Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP Lismore Base Hospital Stage 3C Page 1 of 23 Lismore Base Hospital Stage 3C North Tower LBH-PP-JH-Y-0007-07-TMP TRAFFIC MANAGEMENT PLAN

Transcript of Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C...

Page 1: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 1 of 23

Lismore Base Hospital Stage 3C

North Tower

LBH-PP-JH-Y-0007-07-TMP

TR

AFFIC

MA

NA

GEM

EN

T P

LA

N

Page 2: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 2 of 23

PROJECT 7204B

Lismore Base Hospital Stage 3C

TRAFFIC

MANAGEMENT PLAN

LBH-PP-JH-Y-0007-07-TMP

This Plan is the property of John Holland and may not be copied, distributed or used without the written

consent of the John Holland.

Page 3: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 3 of 23

1 Revisions and Distribution

1.1 Revisions

Draft issues of this document shall be identified as Revision A, B, C etc. Upon initial issue (generally Contract Award)

this shall be changed to a sequential number commencing at Revision 0. Revision numbers shall commence at Rev.

1, 2 etc.

Multiple copies of copy #1 may be issued to the Principal for Contract purposes. Following Contract award, all copies

shall be distributed in accordance with the Distribution List. On receipt of a revision, the copyholder shall incorporate

the revised pages into this document. The document shall be subject to reissue after a practical number of changes

have been made.Draft issues of this document are identified as Revision A, B, C etc. Upon initial issue (generally

Contract Award) this will be changed to a sequential number commencing at Revision 0. Revision numbers will

continue at Rev. 1, 2 etc.

Revision list

Rev Date

Prepared By [Name & Signature]

Reviewed By [Name & Signature]

Approved By Remarks

00 6/6/16 Brett

Popham Brett

Popham Brett

Popham Initial Issue

01 05/5/16 Brett

Popham Brett

Popham Brett

Popham Revised to incl. Stage 3B1

02 31/8/16 Brett

Popham Brett

Popham Brett

Popham Revised for Stage 3B2

03 8/9/16 Brett

Popham Brett

Popham Brett

Popham Updated for Principals comments

04 24/4/18 Michael Sawyer

Brett Popham

Brett Popham

Updated for North Tower scope and Little Uralba St TCP

05 14/9/18 Michael Sawyer

Brett Popham

Brett Popham

Updated to include Driver Code of Conduct

06 19/09/18 Michael Sawyer

Brett Popham

Brett Popham

Request from HI change Stage 3B to Stage 3C

07 01/02/19 Michael Saywer

Brett Popham

Brett Popham

Minor updates to include Traffic controller checks and monitoting program

Page 4: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 4 of 23

AMENDMENT RECORD

DISTRUBUTION LIST/DOCUMENT CONTROL

Rev Amendment Record Section Page

00 Initial Issue to Principal All All

01 Initial Issue to Principal All All

02 Revised for Stage 3B2 All All

03 Updated for Principal comments All All

04 Updated for North Tower scope and Little Uralba St TCP

All All

05 Updated to include Driver Code of Conduct 3.4 11

06 Updated to reference Stage 3C instead of 3B All All

07 Updated to include Traffic controller checks and monitoting program

All All

Copy Holder Details

Name Position Copy

Number

TBC Principal (Health Infrastructure) 1

Fintan O’Dwyer, Mohaned El Gubbi Principal’s Authorised Person (CBRE)

2

Brett Popham Project Manager 3

Michael Sawyer Project Environmental Representative (PER)

4

Project Personnel Electronic Copy

Page 5: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 5 of 23

Table of Contents

1 Revisions and Distribution ........................................................................................ 3

1.1 Revisions .............................................................................................................. 3

1 INTRODUCTION .......................................................................................................... 6

1.1 Project Description .............................................................................................. 6

1.2 Site ........................................................................................................................ 6

1.3 Access .................................................................................................................. 7

2 OBJECTIVES ............................................................................................................... 8

2.1 Objectives Overview ............................................................................................ 8

2.2 Key Performance Indicators ............................................................................... 8

3 VEHICULAR TRAFFIC IMPACTS ............................................................................... 9

3.1 General Site Considerations ............................................................................... 9

3.2 Construction Materials Delivery and Removal .................................................. 9

3.3 Site Access ......................................................................................................... 11

3.4 General Construction Deliveries ....................................................................... 11

3.5 Concrete Deliveries ............................................................................................ 11

3.6 Traffic Management Implementation ................................................................ 12

3.7 Uralba Street Closure for Generator Install to L7 South Tower ..................... 12

4 INTERNAL TRAFFIC ................................................................................................. 13

4.1 Construction Personnel .................................................................................... 13

4.2 Construction Parking ......................................................................................... 13

4.3 Internal Traffic Movements ............................................................................... 13

5 OPERATIONAL MATTERS ....................................................................................... 14

5.1 Approvals ........................................................................................................... 14

5.2 Notices ................................................................................................................ 14

5.3 Revisions and Future Consultation .................................................................. 14

6 COMPLAINTS AND REPORTING ............................................................................. 15

6.1 Reporting Protocol ............................................................................................. 15

6.2 Complaints Flowchart ........................................................................................ 16

DEFINITIONS & ABBREVIATIONS .................................................................. 17

TRAFFIC CONTROL PLANS (TCP) ................................................................. 18

SITE ACCESS PLAN ........................................................................................ 19

SAMPLE COMPLAINT FORM .......................................................................... 20

CONSTRUCTION PARKING RESTRICTIONS ................................................. 21

LCC APPROVAL OF TCPs .............................................................................. 22

TCP FOR TEMPORARY CLOSURE OF URALBA STREET FOR CRANAGE LIFTS TO LEVEL 7 WESTERN BALCONY ............................................................................................. 23

Page 6: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 6 of 23

1 INTRODUCTION

The following strategy details the Traffic Management Plan (TMP) for the Lismore Base Hospital Stage 3B Main Works Redevelopment. The strategy highlights the planned access arrangements for construction vehicles and pedestrians. Ultimately the TMP has been designed to minimise the potential impact from increased construction vehicles on pedestrian and traffic on surrounding roads (namely Uralba Street, Little Uralba Street and Fermoy Avenue). To aid this, appropriate kerbside signage and provisions will be implemented as required to ensure ongoing operational safety and efficiency during the project.

JH notes that the TMP is a live document, and as required will be renewed and updated throughout the project.

