON
OFF
Sh
3,4
NO.2 GAS
BNR INC. ORD
Sh 14NO.2 BNR FLAMEFAIL
Sh3,4
Sh9
BLR GAS V/VCLOSE
NO.3 GASBNR INC. ORD
Sh 14NO.3 BNR FLAMEFAIL
Sh 7 NO.2 F.O. BNRBURNING
Sh 8NO.3 F.O. BNRBURNING
S
R
S
R
Sh 7
Sh 8
Sh 7 "NO.2 GAS BURNER BURNING"
NO.2 GAS BNR START Sh 13,14
NO.2 GAS BNRV/V OPEN
LS
NO.2 AIRREG. OPEN
LS
NO.2 GASBNR BURNING
Sh 3,67,8,9,13
Sh 8 "NO.3 GAS BURNER BURNING"
NO.3 GAS BNR START Sh 13,14
NO.3 GAS BNRV/V OPEN
NO.3 AIRREG. OPEN
LS
LS
NO.3 GASBNR BURNING
Sh 3,6,7,8,9,13
BNS-12
Sh. No. 12
BLOCK DIAGRAM OF GAS BURNER
IGNITION SEQUENCE
LNGC DISHA Machinery Operating Manual
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 191/302
4 - 48 Part 4 Main Boiler Control System
LNGC DISHA Machinery Operating Manual
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 192/302
4 - 49 Part 4 Main Boiler Control System
LNGC DISHA Machinery Operating Manual
AIR FLOWCONTROL
F.O. FLOW
CONTROL
BLR H.F.OSHUT V/V
LOCAL
BGB
EMERGENCYSWITCH
NOR
PURGE
BURN
ALL BNR AIR REG. OPEN
ALL BNR AIR REG. CLOSE
AUTO
MAN
AUTO
MAN
CLOSE
OPEN
3 min
PURGE FINISH
SET F.D.F. INLET VANEOPENING ANGLE FORFURNACE PURGE
SET F.O. FLOW CONT.V/V OPENING ANGLE
FOR IGNITION
SET F.D.F. INLET VANEOPENING ANGLE FORIGNITION
BLR HFO SHUT V/V OPEN
HFO RECIRC. V/V CLOSE
LS
BMS EMERGENCY OPERATION
THE F.O. BURNER CAN START OR STOP BY USING "EMERGENCYOPERATION PANEL" AT LOCAL (BGB) POSITION, WHEN THE BMS
CONTROLLER CANNOT OPERATE.IN THIS CASE, OPERATOR MUST WATCH AND CONFIRM TO ALLINTERLOCK CONDITIONS DIRECTORY.WHEN THE ABC CONTROLLER IS RUNNING NORMALLY,OPERATOR CAN SELECT THE MODE(AUTO/MAN) OF ABC CONTROL(AIR FLOW AND FO FLOW) AFTER BURNER IGNITION.
(15 - 1)
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 193/302
4 - 50 Part 4 Main Boiler Control System
BASE BNRIGNITER
BASE F.O.BNR V/V
R
S
F / EON
YES
NO
: SAME AS BASE F.O. BURNER
: SAME AS BASE F.O. BURNER
OFF
ON
CLOSE
OPEN
IGNITER FORWARD & SPARK
L
SBASE F.O. V/V OPEN
LS
BASE ATOMIZ. STEAM V/V OPEN
NO.2 F.O.BNR V/V
NO.3 F.O.BNR V/V
CLOSE
OPEN
CLOSE
OPEN
BASE BNR AIR REG. OPENLS
BMS-15
Sh. No. 15
BLOCK DIAGRAM OF BMS
EMERGENCY MODE
LNGC DISHA Machinery Operating Manual
4.6.2 Automatic Boiler Control System Diagram
DIAGRAM OF AUTOMATIC BOILER
CONTROL SYSTEM
BACK-UP UNIT
ACC MASTER CONTROL LOOP
STEAM DUMP CONTROL LOOP
FO FLOW CONTROL LOOP
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 194/302
4 - 51 Part 4 Main Boiler Control System
BACK-UP UNIT
BACK-UP UNIT
BACK-UP UNIT
BACK-UP UNIT
BACK-UP UNIT
OTHER
ATOMIZING STEAM PRESSURE CONTROL LOOP
GAS FLOW CONTROL LOOP
AIR FLOW CONTROL LOOP
FEED WATER FLOW CONTROL LOOP
STEAM TEMPERATURE CONTROL LOOP
FO PUMP DISCHARGE PRESSURE CONTROL LOOP
LNGC DISHA Machinery Operating Manual
Master Control
S.H. OUTLET STEAMPRESS. TRANSMITTER
0~8 Mpa
165B-Sa
165B-Pa
165B-Sb
165B-Pb
TO OTHER BOILER
S.H. STEAM PRESS
FROM OTHER BOILER
S.H. STEAM PRESS
FROM OTHER BOILER
MASTER SIGNAL
TO OTHER BOILER
MASTER SP
FROM OTHER BOILER
MASTER SP
MASTER SP
SP
SW
SFT
0 BIAS (0.1 Mpa)
AUTO
SET DOWN PARA-RUN
AND
ON/OFF ON/OFF
NO.1 BOILER
HOT START V/V
CLOSE
NO.2 BOILER
HOT START V/V
CLOSE
LOCAL OR
OTHER
(INPUT)
ABC
CONTROL
PANEL
AUTO-RUNHMS
SW
_
SLAVEINIT.
6.03
Mpa
TO OTHER BOILER
MASTER SIGNAL
4~20 mA4~20 mA
MASTERCONTROL
MST
FWC DMP
S.H. STEAM
PRESS HSE +
LAG
HSE SW
0
2 BOILER
PARA-RUN
2 BOILER
PARA-RUN
& SLAVE
TRACKING
PV
SP
+
PI
MST
STEAM FLOW
+L/L SFT
BIAS SP
6 - a 1 - b
FO3 - c
FO5 - a
GAS
FO FLOW
GAS FLOW
AIR FLOW
STEAMING
UP RATE
4 - d
33.3% 66.6%
100%
SFT
SFT
2 BNRS
3 BNRS
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 195/302
4 - 52 Part 4 Main Boiler Control System
GRAPHIC
OPERATION
PANEL
BOP
GRAPHIC
OPERATION
PANEL
LOCAL OR
OTHER
(OUTPUT)
BGB
+BIAS SP
SP
INIT.
100% X
FO
GAS
AIRMASTER
SIGNAL
1 - a DMP
MIN
SFT
PRESS
MAS LOAD
SFT
BIAS
X
+
LSE
LOAD LIMIT
BOILER LOAD
BIAS
BOILER
"BIAS"
LOADER
1 - d DMP
MASTER SET
POINT
FROM OTHER BOILER
SPDMP
0~8Mpa
0~8 Mpa
MASTER SET
STATION
MST
SPDMPMST
PVNO.1 NO.2
PVNO.1 NO.2
0~8Mpa
1 - c
LNGC DISHA Machinery Operating Manual
Steam Dump Control
STEAM DUMP PISTON
VALVE (330B) CLOSE
SIGNAL
RECOMMENDED BOILER LOAD
FOR EXCESS BOG DUMP
SIGNAL BY YARD
BOG DUMP
MODE
BY YARD
STEAM DUMP
AVAILABLE
BY YARD
FROM OTHER BOILER
ON/OFF
S.H. STEAM PRESS
STEAM DUMPCONTROL
DMP
MST
S.H. STEAM
PRESS
HSE
LAG
PV
SPPIDMP
HSE
PV
PI
100%
SFT
LSE LOAD LIMIT
+
+
4 t/h GAS BNR
RUNNING
HSEBIAS
(0.1 Mpa)
MASTER
SET POINT
LMS
0
LSE
SP
1 - b FWC
STEAM FLOW
STEAM FLOW
FROM OTHER BOILER
FO FLOW
4~20 mA ON/OFF
FROM OTHER BOILER
GAS CONT. V/V OPENING
FROM OTHER BOILER
STEAM FLOW
LOCAL OR
OTHER
(INPUT)
ABC
CONTROL
PANEL
FROM OTHER BOILER
6 - a
FO
FO FLOWLSE
3 - c
MST1 - c
MST
AND HSE
NOT
1 - d
GAS CONT. V/V OPENING
HMS
ORPV
SP
FROM BMS
(M/T REMO-CON
SIGNAL)
0.05
Mpa _
GAS4 - a
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 196/302
4 - 53 Part 4 Main Boiler Control System
HSE
SFT
0.0
A/M
A/M
A/M
4~20 mA4~20 mA
STEAM
DUMP
CONTROL
V/V (1)
331B
ASI/PSTEAMDUMP
CONTROL
CONTROL V/V OPENING
SIGNAL FOR SPRAY
WATER CONTROL
4~20 mA
STEAMDUMP
CONTROL
V/V (2)
332B
I/P AS
DUMP A/M
STATION
ON/OFF ON/OFF
BURNER RUN
ANDHMS
1.0
LSE
EXC
TRACKING
MASTER SET
STATION
SPMST DMP
SPMST DMP
0~8 Mpa
0~8 Mpa
HOT START PISTONVALVE OPEN ORDER
STEAM DUMP PISTONVALVE OPEN ORDER
M
GRAPHIC
OPERATION
PANEL
BOP
GRAPHIC
OPERATION
PANEL
LOCAL OR
OTHER
(OUTPUT)
BGB
AND
MAX GAS
CONT. V/V
OPENING
SET
PI
FOE
SP SIGNAL)
LNGC DISHA Machinery Operating Manual
FO Flow Control
FO PRESSURETRANSMITTER
FO FLOWCONTROL
FO
0~3 Mpa
ATOMIZING PRESS.TRANSMITTER
0~1.5 Mpa227B-P
227B-S
4~20 mA
LAG
FO PRESS
ATM SP
TRACKING
PV
SPPI
ATM
ABCCONTROL
PANEL
LOCAL
(INPUT)
DO PRESS
ATM SP
X36
X37
DO USED
IGNITIONSW
SW
SW
4~20 mA
HSE
LAG SFT
33.3%
66.7%
2 BNRS
SFT
SFT
100%
3 BNRS
FO BNR
STOP
FO PRESS
FO FLOW
(BLR LOAD)
03 - a
AIR
ATM
FO PUMP
231B-Sa
231B-Pa
231B-Sb
231B-Pb
4~20 mA
MASTERGAS
FO PUMP
DMP
3 - cHSE
MASTER
GAS FLOW
FO BNR HI LIMIT
2 BNRS
BNR INCREASE AT DUAL MODE
LSE
SW
SW
SFT
X34 X35
_
1 - a
GAS
FO BOOST-UP
ORDER
GAS FLOW
FO BOOST-UPRATE
X31
X32
X33
X36
X35
X342 BNRS
2 BNRS 3 BNRS
0
FO SHUT-OFF
V/V CLOSE
3 BNRS
SW
SW
SW
SW SFT
4 - d
FO3 - a
TRACKING
PV
SP
PI
FO
X
ATOMIZINGPRESSURECONTROL
ATM
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 197/302
4 - 54 Part 4 Main Boiler Control System
M
M
CONTROLPOSITION
SELECTOR
ECR
GRAPHICOPERATION
PANEL
BGB
GRAPHIC
OPERATION
PANEL
LOCAL(OUTPUT)
EM-M
A/M
A/M ATM A/MSTATION
4~20 mA
ATOMIZINGPRESS.
