LL-C (Certification) · 17021-1 (up to date version), ... EN ISO/IEC 17065 - General Requirements...
Transcript of LL-C (Certification) · 17021-1 (up to date version), ... EN ISO/IEC 17065 - General Requirements...
LL-C (Certification)®
Czech Republic s.r.o.
Rule 03
CERTIFICATION PROCEDURE
1) MANAGEMENT SYSTEMS
2) PRUDUCTS, PROCESSES AND SERVICES
Revision No. 20 from 06. 10. 2016
Owner and Publisher: Head of CB, MUDr. Michal Krutský
LL-C (Certification)
RULE 03, Revision 20, Page 2 (total 22)
LL-C (Certification) Czech Republic s.r.o., Pobřežní 620/3, Praha 8 - Karlín 186 00
M.C., section C, inset 97630, IC 27118339
Content
List revisions and motivations ...................................................................... 3
I. Supporting Statements .......................................................................... 3
II. Scope and Objectives ......................................................................... 5
III. Definitions and Abbreviations .............................................................. 5
Abbreviations used: ................................................................................. 6
Documents mentioned: ............................................................................ 6
IV. Selection and Use .............................................................................. 6
A. Selection and use of Certification Standard ......................................... 6
B. Selection and Use of Certification Scheme .......................................... 7
V. Certification processes ........................................................................ 9
A. Management Systems Certification .................................................... 9
B) Process of Product Certification ........................................................... 14
VI. Suspension or termination of certification ............................................ 18
VII. Responsibility of Certification Body ..................................................... 19
VIII. Responsibilities of Certified Client .................................................... 20
(holder of certification) ............................................................................. 20
A. Management Systems certification .................................................. 20
B. Product certification ....................................................................... 20
IX. Application of Certification Rules modifications ..................................... 22
X. Certification fees and other expenses ................................................. 22
XI. Complaint and Appeal Procedure ........................................................ 22
LL-C (Certification)
RULE 03, Revision 20, Page 3 (total 22)
LL-C (Certification) Czech Republic s.r.o., Pobřežní 620/3, Praha 8 - Karlín 186 00
M.C., section C, inset 97630, IC 27118339
List revisions and motivations
Rev. Date Motivation Insert Approved by
1 4.1.2004 First publication M.Krutský M.Krutský
2 15.6.2004 Page 8 M.Krutský M.Krutský
3 27.9.2004 Page 3-8, 10 M.Krutský M.Krutský
4 30.5.2005 Page 3-8, 12-13 M.Krutský M.Krutský
5 12.10.2005 Page 8 M.Krutský M.Krutský
6 28.2.2006 Page 1 M.Krutský M.Krutský
7 1.7.2008 Page 3-12 M.Krutský M.Krutský
8 20.8.2009 Page 3-12 M.Krutský M.Krutský
9 13.1.2010 Page 3-12 M.Krutský M.Krutský
10 29.11.2010 Page 3-12 I.Angelovski M.Krutský
11 10.12.2012 Page 2- 12 I.Angelovski M.Krutský
12 22.05.2013 Page 2, 4, 5, 7 I.Angelovski M.Krutský
13 1.12.2013 Revision of all document B.Kuchtová M.Krutský
14 10.2.2014 Page 2,20 L.Holub M.Krutský
15 18.2.2014 Page 19 B.Kuchtová M.Krutský
16 25.4.2014 Pages 12, 13 D.Tokar M.krutský
17 9.4.2015 Revision of all document B.Kuchtová M.Krutský
18 5.11.2015 Page 7 D.Tokar M.Krutský
19 13.1.2016 Page 22 L. Holub L. Holub
20 06.10.2016 Page 3, 7, 11, 12, 13, 21 M.K., I.A M.Krutský
I. Supporting Statements
The LL-C (Certification) Czech Republic s.r.o. (hereinafter LL-C) is a certification body
offering a national and international wide range of certification services in the field of
Management Systems, e.g. Quality Management Systems (as per ISO 9001),
Environmental Management Systems (as per ISO 14001), Occupational Health & Safety
Management Systems (as per ISO 18001) and Information Security Management
Systems (as per ISO/IEC 27001). Further, certification services are offered in
Management of Critical Control Points in the Food Industry with requirements of
Food/Feed Safety Management Systems (as per ISO 22000, FSSC 22000 and GMP+)
LL-C (Certification)
RULE 03, Revision 20, Page 4 (total 22)
LL-C (Certification) Czech Republic s.r.o., Pobřežní 620/3, Praha 8 - Karlín 186 00
M.C., section C, inset 97630, IC 27118339
with the requirements of HACCP, IT Service Management Systems (as per ISO 20000-1),
both in production and service companies.1
LL-C offers certification of products according to EN ISO 3834, EN 15085-2, EN 17660-1,
EN 17660-2, EN 14554-1, EN 14554-2 and ISO 22716 in the scope of its accreditation
and in a conformity with ISO/IEC 17065, EA-6/02 as well as valid Guidelines for
accreditation.
Further, LL-C offers certification of products (Construction Products REG EU 305/2011,
Medical Devices and Machinery Devices) in the scope of its accreditation and in
conformity with ISO/IEC 17065.
The legal status of LL-C is a limited liability company with 100% foreign investments.
LL-C company was established as a subsidiary in the Czech Republic. The company is
registered with the Municipal Court in Prague, section C inset 97630 IN 271 18 339. The
company operates in the EU and beyond.
Certification services offered by LL-C are available to all candidates who adopt rules laid
down in this Directive (Rule 03) and officially demand any certification from LL-C.
The policy of LL-C and its management is to offer certification of Management Systems
and Products only within its own certification system while ensuring impartiality,
confidentiality and independence for the Certified Client (hereinafter Client). All policies
applied to LL-C employees, such as knowledge, skills or relevant experiences are equally
applicable to LL-C´s external Auditors, Assessors, Decision Makers, Evaluators and
Technical Experts.