1.1 Project Description

Health Infrastructure has appointed John Holland Pty Ltd (JH) under a GC21 Edition 2 Contract (Head Contract), to perform the design, construction, commissioning and completion of Lismore Base Hospital Stage 3B Redevelopment – Main Works.

For clarity, the scope of this plan includes the North Tower scope including the lower floors from Level 3 to Level 7 (Development Consent SSD 6848 dated 1st May 2015) and the North Tower Extension from Level 7 to Level 10 (Development Consent SSD 17_8963). The TMP for South Tower and Block A demolition is documented in the previous revision, namely LBH-PP-JH-Y-0007-03.

The major project stakeholders are:

- Health Infrastructure (HI) – Project Principal

- CBRE – The Principal’s Project Management company for the project, engaged by HI

- Lismore Base Hospital – Staff, users and visitors including the Local Health District Representatives (LHD)

- Local Indigenous Community

- Local and surrounding community and residents – Benefit through construction and at completion with the

new and refurbished Departments

- Local Authorities – Including Lismore City Council, Essential Energy, Rous Water, Telstra, NSW Fire &

Rescue, Northern Rivers Buslines, Elgas, etc.

- JH as Design Finalisation and Construction Contractor – Engaged under ECI Agreement and Early Works

GC21 Contract with HI

- Conrad Gargett – Engaged by JH as Architect

- All services and other building element design consultants – Engaged by JH for design of all services and

elements for the building

- Building Subcontractors – Engaged by JH to construct the works

- Local suppliers and companies – Direct benefit from the project

All contractors engaged will comply with JH systems and requirements for Safety (including Workplace Risk Assessment, Activity Method Statements, Task Risk Assessment and Start Cards as a minimum), Quality, Design and Environment.

1.2 Site

The Lismore Base Hospital is located at 60 Uralba Street, Lismore, NSW, 2480.

The site is approximately 5000 sqm with site access along Little Uralba Street which is a steep one-way residential street and adjacent to the new Ambulance entry bay. The site is heavily sloping and is constrained by adjacent hospital buildings to all building perimeters and private residencies along Little Uralba Street. Three properties along Little Uralba Street will be used as site amenities, deliveries and material laydown area for the construction works.

The site is part of Lismore Base Hospital precinct and the construction site is co‐located with the operational Public Hospital. The Contractors site will be surrounded by other existing operational hospital buildings.

Page 7: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 7 of 23

1.3 Access

JH will put in place a number of key initiatives to control traffic flow onsite. These will include but are not limited to the

following:

- Use of the properties (numbers 9,11,15) on Little Uralba Street for site sheds, amenities, loading/unloading

zones and materials laydown zone to feed the project;

- Develop site layout plan to demarcate site access, sheds, worker pedestrian areas, material laydown areas to

assist with management of traffic within site compound;

- Regular consultation and coordination of works with LHD (Local Health District) representative, in particular

keeping them fully informed of layout and any changes to the site access and pedestrian pathways;

- Traffic Management controls within Little Uralba Street site compound (i.e. signage, 5km/h speed limit,

barriers between plant and people, etc.);

- Design and documentation of compliant traffic control plans (TCP’s) to define the control measures required to

be implemented to manage the construction traffic and pedestrians. A third-party specialist will be engaged to

develop the TCP’s.

- Implementation of third-party designed and certified traffic control plans (TCP) for all external road

entrances/exits and the pedestrian pathways around the site (see Appendix 2 for the proposed TCP’s for the

project);

- Engage accredited, qualified and competent traffic controllers to manage traffic and pedestrians as required

by approved TCP’s to ensure safety of staff, the public and motorists;

- Engagement and consultation with Lismore City Council (LCC) and relevant neighbours on the proposed

traffic control plans (TCP);

- Construction car parking: It is acknowledged that no construction parking on or within one block of the hospital

campus is allowed;

- Encourage car‐pooling/sharing among site workers where possible;

- No right turn for normal vehicles (Ambulances are excluded) off Uralba Street into Little Uralba Street when

approaching from Ballina (i.e. no right turn into site from the eastern approach);

- Planning of large material deliveries to minimise impact;

- Utilising school holidays for large deliveries where possible;

- Permits for oversized vehicles and times of operation on the external road network as required by regulations

and legislation;

- Stabilisation of site access routes to prevent dust creation;

- Controlled and monitored entrances to the Work Site to prevent unauthorised and public vehicle entry;

- Ongoing monitoring and review in conjunction with various stakeholders and LCC on the traffic controls and

measures implemented throughout the project.

Page 8: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 8 of 23

2 OBJECTIVES

2.1 Objectives Overview

The TMP has been designed to effectively and proactively manage traffic conditions coming on to and moving within

the Lismore Base Hospital Stage 3B project site. This includes management of onsite vehicles and deliveries,

construction parking and the associated impacts on surrounding roads and pedestrians.

Specific objectives include:

- To ensure all pedestrian access is maintained at all times. In event works impede or impact on pedestrian

walkways, develop a management plan including, as required, signs, personal, barriers etc. to redirect

pedestrians. Any changes to pedestrian paths along Uralba Street or into the hospital departments require

consultation and approval by LHD;

- Develop and implement traffic control plans (TCP’s) that detail control measures to demarcate the public,

pedestrians and construction traffic;

- To recognise the critical importance of hospital operations and develop TCP’s to mitigate any impact on the

Hospital Main Entrance and Emergency Department along Uralba Street. A priority is to ensure that the

Ambulance Bay drop-off is not impeded by construction vehicles and traffic;

- Any modification, if required to public roads, entrances, kerbs and associated drainage within road reserves is

to be consulted and approved by Lismore City Council (LCC) and other relevant authorities;

- Access to properties, vehicular driveways, carparks and adjacent businesses are to be maintained where

possible and any temporary closure requires consultation with the relevant parties including the LCC

- Qualified traffic controllers are to manage traffic into and out of site as required by the implemented TCP’s

- Reporting of any traffic or pedestrian incidents immediately to the Principal (verbally) and in writing within 24

hours

- To prevent incident or injury due to traffic movements/conditions;

- To minimise traffic delays and adverse impacts on the streets surrounding the site, particularly on Uralba

Street, Little Uralba Street, and Fermoy Avenue;

- To provide a suitable parking solution for workers/visitors;

- To have a clear traffic procedure for all site deliveries to improve efficiency and safety.

