LIFE13 ENV/IT/000470LIFE13 ENV/IT/000470
ECODEFATTINGEnvironmentally friendly natural
products instead of chemical products in the degreasing phase of the tanning
cycle
Start: 01/10/2014End: 30/09/2016
22/10/201512 month meeting
S.Croce sull’Arno (Pisa) - ItalyNEWPORT Premises
AGENDA09:30 [NEWPORT and UNIFI] Welcome and opening of the
meeting09:40 [All] Actions carried out by each partner and
scheduled activities from February 2015 until the end of September 2015.
11:15 Coffee break 11:30 ECODEFATTING Technical future issues:
[UNIFI] Technical activities scheduled in the next six months of the project [All] Open discussion on actions to be carried out in the next six months of the project
LIFE13 ENV/IT/470 ECODEFATTING
AGENDA12:00 [UNIFI] Management and dissemination issues, in
particular: [UNIFI] Dissemination activities carried out from February 2015 until the end of September 2015 [UNIFI] Project amendment [UNIFI] Administrative issues
13:30 Tour of Newport tannery13:00 Lunch
LIFE13 ENV/IT/470 ECODEFATTING
Commercial products
Defatting products
Scale-up
Whole leather dyeing tests
Leather products
Effluent treatments
Defatting comparative studies
Synthetic procedures
Defatting tests
Architecture
A.2, 3-15, Unifi
A.1, 0-6, InescopC.1, 0-12, Inescop, Unifi
A.2, 3-15Sub-contractor B.1, 3-15,
Inescop
B.2, 6-18, Inescop (pilot studies)B.3 9-21, Inescop (pre-industrial level)
B.4, 18-24, Inescop
C.2, 3-9 ; C.3, 6-18 ; C.4, 9-21
Iccom, Unifi
Product qualityC.6, 15-24, Inescop
Data modellingC.5, 15-24
Inescop, Unifi, Iccom Project
assessmentC.7, 18-24, Unifi, Iccom
LIFE13 ENV/IT/470 ECODEFATTING
Emulsifiers from lactoseEmulsifiers from lactose
Lactose in milkLactose in milk40-50 g 40-50 g l l-1-1
serumserum
Low cost raw materialLow cost raw materialHarmful substance for the Harmful substance for the
environmentenvironment
_ Eco-friendly products_ Eco-friendly products
_ Higher defatting efficiency_ Higher defatting efficiency
_ Biodegradable effluents_ Biodegradable effluents
_ Reduction of process environmental impact_ Reduction of process environmental impact
ECODEFATTINGECODEFATTING
LIFE13 ENV/IT/470 ECODEFATTING
Coordination
EUROPEAN COMMISIONEUROPEAN COMMISION
LIFE External teamLIFE External team
ICCOM-CNR (ITALY)ICCOM-CNR (ITALY) INESCOP (Spain)INESCOP (Spain)Chemical ExpertChemical Expert Spanish Spanish
TanneriesTanneries
UNIFI (Italy)UNIFI (Italy)
UNIFI (Italy)UNIFI (Italy)coordinatorcoordinator
Chemical ExpertChemical Expert
Monitor
NEWPORT (TALY)NEWPORT (TALY)
Italian TanneryItalian Tannery
LIFE13 ENV/IT/470 ECODEFATTING
PURITYPURITY
Lactose derived emulsifiers are Lactose derived emulsifiers are chemical additive free specieschemical additive free species
REACHREACH(CE) No. 1907/2006(CE) No. 1907/2006
Full complianceFull compliance
PURIFICATION and RECYCLEPURIFICATION and RECYCLE
Purification and reuse of defatting effluents are Purification and reuse of defatting effluents are complementary to the concept of defattingcomplementary to the concept of defatting
LACTOSELACTOSE
A A wastewaste sugar for sugar for high value productshigh value products
LACTOSELACTOSE
A A wastewaste sugar for sugar for high value productshigh value products
The goal of the Ecodefatting project is the improvement of the
defatting process of hides, to reduce its environmental impact.