Auditors, Assessors, Evaluators, Decision Makers or Technical Experts involved in
certification process shall carry out their obligations without any unfair advantage; no
influence by any third party. Further, all of them are bound by strict rules of impartiality
and independence of the certification body. Performed activities are an act carried out
based on following principles:
- Access maintenance to all certified entities, ensure non-discrimination of any
organization or an individual;
- Exclusion from participation in an audit and a decision-making granting a certificate
for a specific Client where personally involved in consulting of management systems
activities (above mentioned standards); impartiality and independence of the
assessment for a particular Client is ensured;
- Exclusion from participation in an evaluation process/conformity assessment, and on
decision on certification granting, where activities of personnel might be considered
as violating obligation of impartiality;
- Strict separation of Audit/Expert advice and decision on certification granting;
- Strict separation of Evaluation/Conformity assessment and decision on certification
granting;
- Respect for confidentiality of all personnel involved in any certification process.
LL-C services are based on following policies and principles:
- Philosophy to promote confidence in certification as an effective instrument to
improve the quality of products and services and as a more careful approach to the
environment and other risk prevention;
- Information system security improvement;
- Ensuring the highest possible level of integration during assessment of management
systems according to various established standards and regulations;
- Ensuring territorial and term availability of Auditors and Assessors;
1 All standards mentioned are in up to date version.
LL-C (Certification)
RULE 03, Revision 20, Page 5 (total 22)
LL-C (Certification) Czech Republic s.r.o., Pobřežní 620/3, Praha 8 - Karlín 186 00
M.C., section C, inset 97630, IC 27118339
- Ensuring personnel with relevant experiences and competence – Auditors and
Assessors regarding expertise required, Auditor experience, conformity assessment
experiences and of equal existence of ethical behaviour and empathy;
- Strict respect for confidentiality;
- Effective preference of precautions prior to formality of meeting the requirements of
standards;
- Use of the most modern techniques for testing, as well as an adoption of
organizational measures preventing conflicts of interest and challenging the legality of
tests.
II. Scope and Objectives
Objectives
The present Rule defines:
A) Procedures used for Management Systems Certification. Further, the Rule
explains substances and procedures of certification process relevant for organizations
with an interest for certification. Instructions are based on the requirements of ISO
17021-1 (up to date version), MPA 50-01-07, ČSN EN ISO 19011 (up to date
version).
B) Procedures used for Product Certification. Further, the Rule explains
substances and procedures of certification process relevant for organizations with an
interest for certification. Instruction are based on the requirements of ISO/IEC 17065.
Scope
This definition of scope applies to Management Systems Certification of organizations
active in manufacturing, non-state or government sectors in areas for which LL-C is
accredited for.
This definition of scope applies to Product Certification of organizations active in
manufacture of products for which LL-C is accredited for.
Regulations or standards specific for a particular field, not designated here in detail, are
adequately regarded and applied according to inherent requirements if needed. Any non-
conformities or deviations will be presented to any Client case by case pursuant inherent
requirements.
III. Definitions and Abbreviations
The present Rule contains definitions from:
EN ISO 17021 (up to date version) - General requirements for certification bodies for
Management System Certification (including MPA 50-01-07 of Czech accreditation
institute)
EN ISO 19011 - Guidelines for Auditing of Management Systems
LL-C (Certification)
RULE 03, Revision 20, Page 6 (total 22)
LL-C (Certification) Czech Republic s.r.o., Pobřežní 620/3, Praha 8 - Karlín 186 00
M.C., section C, inset 97630, IC 27118339
EN ISO/IEC 17065 - General Requirements for Bodies Operating Product Certification
Systems
Abbreviations used:
CB – Certification Body
CBP – CB for Product Certification
HCB – Head of CB
DHCB – Deputy Head of CB
QM – Quality Manager
A – Assessor which provides Conformity Assessment
LA – Lead Assessor
DM – Decision Maker on Certification
TE – Technical Expert
Certified Client - Client
Documents mentioned:
F30 -
F31 -
F32 -
F46 -
Rule 01 -
Rule 02 -
Rule 03 -
Rule 05 -
Rule 12 -
IV. Selection and Use
A. Selection and use of Certification Standard
Quality Management System (QMS)
For Quality Management System certification ISO 9001 standards (up to date version) is
used. Further, quality management system must meet expectations of the relevant field
and customers.
LL-C (Certification)
RULE 03, Revision 20, Page 7 (total 22)
LL-C (Certification) Czech Republic s.r.o., Pobřežní 620/3, Praha 8 - Karlín 186 00
M.C., section C, inset 97630, IC 27118339
Environmental Management System
For Environmental Management System certification standard ISO 14001 is used.
Further, management system must meet expectations of the relevant field and
customers.
Information Security Management System
For Information Security Management System certification standard ISO 27001 is used.
Further, quality management system must meet expectations of the relevant field and
customers. Currently, IT Service Management System is currently often used in ICT
sector; as per ISO 20000-1. This standard contains elements of IT services outsourcing
management, quality management of ICT services and security management system
information.
Critical Control Points Management
Food Industry is certified in accordance to HACCP regulation (FAO/WHO Codex
Alimentarius). Further, quality management system must meet expectations of the
relevant field and customers. This standard gives basis for a more comprehensive Food
Safety Management System (ISO 22000 and FSSC 22000), which integrates feedback
and process management, as well as quality compatibility.
As well as GMP+ (B2, B4, B4.3) feed safety certification scheme
Occupational Health & Safety Management System
For Occupational Health & Safety Management System certification ISO 18001 OHSAS
standard is used. Further, management system must meet expectations of the relevant
field and customers.
Other management systems
When other standards are used, additional requirements according to relevant
accreditation body or contractual entity might occur. These additional requirements will
be provided to interested parties upon request.
B. Selection and Use of Certification Scheme
Products/Processes as per EN ISO 3834-2/3/4, EN 1090-2/3, EN 15085-2, EN
17660-1, EN 17660-2, EN 14554-1, EN 14554-2 and IS0 22716,
The conformity assessment is based on system certification audit methodology in the
scope of accreditation, in accordance with EN 45011, EA-6/02 and a valid accreditation
entity prescription. The quality assurance of welding processes in manufacturing,
execution of steel/aluminium construction, welding work on railway vehicle and ensuring
GMP-cosmetics products are generally controlled during the certification procedure.