2.2 Key Performance Indicators

Outlined below are the Project’s overriding Traffic Management key performance indicators;

- JH target to have no more than 5 traffic complaints per month;

- JH to target zero Loss Time Injuries (LTIs) due to a traffic related incident;

- JH to target zero traffic incidents both within the site compound and on Uralba Street, Little Uralba Street and

Fermoy Avenue during designated deliveries;

- JH to advise Principal’s Authorised Person of traffic complaints within 24 hours from time of complaint;

- JH to maintain a maximum 24‐hour response to community traffic complaints/queries;

- JH to include traffic complaints/issues close out actions to the Principal’s Authorised Person via Monthly

Report and formally register within Project Pack (JH internal system) complaints section.

Page 9: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 9 of 23

3 VEHICULAR TRAFFIC IMPACTS

3.1 General Site Considerations

JH understand and acknowledge the importance to ensure Hospital operations and business continuity is maintained. The objective of the traffic assessment and proposed delivery strategies have been developed to maintain and where possible eliminate disruption to the Hospital’s Main Entry and Emergency Department (including the ambulance bay) that are located along Uralba Street, in particular the intersection of Uralba and Little Uralba Street (location of Ambulance Bay entry). As required, any impacts or disruption to vehicular and pedestrian access to these areas will require detailed planning and consultation with the LHD representative and the Principal.

It is recognised that Uralba Street is a major thoroughfare for heavy vehicles, passenger vehicles, bike riders and pedestrians. Because of this, it is mandatory that specific Traffic Control Plans (TCP) be developed and implemented to safely control and segregate general users of the surrounding roads from construction traffic. The project specific Traffic Control Plans (TCP) are included in Appendix 2 with below paragraphs explaining the development and need for those TCP’s.

The Stage 3B2 site is heavily constrained and restricts all project deliveries to be via Little Uralba Street. John Holland’s proposal for deliveries management during North Tower construction took into account the probable impact on surrounding properties and roadways, the safety of public motorists and pedestrians, the safety of site personnel, and the ability of different sized trucks/vehicles to navigate the intersections at either end of Little Uralba Street.

The keys points to developing the TCP’s for the use of semi-trailers and rigid vehicles are:

- Key plant and deliveries for North Tower that necessitate the need for semi-trailers, these include: Piling Rig,

pile cages, structural steel, reinforcement deliveries, material hoist components, tower crane components,

satellite pump components, formwork, fit out materials, etc.

- JH developed and implemented a TCP for semi-trailers for the removal of the Maternity pod sections in early

2017 along Little Uralba Street. The methodology developed and implemented was the approach of the semi-

trailer from Hunter Street to Little Uralba Street and then exiting via a right turn onto Uralba Street. During the

maternity pod removal, it was learned that semi-trailers were able to successfully navigate Weaver Street and

Fermoy Avenue to access Little Uralba Street without damaging kerbs. A detailed TCP was developed that

included the closure of Little Uralba Street to general traffic that would detour via Fermoy Avenue.

- Closure of Little Uralba Street enables the movement of rigid trucks (flatbeds, concrete, etc.) within the site

compound and exit back onto Uralba Street therefore eliminating the exit route of all rigid vehicles through the

residential streets of Fermoy Avenue and beyond.

3.2 Construction Materials Delivery and Removal

All construction deliveries to site will be planned and pre‐arranged by JH through the subcontractors at the daily coordination meeting (held in the afternoon and coordinated by the JH Site Manager and Supervisors).

The major deliveries and vehicle movements for the construction of the Lismore Base Hospital Stage 3B works are:

- Delivery vehicles – heavy rigid, articulated, utes, etc.

- Possible precast concrete elements

- Formwork

- Steel reinforcement

- Concrete/steel/façade panel deliveries, glazing, roof sheeting

- Ceilings and partitions material: stud and plasterboard, internal glazing, door frames, doors, etc.

- Services: cable trays, cabling, pipework, etc.

- Finishing materials and FFE: vinyl, ceiling tiles, paint, waterproofing, FFE, handrails, door hardware, etc.

- Earthworks/pavement materials deliveries;

- Excavated earthworks materials transported from / off site;

- Tank and pump deliveries (potable water tanks, sprinkler pumps, potable water pumps, etc.)

Page 10: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 10 of 23

- Tower crane

- Materials hoist

- Satellite concrete pump

- Plant visits (excavators, tipper trucks, Manitou, forklifts, mobile cranes, mobile concrete pumps, concrete

trucks, hired equipment, scissor lifts, EWP’s, excavators, etc);

- Delivery of new plant including but not limited to: main switchboard (MSB), generator, chillers, condenser

pumps, Air Handling Unit’s (AHU), electrical boards, hot water units, medical gas pumps, etc.

- Miscellaneous large MME and FFE equipment deliveries (i.e. imaging equipment, pendants etc.).

The proposed traffic control plan for North Tower plant, deliveries and materials handling is:

- Closure of Little Uralba Street from Ambulance Entry to the northern edge of the JH site compound on Little

Uralba Street with designated signage. This will eliminate the interface of public vehicles with construction

traffic within the construction deliveries and materials handling site compound.

- To eliminate pedestrians interface with the high volume of construction deliveries on Little Uralba Street, JH

will be installing a chain-wire fence with gates adjacent to the HI office driveway (i.e. still provide access to HI /

CBRE / LHD to the house and office) and to the northern edge of the JH site compound.

- The chain-wire gates will eliminate both public vehicles and pedestrians from interacting with construction

plant and deliveries.

- The gates will be closed when the TCP are implemented. JH proposal is for the TCP to be implemented

during construction hours and then opened to allow public to use outside of construction hours. JH understand

that through consultation with stakeholders (HI, CBRE, LHD, and LCC) that the TCP will be implemented

permanently during construction/working hours of the construction phase of North Tower.

- These gates will allow residents unimpeded access to the houses located north of the site compound, while

keeping the construction area clear of public vehicles and pedestrians.

- With the proposed gate location, all loading/unloading activities would be isolated from any public vehicles and

pedestrians, including the residents on Little Uralba Street who would retain access to their properties from the

northern end of Little Uralba street.

- As per the developed TCP, the public can use the detour from Uralba Street, to Bent Street, to Fermoy

Avenue to access residencies, etc.