CONTROL
V/V
226B-P
226B-S
I/P AS
A/M
GASMIN FO FLOW
3 - dFO BOOST-UP
ORDER
FO CV SET
A/M
M
M
EM-M
SFT
SFT
FO CONTROL
V/V I/P AS
4~20 mA
FO FLOW A/M
STATION
A/M
CONTROL
POSITION
SELECTOR
A/M
220B-S
220B-P
LNGC DISHA Machinery Operating Manual
F.G. Flow Control
GAS FLOWTRANSMITTER
0~100 kpa
249B-P
249B-S
4~20 mA
LAG
GAS PRESS
GAS FLOW
CONDITION MONITOR
CARORIE SET X
X
SFT GAS BNRSTOP
0
GAS FLOW
GAS FLOW
(BLR LOAD)
SFT
33.3%
66.7%
2 BNRS
3 BNRS
SFT
X
_ FO BNR
MAN
FO
MIN
FLOW
MASTER
SW SW
X41
X42
X43
0
SW2 BNRS
3 BNRS
BLR GAS V/V CLOSE
LOCAL
& OTHER
(INPUT)
CONTROL
PANEL
UNITSFT
SFT
GAS CV SET
FO
BOOST
-UP
FO FLOW
GAS MIN
100%
SFT
X
GAS PRESS
GAS PRESS
AIR 4 - c
1 - MSTa
3 - FOa
3 - FOd
BOG TEMPERATURE
SENSOR0~100 C
238B
238B
230B-P
230B-S
R/I
4~20 mA
LAG
T1
LAG
P1 P0
TO : DESIGN 3- DEG.C
T0/T1
P0/P1
4~20 mACONVERTER
R/mA
O
BOG PRESS.
TRANSMITTER0~0.1 Mpa
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 198/302
4 - 55 Part 4 Main Boiler Control System
PV
SPPI
GCV
PV
SP
MIN SFT
GAS BNR
HI LIMITBNR INCREASE
AT DUAL MODE
SW2 BNRS
MAN
ECR
GRAPHIC
OPERATION
PANEL
BGB
GRAPHIC
OPERATION
PANEL
LOCAL
& OTHER
(OUTPUT)
100%
X44 X45
GAS MIN.
PRESS.
SETPI
MIN.
TRACKING
HSE
GAS FLOW
4 -DMP
A/M
A/M
CONTROL
POSITION
SELECTOR
A/MGAS FLOW A/M
STATION
4~20 mA
I/P AS
208B-P
208B-S
F.G. FLOW
CONTROL V/V
CONTROL V/V OPENING
SIGNAL FOR L/D COMP.
M
M
EM-M
a
MST
FO4 - d
LNGC DISHA Machinery Operating Manual
Air Flow Control
COMBUSTION AIR FLOW
(BNR DRAFT LOSS)0~5 kpa
EXH. GASO2 CONTENTS
MONITOR0~10 %
4~20 mA
LAG
SPPI
O2
> <
100~110 %
PV
277B-P
277B-S
TO OTHER BOILER
AIR SP
FROM OTHER BOILER
AIR SP
100
1 FAN 2 BLR
TRACKING
PV
SP
IGNITIONSET
FURNACE PURGESET
FURNACEPURGE
PI
AIR
0
1 FAN 2 BLR
BNR DRAFTLOSS
BLRLOAD
STEAMFLOW
MST 5 -
FWC 6 - 70 %
HMS
AND
3 BNRRUN
SW
HSE
SW
XBNR LOAD
BNR LOAD
EXCESS AIRRATIO
GAS PRESS
BURNERLOAD
GAS PRESS
GAS PRESSGAS 4 -
BLR LOAD
FO PRESS
FO PRESS3 - FO
LOCAL(INPUT)
ABCCONTROL
PANEL
BLR LOAD FO PRESS
BURNERLOAD
+
+
SW
LSE
LAG
TO OTHER BOILER
AIR PV
FROM OTHER BOILER
AIR SP
4~20 mA
247B-P
247B-S
a
a
a a
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 199/302
4 - 56 Part 4 Main Boiler Control System
100
SFT
INLETVANESET
(IGNITION)
MST 1 -
AND
MASTERSIGNAL
+ L/L
REQUIRE AIR
BNR DRAFTLOSS
SFT
M
M
A/M
A/M AIR FLOW A/M
STATION
AIR LOCK V/V
FD FAN INLET VANECONTROL DRIVE UNIT
FUEL/AIRRATIO
ADJUSTOR
X
X
X
M
X
100 105
SFTSOOT BLOWER
RUN
O2 RATE
ECR
BGB
GRAPHICOPERATION
PANEL
GRAPHIC
OPERATIONPANEL
LOCAL(OUTPUT)
0.5~1.0~1.5
248B-S
248B-P
ASI/P
4~20 mA
A/M
EM-M
a
LNGC DISHA Machinery Operating Manual
Feed Water Flow Control & S.H. Steam Temp. Control
DRUM WATERLEVEL TRANSMITTER
FEEDWATER FLOW
CONTROL
FWC
SUPERHEATERSTEAM
TEMPERATURECONTROL
STC
300 mm
STEAM FLOWTRANSMITTER
0~68.645 kpa
FEED WATER FLOWTRANSMITTER
0~68.645 kpa
S.H. OUTLETSTEAM TEMPERATURE
0~600 C/CAO
S.H. 5 PASS INLETSTEAM TEMPERATURE
0~600 C/CA
129B-Sb
129B-Pb
119B-Sb
119B-Pb
O
O
4~20 mA
LAG
CONDITION MONITOR
VARIABLE MODE
SW
SP
SP
SP
STEAM
FLOW
RATIO
X
TRACKING
PV
SPPI
FWC
N.W.L.
PV
PI
DWL
4~20 mA 4~20 mA
HSE
LAG
LAG
X
RATIO
SP
4~20 mA
166B-P
166B-S
167B-Sa
166B-Pa
167B-Sb
166B-Pb
30B-P
30B-S
4~20 mA
CONVERTERCA C/mA
129B-Sa
129B-Pa
O
4~20 mA
MV/I
HSE
LAG
LAG
STEAM FLOWMIST
AIR
DMP
LOCAL
(INPUT)
CONTROLPANEL
UNIT
STEAM
TEMP.
STC V/V
OPENING
HSE
PV
SPPI
STC
+
STEAM
FLOW
STC V/V
OPENING
MV/I MV/ICONVERTERCA C/mA
O
4~20 mA
CONVERTERCA C/mA
6 - a
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 200/302
4 - 57 Part 4 Main Boiler Control System
0~600 CO
+
SW
A/M
A/M
A/M
M
M
EM-M
SP PV
-300~0~+300 mm
-300~0~+300 mm FWC A/M STATION
AIR LOCK V/V
4~20 mA
ASI/P
FEED
WATER
FLOW
CONTROL
V/V
26B-P
26B-S
DRUM LEVEL A/MSTATION
FEED WATER FLOW
TRANS. NORMAL
GRAPHICOPERATION
PANEL
ECR
GRAPHICOPERATION
PANEL
LOCAL
(OUTPUT)
BGB
CONTROL
POSITIONSELECTOR
STC A/M STATION
AIR LOCK V/V
4~20 mA
ASI/P
SP PV
PVSPSTC SET A/M
STATION
A/M
A/M
M
M
A/M
EM-M
0~600 CO
SH STEAM
TEMP.
CONTROL
V/V
130B-P
130B-S
LNGC DISHA Machinery Operating Manual
FO Pump Discharge Pressure Control
3 - FO
ABC
CONTROL
PANEL
LOCAL OR
OTHER
(INPUT)
c
FO PUMPDISCHARGE
PRESS. CONTROL
FO PUMP
4~20 mA
LAG
PV
PI
FOP
OTHER
SP
FO PUMP DIS.
PRESS. TRANSMITTER0~4 Mpa
200B
3 -FO
OTHER
BOILER
HSE
SFT
90
FO BNR
STOPFO
PRESS
SP
a
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 201/302
4 - 58 Part 4 Main Boiler Control System
GRAPHIC
OPERATION
PANEL
ECR
GRAPHIC
OPERATION
PANEL
LOCAL OROTHER
(OUTPUT)
BGB
TRACKING A/M
A/M
A/M
OTHER
BOILER
LMS
ON/OFF
FO HEATER RECIR. PISTONPISTON V/V OPEN ORDER
30
+M
FO PUMP A/M
STATION
4~20 mA
215B
FO PUMPDIS. PRESS.