Machinery Devices
Machinery devices certification means conformity assessment and evaluation procedures
are provided based on EC type-examination. In this regard, CB ascertains and certifies
that a sample of machinery devices (product concerned) meets provisions and
requirements of Directive 2006/42/EC.
LL-C (Certification)
RULE 03, Revision 20, Page 8 (total 22)
LL-C (Certification) Czech Republic s.r.o., Pobřežní 620/3, Praha 8 - Karlín 186 00
M.C., section C, inset 97630, IC 27118339
Medical Devices (MDD)
MDD certification means that conformity assessment and evaluation procedures are
provided based on EC Declaration of Conformity assessment procedures of Full Quality
Assurance System (Annex II of Directive 93/42/EEC), Production Quality Assurance
(Annex V of Directive 93/42/EEC) and Production Quality Assurance (Annex VI of
Directive 93/42/EEC), by which CB ascertains and certifies that a sample of MDD
(product concerned) meets provisions and requirements of this Directive.
Construction Products (CPR)
The procedure provides an evaluation based on conformity assessment and durability
verification in accordance with Regulation (EU) No 305/2011 of the European Parliament
and of the Council, Annex V (System 2+).
CB conducts Factory Production Control (FPC) certification based on factory´s initial
inspection, factory production control and continuous surveillance and factory production
control (FPC) approval.
Toys
Evaluation of Toys means conformity assessment procedure is provided based on EC
Declaration of Conformity by procedure EC type-examination. In this regard, CB
ascertains and certifies that a toy sample (product concerned) meets provisions and
requirements of Directive 2009/48/EC, Regulation of Government No. 86/2011.
Software for MDD
The conformity assessment is based on system certification audit methodology in
accordance with ISO 13485 and efforts to fulfil individual chapters of Directive 93/42/EEC
related to MDD and Directive 98/79/EC related to IVVD. The assessment model is based
on other Annexes of Directives and Client requests. LL-C provides assessment of MDD
class III based on Annex II of Directive 93/42/EEC; including examination of product
design.
LL-C (Certification)
RULE 03, Revision 20, Page 9 (total 22)
LL-C (Certification) Czech Republic s.r.o., Pobřežní 620/3, Praha 8 - Karlín 186 00
M.C., section C, inset 97630, IC 27118339
V. Certification processes
A. Management Systems Certification
Certification process diagram
CLIENT
LL-C
Process participants:
SUBCONTRACTOR
CLIENT INQUIRY
INQUIRY DETAILS
TELEPHONE
APPLICATION REGISTRATION
APPLICATION FORM (F30)
APPLICATION EVALUATION
CERTIFICATION STANDARDS
INTEGRATION
OTHER NORMATIVE DOCS.
ASSESSMENT SCOPE DEFINITION
STAGE 2 AUDIT - ON SITE
STAGE 1 AUDIT - OFF SITE /ON SITE
NON-CONFORMITY REPORTS
(F46)
AUDIT RECORD (F44)
AUDIT REPORT (F43)
QUESTIONNAIRE (F42 I+II.)
COMPILATION OF FINAL DOCUMENTS
(Certificates)
COMMENTS AND ACCEPTANCE BY
CLIENT
f
AUDIT REPORT (F 43)
CERTIFICATE (F 49)
EVALUATION
Successful
evaluation
Evaluation failed due to incorrect audit/assessment procedure
ACCEPTANCE BY CLIENT
Unsuccessful evaluation
NON-CONFORMING
REJECTION NOTICE OF
CERTIFICATE ISSUE (F 48 V)
APPOINTMENT OF AUDITORS
(F40) AUDIT PLAN (F41)
OFFER/AGREEMENT (F31)
BUSINESS CONDITIONS (F32)
STAGE I QUESTIONNAIRE
(F42 I.) – GMP+ temporary
acceptance (max 4th months)
GMP+
AUDIT OUTCOME EVALUATION
LL-C (Certification)
RULE 03, Revision 20, Page 10 (total 22)
LL-C (Certification) Czech Republic s.r.o., Pobřežní 620/3, Praha 8 - Karlín 186 00
M.C., section C, inset 97630, IC 27118339
The certification process mainly consists of:
- Inquiry – completion of Application F30 (Questionnaire for Proposal – Management
System certification);
- Verification of required documentation;
- Identification of aspects, risks and processes of manufacture or services provided
(Stage 1 Audit - On-site/Off-site);
- On-site audit of implementation and application at both, the contractors Head Office
and active operational site (branches), to demonstrate capabilities (Stage 2 Audit);
- Audit evaluation results.
Certification cycle:
- Certification audit - Initial audit and evaluation;
- Surveillance audits as per IAF requirement; the first surveillance shall be carried out
within 12 months from the last day of Stage II Audit;
- Recertification audit (audit re-assessment) with the frequency of 3 years after initial
certification and before the expiry of valid certificate; to maintain a valid certification.
The following articles describe details of individual steps of Certification cycle.
Inquiry/ Offer /Offer Submission and Application Registration
Inquiry of any new Client for Management System certification may be personally
discussed with a responsible LL-C persona, send via email at [email protected] or by mail to
company address, as well as send via electronic form available at LL-C website www.ll-
c.cz. Based on written inquiry or a face-to-face meeting, the LL-C coordinator conducts a
review of obtained information and verifies whether the CB has a competence and
abilities to perform the certification demanded (based on the scope of accreditation).
Further, reviews whether specific processes (e.g. welding, sterilization) should be
considered is conducted; in cooperation with the Head of CB.
Based on Inquiry, Questionnaire data and a current tariff, LL-C issues F31 form (Proposal
on a management system certification according to the standard(s) …) in written form,
which is send to the address of the Applicant. Further, every Offer must be accompanied
by Business Conditions (F32 form) as this document is its integral and mandatory annex.