- Outside of working hours, the gates would be opened to allow residences to use Little Uralba Street whilst

also maintaining the 24-hour access to mortuary driveway

- A JH traffic controller will manage all incoming and exiting deliveries and eliminate any parking or blockage to

Ambulance Entry Bay

- JH will not accept any delivery vehicles parking along Uralba Street outside the hospital precinct.

The construction plant and delivery movements proposal for North Tower is:

- For heavy rigid, flatbed, concrete trucks, incoming route will be heading east along Uralba Street with a left

turn into Little Uralba Street through the chain wire gates and unloaded within the site compound area. The

exit route would be out the southern gates on Little Uralba Street and a left turn onto Uralba Street. These

type of delivery vehicles can manoeuvre the turnaround within the site compound area.

- For articulated (semi-trailer) vehicles, it is proposed the incoming route would be from the northern end of

Little Uralba Street (i.e. Uralba Street to Hunter Street, with right turn to Orion Street, right turn to Weaver

Street, left turn onto Fermoy Avenue and a right hand turn into Little Uralba Street). The semi-trailer would

reverse into the south-western corner of the site compound, utilizing the flat area at the southern end of the

site compound to load/unload. The exit route would be heading south from Little Uralba Street and right turn

onto Uralba Street with traffic controllers. Noted that semi-trailers could not reverse from Uralba Street to Little

Uralba Street from a traffic movement perspective or from a safety perspective (reversing of vehicles from

Uralba Street down Little Uralba Street would also increase impact to Ambulance Bay Entry).

The above proposed semi-trailer movement is very similar to the movements implemented for the removal of the Maternity Pod segments in early 2017.

Page 11: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 11 of 23

3.3 Site Access

The site layout will include a loading/unloading area on Little Uralba Street (property lots for numbers 9, 11 and 15) which will also incorporate a turning area for rigid vehicles. Appendix 3 contains a plan showing the site layout and turning area on Little Uralba Street. As described above, access to the loading/unloading area will be from either the southern (Uralba Street) end of Little Uralba Street for rigid/flatbed/smaller vehicles, or the northern (Fermoy Avenue) end of Little Uralba Street for semi-trailers.

A luffing tower crane located on the western side of Little Uralba Street will service the loading/unloading zone, with an overhead-protected walkway providing pedestrian access between the construction area and the loading/unloading and amenities areas.

A concrete pump located directly adjacent the vehicle turning area on Little Uralba Street will pump concrete across (via an

underground pump line installed under the road) to the construction area where it will be placed via a satellite concrete pump.

Concrete trucks will access via the southern end of Little Uralba Street, enter the truck turning area to feed the concrete pump, and

exit via the southern end of Little Uralba Street.

3.4 General Construction Deliveries

As shown in Appendix 3, all construction deliveries will enter/exit the site via Little Uralba Street. The project will separate worker access routes from vehicle routes using either water-filled barriers or concrete barriers and applicable signage.

All visitors must report to JH site office at 73 Uralba Street prior to being permitted to enter the construction site. Deliveries for large scale items and oversized sections will be coordinated and planned to mitigate the disruption to external roads and pedestrians as well as the normal onsite traffic and pedestrian access.

JH will implement a brief Delivery Driver Induction process which will educate drivers on key site risks and requirements (i.e. sloping site, restricted space, use of wheel chocks etc.), mandatory PPE, designated loading/unloading zones and emergency response information.

All drivers will adhere to the below Code of Conduct, which aims to minimise the impacts of earthworks and construction on the local and regional road network, minimise conflicts with other road users, minimise road traffic noise, and ensure truck drivers use specified routes.

Driver Code of Conduct

- All drivers will adhere to the LBH 3B Traffic Control Plans (for both north-bound and south-bound traffic on

Little Uralba Street). This includes all vehicles (with the exception of semi-trailers) turning left onto Uralba

Street when exiting Little Uralba Street from the southern end, to prevent the need to close both lanes of

Uralba Street. Semi-trailers are to turn right onto Uralba Street when exiting Little Uralba Street from the

southern end, and this must only be done as per the TCP (both lanes of Uralba Street temporary closed).

- Drivers of semi-trailers must not travel east on Fermoy Avenue past the Little Uralba Street intersection, nor

must they enter Bent Street from Uralba Street.

- Delivery vehicles must not stop on Uralba Street or hinder Hospital parking, loading or unloading areas,

including the Uralba Street Ambulance Bay.

- Deliveries must only be performed during approved construction hours.

- All delivery drivers entering the site will undergo a Delivery Driver Induction outlining the site rules and TCPs.

3.5 Concrete Deliveries

Concrete deliveries, predominately for North Tower structure, are considered to be a special case of deliveries, given that once a concrete pour has commenced it is essential that concrete continues to be delivered without delay until the pour is complete. The strategy will be to commence larger pours first start in the morning and finish by mid‐ afternoon.

During peak stages of construction, concrete deliveries would involve up to a maximum of 14 trucks per hour (including allowance for a member of ancillary trucks for large scale steel/façade deliveries that might be coordinated concurrently). Due to the nature of concrete pours it is necessary to ensure continuous deliveries; hence the concrete deliveries will extend through the morning peak hour. It is noted that large concrete pours may require concrete deliveries to extend into the afternoon, however they are not expected to extend into the peak afternoon / PM traffic period.

Page 12: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 12 of 23

3.6 Traffic Management Implementation

3.6

Please refer to Appendix 2 which includes the project specific TCP’s for the project. The plans nominate traffic control

measures, signage and site arrangements to be implemented for the project. An accredited traffic control designer will

be engaged by JH to develop, consult with Lismore City Council and obtain approval for the relevant TCP’s that will be

implemented during the various phases of the project including the use of accredited traffic controllers, signage and

equipment (witches hats, barricades etc.) to control the traffic and pedestrians through the project.

As required during the project, additional TCP’s maybe required to be designed, approved & implemented due to

specific requirements.

Implementation of the Traffic Management Plan will be monitored via a daily signage register and inspection

completed by the site traffic controller. In line with the LBH 3B/3C HSE Risk 3 Month Look-Ahead Tool, John Holland

will also conduct Traffic Management inspections using form 3B2-FRM-012 Traffic Management Inspection.

3.7 Uralba Street Closure for Generator Install to L7 South Tower

North Tower works will include the installation of a new generator to the level 7 western balcony of South Tower (E

Block). This will involve the set-up and operation of a mobile crane on Uralba Street, along with delivery vehicle

access adjacent to the crane, which was performed on the previous stage of works to lift plant to the same balcony

area.