CONTROL ASI/P
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 202/302
LNGC DISHA Machinery Operating Manual
Boiler Gauge Board Emergency Control Panel
NO1 BOILER
ABC EMERG MODE
NOR EMERG
BMS EMERG MODE
54A
69A
NOR BURN
PURGE
IGNITER
NO2 BURNER
OFF ON
F O SHUT V/V
C LOS E OPEN
F O V/V
C LOS E OPEN
F O V/V
C LOS E O PEN
F O V/V
C LOSE OP EN
IGNITER
OFF ON
IGNITER
OFF ON
60A
59A53A
52A
58A
64A
EMERGENCY OPERATION
BASE BURNER
57A
56A
55A
NO3 BURNER
63A
62A
61A
PURGE FINISH
68A
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 203/302
4 - 60 Part 4 Main Boiler Control System
NO2 BOILER
ABC EMERG MODE
NOR EMERG
BMS EMERG MODE
54B
69B
NOR BURN
PURGE
IGNITER
NO2 BURNER
OFF ON
F O SHUT V/V
C LOSE OP EN
F O V/V
CL OSE O PEN
F O V/V
C LOSE OP EN
F O V/V
C LOS E OPEN
IGNITER
OFF ON
IGNITER
OFF ON
60B
59B 53B
52B
58B
64B
EMERGENCY OPERATION
BASE BURNER
57B
56B
55B
NO3 BURNER
63B
62B
61B
PURGE FINISH
68B
LNGC DISHA Machinery Operating Manual
Boiler Monitor Panel of ECR
NO1CPUFAIL
221A
GAS HDR
VENT V/V
GAS HDR
VENT V/V
N2
GASBNRV/V
BNRN2V/V
BMS
CONTROLLER
NO2CPUFAIL
222A
NO1CPUFAIL
223A
NO2CPUFAIL
224A
EMERGMODE
235A 236A
V® ABNOR
187A
B GASMANUTRIP
188A
BLRTRIP
189A 193A
EMERGMODE
MANUTRIP
GAS T
ABC BMS ABC
CONT AIRP L/L
239
FOBACK-UP
220
MANUTRIP
193B
BLRTRIP
189B
B GASMANUTRIP
188B 187B
EMERGMODE
236B
EMERGMODE
235B
UPS ABNOR
237 238
V® ABNOR
POWER
SUPPLY
FAIL
BMS ABC
NO1CPUFAIL
223B
ABC
CONTROLLER
NO2CPUFAIL
224B
NO1CPUFAIL
221B
NO2CPUFAIL
222B
BMS
FIREDETECT
213
MASTER GAS V/V TRIP CONDITION
HOODFAN
STOP
218
GASLEAK
217
ESDS ACT
216
GAST L/L
215 214
VAPORHDRP L/L
219
BOGHTR
ABNOR
211
MANUTRIP
212
BLRGASTRIP
171ABLRGASTRIP
171B158A 158B
GAS VENT V/V
161A 162A
202
226
201
BOTHBLRTRIP
1FAN 2BLR MODE
NO1BLRUSE
242
COMDMPROPEN
169
NO2BLRUSE
243
FUEL GAS AUX MACH
1 LDCOMP
207
2 LDCOMP
208
NO1HOOD
RM FAN
209
NO2HOOD
RM FAN
210
159A
134A
135A
136A
N2
GASBNRV/V
BNRN2V/V
159B
134B
135B
136BGASBNRV/V
BNRN2V/V
BNRN2V/V
123A
19 9A 20 0A
HIGH LOW
GAS P
1 85A 18 6A
H/H L/L
GAS P
1 86 B 18 5B
L/L H/H
GAS T
2 00 B 19 9B
LOW HIGH
124A
125ABNRN2V/V
123B
124B
125BGASBNRV/V
BNR
GAS V/V
GASCONT V/V
IGNPOSIT
MASTERN2V/V
HDR N2 V/V
145A
160A
161B
BNR
GAS V/V
GAS TL/L
MASTER146A
147ABNRN2V/V
GASBNRV/V
GASBNRV/V
HDR N2 V/V
145B
160B
146B
147B
162B
GASCONT V/V
IGNPOSIT
BOILER MONITOR PANEL
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 204/302
4 - 61 Part 4 Main Boiler Control System
V/V
IGNIT
FO BNRV/V
BNRPURGE
V/V
FO REC V/V
ATMSTMV/V
AIRREG
FL1
FAIL
176A
FL2
FAIL
177A
BNRFAIL 175A
142A
141A
156A
BLRFO
TRIP
GAS SUPPLY
201
225
139A
140A
143A
137A144ANO2 BNR BASE BNR
138A
FO REC V/V
156B
V/V
IGNIT
FO BNRV/V
BNRPURGE
V/V
ATMSTMV/V
AIRREG
FL1
FAIL
176B
FL2
FAIL
177B
BNRFAIL 175B
142B
141B
139B
140B
143B
137B144BNO2 BNR
138B
V/V
IGNIT
FO BNRV/V
BNRPURGE
V/V
ATMSTMV/V
AIRREG
FL1
FAIL
173A
FL2
FAIL
174A
BNRFAIL
BNRFAIL172A
FL1
FAIL
179B
FL2
FAIL
180B
BNRFAIL 178B
131A
130A
182A
240A
128A
129A
132A
126A133A
127ABASE BNR
IGNIT
FO BNRV/V
BNRPURGE
V/V
ATMSTMV/V
AIRREG
FL1
FAIL
173B
FL2
FAIL
174B
BNRFAIL 172B
131B
130B
128B
129B
132B
126B133B
127BNO3 BNR
V/V
IGNIT
FO BNRV/V
BNRPURGE
V/V
ATM SUPPLY
STM STM
312A 312B
ATMCONT V/V
L/L
FO PL/L
FO P L/L181A
BY-PASS
163A
ATMCONT V/V
ATMSTMV/V
AIRREG
FL1
FAIL
179A
FL2
FAIL
180A
MASTGASTRIP
178A
153A
152A
GAS V/V
150A
151A
154A
148A155A
149ANO3 BNR
V/V V/V
IGNIT
FO BNRV/V
BNRPURGE
V/V
ATMSTMV/V
AIRREG
153B
152B
150B
151B
154B
148B155B
149B
230A
194A
FOSHUT V/V
FOCONT V/V
IGNRATE157A
BLRFO
TRIP
230B
194B
FOSHUT V/V
FOCONT V/V
IGNRATE157B
183A
233 234
AIR AIR
313A 313B
HFO DO
182B
FO PL/L
L/L
203 204
183B
RUNFO PUMP
TRIP
FO P L/L181B
BY-PASS
163B
F/E
BY-PASS240B
F/E
BY-PASS
241BXXXX
241AXXXX
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 205/302
Part 5 : Main Turbine System
5.1 Main Turbine.................................................................................... 5 - 1
5.1.1 Manufacturing Specification............ ............ ............ ............ .. 5 - 3
5.1.2 Instruction of Main Turbine Operation ........... ............ ........... 5 - 6
5.2 Main Turbine Control System............. ............ ............ ............. ....... 5 - 10
5.3 Function of the Remote Control System........... ............ ............ ...... 5 - 12
5.3.1 W/H Manoeuvring ............................................................... 5 - 13
5.3.2 ECR Manoeuvring............................................................... 5 - 17
5.3.3 Machine Side Manoeuvring....... ............ ............ ............ ...... 5 - 17
5.3.4 Automatic Slow Down...... ............ ............ ............ ............. .. 5 - 17
5.3.5 Program Interlock................................................................ 5 - 19
5.3.6 Control System Monitoring Function ............ ............ .......... 5 - 19
5.3.7 Safety System ...................................................................... 5 - 20
5.3.8 Safety System Monitoring Function ........... ............ ............ . 5 - 21
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 206/302
Part 5Main Turbine System
LNGC DISHA Machinery Operating Manual
Part 5 : Main Turbine System
5.1 Main Turbine
Main Particulars :
Type : KAWASAKI UA-360 Cross compound, impulse, double reduction geared marine turbine.
MCR NCR
Output PS 36,000 32,400
HP Turbine rpm 4,962 4,793
LP Turbine rpm 3,275 3,163Revolution
Propeller rpm 88 85
Steam Pressure(at maneuv. valve inlet)
5.88 MPag
Steam Temperature(at manoeuv. valve inlet)
510°C
Condenser vacuum
(at normal & maximum output with 27°Csea water inlet temperature)
722 mmHg (-96.3 kPag)at cond. top
Astern max. torque80% of the MCR ahead torque at main shaft revolution
of 50% rpm of MCR rpm
Astern allowable max. continuous rpm70% of the MCR ahead rpm
not exceed more than two (2) hours
Manoeuvring Valve : One (1) Unit
Type Single lid diffuser type
Dia. throttle/pilot mm 185 / 80Valve
Lift ahead/astern mm 71 / 45
Piston dia. mm 600
Stoke ahead/astern mm 160 / 100Oil Cylinder
Oil Pressure MPag
Kgf/cm2G
0.29
3.0
Reduction Gear : One (1) Unit
Type : Tandem articulated, double reduction, double helical type
Item P.C.D. mm No. of teeth
HP 291.0 361st red. pinion
LP 396.1 49
HP 2,626.9 325
1st red. gearLP 2,360.2 292
HP 658.2 572nd red. pinion
LP 658.2 57
Main gear - 4 110 7 356
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 207/302
5 - 1 Part 5 Main Turbine System
not exceed more than two (2) hours
Ahead rotating direction Clockwise looking from after
Main shaft speed at torsional vibration 28.56 rpm & 58.47 rpm
HP Turbine abt. 63.0 rpmCritical speed of turbine rotor(converting into main shaft)
LP Turbine 117.9 rpm
Turbine : One (1) Unit
HP Turbine LP Turbine
No. of stages 108 (Ahead)2 (Astern)
Main steam inlet nominal dia. 175 mm x 2 175 mm (Astern)
Cross-under pipe nominal dia. 420 mm -
HP 65 mm at HP turbine 5th stage
IP 200 mm at cross over pipeBleeding pipe nominal dia.LP 300 mm at LP turbine 3rd stage
Main gear 4,110.7 356
1st. Red. HP 510 mm / LP 510 mmEffective face width
(at P.C.D.)2
nd Red. 1,168 mm
Main Condenser : One (1) Unit
Type Reheating, surface type
Vacuum mmHg (kPag) 722 (-96.3)
Cooling surface m2 3,300
Quantity of condensed steam kg/h 83,600
Cooling water inlet temperature °C 27
Quantity of cooling water m3/h 19,000
Number of flow - 1
Velocity of cooling water m/s 1.88
Distance between tube sheets mm 5,000
Dia. / Thickness mm 19.0/0.7
Length mm 5,079Cooling tubes
Number - 11,057
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 208/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 209/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 210/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 211/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 212/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 213/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 214/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 215/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 216/302
LNGC DISHA Machinery Operating Manual
VALVE NAME SETTINGEMERGENCY
CASE(AIR FAILURE)
REMARKS
HP BLEEDEROPEN AT 0.98 MPagCLOSE AT 0.88 MPagBLEEDER
VALVEIP BLEEDERLP BLEEDER
OPEN AT 0.304 MPag OF IP BLEED PRESS.CLOSE AT 0.255 MPag OF IP BLEED PRESS.
CLOSEWITH MANUALOPERATING HANDLE
GUARDIAN (T-3) OPENWITH MANUALOPERATING HANDLE
MANEUV. VALVE DRAIN(T-51)
HP STEAM CHESTDRAIN (T-52)
HP TURBINE 2NDSTAGE DRAIN(T-53)
HP CASING DRAIN(T-54)
OPEN .. BELOW AHEAD abt. 72 rpm (MV lift)CLOSE.. ABOVE AHEAD abt. 75 rpm (MV lift)
DRAINVALVE
HP BLEEDER DRAIN
(T-55)
OPEN AT HP BLEED VALVE CLOSECLOSE AT HP BLEED VALVE OPEN
OPENWITH MANUALOPERATING HANDLE
MAIN CONDENSER LEVELCONTROL (T-42)
OPEN
COND. WATER RECIRCULATION(T-43)
NORMAL LEVEL
AUTOMATICALLY CONTROL BYSIGNAL OF MAIN CONDENSER HOT WELLLEVEL TRANSMITTER CLOSE
WITH MANUALOPERATING HANDLE
MAKE-UP (T-302) OPENPACKINGSTEAM
SPILL (T-303)19.6 kPag
CLOSE
WITH MANUALOPERATING HANDLE
LUB. OIL TEMP. CONTROL (T-145) 45°CCOOLERSIDE OPEN
WITH MANUALOPERATING HANDLE
(10) Main Turbine Auto Slow Down
Main turbine auto slow down circuit is operated in the following
instances.
Main steam pressure low low
Main boiler steam drum level high high
Main boiler steam drum level low low
Main condenser hotwell water level high high
Stern tube bearing temperature high high
One boiler trip
Main condenser vacuum low low
Main thrust pad temperature high high
The function of the automatic slow down can be bypassed by AUTO
SLOW DOWN BYPASS provided on the N/C(Navigation Console)
and the ECC(Engine Control Console).