Client who accepts an Offer for certification has to confirm the F31 form and Business
Conditions (F32 form). Only an Offer that is signed by an authorised persona and
submitted with signed Business Conditions is taken as a valid contract/agreement for
Management System certification.
By the Application confirmation, following process is initiated:
- Offer is registered to the internal system of LL-C, including information about the
Applicant;
- Lead Auditor is appointed; Lead Auditor starts to plan the audit (contact person
authorised by the Applicant, additional conditions, creation of audit team, fix an audit
date);
- The Applicant is requested to submit the management manual or other document(s)
describing the management system at least 14 days before the audit starts (first date
of audit).
Auditors
The Lead Auditor, Auditors, members of Audit team, Technical Expert and DM (Decision
Maker) are appointed by Head of CB LL-C. The appointment process must comply with
general qualification of Auditors, including their competence and experience, reflecting
LL-C (Certification)
RULE 03, Revision 20, Page 11 (total 22)
LL-C (Certification) Czech Republic s.r.o., Pobřežní 620/3, Praha 8 - Karlín 186 00
M.C., section C, inset 97630, IC 27118339
applicant activity and any specific processes (e.g. welding) if any occur, impartiality and
independence. The Applicant must be notified in advance about the Lead Auditor
appointment.
Client´s documentation submitted
Documentation submitted must reasonably depict the organizational structure of
Applicant company as well as it shall include a precise description of company´s
activities. Above the system management manual, the documentation may include
procedures and work instructions. Documentation must take into account both, direct
and indirect, requirements based on standard(s) applied and Client business scope.
Documentation assessment
LL-C considers all information and documentation of the Applicant/Client to be
confidential.
Lead Auditor shall examine documentation presented in adherence to completeness and
conformity to the requirements of selected standard. In case of major nonconformities,
the applicant receives a Protocol of nonconformities (F46 form). The applicant shall
accept corrective actions to nonconformities which occurred and specify the date for their
compliance. Major nonconformities must be corrected before Stage II Audit. Insignificant
nonconformities and other anomalies may be clarified during the Stage II audit.
Stage I Audit - Initial certification
Stage I Audit is an obligatory part and is carried out as a part of the initial certification
audit (Stage I Audit). Stage I Audit is performed to determine the preparedness of Client
location, status and the main conditions for Stage II Audit.
Results are documented in I. stage Questionnaire, Protocol of nonconformities (F46 form)
and other forms.
In certain cases, and under specific circumstance (particularly standard ISO 9001) Stage
I Audit may be carried out as an offsite audit of the Applicant location via questionnaires
and telecommunication technology (RAP – remote auditing procedures).
In case of GMP+ certification temporary acceptance for max 4 month can be issued.
Audit planning and preparation
Lead Auditor in cooperation with the Applicant draw up an Audit plan and inform the
Applicant about its final version in an appropriate way. The Audit plan shall contain all
information needed for the Applicant to prepare for audit. If necessary, Lead Auditor may
visit the Applicant to plan details.
In case of an integrated audit only one Audit plan is created. Lead Auditor prepares the
Audit plan in order to avoid repeated verification of the common requirements of
individual standards.
AUDIT ON SITE
Opening meeting
The Opening meeting stands for an interview of Auditors with an Applicant and person
responsible for management system in the Applicant company. The goal of Opening
meeting is to:
- Reach a consensus of both parties (Applicant and CB) on the content and procedures
of certification;
- Discuss results of Stage I Audit;
- Determine a manner of communication between both parties;
LL-C (Certification)
RULE 03, Revision 20, Page 12 (total 22)
LL-C (Certification) Czech Republic s.r.o., Pobřežní 620/3, Praha 8 - Karlín 186 00
M.C., section C, inset 97630, IC 27118339
- Verify whether the extent of audit shall provide sufficient results for further
assessment carried out by the Auditors;
- A declaration of confidentiality and impartiality of audit team.
Stage 2 Audit - Audit performance
Auditors with an assistance from company management or its representatives shall
examine whether the organization unit system is in accordance with the plan; including
amendments adopted during the Opening meeting. During the assessment Auditors can
use questionnaires (for specific standards) and verify whether the management system is
introduced and applied in conformity with requirements of the selected standard as well
as with Client´s documentation. Lead Auditor shall communicate a preliminary report on
results after the audit is done. Audit team is not authorized to release the final result of
certification. A written Audit report containing results of an audit and other important
information shall be received by an Applicant within 14 days. The Applicant may raise
objections and comments within following 14 days. If any nonconformities (major or
minor) are found in the system, the Applicant must propose appropriate corrective
actions and the date of their implementation; the date depends on specific findings.
In case of GMP+ the period between Stage I and II. must not be longer than 4 months.
Evaluation of Audit results
Lead Auditor shall forward all necessary documentation from audit performed to a
responsible persona for an impartial evaluation and decision on certification.
Criteria for evaluation of audit results are as follows:
- Verification of compliance with the relevant standard;
- Verification of compliance with the LL-C Rules;
- Submission and completeness of audit results in the documentation of audit (f.e.
report, questionnaire, reports of nonconformities).
If any uncertainties occur, they shall be clarified by a responsible Evaluator and Lead
Auditor.
If any nonconformities occur an additional audit is needed to verify that corrective
actions were taken successfully before the certificate will be granted.
Information for Applicant
If an Evaluator decides that an outcome of an audit assessment authorizes the CB to
grant a new certificate or maintain a current certificate, the Applicant will receive a
certificate (in case of an initial audit) as well as the Audit report.
If an Evaluator decides that an outcome of an audit assessment does not allow the CB to
grant a new certificate or maintain current certificate, the final decision is notified to the
Applicant including reasons for the decision.
The Applicant has the right to appeal to the Head of CB with a request to challenge the
decision.