ENVIRONMENTENVIRONMENTENVIRONMENTENVIRONMENT
LIFE13 ENV/IT/470 ECODEFATTING
LIFE13 ENV/IT/470 ECODEFATTING
Technical Actions carried out by each partner in the last six months
A1: commercial products in leather defatting (M1-M6) A2: demonstration of natural products (M3-M15) B1: natural products in the defatting phase at laboratory level (M3-
M15) B2: defatting at a semi-industrial level by using natural products
(M6-M18) B3: natural products defatting at a pre-industrial level (M6-M21) C1: environmental impact of commercial products (M1-M12) C2: environmental monitoring of defatting with natural products at
laboratory level (M3-M9) C3: environmental monitoring of defatting with natural products at
semi-industrial level (M6-M18) C4: environmental monitoring of defatting with natural products at
pre-industrial level (M9-M21)
LIFE13 ENV/IT/470 ECODEFATTING
AGENDA09:40 [All] Presentation of Partners
UNIFI
ICCOMCNR
INESCOP
NEWPORT
LIFE13 ENV/IT/470 ECODEFATTING
Dissemination actions
D1 Website creation
D2 Notice boards
D3 Innovative technology for leather industrial degreasing manual
D4 Leather sample book of hides degreased with the innovative glicerol diacetato composition
D5 Training course for Italian tanneries
D6 Training course for Spanish tanneries
D7 Demonstration workshop in Italy
D8 Demonstration workshop in Spain
LIFE13 ENV/IT/470 ECODEFATTING
Dissemination actions
D9 Diffusion material preparation
D10 Articles and press releases
D11 International conferences and fairs
D12 Digital supports for international diffusion
D13 Networking
D14 Layman's report
D15 After-LIFE Communication Plan
LIFE13 ENV/IT/470 ECODEFATTING
Dissemination actions carried out by each partner in the last six months
D1 Project website
D9 Diffusion material preparation
D10 Articles and press releases
D11 International conferences and fairs
D12 Digital supports for international diffusion
D13 Networking
LIFE13 ENV/IT/470 ECODEFATTING
LIFE13 ENV/IT/470 ECODEFATTING
D1 Project website
•ECODEFATTING website in English , in Italian and Spanish: www.life-ecodefatting.com•In the website:
Visit counter Link to LIFE+ Link to each beneficiary website Results update News update Coming up Reserved area Link with the Facebook page for event booking/registration• Website visitors: 6,605
•Facebook page
LIFE13 ENV/IT/470 ECODEFATTING
D9 Diffusion material preparation
•5,000 ECODEFATTING brochures•1,000 ECODEFATTING pendrives as project gadget•1 ECODEFATTING tissue poster•2 INESCOP posters•1 English project presentation•1 Italian project presentation•1 Spanish project presentation
LIFE13 ENV/IT/470 ECODEFATTING
D10 Articles and press releases
• UNIFI has submitted 1 article for Researchmedia• INESCOP has produced 1 article in INESCOP’s Environment Newsletter No. 174, November 2014• INESCOP has produced 1 article in INESCOP’s News, No. 275, May 2015• INESCOP has produced 1 article in Revista del Cuero. Colombia. Enero-Marzo 2014• INESCOP’s Environment Newsletter, No. 181, June 2015
LIFE13 ENV/IT/470 ECODEFATTING
D11 International conferences and fairs
•Co-Shoes Fair, 22-23 October 2014, Alicante (Spain)•Co-Shoes Fair, Alicante (Spain), 22nd -23rd April 2015•“TOSCANA & AMBIENTE La sfida europea dei progetti LIFE” UNIFI LIFE event at Firenze on 24th October 2014•LIFE+ Networking Event,19 November 2014, Ibi -Alicante (Spain)•Meeting of the Leonardo mobility Vetpro project “The Adaptation of European Union, Footwear Education, Design and Product Systems being examined to Turkey Footwear Industry”, INESCOP, Elda-Alicante (Spain), 21st October 2014•Conference titled “Best Avalaible Technologies in the Tanning Industry”, Lorca – Murcia (Spain), 14th May 2015•All the ECODEFATTING beneficiaries are responsible for the organisation of specific communication activities in order to disseminate the project actions and results to Institutions and policy makers: 1. Senator of the Italian Government – Italy in the UNIFI LIFE event at Firenze on 24th October 2014