Automatic slow down (II)
Automatic slow down (III)
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 217/302
5 - 11 Part 5 Main Turbine System
LUB. OIL PRESS. CONTROL 0.39 MPag CLOSEWITH MANUALOPERATING HANDLE
SPRAY WATER FOR STEAM DUMP.(T-56)
OPEN .. NOT FULLY CLOSE OF STEAM DUMPVALVE
CLOSE .. NOT FULLY CLOSE OF STEAM DUMPVALVE AND TIMER(ABOUT 5 MINUTES)
CLOSEWITH MANUALOPERATING HANDLE
SPRAY WATER FOR ASTERNOPERATION(T-57)
OPEN .. AST MV OPEN AND NOT AUTOSPINNING CONDITION
CLOSE .. AST MV CLOSE AND TIMER(ABT. 5 MINUTES)
CLOSEWITH MANUALOPERATING HANDLE
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 218/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 219/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 220/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 221/302
LNGC DISHA Machinery Operating Manual
TELEGRAPH
"STOP"
POSITION
MANEUV. DUTY
"W/H"
MANEUV. DUTY
"ECR"
TELEGRAPH
"STOP"
POSITION
AUTO SPINNING
ON
AUTO SPINNING
OVER SPEEDTURBINE TRIP
AUTO SPINNING
OFF
ASTERN MANEUV. V.
OPENNING ORDER
ASTERN MANEUV. V.
IS CLOSED
ASTERN MANEUV. V. IS
OPENED TO PRESET LIFT.
AHEAD MANEUV. V/V IS
OPENED TO PRESET LIFT.
PROPELLER REVOIL UTION
EXCEEDS AST. "F" (G) RPM.
PROPELLER REVOLUTION
EXCEEDS AH. "F" (G) RPM.
PROPELLER REVOLUTION
EXCEEDS AH. "F" (G) RPM. AHEAD MANEUV.V.
IS CLOSED
AHEAD MANEUV.V.
OPENNING ORDER
<W/H> <ECR> <ECR>
"YES"
"NO"
MAIN TURUINE TRIP-RESET
CONDITION
TURNING GEAR DISENGAGED
OFF ON
DIR LEV
NOT
3 MINUTES
(8) Rough Sea Control
When the selector switch of ROUGH SEA (ROUGH/CALM) is set at the
ROUGH position, rough sea control to prevent overspeed is effected as
described below;
- Once the propeller revolution exceeds the racing trip level (105% of
MCR) due to some cause, the RPM feedback controller starts for its set
point at a racing trip reset level.
- The shaft revolution is reduced to the racing trip reset level.
- When the revolution reaches at the reset level, rough sea control is
canceled, and the shaft revolution returns to the lever position according
to the time program.
Unexpected revolution
raise-up occurs due torough sea condition
such as racing.
RPM feedback
control operateswith set point at
reset level.
Set point returns
to lever position
according to time
program.
Time
Time
Set point of
RPM/valve lift
Lever position
Reset level
Actual revolution
Racing trip level
Reset level
Rough sea control
Figure 1-11 Control Pattern of Rough Sea Control
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 222/302
5 - 16 Part 5 Main Turbine System
AUTO SPINNING
FAILURE
<W/H><ECR>
(MCB) (MCB)
(MCB)
"YES"
<ECR>
PROPELLER REVOLUTION IS
W ITH IN " G" (1 ) R PM
2.5 MINUTES
SPIN ZONE
SHAFT STOP
AUTO SPINNING CANCEL
TELEGRAPH IS OPEATED
TO OTHER DIVISION
PROPELLER REVOLUTION
NOT EXCEEDS "F" (G) RPM
PROPELLER REVOLUTION
NOT EXCEEDS "G" (1) RPM
PROPELLER REVOLUTION
EXCEEDS “H" (12) RPM
Figure 1-10 Block Diagram for Auto Spinning
Telegraph lever control
Shaft revolution exceeds the
racing trip Level (105% of MCR)
Shaft revolution reaches
at reset level.
Shaft revolution/ valve lift returns tolever position according to time
program.
A
N
D
RPM controller starts operating
With set point at r eset level.
ROUGH CALM
ROUGH SEA CONTROL
ROUGH SEA
Normal operation By
telegraph is available.
W/H
Lamp on
IndicationLamp (W/H)
Lamp off
Figure 1-12 Control Pattern of Rough Sea Control
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 223/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 224/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 225/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 226/302
LNGC DISHA Machinery Operating Manual
5.3.8 Safety System Monitoring Function
Main Turbine Safety System Failure
The M/T SAFETY SYSTEM FAIL alarm is annunciated in the W/H and the
ECR, and individual cause is indicated on the cause indicator panel, in case of
the following conditions;
(1) Trip solenoid valve circuit disconnection
(2) Trip sensor circuit disconnection
(3) Manual trip switch circuit disconnection
(4) M/T trip override switch circuit disconnection
Main Turbine Safety System Power Failure
In case of trip electric source failures, the SAFETY SYSTEM FAIL alarm is
annunciated in the W/H and the ECR.
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 227/302
5 - 21 Part 5 Main Turbine System
Figure 1-19 Block Diagram for the Safety System
Part 6 : Steam Plant Heat Balance System
6.1 100% MCR FO Burning................................................................... 6 - 1
6.2 100% MCR GAS Burning ................................................................ 6 - 2
6.3 100% MCR Dual Burning ................................................................ 6 - 3
6.4 90% MCR FO Burning..................................................................... 6 - 4
6.5 90% MCR GAS Burning.................................................................. 6 - 5
6.6 90% MCR DUAL Burning............................................................... 6 - 6
6.7 80% MCR FO Burning..................................................................... 6 - 7
6.8 80% MCR GAS Burning.................................................................. 6 - 8
6.9 80% MCR DUAL Burning............................................................... 6 - 9
6.10 50% MCR FO Burning................................................................. 6 - 10
6.11 50% MCR GAS Burning .......... ............ ............ ............ ............ .....6 - 11
6.12 50% MCR DUAL Burning........................................................... 6 - 12
6.13 30% MCR FO Burning................................................................. 6 - 13
6.14 30% MCR GAS Burning.............................................................. 6 - 14
6.15 30% MCR DUAL Burning........................................................... 6 - 15
6.16 Cargo Loading (FO)............. ............ ............ ............ ............ ......... 6 - 16
6.17 Cargo Unloading (FO) .................................................................. 6 - 17
6.18 Anchoring (FO)......... ............ ............ ............ ............ ........... ......... 6 - 18
6.19 Anchoring Loaded (Dumping, BOG) ........... ............ ............ ........ 6 - 19
6.20 Guarantee (FO, SNAME3-11)..... ............ ............ ............. ............ 6 - 20
6.21 90% MCR FO Burning(32°
C S.W)............................................. 6 - 21
6.22 100% MCR FO Burning (Electric load of 2,100 Kw) ........... ....... 6 - 22
6.23 100% MCR DUAL Burning (Electric load of 2,360 Kw) .......... .. 6 - 23
6.24 90% MCR FO Burning (Electric load of 2,100 Kw). ........... ........ 6 - 24
6.25 90% MCR DUAL Burning (Electric load of 2,360 Kw) .......... .... 6 - 25
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 228/302
Part 6
Steam Plant Heat Balance
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 229/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 230/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 231/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 232/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 233/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 234/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 235/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 236/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 237/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 238/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 239/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 240/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 241/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 242/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 243/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 244/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 245/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 246/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 247/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 248/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 249/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 250/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 251/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 252/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 253/302
Part 7 : Description of Emergency Operation
7.1 Flooding in the Engine Room... ............ ............ ........... ............ ......... 7 - 1
7.2 Main Boiler Emergency Operation.. ............ ............ ............ ............ . 7 - 3
7.2.1 Main Boiler Initial Ignition by Portable Igniter....... ............. . 7 - 3
7.2.2 One Boiler Operation............................................................. 7 - 4
7.2.3 Operation of 1-FAN 2-BOILER .......... ............ ............ .......... 7 - 5
7.2.4 Main Boiler Emergency Operation With Both CPU Failure.. 7 - 5
7.3 HP and LP Turbine Solo Running Operation............. ............ ........... 7 - 6
7.4 Restore Engine Room Plant after Black Out ........... ............ ............ . 7 - 7
7.5 Generator Manual Synchronizing Procedure...... ............ ............ ...... 7 - 9
7.5.1 Parallel Operation.................................................................. 7 - 9
7.5.2 Stopping a Generator Engine ........... ............ ........... ............ . 7 - 10
7.6 Procedure of Steering Gear Emergency Operation ........... ............ .. 7 - 13
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 254/302
Part 7Description of Emergency Operation
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 255/302
LNGC DISHA Machinery Operating Manual
Floodable time, control position and method for valve operation
NO
Start reciprocating bilge pump, taking suction
from its bilge main and any of the associated
bilge wells, and ensure that it is pumping.
If it does not pump immediately, investigate
in particular that no additional suction valves are
open.
Procedure
YES
Is reciprocating bilge pump pumping ?
NO
Check reason why pump is
not pumping.Check the position of all valves,
particularly that extra suction
valves are not open.
YES
LEVEL STILL RISING
Is reciprocating bilge pump running ?
LEVEL NOT RISING
Find and isolate the source
of ingress of water.
Restrict the rate of entry by
any means available, such as
shoring, bandaging, caulking,
if the source of water cannot
be isolated by valves.
LEVEL STILL RISING
Start No.1 bilge G/S pump, taking
suction from the direct bilge
suction (stb’d fwd) & dischargingdirectly overboard.
LEVEL NOT RISING
Find and isolate the source of ingress of water.
Restrict the rate of entry by anymeans available, such as shoring,bandaging, caulking, if the sourceof water cannot be isolated byvalves.
LEVEL NOT RISING
LEVEL STILL RISING
Start No.2 bilge G/S pump taking
suction direct from bilge main,
discharging direct overboard. Find and isolate the source of
ingress of water.
Restrict the rate of entry by any
means available, such as shoring,bandaging, caulking, if the source
of water cannot be isolted by
valves.
Advise bridge.
Stop the main engine and secure
it aganist the ingress of water.
Isolate equipment from the main
switchboard before the equipment
is flooded.
Before the sea water pumps are
flooded, it will be necessary to shut
down the boilers, stop the turbo
Generators, and start the
emergency diesel.
Secure the boilers against the
ingress of water. Secure the main
Feed pumps turbo generators and
LAH or bilge pump long run
alarm occur
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 256/302
7 - 2 Part 7 Description of Emergency Operation
Be prepared to abandon ship
Feed pumps, turbo generators andmain diesel generator aganist the
ingress of wate
Start S/by Ballast pump for
Discharging for emergency bilge
suction.
Summon assistance using
the engineer's call bell.
The inflow of water is exeeding
the capacity of the reciprocating
bilge pump.