Certification contract
The certification contract on management systems dealing with rights and obligations of
any Applicants and CB is concluded by a confirmation of Offer of Management System
Conditions (F31 form) and Business Conditions (F32 form). The Applicant must confirm
both documents (sign), before the Stage I Audit starts. Signed contract is mandatory for
the certification and follow up/ surveillance period.
Certification
LL-C (Certification)
RULE 03, Revision 20, Page 13 (total 22)
LL-C (Certification) Czech Republic s.r.o., Pobřežní 620/3, Praha 8 - Karlín 186 00
M.C., section C, inset 97630, IC 27118339
Ones all criteria are met; LL-C grants a certification in the form of a certificate. The
Applicant receives official certificates, two original sets in Applicant national language as
well as two original sets in English. Additional fee might be charged if additional copies or
the foreign language version(s) of certificate are required. All issued certificates are valid
for a period of three years under certain conditions; follow up / surveillance audits are
performed as well as compliance with conditions of the relative standard are confirmed.
Use of LL-C logo and other marks
The use of LL-C logo and marks is regulated in compliance with Business Conditions (F32
form). Any certified entity must comply with the terms in F32 form.
Certification maintenance
In order to maintain the valid certificate LL-C provides an annual surveillance audit to
determine the effectiveness of the system. Surveillance audits are carried out in
compliance with the certification cycle; surveillance audit shall not be later than 1 year
from the last day of Stage II Audit or no later than last day of first surveillance audit.
If surveillance audit findings show nonconformities in Client´s management system
according to the standards, the Client is allowed to take corrections and corrective
actions and implement them by the established deadline. LL-C verifies and decides if the
relative corrective action(s) is/are sufficient enough to maintain the current certification.
The recertification audit shall be done prior to the expiry date of the certification if Client
wishes to continue certification with LL-C. Therefore, recertification audits shall be
planned ahead of time and Client shall be informed. Recertification audits evaluate and
confirm the continued conformity and effectiveness of the management system, further
its commitment to maintain the effectiveness and improvement, and its continued
relevance and applicability for the scope of certification. The recertification audit shall be
planned and conducted in due time to enable for timely renewal before the certificate
expiry date.
Procedures and guidelines for recertification audits are consistent with procedures and
guidelines for an initial audit. If any important changes, e.g. object of activity or
documentation, in Client´s organization occur they shall be submitted to LL-C at least 14
days before the audit starts.
Additional audits (in GMP+ schemes are carried out in accordance with GMP+C12
document.
LL-C (Certification)
RULE 03, Revision 20, Page 14 (total 22)
LL-C (Certification) Czech Republic s.r.o., Pobřežní 620/3, Praha 8 - Karlín 186 00
M.C., section C, inset 97630, IC 27118339
B) Process of Product Certification
Certification process diagram – certification of product, process or service*
* The Certification process diagram (above) does not apply to Medical Devices Certification process;
Medical Devices Certification process described separately in Technical Guide for Product certification - Medical Devices MDD (Rule 15.11).
CLIENT
LL-C
PROCESS PARTICIPANT SUBCONTRACTOR
OWN EQUIPMENT YES
CLIENT INQUIRY
INQUIRY DETAILS
TELEPHON
APPLICATION
APPLICATION REGISTRATION
APPLICATION
FORM F30 V
APPLLICATION EVALUATION
REGULATIONS OF GOVERN.
HARMONISED STANDARDS
LIST OF SUBCONTRACTORS EVALUATION
SCOPE DEFINITION
PLAN OF EVALUATION F41 V
EXECUTION OF TESTS IN LABORATORY ,
CALCOLATIONS
EXECUTION OF TESTS IN LABORATORY ,
CALCOLATIONS
OWN EQUIPMENT NO
EVALUATION OF THE RESULTS OF
TESTS
EVALUATION QUESTIONNAIRE
(F 42 V) RECORDS FROM
ASSESSMENT( F44)
COMPILATION OF FINAL DOCUMENTS
COMMENTS AND ACCEPTANCE BY
CLIENT
f
EVALUATION REPORT (F 43 V)
DECISION ON CERTIFICATIO (F 47 V) CERTIFICATION OF CONFORMITY (F 49 V)
DM
Successful evaluation
EVALUATION FAILED DUE TO INCORRECT EVALUATION PLAN
ACCEPTANCE BY CLIENT
Unsuccessful evaluation
CERTIFICATE ISSUE
REJECTION NOTICE (F 48 V)
TECNICAL
EXPERT
LL-C (Certification)
RULE 03, Revision 20, Page 15 (total 22)
LL-C (Certification) Czech Republic s.r.o., Pobřežní 620/3, Praha 8 - Karlín 186 00
M.C., section C, inset 97630, IC 27118339
The Certification process mainly consists of:
- Inquiry and completion of application Questionnaire for Proposal – Product
certification (F30V form);
- Verification of required documentation;
- Documentation assessment and creation of Certification Offer – Product certification
(F31V)
- Evaluation process;
- Certification review and;
- Decision on certification.
Certification cycle:
- Initial audit, review and decision on certification by DM (decision maker);
- Surveillance assessment as per IAF requirement; if requested by certification
scheme;
- Recertification (repetitive evaluation and conformity assessment) before the expiry of
valid certificate; to maintain a valid certification.
Inquiry / Offer / Offer Submission and Application Registration
Inquiry of any new Client for Product certification may be personally discussed with a
responsible LL-C persona, send via email at [email protected] or by mail to company´s
address, as well as send via electronic form available at LL-C website www.ll-c.cz. Based
on written inquiry or a face-to-face meeting, the LL-C coordinator conducts a review of
obtained information and verifies whether the CB has a competence and abilities to
perform the certification demanded (the scope of accreditation).
Documentation received at the stage of Application for certification must adequately
define the organizational structure of the Applicant. Further, it has to describe
Applicant´s activities essential for certification for which Application was made.
Documentation may include, in addition to the manual, procedures and work instructions.
Documentation must take into account both, direct and indirect, requirements based on
standards used and the business scope.