These works will require the closure of the west-bound lane of Uralba Street. Vehicles travelling east to west along

Uralba Street will be detoured via Dibbs Street, McKenzie Street and Hunter Street. Traffic flow travelling west to east

on Uralba Street will be maintained at a reduced speed and be diverted into the east-bound lane by traffic cones and

signage (due to closure of west-bound lane). The use of the drop-off / pick-up lane will also be maintained during the

works and will be managed by traffic control and spotters to prevent any suspended loads travelling over vehicles or

pedestrians. The LBH Ambulance Bay will remain open at all times and maintain priority. These controls will be

included in a specific Traffic Control Plan requiring approval by Lismore City Council prior to works. This TCP will use

the same set-up and controls as outlined in the TCP (see Appendix 7) utilised on the previous stage for similar works.

Along with the generator itself, the mobile crane will also be required to lift the associated load banks and the supporting steel frame components to the balcony. It is predicted that there will be three non-consecutive instances (lasting a maximum of one day each) where the TCP will need to be implemented, being;

- One day for lifting the supporting steel frame components

- One day for lifting the generator and load banks

- One day for lifting down the load banks.

The finalisation and approval of the TCP and the execution of the works is planned to occur in late 2018 or early 2019.

Page 13: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 13 of 23

4 INTERNAL TRAFFIC

4.1 Construction Personnel

An average of 80 construction personnel are expected to work on the site per day with peak of up to 200 for the major

stages of construction. It is expected that a majority of personnel will arrive by car. A car occupancy rate of 1.2

persons per vehicle has been assumed, which is consistent with industry standard trends for travel for work purposes.

On average, i.e. during non‐peak construction periods it is estimated that 72 cars will arrive during the morning and

depart during the evening. During the peak construction periods it is estimated that over 150 cars will be travelling to

and from the site each day. The provides average estimates only noting that the workforce will increase from small

numbers at the project commencement and will correspondingly decrease post the peak workforce towards the end of

the project.

The peak hour for construction personnel arriving on site will typically be between 6.00am and 6.45am. The morning

peak hour for general traffic in the area (i.e. on Uralba Street) occurs between 7.30am and 8.30am. Therefore, the

construction traffic is not expected to increase the volume of traffic or degree of saturation of the road network at this

existing peak time (i.e. minimal impact to peak Uralba Street traffic volumes).

Construction personnel will typically leave the site between the hours of 3.30pm and 4.30pm. Hence the majority of the

construction personnel traffic will exit prior to the typical peak times on the external road network which is between

4.30pm and 5.30pm. Due to no schools being located adjacent to the hospital, the construction traffic is not expected

to impact on any school traffic peak times. Based on this the construction traffic will have minimal impact on the

volume of traffic or degree of saturation on the external road network at the existing peak time.

During peak phases of construction, additional construction personnel is not expected to cause an increase in traffic

volumes on the surrounding access roads that would exceed normal peak hour traffic levels.

4.2 Construction Parking

There is shortage of street parking directly around the Hospital to cater for the operational hospital’s number of staff

and visitors. As per the head contract requirements, there will be no construction parking in the hospital campus or

within one block of the hospital campus.

Appendix 5 shows the area prohibited for construction parking, and the JH project induction will include this diagram.

These provisions will also be included in subcontractor agreements.

JH acknowledge the sensitivities of the lack of car parking in and around the hospital and will work with the Principal

and LHD to achieve a mutual outcome.

4.3 Internal Traffic Movements

Internal traffic movements have been designed to minimise reversing activities in line with John Holland GMR 1 –

Traffic, Plant and People. As per the devised Traffic Control Plans in Appendix 2, rigid/flat-bed trucks will enter site via

the southern end of Little Uralba Street, have sufficient room to turn around within the Site and park on level ground for

loading/unloading, and then exit site again from the southern end of Little Uralba Street onto Uralba Street.

Semi-trailers will enter from the northern end of Little Uralba Street, reverse onto the level loading/unloading area

under direction of a spotter and exit via the southern end of Little Uralba Street under traffic control.

Within the site itself, pedestrian walkways will be separated from the vehicle access routes by use of waterfilled

barriers or concrete barriers.The proposed plan of isolating the loading/unloading areas from public pedestrians and

vehicles by use of gates on Little Uralba Street further minimises the risk of a traffic incident.

Page 14: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 14 of 23

5 OPERATIONAL MATTERS

5.1 Approvals

Prior to implementation, JH understands that there is a formal approval process before the implementation of

proposed traffic control plans and any proposed alterations to Council and State infrastructure.

The traffic management strategy for heavy rigid and for semi-trailer vehicles accessing from the south and north ends

of Little Uralba Street respectively has been submitted and consulted with LCC and the Principal. JH understand that

the proposed strategy has been endorsed by LCC (see Appendix 6).

Further, this plan provides the Principal with detailed proposal of the traffic management strategies, objectives and the

developed TCP’s for the project.

5.2 Notices

Where applicable, JH will notify surrounding residences and businesses of significant traffic condition changes and

heavy vehicle movements via a letterbox drop process. This will be at the discretion of JH in consultation with the

Principal. If the traffic conditions are deemed to be highly significant, it may be that a public notice is placed in the local

newspaper.

5.3 Revisions and Future Consultation

The overarching TMP for the Lismore Base Hospital is a live document. As such, JH will review and update the

document if required. JH will also continue to consult LCC of any changes to site access/traffic issues as the project

develops.

Page 15: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 15 of 23

6 COMPLAINTS AND REPORTING

6.1 Reporting Protocol

All traffic complaints will be directed to a phone line within the JH Project Site Office. In the event of an urgent enquiry

(i.e. medical/emergency), the contact details for the Site Manager and Project Manager are provided on the Project

sign located at site entry and outlined at the site induction.

Complaints will be classified and issued to the Project Manager daily. The Project Manager will keep the Principal

informed of any complaint and the response proposed. A summary of complaints and resolutions will be provided

fortnightly at the Site Coordination Meeting and in the monthly report to the Principal’s Authorised Person. Complaints

will also be logged on a complaint form and lodged into JH’s internal reporting process, Project Pack. Refer to

Appendix 4 for sample of the complaint form.