LIFE13 ENV/IT/470 ECODEFATTING
D12 Digital supports for international diffusion
•Each beneficiary started to think about the specific video of each beneficiary activity•UNIFI started to have some contacts with some expert video companies in order to organise the general structure of the video•UNIFI started to think on the video text
LIFE13 ENV/IT/470 ECODEFATTING
D13 Networking
•Cluster with OXATAN, SHOELAW, ECOFATTING, PODEBA, MICROTAN, SHOEBAT, CO2SHOE, BIONAD, TAN (LIFE 9-10-11-12-13-14 projects)•Networking contacts at the UNIFI LIFE event at Firenze on 24th October 2014•LIFE+ Networking Event,19 November 2014, Ibi -Alicante (Spain)•Meeting of the Leonardo mobility Vetpro project “The Adaptation of European Union, Footwear Education, Design and Product Systems being examined to Turkey Footwear Industry”(number 2013-1-TR1-LEO03-50777), INESCOP, Elda-Alicante (Spain), 21st October 2014
LIFE13 ENV/IT/470 ECODEFATTING
ACTION E.1: Project management ACTION E.2: Monitoring
UNIFI has continuous contact with all project partners for monitoring project activities
UNIFI prepares and sends a summary of the project activities carried out to monitoring team at the end of each month
UNIFI receives from each beneficiary technical inputs for the monitor month summary
Definition of management structures Definition of payment procedures of each beneficiary UNIFI organised the kick-off meeting in October 2014 in UNIFI
premises UNIFI defined the Partnership Agreement (following the EC
scheme) and collected all the beneficiaries signatures
LIFE13 ENV/IT/470 ECODEFATTING
ACTION E.1: Project management ACTION E.2: Monitoring
UNIFI uses project progress indicators for monitoring project activities
UNIFI will revise the project progress indicators in each of the projects coordination meeting in order to check any irregularities
UNIFI will check the number and type of people reached by each dissemination activity in order to check if the diffusion actions have met their goals
LIFE13 ENV/IT/470 ECODEFATTING
ACTION E.1: Project management
Definition of management structures
Management and technical committe• UNIFI: Roberto Bianchini• ICCOMCNR: Emilia Bramanti• INESCOP: Mercedes Roig• Newport: Maurizio Sabatini
Administrative committe• UNIFI: Silvia Borselli• ICCOMCNR : Manuela Cempini• INESCOP: Julio Gutierrez • Newport: Maurizio Sabatini and Paola Nacci
LIFE13 ENV/IT/470 ECODEFATTING
ACTION E.1: Project management
Definition of payment procedures of each beneficiary
Each beneficiary has a specific payment responsible• UNIFI: Roberto Bianchini selects the project cost formally approved
by department director or UNIFI council• ICCOMCNR: Emilia Bramanti selects the project cost formally
approved by department director• INESCOP: Mercedes Roig selects the project cost formally
approved by company director and administration department• Newport: Maurizio Sabatini as company manager selects and
decides
LIFE13 ENV/IT/470 ECODEFATTING
ACTION E.1: Project management
Definition of project accounting system and cost center
All beneficiaries have defined the following internal specific code (codice commessa) which identify the project and all costs and income related to the project:
UNIFI: CUP B92I14000360006 ICCOMCNR: CUP B92I14000360006 INESCOP: 6200200037 NEWPORT: ECODEF
For UNIFI and ICCOMCNR VAT is a cost.