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 257/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 258/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 259/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 260/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 261/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 262/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 263/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 264/302
LNGC DISHA Machinery Operating Manual
ENG CONT
“STOP”
ENG CONT
“STOP”
ENG CONT
“OPEN”
ENG CONT
“OPEN”
ENG CONT
“STOP”
ENG CONT
“STOP”
ENG CONT
“STOP”
ENG CONT
“STOP”
POWERSUPPLY
POWERSUPPLY
CONT POSIMSB1(2)
CONT POSIMSB1(2)
GOV CONT“RAISE/LOWER”
GOV CONT“RAISE/LOWER”
LOADSHIFT
LOADSHIFT
LOAD SHIFT
FINISH
LOAD SHIFTFINISH
VCB CONT“OPEN”
VCB CONT
“OPEN”
(MSB1(2))
TO BE CHECKED
BY KWMBCS(MSB1(2))
DG VCB OPEN
COMMAND
DG VCB OPENCOMMAND
DG VCB
OPNED
DG VCB
OPNED
REMAINING
SUPPLY
GEN POWER
(MSB1(2))
(MSB1(2))
GCS(MSB1(2))
REF TO FC11
PB (MSB1)STP (M/S)
PB (IAS)
(MSB1)
(MSB2)
(IAS)
(MSB1(2))
PB (MSB2)
VCB CONT
“CLOSE”
VCB CONT
“CLOSE”
CHECK SYNCHRO
”OFF”
CHECK SYNCHRO
”OFF”
CHECK
SYNCHRO
CHECK
SYNCHRO
CONT POSI
MSB1(2)
CONT POSI
MSB1(2)
CHECK SYNCHROOPERATE
CHECK SYNCHRO
OPERATE
SYNCHRO
POINT
SYNCHROPOINT
EAS-101
(MSB1(2))
REF TO FC11
(MSB1)
(MSB2)
(IAS)
VOLT EST
(CASE 2)
VOLT EST
(CASE 2)
REF TO FC12
GOV CONT“RAISE/LOWER”
GOV CONT
“RAISE/LOWER”
GCS
(MSB1(2))
EAS-101
(MSB1(2))
BCS
(MSB1(2))
SYNCH’ZED
SYNCH’ZED
(MSB1(2))
SYNC
“SET”
SYNC“SET”
SYS
(MSB1(2))
COS-CH
(MSB1(2))
BY SY or SYL
OFF
ONCOS-CH
(MSB1(2))
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 265/302
7 - 11 Part 7 Description of Emergency Operation
ENG STOP
COMMAND
ENG STOP
COMMAND
ENG
STOPPED
ENG
STOPPED
(MSB)
Refer to Inst. Manual for 6.6kV main switchboard & Generator automatic control panel FC15
GOV CONT
“RAISE/LOWER”
GOV CONT
“RAISE/LOWER”
DG VCB CLOSE
COMMAND
DG VCB CLOSE
COMMAND
DG VCB CLOSEDDG VCB CLOSED
POWER
SUPPLY
POWER
SUPPLY
(MSB1(2))
(MSB1(2))
POWER
CONTROL
POWER
CONTROL
AUTO LOAD
BALANCE
AUTO LOAD
BALANCEMANUAL LOAD
BALANCE
MANUAL LOAD
BALANCE
GCS
(MSB1(2))
COS-P1(2)
(MSB1(2)
“MANU”
“AUTO”
Refer to Inst. Manual for 6.6kV main switchboard & Generator automatic control panel FC14
LNGC DISHA Machinery Operating Manual
Illustration 7.6i Procedure of Steering Gear Emergency Operation
No.4 Cylinder
No.2 Cylinder No.1 Cylinder
No.3 Cylinder
SafetyValve
SafetyValve
PilotRelief ValveBoost
Relief Valve
No.2 Transfer Valve
N o.2 M ai n c i r c ui t
B y - p a s s v al v e
Wi t h l i mi t s wi t c h
No.2 Valve Block
No.2
Janney
Pump
No.2 Pump Unit
Hyd. Oil TankFor Steering Gear
(1,240 L)
SafetyValve
SafetyValve
PilotRelief ValveBoost
Relief Valve
No.1 Transfer Valve
No.1 Valve Block
No.1
Janney
Pump
No.1 Pump Unit
Air Breather
SV2SV1
N o . 1 M a i n c i r c u i t
B y - p a s s v a l v e
W i t h l i m i t s w i t c h
Motor pump Hand pump
B A
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 266/302
7 - 12 Part 7 Description of Emergency Operation
M
Orifice
No.2 Hyd.
By-pass V/VNo.2 Oil Tank
L
No.2 Servo.Controller
Pump
No.2 Auxiliary
Pump
M
Orifice
No.1 Hyd.
By-pass V/V
No.1 Servo.Controller
Pump
No.1 Auxiliary
Pump
No.2 Oil Tank
L
H S
0 0 4
H S
0 0 5
L.LL.L
L/L level switch for
auto isolation controlL/L level switch for
auto isolation control
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 267/302
Part 8 : Fire Fighting Systems
8.1 Fire and Deck Wash System ............ ............ ............ ............ ............ . 8 - 2
8.2 Water Spray System...... ............ ............ ............ ............ ............ ........ 8 - 4
8.3 Dry Powder System .......................................................................... 8 - 6
8.4 Fire Detection System.............. ............ ............ ............ ............. ........ 8 - 9
8.5 High Expansion Foam Fire Extinguishing System........... ............ .. 8 - 13
8.6 CO2 System..................................................................................... 8 - 16
8.7 Hyper-Mist System......................................................................... 8 - 18
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 268/302
Part 8Fire Fighting Systems
LNGC DISHA Machinery Operating Manual
Illustration 8.1i Fire and Deck Wash System
CARGOSTORE
PI
PI
SWIMMINGPOOL
MOOR'G DECK
HIGH EXP.
FOAM SYS.
WD360
WD359 WD356
WD355
WD351
WD350
WD319 WD397
WD349W D3 48 W 38 7
WD385 WD383 WD399
WD380WD398WD382WD384WD316
WD392
WD389
WD381
WD388
WD401
WD393
WD343
WD314
WD315WD396
WD344
WD342
WD313
WD338
WD311WD394
WD337
WD336 WD332
WD334
WD309 WD390
WD328
WD326
WD324
WD307
W D 3 2 2
WD320
WD305
WD306
T O B I L G E
E D U C T O R
F O R P A S
S A G E W A Y
C/ L
C/ L
WD301
WD302
WD303
WD304
WD321
W D 3 2 3
WD325
TO BILGE EDUCTORFOR PASSAGEWAY
WD308
WD027
WD310 WD391
WD329
WD312
WD339
WD335WD340
WD333WD341
INTERNATIONAL SHORE CONNECTION
TO BILGE EDUCTORFOR PASSAGEWAY
TO BILGE EDUCTORFOR PASSAGEWAY
WD346
WD345
DRAIN V/V TO BELOCATED AT WEATHER DK
WD352
WD318
LIQUIDDOME
NEARF.C.RM
WD358
WD357
FROME/R
ACCOM. LADDER
ACCOM. LADDER
WD516
UP 80A
UP 80A
WD519
FROM FIRE MAIN
WD515 WD513
WD514
WD512
WD502
WD501
WD508
WD507
WD506
WD511
WD510 WD509
TRUNK DECK
TRUNK DECK
TO WATER SPRAY MAIN
FOR SILTY WATER
200A (P) FWD
WD219WD240
1ST DK
(10K)
WD206 S.L.W.L.
WD208 WD2 07
WD211 WD210
WD209
WD212
WD205
WD358 WD203
WD518
WD202
WD201
W D2 32 W D5 17
OUTSIDE ENG. CASING
FROM RM
WD360
WD362
S.G RM
NAV.-DK
WD502 WD501
WD508WD507WD506
WD509
WD512
WD519
WD511
WD514
WD516
WD513
WD515
WD510
D-DK
C-DK
B-DK
A-DKWD357
WD356
WD355(P) WD352(S)W D3 54 W D3 53
EM/CY FILL TO TRUNK DK. SPACE
A-DECK
C-DECK D-DECK
B-DECK
NAV. DK
WD395
FROM FRESH WATER FROM FRESH WATER
INTERVAL 300mm
10mm x 74 HOLES
ABT. 22.6 m
CU-NI 90/10 80A
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 269/302
8 - 1 Part 8 Fire Fighting System
(1100KPA)
WD367
WD004
WD002
WD303
WD003
WD001 WD402
WD008
WD009
WD366
WD368 WD369
WD304
FWDP/P RM
SEA
CHEST
UPPER DECK
BOSUN STORE
NO.1 CARGO TK.
BILGE EDUCTOR FOR
BOWTHRUSTER RM.
F.P TK
B.T. RM
PIPE DUCTPIPE DUCT
WD007
WD010
BILGE EDUCTORFOR BOSUN STORE
BILGE EDUCTOR
FOR FWD. P/P RM.
FR69
WD229
WD228
S.W. MAININE/R
WD226 (1100 KPA)(1100KPA)(1100KPA)NO.2 FIRE
PUMP
NO.1 FIRE
PUMP
WD225
WD222WD223WD224
WD230
WD220
WD221
WD239
WD227
JOCKEY
PUMP
EM'CYFIRE
PUMP
WD234WD235 WD236
F.WTK(S)
F.WTK(P)
CORROSIONPIECE OF ZINCANODE SHALLBE FITTEDONINLET ANDOUTLET OF EACHFIRE PUMP.
TO BIL EJECTOR FOR
PIPE DUCT/COFFERDAMS
ENGINE ROOM
TO WATER SPRY MAIN
FOR RINSING
D.L.W.L.WD241WD231
2NDDK
3DDK
FLOOR
WD214 WD213
WD217 WD216
WD242
WD215
WD218
A.P TK
LNGC DISHA Machinery Operating Manual
Part 8 : Fire Fighting Systems
8.1 Fire and Deck Wash Systems
The fire main system is supplied from the engine room, by the two Fire pumps.
They are single speed centrifugal pumps, with a delivery capacity of 150 m3/h at
1MPag.
The emergency fire pump is located in the forward pump room in a well. This
pump is a self-priming centrifugal pump with its own direct sea suction. The
pump is rated at 340 m3/h and is supplied from the emergency switchboard.
The fire main is kept pressurized by a jockey topping up pump rated at 10 m3/h
at 1 MPag. This pump has an automatic pressure cut-in/out switch and is kept
topped up and under pressure at all times.
(Auto. start : 0.5 MPag, Auto. stop : 0.75 MPag)
The deck fire main has a main isolator valve WD353 before the port and
starboard main ring main isolator valves. The ring main is fitted with a further
four section isolator valves on each side at regular intervals along the deck to
allow any part of the system to be supplied from either side of the ship.
The fire main also serves the water curtain below the port and starboard manifoldareas during loading and unloading conditions.
The fire main supplies the driving water for the bilge eductors in the side passage
way, duct keel pipe duct, forward pump room, bow thrust room and boson store.
It also supplies anchor washing water filling.
