Lec 19, Supply Analysis Part 3: Performance analysis methods for facilities Some of the topics in...

10
Lec 19, Supply Analysis Part 3: Performance analysis methods for facilities Some of the topics in Chapter 7 were covered in CEEn 361 and are covered in CEEn 562 and 662. And some of them just do not have enough info in the text. Hence for this lecture read only p.412-417, p.423-425 Exclusive ROW or guideway operations (p.412-417, partly covered in CE361. Get a flavor of transit service supply analysis) Walkway and pedestrian path LOS (p.423-425, covered in this lecture)
  • date post

    20-Dec-2015
  • Category

    Documents

  • view

    214
  • download

    1

Transcript of Lec 19, Supply Analysis Part 3: Performance analysis methods for facilities Some of the topics in...

Page 1: Lec 19, Supply Analysis Part 3: Performance analysis methods for facilities Some of the topics in Chapter 7 were covered in CEEn 361 and are covered in.

Lec 19, Supply Analysis Part 3: Performance analysis methods for facilities

Some of the topics in Chapter 7 were covered in CEEn 361 and are covered in CEEn 562 and 662. And some of them just do not have enough info in the text. Hence for this lecture read only p.412-417, p.423-425

Exclusive ROW or guideway operations (p.412-417, partly covered in CE361. Get a flavor of transit service supply analysis)

Walkway and pedestrian path LOS (p.423-425, covered in this lecture)

Page 2: Lec 19, Supply Analysis Part 3: Performance analysis methods for facilities Some of the topics in Chapter 7 were covered in CEEn 361 and are covered in.

Pedestrian flow as traffic flow Flow-density

relationshipVped = Sped * Dped

or Vped = Sped/M

where M = pedestrian space (m2/p)[Vped peds/min/m, Sped m/min, Dped peds/m2]

Page 3: Lec 19, Supply Analysis Part 3: Performance analysis methods for facilities Some of the topics in Chapter 7 were covered in CEEn 361 and are covered in.

Pedestrian flow rate – No. of pedestrians passing a point per unit of time (pedestrians per 15 min or pedestrians per min)

Pedestrian flow per unit of width (pedestrians/minute/ft), vp

Pedestrian density (No. of pedestrians per unit of area)

Space (ft2/p)

Speed-average walking speed (ft/s)

vp/c ratio where capacity is about 23 p/min/ft

Walkways and pedestrian paths LOS terms

Page 4: Lec 19, Supply Analysis Part 3: Performance analysis methods for facilities Some of the topics in Chapter 7 were covered in CEEn 361 and are covered in.

Determining effective walkway width

Page 5: Lec 19, Supply Analysis Part 3: Performance analysis methods for facilities Some of the topics in Chapter 7 were covered in CEEn 361 and are covered in.

Preemption of Walkway Width

Light pole = 2.5-3.5 ft Traffic signal pole and

boxes = 3.0-4.0 ft Fire hydrants = 2.5-3.0 ft Traffic signs = 2.0-2.5 ft Waste basket = 3.0 ft Benches = 5.0 ft Subway stairs = 5.5-7.0 ft Subway ventilation gratings

(raised) 6.0+ ft Trees = 2.0-4.0 ft Planter boxes = 5.0 ft

Newsstand = 4.0-13.0 ft Vending stands =

variable Advertising displays =

variable Store displays = variable Sidewalk cafes (two

rows of tables) = 7.0 ft Etc...

Page 6: Lec 19, Supply Analysis Part 3: Performance analysis methods for facilities Some of the topics in Chapter 7 were covered in CEEn 361 and are covered in.

LOS criteria

Capacity is about 23 p/min/ft, or 75 p/min/m

Page 7: Lec 19, Supply Analysis Part 3: Performance analysis methods for facilities Some of the topics in Chapter 7 were covered in CEEn 361 and are covered in.

LOS criteria for walkways (1)

Page 8: Lec 19, Supply Analysis Part 3: Performance analysis methods for facilities Some of the topics in Chapter 7 were covered in CEEn 361 and are covered in.

LOS criteria for walkways (2)

Page 9: Lec 19, Supply Analysis Part 3: Performance analysis methods for facilities Some of the topics in Chapter 7 were covered in CEEn 361 and are covered in.

Queuing area LOS

Page 10: Lec 19, Supply Analysis Part 3: Performance analysis methods for facilities Some of the topics in Chapter 7 were covered in CEEn 361 and are covered in.

Pedestrian paths on campus

11:10 AM 3/6/03 11:55 AM 3/6/03