Receipt of a call

Details of the call are recorded including time, issue or enquiry, name and details if provided,

answer provided, and action taken. These details are also to be entered on to the complaint

form in the Project Pack (JH internal system).

Unanswered calls

Outside of business hours callers can leave a message which will be recorded as above. If

further detail is required or a request for a call‐back is received, staff will contact the caller

(where contact details have been provided) and request further information. This call‐back will

take place within 24 hours of receiving the message.

If no contact details are provided, comments will be entered into the reporting template under

‘anonymous’.

Response time

All queries will be responded to within 24 hours and where possible within a shorter timeframe,

Monday to Friday (during business hours). Any queries received on the weekend/public holiday

will be responded to on the next working day.

Register

All complaints will be registered into JH’s internal reporting mechanism, Project Pack (refer

Appendix 4) and included in JH Monthly Report issued to the Principal’s Authorised Person.

Page 16: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 16 of 23

6.2 Complaints Flowchart

Page 17: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 17 of 23

DEFINITIONS & ABBREVIATIONS

The following definitions and/or abbreviations are used in this document:

Consultant The Consultant who has been engaged by JH to perform the design, preparation of

detailed ‘For Construction’ documentation and necessary certification to meet the

contractual requirements.

Head Contract Contract between the Principal (Health Infrastructure) and John Holland Pty Ltd,

namely the GC21 Edition 2 contract

Items Used as a general term to refer to material, equipment, fabricated components, etc.

JH

John Holland Pty Ltd and John Holland Queensland Pty Ltd, which complies with all

John Holland Groups processes and procedures. JH is the organisation responsible

for the total performance of the works under the Head Contract.

LCC Lismore City Council, the authority responsible for the road network surrounding the

project

Plan A document setting out the specific practices, resources, activities and responsibilities

relevant to a particular project or contract.

Principal (Client) The party to whom John Holland is contracted for a Project. For this project the

Principal is Health Infrastructure

Principal's Authorised Person

The person appointed by the Principal to perform the duties of Health Infrastructure as

defined in the contract. For this project the Principal’s Authorised Person is David

Oliver of CBRE.

Subcontractor/Supplier Any company, body or person who is contracted to John Holland for the purpose of

supplying goods or services. Categories such as manufacturer, fabricator and supplier

are considered Subcontractors.

System Element The administrative activities that need to be implemented and controlled to ensure that

the product or service meets environmental requirements.

TCP Traffic Control Plan

TMP Traffic Management Plan

Page 18: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 18 of 23

TRAFFIC CONTROL PLANS (TCP)

Page 19: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Chain Wire Gates

No Parking

P

P

P

No Parking P

Tower Crane

Semitrailer Loading Zone

Ambulance Bay

Hospital Drop Off Bay

25m

PREPARETO

STOP

DE

TOU

R

Fermoy Ave

ROAD CLOSED

LOCAL

TRAFFIC

ONLY

NOENTRY

Regulatory NO ENTRY Sings will be covered to allow local residents to

access their properties

These Signs to be covered or removed during out of hours

or when workers are notpresent on site

PREPARETO

STOP

DE

TOU

R

Traffic Control Plan for Articulated Semi trailer Movements (In and Out)

Available area for wide turn maneuver

Traffic Controllers will hold traffic when required

for long vehicles performingwide turns exiting Little Uralba St.

Ambulance Bay will remain operational and will have priority at all times.

Work AreaSite Compound

25m

50m

25m 50m 50m

30m

50m

50m

50m

END ROAD WORK

EN

D

RO

AD

WO

RK

EN

D

RO

AD

WO

RK

N

RO

AD

WO

RK

ON

SID

E R

OA

D

ROAD WORK ON SIDE ROAD

SLOW

PR

EPA

RE

TO

STO

P

PR

EPA

RE

TO STO

P

RO

AD

WO

RK

AH

EA

D

RO

AD

WO

RK

AH

EA

D

Gardner Ave

Dib

bs

St

Little Uralba S

t

Bent St

Date: 15/02/208 Author: Tiago Ortolani - TMD/NSW #0037826560 Project: Little Uraba St, Lismore Plan #: 16/4321 V4 Client: John HollandComments:

Traffic Control Plan for large vehicles accessing Little Uralba St.

1. All signage displayed on this traffic control plan is in accordance with TCWS as detailed in section 3.2

2. All existing speed signs to be covered if they conflict with this Traffic Control Plan3. Traffic Controllers are certified as competent in accordance to RMS`s training course - Traffic Controllers4. This TCP will be implemented by a Traffic controller certified as competent in accordance to RMS`s course

Apply Traffic Control Plans.5. Signs to be checked during each shift and daily records kept 6. This Plan is in accordance with TCWA Section 4.5 & 4.77. The sequence of erection and removal of the signs will vary to suit safety of the traffic controller according

to TCWA Section 3.4.4

Scale: NTS TCWS Diagram No: 53 , 440 & 195 - modified

PEDESTRIANSWATCH YOUR

STEP

Pedestrian signs to be postedon both sides of the footpath

when pedestrian traffic is affected

Rotary Dr

SLOW

Uralba St

Access toCarpark

Red Arrow indicatestruck movements

ROAD CLOSED

No Pedestrian access between

Chain Wire Gates

ACCESSPEDESTRIANNO

ACCESS PEDESTRIAN NO

Little Uralba St - Loading ZoneSouthbound access via Fermoy Ave

Chain Wire Gates

Detour MapDETOUR

ENDDETOUR

www.invarion.com

Page 20: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Chain Wire Gates

No Parking

P

P

P

No Parking P

Tower CraneFlatbed/ Rigid Truck

Loading zone

Ambulance Bay

Hospital Drop Off Bay

25m

PREPARETO

STOP

DE

TOU

R

Fermoy Ave

ROAD CLOSED

LOCAL

TRAFFIC

ONLY

NOENTRY

Regulatory NO ENTRY Sings will be covered to allow local residents to

access their properties

These Signs to be covered or removed during out of hours

or when workers are notpresent on site

PREPARETO

STOP

DE

TOU

R

Available area for wide turn maneuver

Traffic Controllers will hold traffic when required

for long vehicles performingwide turns exiting Little Uralba St.

Ambulance Bay will remain operational and will have priority at all times.

