List of Multimedia Cbt Packages Developed by Npti

download List of Multimedia Cbt Packages Developed by Npti

of 2

Transcript of List of Multimedia Cbt Packages Developed by Npti

  • 7/27/2019 List of Multimedia Cbt Packages Developed by Npti

    1/2

    NATIONAL POWER TRAINING INSTITUTEpln ISO 9001 d ISO 14001 Organization)Sector-33, Faridabad-121003

    Multimedia Computer Based Training (CBT) Packages(Special Concession rates for Academic Institutions)With Effect From: 15-11-06Sr.No Name of the Multimedia CST BasiciscountedTwo Copiesll Other Pricerice Copies -..:..1 Combustion System in Boilers Rs.40,OOOI-s. 25,0001-s.40,OOOI-s. 10,0001-oiler Drum and Drum internals -do-do-- do -- do -uper heater, Re-heater and De-Super -do-do-- do -do -4. Air Heater -dodo- do -- do -5. Waterl Steam Cycle of a Thermal Powers. 25,0001-s. 15,0001-s.25,OOOI-s.10,OOOI-6. Steam Turbine Construction Rs.40,OOOI-s. 25,0001-sAO,OOOI-s.10,OOOI- .urbine Governinq System (KWU) -do-do-- do -- do -eqenerative Feed Heatinq System -do-do-- do -- do -urbine Vacuum System -dodo-- do -- do -P-LP Bypass System

    ~.' . , I '.-do- -do-- do -- do -urbine Lubricatin!:) Oil System .... ::;: '-do-do--d 0----d 0--12. Working Principles of Generator &

    Rs. 25,0001-s. 15,000/-s.25,0001-s.10,000/-r---'Systems in a Thermal Power Station

    13.Generator Construction Rs. 40,0001-s. 25,0001-sAO,OOOI-S.10,000/- ..~enerator Excitation System -do-do-- do -- do -enerator Seal Oil System -dodo-- do -- do -enerator Coolin!:) System -dodo-- do -- do -

    17.Power Station Fans -do-do-sAO,OOOI- .s.10,OOOI-lectrical Motors in Power Station Rs. 40,000/-s. 25,000/-- do -s. 10,0001-uel Handlinq System Rs. 25,000/-s. 15,000/-sAO,OOOI-s.10,OOOI-oal Mills & Milling Systems Rs. 40,0001-s. 25,0001-sAO,OOO/-s. 10,000/-lectrostatic Precipitators Rs. 40,0001-s. 25,0001-- do -s.I0,0001-ooling Water System Rs. 25,0001-s. 15,000/-s.25,0001-s.1 0,0001-'"ompressed Air, Water Treatment -do-do-sAO,OOO/-s.10,000/-& Fire Prevention Systems24. Lub Oil Handlin!:) System Rs. 40,000/-s.25,0001-sAO,OOO/-s.I0,000i-ouplinq for Power Transmission Rs. 40,0001-s.25,OOO/-

    do -s.10,OOOI-umas used in Power Station Rs.40,OOOI-s.25,0001-- do -s.10,000/-.

    Combined Cycle Gas Turbine ( CCGT )s. 25,0001-s.15,OOO/-s.25,000/-s.I0,0001-28.Gas Turbine Rs. 40,0001-s. 25,000/-sAO,OOOI-S.10,0001-,.ontrol System of CCGT Plant. Rs. 25,000/-s.15,000/-s.25,0001-s.IO,OOOI-ater Treatment of CCGT. Rs. 25,0001-s.15,OOOI-s.25,000/-s.I0,0001-ydro Generator Construction RsAO,OOOI-s.25,OOOI-sAO,OOO/-s.10,OOO/-iltin!:) Problems in Hydro Power PlantssAO,OOOI-s. 25,0001-- do --d0--

  • 7/27/2019 List of Multimedia Cbt Packages Developed by Npti

    2/2

    T&Dower Transformers RsAO,OOO/-s. 25,000/-sAO,OOO/-s.10,OOO/-ondition Monitoring of Power RsAO,OOO/-s. 25,000/-- do -- do -5. Maintenance of Power Transformers RsAO,OOO/-s. 25,000/-- do -- do -ower Station Switchgear RsAO,OOO/-s. 25,0001-- do -- do -witchgear Maintenance RsAO,OOO/-s. 25,000/-sAO,OOO/-s. 10,000/-ub Station Maintenance Management-AsAO,OOO/-s. 25,000/-sAO,OOO/-s. 10,000/-9. Drying out System of Power TransformerssAO,OOO/-s. 25,000/-sAO,OOO/-s. 10,000/- .able and Cable Jointing RsAO,OOO/-s. 25,000/-sAO,OOO/-s. 10,000/-otor & Motor Maintenance RsAO,OOO/-s. 25,0001-sAO,OOOI-s. 10,000/-attery and Battery Maintenance RsAO,OOO/-s. 25,0001-sAO,OOO/-s. 10,000/-3. Renewable Enerqies RsAO,OOOI-s. 25,0001-sAO,OOOI-s. 10,000/-4 ISO 9001-A Quality Management SystemsAO,OOO/- "Rs. 25,000/-sAO,OOO/-s. 10,000/-roject Management through the RsAO,OOO/- .s. 25,000/-sAO,OOO/-s. 10,000/- _.1. Rs.16,80,000 .s. 10,45,000s.17,50,000s. 45,000/-

    Note: All CDs are Copyright NPTI.The CDs are to be used in the premises for which they have been procured.Reproduction of any of these CDs in any form is illegal under copyright act.For more details, please write to:Director ( Projects)Corporate office, Sector-33, Faridabad-121 003 (Haryana),Ph: 0129-2270949, 2274916-17/Extn.,...323 & 316E-mail: [email protected]@npti-india.com

    '"