There are 24 fire hydrants situated along the cargo space, each with its fire hose
mounted adjacent.
The emergency fire pump can be started locally, from the bridge or the fire
control center (FCC).
Under normal operating conditions the fire main will be under pressure during
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 270/302
8 - 2 Part 8 Fire Fighting System
port time, supplying the manifold water curtain and with hoses run out as a fire
precaution.
LNGC DISHA Machinery Operating Manual
Illustration8.2i Water Spray System
W/H-TOP
SATCOME DOME
NAV.-DK
D-DK
C-DK
B-DK
A-DK
TO LIFE BOAT AREA (P&S)
W W0 01 W W0 02
WW075
WW003
WW004 WW006
NO.1 W/S PUMP
FROM FIRE MAIN (150A)FOR FRESH WATERRINSING
TO BALLAST STRIP.EJECTOR
ENGINE ROOM
NO.4 CARGO TANK NO.3 CARGO TANK
MOTOR
RM
MOTOR
CARGO COMP.
RM
GROUP 1 FOR CARGO MANIFOLD AREA (P&S) SERVICE
GROUP 2 FOR LIQUID / GAS DOME & V/VS SERVICE
GROUP 3 FOR ACCOMM. & CARGO MACH. RM & LIFE BOAT
AREA SERVICE
N O. 4 W
. B. T K
( P & S )
N O. 3 W
. B. T K
( P & S )
INCLINDED HATCHING AREA SHOWS
THE AREA PROTECTED BY RUNDOWN
OF HIGHER SPRAY NOZZLES.
W/H-TOPFOR SATCOME DOME
NAV.-DK
D-DK 22 SPRAY NOZZLES38 SPRAY NOZZLES
18 SPRAY NOZZLES
1 SPRAY NOZZLE
22 SPRAY NOZZLES
ELEV. VIEW
FOR LIFE BOAT/EMBAR. LAD.
(P & S)
TO FIRE MAIN (200A)FOR SILTY WATER
S.CROSS MAININ E/R
WW075 WW005
WD239
BA213
WD219
NO.2 W/S PUMP
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 271/302
8 - 3 Part 8 Fire Fighting System
MOTOR
RM
C-DK
B-DK
13 SPRAY NOZZLES 13 SPRAY NOZZLES38 SPRAY NOZZLES
FRONT VIEW
LOOKING AFT
SECT. VIEW
LOOKING FWD
TRUNK DECK SPACE TRUNK DECK SPACE
WW067WW066
WW016
WW011
WW015WW071WW007
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 272/302
LNGC DISHA Machinery Operating Manual
Illustration 8.3.1i Dry Powder System
No.3
No.2
3 3 m
3 3 m
3 3 m
3 3 m
3 3 m
3 3 m
3 3 m
3 3 m
3 3 m
3 3 m
3 3 m
3 3 m
3 3 m 3 3
m
A Type Hand Hose Cabinet (5 Sets)
A Type B Type
No.4 Tank Deck House
(4 Sets Hand Hose Line)No.2 Tank Deck House
(Monitor)
No.3 Tank Deck House(Monitor)
No.1 Tank Deck House
(4 Sets Hand House Line)
B Type Hand Hose Cabinet (3 Sets)
8 7 6 54 3 2 1
House
Cabinet
House
Cabinet
House
Cabinet
House
Cabinet
House
Cabinet
House
Cabinet
House
Cabinet
House
CabinetDry Power Room
Dry Power Room
Dry Power Room
Dry Power Room
No.4 No.1
TO OPERATE DRY POWDER
1 Open door
MONITOR RELEASE CABINET
3 - 2
AFTER USE OF SYSTEM
1. Set No.3 control valve to "close" position.M i l i l d
Monitor
Monitor
8 - 1
5 - 1
V/VCLEANING
EXHAUST V/V
NO.3 CONT. V/V
15A CLEANING LINE
DIA.6 COPPER TUBE
15A EXHAUST
LINE
80A25A
UPPER INLET
N2 GAS LINE
RELEASE CONTROL CABINET
DRY POWDER TANK ROOM
TO THE OTHER DRY POWER TANK
TO DRY POWER HOSE CABINET
(NO. 1, NO. 4)
TO DRY POWER MONITOR CABINET
(NO 2 NO 3)
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 273/302
8 - 5 Part 8 Fire Fighting System
1. Open door.
2. Open one cylinder valve.
3. Open ball valve.
4. System Should Operate.
5. If system fails to operated go to
dry powder tank room and follow emergency operation procedure.
EMERGENCY OPERATING
1. Open valve 3 - 2 and 10 - 2
8 - 1
5 - 1
Main valve is closed.2. Set No.1 control valve to "N2 STOP" position. Stop pressurizing dry powder tank.3. Set exhaust valve to "OPEN" position
Dissipate remaining gas in dry powder tank.4. Set exhaust valve to "CLOSE" position.
5. Set No.3 ball valve to "OPEN" position.6. Set No.2 control valve to "N2 RELEASE" position. (For about 5 seconds.)7. Set No.2 control valve "NORMAL" position. (slowly changeover)
8. Set No.3 ball valve to "CLOSE" position.9. Set cleaning valve to "CLEANING" position.
10. Set No.2 control valve "N2 RELEASE" position.
11. Set exhaust valve to "OPEN" position.12. Return valve to normal positions after all nitrogen gas has been dissipated.13. Recharge N2 cylinders.
14. Refill dry chemical agents to dry chemical container.
10 - 2NO.3 BALL V/V
25A
15A CLEANING LINE
LOWER INLET
N2 GAS LINENITROGEN CYLINDER
(NO. 2, NO. 3)
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 274/302
LNGC DISHA Machinery Operating Manual
Illustration 8.3.2i Dry Powder System
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 275/302
8 - 7 Part 8 Fire Fighting System
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 276/302
LNGC DISHA Machinery Operating Manual
8.4 Fire Detection System
Illustration 8.4i(1) Block Diagram for Fire Detection and Alarm System
ABNORMAL
(INTERNAL)
SDR B
(INTERNAL)
POWER LINE
(INTERNAL)
C LOOP CABLE
(INTERNAL)
E LOOP CABLE(INTERNAL)
ZONE 1 : ACCO. NAV. DKZONE 2 : ACCO. D-DK
ZONE 3 : ACCO. C-DK
TO MAGNETIC DOOR HOLDER
- ACCO. D-DK (5 EA)
- ACCO. C-DK (6 EA)
TO MAGNETIC DOOR HOLDER
- ACCO. B-DK (5 EA) - ACCO. A-DK (6 EA)
- ACCO. UPP. DK (2 EA)
TOP D LOOP IN
TOP C LOOP IN
TOP B LOOP IN
TOP E LOOP IN
TOP A LOOP IN
FO121
DH2
TO I.A.S
1. FIRE ALARM (N/C)
2. POWER FAILURE (N/C)
3. ABNORMAL (N/C)
TO FIRE DAMPERS (M-HB-A)
1. ACCO. C-DK FIRE (N/C)2. ACCO. C-DK FIRE (N/C)3. ACCO. B-DK FIRE (N/C)
4. ACCO. A-DK FIRE (N/C)
5. ACCO. A-DK FIRE (N/C)
6. ACCO. A-CK FIRE (N/C)
7. ACCO. FIRE (N/C)
FROM / TO P.A
1. FIRE ALARM (N/O) TO P.A2. GEN. ALARM FOR FIRE ALARM SOUNDER
MUTE FROM P.A
EM'CY AC 220VFDH2
(A15203) MH7
(F0187) FMH12
FAN STOP SIGNAL (N/O CONTACT) TO W/H CONSOLE
(F0109) FMH4
TO W/H FIRE DAMPER (ACCO. W/H FIRE, N/C)
(F0186) FMH2
TO BOILER CONT. PANEL (FIRE IN E/R, N/O)(A1004) FMH4
(F0101) FMH4
FO134
DH2
A LOOP CABLE
(INTERNAL)
B LOOP CABLE
(INTERNAL)
MAIN AC 220V
DH2
NO.2 W/H GROUP PANEL
LOOP A
ZONE 4 : ACCO. B-DK
(INSIDE OF PANEL)
POWER SUPPLY& RELAY UNIT
FLUSH MTG TYPE (N.W.T)
T890CONTROL UNIT
(4 LOOPS)
T290REPEATER UNIT
FLUSH MTG TYPE(IN C.C.C)
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 277/302
8 - 9 Part 8 Fire Fighting System
ZONE 5 : ACCO. A-DK
ZONE 6 : ACCO. UPP. DKLOOP E
ZONE 7 : ENGINE CASING
ZONE 8 : E/R 1 ST DKLOOP B
ZONE 9 :E/R 2ND DK
ZONE 10 : E/R 3RD DK
ZONE 11 : E/R FLOORLOOP C
ZONE 12 : EM'CY SWBD RMZONE 13 : EM'CY D/G RM
ZONE 14 : S/G/R
ZONE 15 : ELEC. MOTOR RM
ZONE 16 : CARGO COMP. RMZONE 17 : BOSUN STORE
ZONE 18 : BOW TH. RM
ZONE 19 : FWD PUMP RM
LOOP D
EACH LOOP
T290
REPEATER UNIT
FLUSH MTG TYPE(IN E.C.C)
LOOP CABLEST290
REPEATER UNITWALL MTG TYPE
(IN F.C.S)
LNGC DISHA Machinery Operating Manual
Illustration 8.4i(2) Block Diagram For Device Arrangement
CONTROL UNIT
T890 (10 LOOPS, 80 ZONES) /T891 (2 LOOPS, 16 ZONES)
A1
DET
A2
DET
A6
DET
A7
DET
A8
DET
A13
DET
A14
DET
H
902
A18
DET
A19
DET
A20
DET
A21
DET
A23
DET
A24
DET
A25
DET
A31
DET
A32
DET
A33
DET
A34
DET
A35
DET
A17
DET
A3
CP
LI
520
LI
520
LI
520
A15CM
A16DM
RI
500
MDHMDHMDH
MAXIMUM 25 MDHs ARE CONNECTED TO EACH RM520
DC 24V
N/O OR N/C FOR ZONE OUTPUT (FIRE OR FAULT)
I.S I.S
I.S
I.S
I.S
(MAX. 2 CP540EX)
(MTL788)
I.S I.S
(MTL788)
(ONLY HIGH TEMPERATURE AT 90 C)
E.L.O DEVICE
(4.7 Kohm)
O
I.S I.S
ALL DEVICES WILL BE INTRINSICALLY SAFE (I.S) TYPE
IN A HAZARDOUS AREA.
SHIELD CABLE TO BE USED IN A HAZARDOUS AREA.
I.SI.S
DC 24V
DC 24V
ALL DEVICES WILL BE INTRINSICALLY SAFE (I.S) TYPEIN A HAZARDOUS AREA.
SHIELD CABLE TO BE USED IN A HAZARDOUS AREA.