Coordinator reviews documentation received to assure that a product certified is covered
by the LL-C accreditation, and whether the CB has competences and capabilities to
perform certification itself. If evaluated positively, based on Inquiry, data from
Questionnaire and a current tariff, LL-C issues Certification Offer – Product certification
(F31V) in written form, which is send to the address of the Applicant. Further, every offer
must be accompanied by Business Conditions – Product certification (F32V) as this
document is its integral and mandatory annex.
Client who accepts an offer for certification has to confirm the Certification Offer –
Product certification (F31 form) and Business Conditions (F32). Only an Offer that is
signed by an authorised persona and submitted with signed Business Conditions is taken
as a valid contract/agreement for Product Certification. The contract is generally
governed by the provisions of the Civil Code Nr. 89/2012 Sb. § 2652 - § 2661 in Czech
Republic and accreditation criteria.
By the Application confirmation, following process is initiated:
- Offer is registered to the internal system of LL-C, including information about the
Applicant;
- Lead Assessor is appointed; Lead Assessor starts to plan the assessment (contact
person authorised by the Applicant, additional conditions, creation of Assessor team,
fix a date of assessment);
- The Applicant is requested to submit Product technical documentation (product
documents, design drawings, validation test reports, instruction manual, risk analysis,
LL-C (Certification)
RULE 03, Revision 20, Page 16 (total 22)
LL-C (Certification) Czech Republic s.r.o., Pobřežní 620/3, Praha 8 - Karlín 186 00
M.C., section C, inset 97630, IC 27118339
investigations, technical test, etc.) at least 14 days before the assessment starts (first
date of assessment).
Assessors
The Lead Assessor, Assessment team members, Technical Experts and person
responsible for the review and Certification decision are appointed by Head of CB LL-C.
The appointment process must comply with general qualification of Assessors, including
their competence and experience, reflecting specificities of the product – its
assessment/evaluation, impartiality and independence. An Applicant must be notified in
advance about the Lead Assessor appointment.
Evaluation activities/processes
Conformity assessment of requirements covered by the scope of certification and other
requirements of certification scheme.
Conformity assessment shall be governed by different procedures depending on the type
of product and consists mainly of:
- Verification of supporting documents, requirements and provisions of the
manufacturer for his quality system, documented in a systematic and orderly
manner in the form of written policy statements, procedures, further a uniform
interpretation of quality policy and procedures such as quality programmes, plans,
manuals and records is granted;
- Conformity assessment of Quality Assurance system to determine whether
requirements set by documentation structure are met;
- Inspection on the manufacturer premises, where technical documentation is
verified, to ensure health and safety requirements are met;
- Verification of Technical documentation submitted by the Applicant, further
conformity assessment of product type (demonstrated) with technical
documentation;
- Appropriate inspection, measurements and tests verifying the compliance with
basic technical requirements for health and safety;
- Appropriate inspection whether harmonised standards were applied.
If any nonconformities occur, the Applicant receives a Report of Nonconformities (F46
form) to which corrective actions must be accepted and a date for their compliance must
be specified. These nonconformities shall be removed before the assessment is done.
Irrelevant nonconformities and anomalies shall be clarified during the assessment period,
if any.
During the evaluation DMs use Questionnaire and verify whether there is a conformity of
documents; relevant standards, Applicant documentation, government regulation and
directives. Lead Assessor shall communicate a preliminary report on the results of
evaluation. The team of Assessors is not authorized to release the final result. A written
Evaluation report containing results of evaluation and other important information shall
be received by the Applicant within 14 days. The Applicant may rise objections and
comments within following 14 days. If any nonconformities (major or minor) are found,
the Applicant must propose appropriate corrective actions and the date of their
implementation; the date depends on specific findings.
Review of certification decision
Lead Assessor shall forward all necessary documentation related to evaluation to DM
(e.g., Head of CB or his deputy) for an impartial assessment and decision on certification.
Criteria for an assessment and a review of evaluation results are as follows:
LL-C (Certification)
RULE 03, Revision 20, Page 17 (total 22)
LL-C (Certification) Czech Republic s.r.o., Pobřežní 620/3, Praha 8 - Karlín 186 00
M.C., section C, inset 97630, IC 27118339
- Test records/questionnaires;
- Theoretical calculation records and reports (if requested);
- Evaluation Report (F43V);
- Verification of compliance with the LL-C Rules;
- Submission and completeness of evaluation results in the documentation (report,
questionnaire, reports of nonconformities)
- Corrective actions list including response actions and a date of implementation.
If any uncertainties occur, they shall be clarified by a responsible DM and Lead Assessor.
If any nonconformities occur additional tests may be needed to verify that corrective
actions were taken successfully before the certificate will be granted.
Based on findings review the Applicant is informed if additional tests will be needed to
verify the effectiveness of the corrective action(s) taken before granting the Certificate.
The DM reviews the results of additional evaluation. In relation, DM reviews the final
results of evaluation and assessment.
Information for Applicant
If DM decides that outcome of a conformity assessment authorizes the CB to grant a new
Certificate or maintain a current Certificate, the Applicant will receive a Certificate (in
case of an initial evaluation) as well as the Evaluation report, further a report with
additional conditions to be fulfilled before issuing a Certificate (maintaining in case of
surveillance audits).
If a Decision Maker decides that an outcome of conformity assessment does not allow the
CB to grant a new Certificate or maintain a current Certificate, the final decision is
notified to the Applicant including reasons for the decision.
The Applicant has the right to appeal to the Head of CB with a request to challenge the
decision.
Certificate Issuance
Ones all criteria are met; the LL-C grants a certification in the form of a Certificate. The
Applicant receives official Certificates, two original sets in Applicant´s office national
language as well as two original sets in English. Additional fee might be charged if
additional copies or foreign language version(s) of Certificate are required. All issued
certificates are valid for a period of three years under certain conditions; surveillance
audits are performed as well as compliance with conditions of the relative standard are
confirmed.
Use of LL-C logos ad marks
The use of LL-C logo and marks is regulated in compliance with Business Conditions (F32
form). Any certified entity must comply with the terms in F32 form.