Work AreaSite Compound

25m

50m

25m 50m 50m

30m

50m

50m

50m

END ROAD WORK

EN

D

RO

AD

WO

RK

EN

D

RO

AD

WO

RK

N

RO

AD

WO

RK

ON

SID

E R

OA

D

ROAD WORK ON SIDE ROAD

SLOW

PR

EPA

RE

TO

STO

P

PR

EPA

RE

TO STO

P

RO

AD

WO

RK

AH

EA

D

RO

AD

WO

RK

AH

EA

D

Gardner Ave

Dib

bs

St

Little Uralba S

t

Bent St

Date: 15/02/2018 Author: Tiago Ortolani - TMD/NSW #0037826560 Project: Little Uraba St, Lismore Plan #: 18/7373 V1 Client: John HollandComments:

Traffic Control Plan for large vehicles accessing Little Uralba St.

1. All signage displayed on this traffic control plan is in accordance with TCWS as detailed in section 3.2

2. All existing speed signs to be covered if they conflict with this Traffic Control Plan3. Traffic Controllers are certified as competent in accordance to RMS`s training course - Traffic Controllers4. This TCP will be implemented by a Traffic controller certified as competent in accordance to RMS`s course

Apply Traffic Control Plans.5. Signs to be checked during each shift and daily records kept 6. This Plan is in accordance with TCWA Section 4.5 & 4.77. The sequence of erection and removal of the signs will vary to suit safety of the traffic controller according

to TCWA Section 3.4.4

Scale: NTS TCWS Diagram No: 53 , 440 & 195 - modified

PEDESTRIANSWATCH YOUR

STEP

Pedestrian signs to be postedon both sides of the footpath

when pedestrian traffic is affected

Rotary Dr

SLOW

Uralba St

Access toCarpark

Red Arrow indicatestruck movements

ROAD CLOSED

No Pedestrian access between

Chain Wire Gates

ACCESSPEDESTRIANNO

ACCESS PEDESTRIAN NO

Little Uralba St - Loading ZoneNorthbound access via Uralba St

Traffic Control Plan for Flatbed/ Rigid Truck Movements (In and Out)

Chain Wire Gates

Detour MapDETOUR

ENDDETOUR

www.invarion.com

Page 21: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 19 of 23

SITE ACCESS PLAN

Page 22: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

35.50

B B B

A B C D E F G H J K

07

06

05

04

03

02

01

L

EXIS

TIN

G S

ITE

BOU

ND

ARY

LINK TO EXISTING HOSPITAL

RENAL COURTYARD

GARDENBED

GARDEN BED

GARDEN BED

GARDEN BED

GARDENBED

EXTENT OF CANOPY

EXTENT OFCANOPY

EXTENT OFCANOPY

GARDEN BED

EXISTING SITE BOUNDARY

NEW SITE BOUNDARY

STAGE 3A BUILDING

MATERNITY BUILDING

BLOCK A

BLOCK B

BLOCK C

COMMUNITY HEALTHREFURBISHMENT WORKS

URALBA STREET

LITT

LE U

RAL

BA S

TREE

T

TOTEM SIGNANGE READS"LISMORE BASE HOSPITAL"STAINLESS STEEL SURFACE LIT.

SUBSTATION

SUSP

END

ED S

LAB

(AC

CES

S D

RIV

EWAY

TO

MO

RTU

ARY

ON

LEVE

L 4)

1 2 3 4 5 6

CMCLCKCJCHCGCFCECDCBCA

C2

C1

Cc

EXTENT OF CANOPY

EXISTING CANOPY

10

XW:04

XW:04

XW:03

XW:02

XW:06XW:06

XW:05XW:03

XW:06

XW:03

XW:05

XW:03

XW:05XW:06

XW:05

XW:03

XW:05XW:01

PA:27

PA:27

XW:02

XW:01

XW:05 XW:05

XW:02

XW:02

XW:04

XW:05

XW:04

XW:03

XW:01

XW:01

PA:27

PA:27PA:27

XW:01XW:03

XW:04

GARDENBED TO BEREINSTATED

XW:04

XW:03

XW:03

XW:01

XW:01

XW:04

XW:02

XW:04

XW:03

EXTENT OF NEW PAVERS TOEXTENT OF EXISTING BRICKPAVERS

TYP

PA:27 PA:27 PA:27 PA:27 PA:27 PA:27

PA:27

1:20

1:20

GARDENBED TO BEREINSTATED

XW:03

FOR LINK BRIDGE DETAILS REFER TO 4500 SERIES

FOR CANOPY DETAILS REFER TO 4300 SERIES

XW:04

XW:03XW:01

NEW BOUNDARY

LEGEND

EXISTING BOUNDARY

EXISTING

EXTENT OF WORKS BOUNDARY

RevRevRev

CopyrightWOODS BAGOT

Description Date App'd

NotesCONTRACTOR MUST VERIFY ALL DIMENSIONSON SITE BEFORE COMMENCING WORK ORPREPARING WORKSHOP DRAWINGS. DO NOTSCALE DRAWING.

Project number Drawing numberChecked Approved

50mm on original

Drawing title

Project Revision

Status

Scale

Client

DescriptionDescription

@ B1 sheet size

Date generated:

TM

AUSTRALIAASIAMIDDLE EASTEUROPENORTH AMERICA

Date App'dDate App'd

G 1 : 200

C:\My Documents\Autodesk\Revit\RAC2014\BIM-AR-LISMOREBH3A-DO_R2014_sydaas.rvt16-05-14 5:32:58 PM

SITE PLAN

LISMORE BASE HOSPITALREDEVELOPMENT60 Uralba Street Lismore NSW 2480

120179 A1002AJ HA

FINAL TENDER REVIEW

SCALE 1 : 200SITE PLAN1

A ISSUED FOR 100% DD 31/07/13 TOB ISSUE FOR 100% DD 15/08/13 AJC ISSUE FOR 30% CD COORDINATION 17/09/13 ASD ISSUE FOR 50% CD COORDINATION 01/10/13 ASE ISSUE FOR TENDER FOR DF&C 14/10/13 HAF ISSUE FOR TENDER FOR DF&C 25/10/13 HAG FINAL TENDER REVIEW 16/05/14 AS