A4
RM
A5
RMZB
A10
DET
A11
DET
A9
DET
A12
DET
ZB
MS
302
A22CM
A27
IF
TM
520 A30
DET
A28
DET
A29
DET
A26
DET
CP CP
LI
520
LI
520
LI
520
ZONE 7
ZONE 1 ZONE 2 ZONE 3
ZONE 4
ZONE 6 ZONE 5(WORKSHOP)
HAZARDOUS AREA
HAZARDOUS AREA
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 278/302
8 - 10 Part 8 Fire Fighting System
A1~A35 : ADDRESS NUMBER
DET : DETECTOR
MS302 : MS302EX IS FLAM E DETECTOR (CONVENTIONAL TYPE)
CP : CALL POINT
LI520 : LINE ISOLATOR
TM520 : TIMER MODULE
RM : RM520 ADDRESSABLE RELAY MODULE
DM : DM520 CONVENTIONAL DETECTOR MODULE
CM : CM520 ADDRESSABLE CONTACT MONITORING MODULE
MDH : MAGNET DOOR HOLDER (40 mA, POWER CONSUMPTION)
IF : IF500EX INTRINSICALLY SAFE ADDRESSABLE INTERFACE MODULEZB : I.S ZENER SAFETY BARRIER
RI500 : REMOTE INDICATOR
LEGEND
LNGC DISHA Machinery Operating Manual
Illustration 8.4i(3) Typical Schematic of Fire Detection & Alarm System
J U N G L E S
P A R E
UPPER DECK
BOSUN STORE
TRUNK DECK SPACE
MACHINERY SPACE LOOP B
FORE MAST
E/R 3RD DECK
E/R 2ND DECK
E/R 1ST DECK
FUNNEL
SIGNAL LTG POST
NAV.-DK
D-DK
C-DK
B-DK
A-DK
ECR
CONTROL UNIT
KEY
CALL POINT
DETECTOR
LINE ISOLATOR
REPEATER UNIT
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 279/302
8 - 11 Part 8 Fire Fighting System
E/R FLOOR DECK
LNGC DISHA Machinery Operating Manual
Illustration 8.4i(4) T891 MINERVA Marine Control Unit Front Panel Layout
'FIRE' LED 'FIRE' LED
'FAULT' LED
'DISABLE' LED
NO/DELETE KEY
SCROLL UP KEY YES/ENTER KEY
FAST ACCESS KEY'POWER ON'LED
QUIT KEY'POWER FAIL'LED
ZONE DISPLAY LAMP TEST KEY
SCROLL DOWN KEY
LARGE LAPHANUMERICDISPLAY
MINERVA MARINE FIRE CONTROL
NUMERIC KEYPAD
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 280/302
8 - 12 Part 8 Fire Fighting System
RESET KEYFIRE ALARM KEY'FIRE' LEDS
SILENCE KEYKEY SWITCH
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 281/302
LNGC DISHA Machinery Operating Manual
From above operation, the foam will be discharged in the fire protected areaand start extinguishing the fire.
Purifier room
As soon as the sea water pressure rises above 0.5MPag(5 kgf/cm2), the foam
liquid pump will start operating, and the sea water valve (AV2), foam liquidsuction valve (AV7), foam liquid discharge valve (AV4), and pilot valve(AV6) will be opened.
As soon as the foam liquid pressure rises above 0.5 MPag, the discharge
valve (AV13) will be opened.
Following the operation above, the foam will be discharged in the fire
protected area, and start extinguishing the fire.
Engine control room
As soon as the sea water pressure rises above 0.5 MPag, the foam liquid
pump will start operating, and the sea water valve (AV2), foam liquidsuction valve (AV7), foam liquid discharge valve (AV4), and pilot valve
(AV6) will be opened.
As soon as the foam liquid pressure rises above 0.5 MPag, the dischargevalve (AV14) will be opened.
Following the operation above, the foam will be discharged in the fire
protected area, and start extinguishing the fire.
To stop
a) Press the “STOP” button on the control panel.The foam liquid pump will stop operating, and each automatic valves will
be closed.
b) Stop the emergency fire pump manually on the control panel.
Caution
After the fire and cool down, the protected space must be well ventilated before
crew may enter.
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 282/302
8 - 14 Part 8 Fire Fighting System
LNGC DISHA Machinery Operating Manual
Illustration 8.6i CO2 System
I
A
K
C
M
E
O
G
CO2 ROOM
FIRE CONTROL STATION
TO OPEN AIR
15 COPPER TUBE
FN
TD
P
DL
TD
P
HP
11 BTLS 8 BTLS
9 BTLS
9 BTLS
TD
P B
J
TDP
REQUIRED Q'TY OF CYLINDER
* TOTAL : 37 BOTTLES
- CARGO COMPRESSOR ROOM : 28 EA
- MAIN SWBD ROOM : 19 EA
- EM'CY GEN. ROOM/EM'CY SWBD ROOM : 11 EA
- ELECTRIC MOTOR ROOM : 9 EA
65A 40A 50A 40A
40A
MAKERSUPPLY
YARDSUPPLY
MAIN & EM'CY
POWER SUPPLY AC220V
CARGOCOMP. RM
A B
E.G.S/E.S.R
E F
MAINSWBD RM
C D
ELEC.MOT. RM
G H
CARGO
COMP. ROOM
MAIN
SWBD ROOM
ELECTRIC
MOTOR ROOM
EM'CY GEN.RM
/EM'CY SWBD RM
R
ES
EH
B
A
A
PG
PS
PP PPP P
PP PPP
P P
TD
P
PIPE LINE
PILOT LINE
ELECTRIC LINE
THERMOMETER
UNIVERSAL DRAIN
3-WAY VALVE
TIME DELAY UNIT (PNEUMATIC)
BEACON LAMP
AIR HORN
ALARM BELL WITH LAMP
ROTATING LAMP
ELECTRIC HORN
ELECTRIC SIREN
ALARM CONTROL PANEL
CO2 DISCHARGE NOZZLE
HOSE CONNECTION VALVE
PILOT END PLUG
PILOT VENT BLEED
BALL VALVE
LEVEL INDICATOR
BEAM SCALE
INSTRUCTION CHART
CAUTION PLATE
WARNING NOTICE
LIMIT SWITCH
CAP BOX
SPARE PARTS
KEY BOX
PRESSURE GAUGE WITH STOP VALVE
PRESSURE SWITCH WITH STOP VALVE
SAFETY OUTLET
PRESSURE RELIEF VALVE
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 283/302
8 - 15 Part 8 Fire Fighting System
CARGOCOMP. RM
I J
E.G.R/E.S.R
M N
MAINSWBD RM
K L
ELEC.MOT. RM
O P
(3 EA)
7 Kg/cm2 Air Supply
(3 EA) (2 EA) (2 EA)
R
S
S
P
M
P
SYMBOL
R
S
R
S
R
A
S
A A A
PRESSURE RELIEF VALVE
CHECK VALVE (PILOT LINE)
SOLENOID VALVE
MAIN DISCHARGE VALVE
(PNEUMATIC & MANUAL CONTROLLED)
PILOT CYLINDER
(MANUAL CONTROLLED)
DISCHARGE CO2 CYLINDER
(PNEUMATIC & MANUAL CONTROLLED)
VALVE (NORMAL CLOSE)
VALVE (NORMAL OPEN)
DESCRIPTION
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 284/302
LNGC DISHA Machinery Operating Manual
Illustration 8.7i Hyper-Mist System
1
2
3M
M
M
M
M
M
M
PP
M
NOTE
1. PIPE MATERIAL :
- HIGH PRESS. : SUS304TP SCH40 OR HIGHER - LOW PRESS. : SUS304TP SCH20 OR HIGHER
2. LOCATION OF HIGH PRESSURE PUMP :
- HIGH PRESSURE PUMP TO BE LOWER THAN
FRESH WATER OUTLET LEVEL
20L1 x 1 set
TO FIRE ALARM PANEL
ALARM SIGNALNORMAL SOURCE
FIRE
ALARM
PANEL
FIRE CONTROL STATION
STEERING GEAR ROOM
F R E S H
W . T K
HYPER MIST
M. CONT. PANEL
POWER SOURCE
TO H.P. PUMP STATER
TO ALARM MONITOR SYSTEM
EAV6
15A
EAV4
15A
25A
LS
MVL2
ST40A 25A
MVL1
DRAIN
TEST LINE
HIGH PRESSURE PUMPCAP. 100L/min x 7 MPa(SETTING PRESSUREFOR REDUCING V/V 7 MPa)
15A
MVH1(AIR BLOWING TEST LINE)(0.5~0.9 MPag)
STARTER
H.P. PUMP
15A AV1
NO
EAV5
15A
EAV3
15A
EAV1
15A
EAV2
15A
20
INCINERATOR AREA
LCB
20L1 x 1 set
20
I.G.G AREA
LCB
20L1 x 2 sets
20 20
NO.1 MAIN BOILER AREA
LCB
20L1 x 2 sets
20 20
NO.2 MAIN BOILER AREA
LCB
20L1 x 3 sets
20 20
D/G ENG. AREA
LCB
20L1 x 2 sets
20 20
F.O HEATER AREA
LCB
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 285/302
8 - 17 Part 8 Fire Fighting System
Pressure gauge
Fire detector
Globe check valve (low press.)
Manual valve (low press.)
Manual valve (high press.)
Strainer (40 mesh)
Alarm device (column light)
Level switch
P
M
M
P
FLEXIBLE HOSE
LOCAL CONTROL BOX
ELECT. TYPE AUTO. V. (LP)
ELECT. TYPE AUTO. V. (HP)
MOTOR FOR HIGH PRESS. P/P
12S1 WATER MIST NOZZLE
20L1 WATER MIST NOZZLE
SYMBOL NAME SYMBOL NAME TAGTAG
AD
LS
ST
MVH
HIGH PRESS. P/P WITH REDUCING V.
FH
LCB
AV
EAV
M
WMN
WMN
HPP
LCB
M
12
20
DRAIN
15A
MVH2
(0 5 0 9 ag)
POWER SOURCE
FROM CONTROL PANEL
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 286/302
Part 9 : General Information
9.1 Maker List......................................................................................... 9 - 1
9.2 Tank Capacity Plan and List ........... ............ ............ ........... ............ ... 9 - 5
9.3 Lubrication Oil Chart......... ............ ............ ............ ............ ............ ... 9 - 7
9.4 List of Motors and Fans.................................................................. 9 - 14
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 287/302
Part 9General Information
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 288/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 289/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 290/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 291/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 292/302
LNGC DISHA Machinery Operating Manual
Lubricating Oil Tanks S.G.=0.900
Capacities Center of Gravity
Compartment
Location
Frame
NumberVolume
100% (m3)
Weight 98%
(Tons)L.C.G. (m) V.C.G. (m)
Max.
F.S.M.