LIFE13 ENV/IT/470 ECODEFATTING
ACTION E.1: Project management
Definition of project accounting system and cost center
All beneficiaries respects the procedure of the best value for money for selecting all the project external and consumable costs:
UNIFI and ICCOMCNR: public tender through MEPA INESCOP and NEWPORT: historical supplier or market analysis
All the beneficiaries approved only the costs: directly linked to, and necessary for, carrying out the
ECODEFATTING project; reasonable, justified and comply with the principles of sound
financial management, in particular in terms of economy and efficiency;
compliant with applicable tax and social legislation; and actually incurred during the lifetime of the project, as defined in the
grant agreement, and which could be identifiable and verifiable
LIFE13 ENV/IT/470 ECODEFATTING
ECODEFATTING Technical future issues for the next six months
A2: lab synthesis and scale-up of defatting products (M3-M15) B1: lab level defatting tests with project products (M3-M15) B2: Semi-industrial level (M6-M18) B3: Pre-industrial level (M6-M21) C3: monitoring at semi-industrial level (M6-M18) C4: monitoring at pre-industrial level (M9-M21) C5: environmental benefits from the natural fatting process (M12-M24) C6: quality assessment of leather production process (M12-M24)
LIFE13 ENV/IT/470 ECODEFATTING
ECODEFATTING Technical future issues for the next six months
[All] Open discussion on actions to be carried out in the next six months of the project
LIFE13 ENV/IT/470 ECODEFATTING
ECODEFATTING Dissemination issues balance
D1 Project website: update D5-D6 Training courses for Italian and Spanish tanneries: Start to define days D7-D8 Demonstration workshops in Italy and Spain: Start to define days D9 Diffusion material preparation: more posters (foreseen 25 Posters, 10,000 leaflets/brochures/factsheets, 2,500 various branded items, now 5,000 brochures, 3 posters, 1,000 gadgets, 3 presentations) D10 Articles and press release: more articles (foreseen 30 articles, now 5 articles) D11 International conferences and fairs: OK, more meetings with policy makers (foreseen 6 events, now 6 events and 1 policy maker) D12 Digital supports for international diffusion: start (foreseen project video) D13 Networking: OK OK (foreseen 10 projects, now 10)
LIFE13 ENV/IT/470 ECODEFATTING
ADMINISTRATIVE ISSUES
Evaluation of Inception ReportNew EC administrative forms (Timesheet and Financial statement)AmendmentProgress ReportNext DeliverablesPartner costs September 2015Next meeting
LIFE13 ENV/IT/470 ECODEFATTING
Evaluation of Inception Report
VERY POSITIVE EVALUATION!!!!
Two small comments:
1. Please note that the duration set for your Partnership Agreement is not compliant with the LIFE template (Rev.2014). The beneficiaries' commitment to the project is in effect foreseen to end once they receive the payment of the final balance, while it should end five years after the project end date. Please provide with your Progress Report an Addendum to your Agreement, duly dated and signed, that extends its duration accordingly.
2. Please also be advised that, according to Article 12.1 of the Common Provisions, the due date of your Final Report should be set three months after the project end date. It is therefore postponed to 31 December 2016 instead of 30 September 2016, as foreseen in your Grant Agreement.
LIFE13 ENV/IT/470 ECODEFATTING
New EC Administartive documents
From September 2015: New Timesheet
New excel Financial statement (summary of cost justification)
UNIFI is sending the new forms to all the beneficiaries administrative responsibles
LIFE13 ENV/IT/470 ECODEFATTING
Amendment
Unformally we have received the OK: we are waiting soon for the formal communication
LIFE13 ENV/IT/470 ECODEFATTING
PARTNER
AS FOR ORIGINAL BUDGET
Personnel TravelExternal
assistance Consumables Overheads TOTAL
EC CONTRIBUTI
ONUNIFI 185.000 9.140 87.400 105.000 26.000 412.540 206.270 NEWPORT 111.000 9.140 15.400 80.000 16.000 231.540 115.770 ICCOMCNR 118.000 9.140 20.800 105.000 18.000 270.940 135.470 INESCOP 69.000 7.790 16.000 20.000 7.746 120.536 60.268
TOTAL 483.000 35.210 139.600 310.000 67.746 1.035.556 517.778