dschaefer
Polygonal Line
dschaefer
Text Box
TG1
dschaefer
Text Box
A Block
dschaefer
Text Box
C Block
dschaefer
Text Box
Mental Health
dschaefer
Polygon
dschaefer
Text Box
Block A
dschaefer
Text Box
Block C
dschaefer
Stamp
dschaefer
Text Box
North Tower Site Plan 04.04.18 . Site Boundary . Pedestrian Access . Vehicle Access . Vehicle Gates Pedestrian Gates Traffic Gates Mon-Fri - Closed to public 6am to 6pm Sat - Closed to public 6am to 3pm . Water Point . Safety Station . Spill Kit . Toilet . Access Stair . Loading Bay . External Traffic Flow
dschaefer
Line
dschaefer
Line
dschaefer
Stamp
dschaefer
Line
dschaefer
Text Box
GATE 1
dschaefer
Text Box
P1
dschaefer
Oval
dschaefer
Oval
dschaefer
Oval
dschaefer
Rectangle
dschaefer
Text Box
Uralba St
dschaefer
Stamp
dschaefer
Text Box
TG1
talmond
Typewritten Text
talmond
Typewritten Text
talmond
Rectangle
talmond
Typewritten Text
Tower Crane
dschaefer
Rectangle
dschaefer
Rectangle
dschaefer
Text Box
AS
dschaefer
Rectangle
dschaefer
Text Box
AS
dschaefer
Stamp
dschaefer
Oval
dschaefer
Line
dschaefer
Line
dschaefer
Line
dschaefer
Line
dschaefer
Line
dschaefer
Line
dschaefer
Line
dschaefer
Line
dschaefer
Line
dschaefer
Rectangle
dschaefer
Rectangle
jingram
Rectangle
dschaefer
Stamp
jingram
Rectangle
jingram
Rectangle
dschaefer
Stamp
dschaefer
Stamp
dschaefer
Stamp
dschaefer
Text Box
GATE 1
dschaefer
Text Box
GATE 2
jingram
Rectangle
dschaefer
Text Box
North Tower
dschaefer
Text Box
Little Uralba St
talmond
Rectangle
talmond
Typewritten Text
Satellite Pump
jingram
Rectangle
talmond
Typewritten Text
Hoist
dschaefer
Text Box
LBH Fire Egress
dschaefer
Text Box
Loading Zone
dschaefer
Stamp
dschaefer
Stamp
dschaefer
Stamp
dschaefer
Oval
dschaefer
Oval
dschaefer
Oval
dschaefer
Oval
dschaefer
Rectangle
talmond
Typewritten Text
Loading Zone Level 7
dschaefer
Text Box
P1
dschaefer
Text Box
South Tower
dschaefer
Text Box
LHD / HI / CBRE OFFICE
dschaefer
Line
dschaefer
Text Box
Level 3
jingram
Rectangle
talmond
Typewritten Text
DOSA
dschaefer
Text Box
Storage
dschaefer
Rectangle
dschaefer
Text Box
AS
cobrien1
Polygon
dschaefer
Rectangle
dschaefer
Text Box
AS
dschaefer
Stamp
cobrien1
Rectangle
cobrien1
Rectangle
cobrien1
Callout
10kPa crash deck 6x6m
cobrien1
Callout
10kPa crash deck 6x3m
talmond
Typewritten Text
Level 4 Loading ramp
cobrien1
Polygonal Line
cobrien1
Polygonal Line
cobrien1
Line
cobrien1
Polygonal Line
cobrien1
Rectangle
cobrien1
Polygonal Line
dschaefer
Text Box
TG2
dschaefer
Text Box
GATE 3
dschaefer
Line
dschaefer
Text Box
LBH Fire Egress
jingram
Rectangle
talmond
Typewritten Text
Pedestrian Bridge
cobrien1
Polygonal Line
Page 23: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 20 of 23

SAMPLE COMPLAINT FORM

Page 24: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 21 of 23

CONSTRUCTION PARKING RESTRICTIONS

Orange lines show areas where no construction parking is permitted, construction parking to be outside this zone.

No parking on hospital campus or within one block of hospital

campus.

Page 25: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 22 of 23

LCC APPROVAL OF TCPs

Page 26: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Traffic Management Plan LBH-PP-JH-Y-0007-07-TMP

Lismore Base Hospital Stage 3C Page 23 of 23

TCP FOR TEMPORARY CLOSURE OF URALBA STREET FOR CRANAGE LIFTS TO LEVEL 7 WESTERN BALCONY

Page 27: Lismore Base Hospital Stage 3C - Ministry of Health · PROJECT 7204B Lismore Base Hospital Stage 3C TRAFFIC ... (Development Consent SSD 6848 dated 1st May 2015) and the North Tower

Hospital Drop Off Bay Ambulance Bay

PR

EP

AR

ET

OS

TO

P

SLOW

Ambulance access willbe maintained

Hospital Carpark

Date: 03/03/2017 Author: Tiago Ortolani (TMD / NSW # 037826560) Project: Uraba St, Lismore - John HollandPlan #: 17/5315 V2 Client: John HollandComments:

Half Road Closure with detours. Traffic Controllers holding traffic when required to allow traffic out of hospital drop off bay and ambulance access.

Notes:-1. All signage displayed on this traffic control plan is in accordance with TCWS as detailed

in section 3.22. All existing speed signs to be covered if they conflict with this Traffic Control Plan3. Traffic Controllers are certified as competent in accordance to RTA`s training course - Traffic Controllers4. This TCP will be implemented by a Traffic controller certified as competent in accordance to RTA`s course

Apply Traffic Control Plans.5. Signs to be checked during each shift and daily records kept 6. This Plan is in accordance with TCWA Section 4.5 & 4.77. The sequence of erection and removal of the signs will vary to suit safety of the traffic controller according

to TCWA Section 3.4.4

Scale: NTS TCWS Diagram No: 54 - Modified with TC Sheet No: 1 of 1

NTraffic Control Plan Crane Setup

Uralba St

Lit

tle

Ura

lba

St

Dib

bs

St

Gardner Ave

Rotary Dr

50m 100m

EN

DR

OA

D W

OR

K

EN

DR

OA

D W

OR

K

RO

AD

WO

RK

A

HEA

D

DE

TO

UR

DE

TO

UR

AH

EA

D

ROAD WORK AHEAD

DETOURAHEAD

50m50m

50m

50m

RO

AD

WO

RK

A

HEA

D

Crane Setup

SLOW

RO

AD

CL

OS

ED

DE

TO

UR

DETOUR

SLOW

Detour Map

DETOUR

DE

TO

UR

DETOUR

DE

TO

UR

Traffic Controllers to stoppedestrians and traffic when