M4
Main LO. Grav. Tk(S)
Main LO. Sett. Tk(S)Main LO. Stor. Tk(S)
D/G LO. Stor. Tk(S)
D/G LO. Sett. Tk(S)
T/G LO. Stor. Tk(S)
T/G LO. Sett. Tk(S)
Main LO. Sump Tk(C)
32-36
36-4040-47
40-42
38-40
36-40
36-38
29-37
33.6
51.359.9
12.2
12.2
16.7
12.2
68.1
29.6
45.252.8
10.8
10.8
14.8
10.8
60.1
-105.80
-102.60-97.79
-100.20
-101.80
-102.60
-103.40
-106.34
17.97
17.9722.86
22.86
22.86
22.86
22.86
2.11
1
426
2
2
1
2
124
Total - 266.2 234.9 - - -
Miscellaneous Tanks S.G.=1.000
Capacities Center of Gravity
Compartment
Location
Frame
NumberVolume
100% (m3)
Weight 100%
(Tons)L.C.G. (m) V.C.G. (m)
Max.
F.S.M.
M4
Bilge Holding Tk(C)
HFO. Overf. Tk(P)
S/T C.W. Tk(C)
Waste Oil Tk(C)
S/T LO. Drain Tk(C)
FO. Sludge Tk(S)
LO. Sludge Tk(S)
15-26
58-65
7-15
26-28
21-23
38-40
38-40
110.8
64.3
47.8
31.9
4.1
3.1
5.0
110.8
64.3
47.8
31.9
4.1
3.1
5.0
-115.86
-83.80
-122.97
-111.39
-115.40
-101.80
-101.79
1.77
1.20
3.70
1.82
2.80
10.17
10.17
124
52
8
65
4
1
7
Total - 267.0 267.0 - - -
Other Tanks S.G.=1.025
Capacities Center of Gravity
Compartment
Location
Frame
NumberVolume
100% (m3)
Weight
100% (Tons)L.C.G. (m) V.C.G. (m)
Max.
F.S.M.
M4
No. 1 Cargo(Pri. Barrier)
No. 2 Cargo(Pri. Barrier)No. 3 Cargo(Pri. Barrier)
No. 4 Cargo(Pri. Barrier)
No. 1 Cargo(2nd Barrier)
No. 2 Cargo(2nd Barrier)
No. 3 Cargo(2nd Barrier)
No. 4 Cargo(2nd Barrier)
No.1 Cofferdam
No.2 Cofferdam
No.3 Cofferdam
No.4 Cofferdam
No.5 Cofferdam
No.1 Trunk Deck Space
No.2 Trunk Deck Space
No.3 Trunk Deck Space
No.4 Trunk Deck Space
PIPE DUCT(C)
121-133
104-12087-103
72-85
121-133
104-120
87-103
72-86
133-134
120-121
103-104
86-87
71-72
121-133
104-120
87-103
72-86
67-138
1083.4
1604.21604.2
1455.0
1463.9
2224.3
2224.3
2020.2
1240.9
2834.3
2834.3
2834.3
2774.2
738.2
1744.2
1744.2
1526.2
2842.7
1110.5
1644.31644.3
1491.4
1500.5
2279.9
2280.0
2070.7
1271.9
2905.1
2905.1
2905.1
2843.5
756.6
1787.9
1787.9
1564.4
2913.7
78.20
38.60-9.00
-53.80
78.07
38.60
-9.00
-53.80
98.78
62.40
14.80
-32.80
-74.78
76.19
38.60
-9.00
-53.80
12.19
16.16
16.3016.30
16.30
16.11
16.29
16.29
16.30
15.74
17.04
17.04
17.04
17.04
31.99
31.98
31.98
31.98
1.60
-
--
-
-
-
-
-
1715
13610
13610
13610
13606
7306
34397
34397
30097
1759
Total - 34793.0 35662.8 - - -
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 293/302
9 - 6 Part 9 General Information
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 294/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 295/302
LNGC DISHA Machinery Operating Manual
NO. EQUIPMENT (MAKER/TYPE) Q'TY APPLICATION POINT KIND OF LUB. OIL AMOUNT(PER SET)
UNIT REMARK OR CHANGE INTERVAL
24SPRAY PUMP(SHINKO / GVD300-3M)
1 PUMP COUPLING SIDE BEARING MOBIL GREASE XHP 222 * 0.05 KG -
25 AUX. COOL.S.W. PUMP(SHINKO / GVC125-2M)
2 PUMP COUPLING SIDE BEARING MOBIL GREASE XHP 222 * 0.02 KG -
26 AUX. COOL.F.W. PUMP(SHINKO / GVC100M)
2 PUMP COUPLING SIDE BEARING MOBIL GREASE XHP 222 * 0.01 KG -
27GLYCOL W.CIRC. PUMP(SHINKO / GVC100M)
2 PUMP COUPLING SIDE BEARING MOBIL GREASE XHP 222 * 0.01 KG -
2 ACTO 200 MOBIL DTE 11M 0.317 L -
6 ACTO 400 MOBIL DTE 11M 0.964 L -
2 ACTO 800 MOBIL DTE 11M 2.037 L -
3 ACTO 1600 MOBIL DTE 11M 4.246 L -
28REMOTE CONTROL SEA VALVE(AMRI / ACTO)
1 PIPE INSIDE MOBIL DTE 11M 183 L -
29CONTROL AIR DRYER(KEUMSUNG / KRD-300N)
1 REFRIGERANT COMPRESSOR MOBIL ELA ARCTIC 32 * 0.5 L -
1 OILER ON AIR UNIT MOBIL DTE 13M * 0.2 L MAKE UP 600 HOURS
3 GREASE NIPPLE MOBIL GREASE XHP 222 * 0.03 KG MAKE UP 250 HOURS30L.O AUTO FILTER(YOOWON / K8E)
1 BEARING BOX MOBIL DTE OIL HEAVY MEDIUM * 0.1 L MAKE UP TWO YEARS
1 HFO TRANSFER P/P MOBIL GREASE XHP 222 * 0.023 KG 5000 HOURS
2 FWD HFO TRANSFER P/P MOBIL GREASE XHP 222*
0.015 KG 5000 HOURS
1 D.O. TRANSFER P/P MOBIL GREASE XHP 222 * 0.015 KG 5000 HOURS
1 SLUDGE P/P GREASE POINT MOBIL GREASE XHP 222 * 0.018 KG 5000 HOURS
31SCREW PUMP(IMO / SCREW)
1 SLUDGE P/P GEAR BOX MOBIL GREASE XHP 222 * 0.51 L 5000 HOURS
32B.W. SEP. FEED PUMP(HANYOUNG / PISTON)
1 CRANK CASE MOBIL DTE 13M * 2.6 L -
1 NO.1/2 POWER UNIT TANK INCL. CYL/PIPING MOBIL DTE 16M 2400 L EVERY SIX MONTHS
1 HYD. OIL STORAGE TANK MOBIL DTE 16M 1200 L -33STEERING GEAR(TONG MYUNG / FE21-350-T050)
1 GREASE PUMP FOR R/CARRIER MOBILUX EP 0 40 KG -
34PROPELLER(LIPS / F.P.P)
1 CAP INTERNAL MOBILUX EP 0 410 KG -
35INTER. SHAFT BEARING(KOBELCO / F-0287)
1 PIPE INTERNAL MOBIL DTE OIL HEAVY MEDIUM 23 L -
1 AFT SEAL TANK MOBIL DTE OIL HEAVY MEDIUM 35 L -
2 GRAVITY TANK MOBIL DTE OIL HEAVY MEDIUM 80 L 100 L x 80% = 80 L
1 SUMP TANK MOBIL DTE OIL HEAVY MEDIUM 3280 L 4100 L x 80% = 3280 L
1 S O O 1 0
36STERN TUBE SEAL,BEARING(KOBELCO / )
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 296/302
9 - 9 Part 9 General Information
1 STERN TUBE INTERNAL MOBIL DTE OIL HEAVY MEDIUM 1550 L -
1 PIPE INTERNAL MOBIL DTE OIL HEAVY MEDIUM 62 L -
37 A/C PLANT(HI-PRES KOREA / MCU 108/323102V)
2 CRANKCASE MOBIL EAL ARCTIC 100 120 L 20,000 HOUR
38PROV. REF. PLANT(HI-PRES KOREA / MCU 4/271230 V)
2 CRANKCASE MOBIL EAL ARCTIC 68 12 L 30,000 HOUR
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 297/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 298/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 299/302
LNGC DISHA Machinery Operating Manual
NO. EQUIPMENT (MAKER/TYPE) Q'TY APPLICATION POINT KIND OF LUB. OIL AMOUNT(PER SET)
UNIT REMARK OR CHANGE INTERVAL
1 ENGINE MOBIL DELVAC 1 4.8 L 200 HOURS73
LIFE BOAT(HARDING / TOTALLY ENCLOSED)
1 STEERING PUMP MOBIL DTE 13M 4 L WHEN REQUIRED
74RESCUE BOAT(HARDING / OUTBOARD PETROL)
1 ENGINE MOBIL OUTBOARD PLUS 0.4 L WHEN REQUIRED
2 ENCLOSED GEARS MOBIL GEAR 630 18 L
2 WIRE ROPE MOBIL ARMA 798 5 L75LIFE BOAT DAVIT(DONGWOO MACHINERY / HINGEDGRAVITY TYPE)
2 BEARINGS(GREASE) MOBIL GREASE XHP 222 2 KG
76RESCUE BOAT DAVIT(HARDING / SINGLE ARM)
1 HYDRAULIC SYSTEM MOBIL DTE 13M 55 L 6-12 WEEKS
77FLOAT TYPE LEVEL GAUGINE SYSTEM(HENRI SYSTEM / 806 LEVEL GAUGE)
4 GAUGE HEADMOBIL DTE 13M orMOBIL DTE 11M
3.75 L
2 HYDRAULIC SYSTEM MOBIL DTE 13M 800 L EVERY YEAR
2 SLEW/WINCH/TRAVEL GEAR BOX MOBILFLUIED 424 2.5 L FIRST:200 R.H., SECOND:500 R.H./EYERY YEAR
2 GENERAL GREASE POINT MOBIL GREASE XHP 222 2.5 KG EVERY SECOND MONTHS
2 SPHERICAL BEARINGS IN POVIT, MAIN JIB/HYD. CYL. MOBIL GREASE XHP 222 2.5 KG ONE MONTH
2 OPEN GEAR:SLEW(PINION/RING), RACK AND PINION DRIVE MOBILTAC 375 NC 17 KG KEEP WELL GREASED AT ALL TIMES
2 STEEL WIRE MOBIL ARMA 798 2.5 KG KEEP WELL GREASED AT ALL TIMES
78PROVISION CRANE(HYDRALIFT / PORT:MCV-1800-12-18.5,STBD:MCV 1610-12-14)
2 TELESCOPIC JIB WITH NYLATRON SLIDING PADS MOBILTAC 375 NC 2.5 KG DO NOT USE GREASE WITH MOLYBDENUM ADDITIVES.
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 300/302
9 - 13 Part 9 General Information
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 301/302
7/21/2019 LNGC Disha Machinery Operating Manual
http://slidepdf.com/reader/full/lngc-disha-machinery-operating-manual 302/302