Leland Avenue is the commercial hub for the Visitacion Valleyneighborhood, located in southeastern San Francisco. Stretchingapproximately four blocks from Bayshore Boulevard to Rutland Avenue,the Leland Avenue commercial district is an economically struggling strip.Although some new businesses have recently opened on Leland Avenue,
there are still many vacant storefronts, and the street retains an overallundistinguished and cluttered visual environment, with few pedestrian orstreetscape amenities.
However, there are a number of upcoming opportunities and assets thatLeland Avenue can build upon. The City has created the Visitacion ValleyRedevelopment Survey Area encompassing the 20-acre Schlage Lock site
and the adjacent commercial areas on Leland and Bayshore. Newdevelopment on the Schlage Lock site could bring up to 600 to 800 newhousing units to the immediate area, increasing the market base forLelands businesses.
-
7/29/2019 Leland Avenue
3/14
The San Francisco Public Library intends to build a new Visitacion Valley
branch library at the intersection of Leland Avenue and Rutland Street,
anchoring the west end of the commercial district.
Finally, the Third Street Light Rail, scheduled to open in 2006, runs alongBayshore Boulevard in this area, with stops two blocks on either side of
Leland Avenue, improving access to Leland. Through these efforts, the City
is working towards the creation of a Visitacion Valley/Schlage Lock Village
Center to serve the Visitacion Valley community.
This streetscape design project is one piece of a multipronged effort toimprove conditions on Leland Avenue.
-
7/29/2019 Leland Avenue
4/14
-
7/29/2019 Leland Avenue
5/14
Identified issues
Vacancy and litter problems making the street stark, drab and uninviting,
with neither color nor green; the streets look is perceived as rundown.
The produce store is highly used and the residents enjoy its outdoor
display but still the street is not perceived as a place to stroll down or hang
around.
The public resources such as the library or Hans Schiller plaza are seen as
often unavailable; according to most people, library hours should be
longer and the plaza should be more open to the public.
Lack of safety.
Businesses close too early and there are no destinations to attract peopleat night.
-
7/29/2019 Leland Avenue
6/14
Project objectives
Improve the districts identity and appearance through streetscape design
Increase the economic viability of small businesses on Leland Avenue byproviding an attractive, pedestrian friendly street environment
Enhance pedestrian safety and conditions, particularly at the intersection ofLeland Avenue and Bayshore Boulevard
Promote increased transit use by providing better pedestrian connections tothe Third Street Light Rail
Involve and educate Visitacion Valley community stakeholders in the designand planning for Leland Avenue
Build upon and connect to the Visitacion Valley Greenway, a series of smallparks connecting Visitacion Valleys residential neighborhoods to LelandAvenue.
The overall idea for the design was the use of a creative and artisticapproach to create a village feel with little pockets of activities along theavenue.
-
7/29/2019 Leland Avenue
7/14
DESIGN PROCESS ADOPTEDThe City and several community based organizations led a public planning process for
Leland Avenue.
The is process identified economic and physical strategies and preliminary design
concepts for Leland Avenue, and led to the creation of a formalized coalition of
community groups, known as VVBOOM, to focus on revitalizing Leland.
Several workshops were carried out.
The first community workshop :The participants (approximatel 40) received a visual
presentation by the consultant team and then broke into 7 groups for hands-on exercises
with facilitators. Workshop participants developed several concepts for the physical improvement of
Leland Avenue
The overall idea for the design was the use of a creative and artistic approach to
create a village feel with little pockets of activities along the avenue.
Participants identified desirable elements in the plan as follows:
- Native plants and trees with light canopy- Sidewalk extensions (bulb outs) at intersections
-Pedestrian lighting and safer crosswalks
- Art workexpressing uniqueness of place
- A gateway feature visible from the train
- Undergrounding of overhead utility wires
-Encourage businesses to stay open later
-
7/29/2019 Leland Avenue
8/14
At the beginning of Workshop #2 the following alternatives were presented to the community:
-
7/29/2019 Leland Avenue
9/14
Alternative #2: Village Promenade scheme
Emphasis on hardscape elements such as pedestrian lighting and seating; vertical trellis
structures alternating
with pedestrian light fixtures; large trees planted at intersections.
Alternative #3: Hybrid Scheme
The hybrid scheme was the preferred approach: it proposes to introduce alternating
pedestrian scale lighting
and small trees; intersections are green public places with pedestrian amenities.
Participants generally preferred Alternative 3: Hybrid Scheme, which proposes to add smalltrees and lighting equally spaced at 25 intervals along the length of Leland Avenue, and larger
trees at intersections.
WORKSHOP 3:
REFINING THE PREFERRED ALTERNATIVE During workshop 3 participants had the chance
to review the preferred alternative for Leland Avenue.open house was followed by a discussion about future implementation
strategies for the design. Comments from Workshop #3 were incorporated by the design
team into the final preferred design.
-
7/29/2019 Leland Avenue
10/14
The preferred design consists of:
alternating pedestrian lighting and street trees along the length of Leland Avenue,
with special plantings, seating, and corner bulb-outs at intersections.
Typical midblock and intersection treatments .
The design also focuses specific attention at two locations: at Bayshore Boulevard -the
gatewayto Leland Avenue, and at Peabody Street where the Visitacion Valley Greenway
intersects with Leland.
-
7/29/2019 Leland Avenue
11/14
-
7/29/2019 Leland Avenue
12/14
Design elements and principles adopted
1. GREENING : Trees are a primary feature.
a. Mid-block trees - Flowering Pear
b. Intersection trees - Southern magnolia
c. Accent treesGingko
Storm water management :
-
7/29/2019 Leland Avenue
13/14
Design elements and principles
adopted
2. HARDSCAPE :
a. lighting
b. seating
c. customized elements
The customization of some of the proposed elements could introduce alocally-based design vocabulary that ties into the existing public spaces.
Customized elements could include :
1.curvilinear benches, located at the entrance gateway.
2. bollards at specific intersections.
-
7/29/2019 Leland Avenue
14/14
Achievements
The commercial district is well connected to the surrounding neighborhoodand creates gathering places
Public transit is easily accessible for residents to travel between thecommercial district and their homes as well as connections to the rest of thecity, and reasonable parking opportunities are also available.
The entrance to the commercial district is distinctly marked to give a sense ofarrival and pride of the Valley
Improved traffic flow via corner bulb-outs, installation of 30 new ADAcompliant curb ramps and improved sidewalks has made the village center islively and pedestrian-friendly.
Introduced new public art and lighting into the neighborhood made it visually
appealing environment for eating, shopping and socializing during thedaytime and into the early evening hours.
Installed nine bioretention planters (1,400sq ft), landscape planters (1,300sqft)and planted 63 new street trees increasing the greenary in the avenue.