Certification maintenance
If required by the certification scheme, to maintain the valid certificate LL-C provides an
annual surveillance assessment to determine that product requirements are fulfilled.
Surveillance assessments are carried out in compliance with the certification cycle;
surveillance assessment shall not be later than 1 year from the last day of Stage II Audit
or no later than the last day of first surveillance assessment.
If surveillance assessment findings show nonconformities, product requirements do not
comply with the standard, the Client is allowed to take corrections and corrective actions
and implement them by the established deadline. LL-C verifies and decides if the relative
corrective action(s) is/are sufficient enough to maintain the current certification.
LL-C (Certification)
RULE 03, Revision 20, Page 18 (total 22)
LL-C (Certification) Czech Republic s.r.o., Pobřežní 620/3, Praha 8 - Karlín 186 00
M.C., section C, inset 97630, IC 27118339
Certification renewal
The recertification assessment shall be done prior to the expiry date of the certification if
the Client wishes to continue product certification with LL-C. Therefore, recertification
assessment shall be planned ahead of time and the Client shall be informed.
Recertification assessment evaluates and confirms the continued conformity and
effectiveness of the product requirements. The recertification assessment shall be
planned and conducted while taking into consideration time necessary for the renewal
before the certificate expiry date; new Certificate shall be issued before the expiry of the
old one.
If any important changes, e.g. object of activity or documentation, in Client´s
organization occur they shall be submitted to LL-C at least 14 days before the
reassessment starts.
VI. Suspension or termination of certification
Certificate Suspension
In case a breach of certification contract or an infringement by Client occurs and is
followed by a subsequent re-examination of severity violation, the Certificate may be
suspended for a period specified by LL-C.
Certificate suspension may arise for example in following cases:
- Surveillance findings show that the manufacturer does not fulfil obligations imposed
by Management System, further agreed corrective actions were not properly
implemented in time specified and in a way agreed;
- Surveillance audit could not be conducted on time (e.g. entity certified refuses to
perform surveillance);
- Entity certified is in an insolvency or in an anticipation of bankruptcy.
- Entity certified has been using the certificate in an unauthorised way.
The Certificate suspension shall be communicated to the Client by a registered letter and
published on the website of the CB. The holder may appeal to Head of CB within 30 days.
The suspension is withdrawn immediately if the Certified Client demonstrates that
corrective action(s) was/were taken and sufficiently implemented; a breach of
certification contract was removed.
Withdrawal/Termination of certification
If the Certified Client, despite the instructions from LL-C fails to fulfil contract obligations,
e.g. does not take corrective actions or fails to comply with the above mentioned
shortcomings, LL-C immediately terminates the validity of the certificate. Following, the
Client is notified and asked to return all original certificates by registered mail and to
publish information about certificate withdrawal. Other reasons for Termination of
certification may be, for example:
- Surveillance audit shows that essentials Management System requirements are not
met;
- The Certified Client requested a withdrawal;
- Certified products are no longer offered by Client (technical parameters of the product
have changed, therefore the product does not conform with current requirements
anymore);
- The Client fails to meet financial obligations to LL-C
LL-C (Certification)
RULE 03, Revision 20, Page 19 (total 22)
LL-C (Certification) Czech Republic s.r.o., Pobřežní 620/3, Praha 8 - Karlín 186 00
M.C., section C, inset 97630, IC 27118339
- Any other violations of Business Conditions (F32 form) by the Client.
VII. Responsibility of Certification Body
Confidentiality
LL-C considers all information and documentation of the Applicant/Client to be
confidential.
Appointment of Auditors and their qualification (Management System certification)
Auditors with an appropriate qualification and relevant professional experiences are
appointed for Management System certification. Required skills and knowledge of
Auditors are continuously updated by internal and external trainings.
Auditors or appointed Evaluators involved in certification of a certain Client must not
participate in any consultancy, introduction of management system or to be in any other
way connected to the Applicant/Certified client; impartiality needs to be guaranteed.
Appointed Auditors are presented to the Applicant; Applicant has the right to refuse
individual Auditors. However, the Client/Applicant must explain his motivation for the
refusal of an individual Auditor. On those bases Head of LL-C considers and adopts final
decision. If a complaint from a Client arises, Head of LL-C acts in accordance with the
internal Quality Manual (Rule 01) – mentioned bellow. Further, external Experts and
Auditors are also bound by confidentiality pursuant to the contract with LL-C.
Appointment of Evaluators and their qualification (Product certification)
Assessors with an appropriate qualification and relevant professional experience are
appointed by Head of CB for Product certification. Required skills and knowledge of
Assessors are continuously updated by internal and external trainings.
Assessors or appointed Decision Makers for certification assessment and review shall be
only CB employees, who have not participated in any consultancy, further have no work
relationship to the Applicant/Certified client at least for 2 years and have not participated
on the development of a product certified; impartiality needs to be guaranteed. Unless
appointed Assessor/Decision Maker and/or Technical Expert is a permanent full-time
employee of CB, the assessment is provided under conditions written in the Act and
Behaviour of CB personnel (Rule 05); confidentiality and conflict of interest avoidance are
ensured.
Applicant/Certified client has the right to refuse individual Assessors. However, the
Applicant/Certified client must explain his motivation for the refusal of an individual
Assessor. On those bases the Head of LL-C considers and adopts final decision. If a
complaint from a Client arises, the Head of LL-C acts in accordance with the internal
Quality Manual (Rule 01) – mentioned bellow. Further, external Experts and Assessors
are also bound by confidentiality pursuant to the contract with LL-C.
Records (documents stored)
For the purpose of Market Surveillance Authority (CAI in CZ) and Medical Devices
Surveillance Authority (SÚKL – State Institute for Drug control in CZ), complete
documentation, a part of MDD conformity assessment shall be kept by the manufacturer
or authorised representative for minimum of 5 years from the manufacture of the last
product (in case of implantable MDD for 15 years).
In case of critical nonconformity (annex 1 GMP+ C12 document) certification body is
obligate to inform the GMP+ International.