AS FOR AMENDMENT
Personnel TravelExternal
assistance Consumables Overheads TOTAL
EC CONTRIBUTI
ONUNIFI 213.125 7.140 77.400 88.875 26.000 412.540 206.270 NEWPORT 111.000 9.140 15.400 80.000 16.000 231.540 115.770 ICCOMCNR 133.000 6.140 45.800 68.000 18.000 270.940 135.470 INESCOP 69.000 7.790 16.000 20.000 7.746 120.536 60.268
TOTAL 526.125 30.210 154.600 256.875 67.746 1.035.556 517.778
PROGRESS REPORT
The Progress Report deadline is 31 December 2015
UNIFI will be responsible of the production of the Progress report which will be made up by:
Progress report with the summary of technical, administrative and dissemination project issues
Dissemination Annex Deliverables Possible Technical Annexes No administrative documents
All the beneficiaries have to send the technical contribution to UNIFI
LIFE13 ENV/IT/470 ECODEFATTING
PROGRESS REPORT
Deadline
UNIFI will send to each partner a form and request for technical and dissemination contribution for the Progress Report no later than 10th of November
Each partner has to send to UNIFI all the technical contribution no later than 30th of November 2015 (except some December activities)
Each partner has to send to UNIFI all the dissemination contribution no later than 30th of November 2015 (except some December activities)
Each partner responsible for a Deliverable has to send to UNIFI the Deliverable no later than 10th of December 2015
UNIFI will send a draft of the Progress Report to the Monitoring team no later than 10th of December 2015
UNIFI will send to EC and Monitoring agency all the Inception Report documents no later than 18th of December 2015
LIFE13 ENV/IT/470 ECODEFATTING
NEXT DELIVERABLES
All the following Deliverables will be annexes of the Progress Report : Report on natural products for the ECODEFATTING innovative defatting process: Action A.2 Report on laboratory defatting phase with natural products: Action B.1 Report on negative impact of traditional defatting agents use: Action C.1 Report on environmental monitoring of laboratory defatting phase with natural products: Action C.2
LIFE13 ENV/IT/470 ECODEFATTING
PARTNER COSTS SEPTEMBER 2015
LIFE13 ENV/IT/470 ECODEFATTING
PARTNER
AS FOR ORIGINAL BUDGET
Personnel
Personnel September
15 Travel
Travel Septembe
r 15
External assistanc
e
External assistance September
15Consuma
bles
Consumables
September 15
Other cost September
2015Overhea
ds
Overheads September
15 TOTAL
TOTAL September
15
UNIFI 185.000 94.375,00 9.140 87.400 5.306,27 105.000 36.993,90 821,36 26.000 9.624,76 412.540 147.121,29
NEWPORT 111.000 51.057,51 9.140 15.400 13.000,00 80.000 16.000 4.484,03 231.540 68.541,54
ICCOMCNR 118.000 99.651,44 9.140 147,15 20.800 44.652,00 105.000 7.448,58 18.000 10.632,94 270.940 162.532,11
INESCOP 69.000 37.256,09 7.790 2.951,36 16.000 4.099,91 20.000 15.607,48 7.746 4.194,04 120.536 64.108,88
TOTAL 483.000 282.340,04 35.210 3.098,51 139.600 67.058,18 310.000 60.049,96 821,36 67.746 28.935,76 1.035.556 442.303,81
AS FOR AMENDM
ENT
Personnel
Personnel September
15 Travel
Travel Septembe
r 15
External assistanc
e
External assistance September
15Consuma
bles
Consumables
September 15
Other cost September
2015Overhea
ds
Overheads September
15 TOTAL
TOTAL September
15
UNIFI 213.125 94.375,00 7.140 77.400 5.306,27 88.875 36.993,90 821,36 26.000 9.624,76 412.540 147.121,29
NEWPORT 111.000 51.057,51 9.140 15.400 13.000,00 80.000 16.000 4.484,03 231.540 68.541,54
ICCOMCNR 133.000 99.651,44 6.140 147,15 45.800 44.652,00 68.000 7.448,58 18.000 10.632,94 270.940 162.532,11
INESCOP 69.000 37.256,09 7.790 2.951,36 16.000 4.099,91 20.000 15.607,48 7.746 4.194,04 120.536 64.108,88
TOTAL 526.125 282.340,04 30.210 3.098,51 154.600 67.058,18 256.875 60.049,96 821,36 67.746 28.935,76 1.035.556 442.303,81
MEETINGS
1st Kick off meeting in UNIFI premises in Florence in Italy in October 2014
2nd Coordination 6 month and monitoring meeting in ICCOMCNR premises in Pisa (Italy) on March 25th 2015
3rd Coordination 12 month meeting in Newport premises in Italy on October 2015
Next Project meeting 4th Coordination 18 month meeting in Inescop premises
in Spain on March-April 2016
LIFE13 ENV/IT/470 ECODEFATTING