Linkedin

84
Manuel Cabello de Alba [email protected] Solar Energy&Urban Planning Renewables Energies Civil Engineering Thermal Engineering Environmental Engineering Construction Structural Engineering Process Engineering Food Factories Engineering Design Hydraulic Engineering Plants Engineering

Transcript of Linkedin

Manuel Cabello de Alba

[email protected]

Solar Energy&Urban Planning

Renewables Energies

Civil Engineering

Thermal Engineering

Environmental Engineering

Construction

Structural Engineering

Process Engineering

Food Factories Engineering Design

Hydraulic Engineering

Plants Engineering

SINGULAR PROJECTS IN GIBRALTAR (UK)

Mid Harbour

Buena Vista

Tunnel

Airport

Waterport

Terraces

Aerial Farm

537 DWELLINGS. NEW RESIDENTIAL DEVELOPMENT. WATERPORT

TERRACES. GIBRALTAR (UK). BUILDING CONTRACT.

Budget: $83M

Position: Construction Project Manager/Project Engineer

The scheme comprises of 537 apartments in 10 blocks, varying

in height from 4 to 9 storey’s.Car parking for 550 cars, roads,

infrastructure services, podiums and landscaped areas are also

to be provided for the use of the residents, along with the

supporting ancillary accommodation in the form of meter rooms,

waste collection areas, generators, substations, transformers,

etc.

492 DWELLINGS. NEW RENTAL HOUSES. MID HARBOUR.

GIBRALTAR (UK). DESING&BUILDING CONTRACT.

Budget: $100M

Position: Engineering/Construction Project Manager

The scheme comprises of 492 apartments in 6 blocks, varying in

height from 6 to 8 storey’s.Car parking for 500 cars, roads,

infrastructure services, electrical distribution center, podiums

and landscaped areas are also to be provided for the use of the

residents, along with the supporting ancillary accommodation in

the form of meter rooms, waste collection areas, generators,

substations, transformers, etc

GIBRALTAR AIRPORT TUNNEL AND FRONTIER ACCESS ROAD. 2011-2012

Budget: $80M

Position: Engineering/Construction Project Manager

The contract include the construction of a tunnel below sea level fortraffic and another for pedestrians under the airport runway, and a roadbetween the frontier and Eastern Beach. The aim of the investment isto address the problem of traffic decongestion at the airport whenaircraft land or take off.The contract includes design and construction of the following: (1) a dual carriage way (four lanes) from the commercial gate at the frontierto the junction of Eastern Beach Road and Devil’s Tower Road (viaEastern Beach). (2) A tunnel under the eastern end of the runwayconsisting of four traffic lanes and a separate tunnel for pedestriansand a cycle path including dewatering and treatment water plant. Therewill also be a tunnel control centre. (3) An aviation fuel storage tanksfarm buried underground on the north side of the runway. (4) Anoffshore structure (around 100 metres off the eastern end of therunway) to provide aircraft approach lighting required by modernaviation practices and procedures.

GIBRALTAR AIRPORT. 2011

Position: Site Engineering Manager

BUENA VISTA. GIBRALTAR 2012

Position: Project Manager/Project Engineer

AERIAL FARM HOUSING PROJECT; 564 AFFORDABLE HOUSING SCHEME

Budget: $125M. Design&Build

Position: Senior Engineering/Construction Project Manager