LL-C (Certification)
RULE 03, Revision 20, Page 20 (total 22)
LL-C (Certification) Czech Republic s.r.o., Pobřežní 620/3, Praha 8 - Karlín 186 00
M.C., section C, inset 97630, IC 27118339
Publication of Certification
LL-C publishes Certificate holders (Certified clients) at regular intervals on the LL-C
website – www.ll-c.info – on the basis of Validity Code. In case of a suspension or a
withdrawal of Certificate, information is published immediately.
In private certification schemes (FSSC 22000, GMP+) the information about clients and
certification dates etc. are uploaded to specific IS held by scheme owner within 14 days
after every event.
VIII. Responsibilities of Certified Client
(holder of certification)
A. Management Systems certification
Management System supervision
The System Management certification shall be regularly reviewed by documented internal
audits to prove the effectiveness of the system. By acquiring a management certification
Client´s obligation is to uphold to the regular reviews. In case any non-compliance with
the specific standard occur, the Client shall uphold to the commitment to take his own
corrective actions. This commitment shall remain despite the regular monitoring by LL-C.
Assistance for LL-C Auditors
The Certified client is obliged to allow LL-C to perform audit on time, further to provide
any assistance needed to LL-C Auditors performing the audit. The Certified client shall
ensure an access to all premises, inducing scope of certification for Auditors as well as an
access to inspect all relevant documents.
Management System Modifications of Certified Client
The Certified client is obliged to immediately inform LL-C if any changes or modifications
to management system occur and might affect its validity, e.g.:
- Organisational changes occur (change of name/place of cooperation, sale or
undertaking of business or its part, bankruptcy, scope of certification, etc.);
- Substantial changes of product, business activity or services occur;
- In case of product recall (FSSC 22000 scheme, GMP+ FSA)
- Substantial changes in documentation occur.
LL-C shall examine occurred changes. In relation to their character and extent and
extraordinary audit may be scheduled.
B. Product certification
The Certified client (manufacturer) shall affix the EC Declaration of Conformity in
accordance with the Directive.
LL-C (Certification)
RULE 03, Revision 20, Page 21 (total 22)
LL-C (Certification) Czech Republic s.r.o., Pobřežní 620/3, Praha 8 - Karlín 186 00
M.C., section C, inset 97630, IC 27118339
The Certified Client, holder of Machinery Device Certificate must constantly ensure that
the machinery meets the current technical state of art.
The Certified client, holder of construction product certificate must ensure that the
construction product correspond with the manufacturing technical parameters indicated
in the report and on the valid Certificate. If any changes to the manufacturing process or
to product construction technical parameters occur, the Client is obliged not to include
the existing Certificate with the changed product. Further, the Client is obliged to
communicate any changes with CB, LL-C.
The Certified Client undertakes to ensure fulfilment of obligations arising from the
approved Quality System Management, further to ensure its appropriateness and
effectiveness.
Assistance for the LL-C Evaluators
The Certified Client is obliged to allow LL-C to perform an assessment on time, further to
provide any assistance needed to LL-C Assessors performing the assessment. The
Certified Client shall ensure an access to all premises, inducing scope of certification for
Assessors as well as an access for the inspection of all relevant documents.
Product Modifications of Certified Client
The Certified Client is obliged to inform LL-C if any intended changes in quality assurance
occur. LL-C access changes and decides, whether changes caused a need for a new
conformity assessment to be held.
The Certified Client shall inform LL-C (CB) about all modifications to the approved
proposal. Additional assessment of above mentioned modifications is required. The
additional approval is in a form of a supplement to the EC Design-examination
Certificate. The Certified Client is obliged to immediately inform LL-C if any changes or
modifications, which might affect the certificate validity occur, e.g.:
- Organisational changes occur (change of name/place of cooperation, sale or
undertaking of business or its part, bankruptcy, scope of certification, etc.);
- Substantial changes of product, business activity or services occur;
- Substantial changes in documentation.
LL-C shall examine occurred changes. In relation to their character and extent and
extraordinary audit may be scheduled.
LL-C (Certification)
RULE 03, Revision 20, Page 22 (total 22)
LL-C (Certification) Czech Republic s.r.o., Pobřežní 620/3, Praha 8 - Karlín 186 00
M.C., section C, inset 97630, IC 27118339
IX. Application of Certification Rules modifications
The certification system of LL-C is based on the requirements of applicable standards and
accreditation requirements. All Certified Clients shall be informed if
changes/modifications requiring certification system modification occur. This situation
may occur in the following cases:
- Revision and/or modification of certification standards;
- Modification of accreditation rules (e.g. changes in surveillance period, expenses
related to accreditation and audits, etc.).
If the Certified Client does not agree with occurred changes, the certification contract will
terminate by the entry of modifications/changes into force.
X. Certification fees and other expenses
Certification fees are set by the Common Customs Tariff of LL-C, which is in accordance
with methodical guidelines of ISO/EN 17021-1. LL-C must follow these requirements,
especially requirements considering audit timeframe.
Certification fees or any other additional costs are a subject of the certification Offer.
A pro forma invoice shall be paid by the Applicant prior to the beginning of the
audit/assessment; payment shall not be bound by the decision on certification, see F32
form.
XI. Complaint and Appeal Procedure
Appeal
Clients may appeal to the LL-C Head of CB within following 30 days. In relation, CB shall
establish an Appeals Committee consisting of 3 Auditors/Assessors or Experts who were
not involved in certification activities related to a Complaint or an Appeal. This
Committee reviews and verifies all necessary information and decides by simple majority
vote.
Complaints
Any third party has the right to complain about certification decision to LL-C. If such a
situation occurs, similar procedure as with “Appeal” (above mentioned) is applied;
depending on the type of a Complaint.
If an extraordinary audit is ordered, the Appeals Committee is convened after the
outcomes are disputed.
The precise procedure for receiving Complaints and Appeals, their evaluation and
implementation is documented in Rules of Appeals Committee (Rule 12).