IE 343 Engineering Economics
Lecture 14: Chapter 5 – Evaluating a Single Project
Instructor: Tian Ni Sep.23, 2011
IE 343 Fall 2011 1
![Page 2: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/2.jpg)
New Plan: 5th Week Sep 19 Sep 21 Sep 23 (Quiz 3&Chap4, 5) (Hw4 due &Chap 5) 6th Week Sep 26 Sep 28 Sep 30 (Table&Excel&VBA (Quiz 4& (Exam 1 &Chap 4 Problems) Review 1) &HW5 out) 7th Week Oct 3 Oct 5 Oct 7 8th Week Oct 10 Oct 12 Oct 14 (Oct Break) (HW5 due
& HW6 Out) IE 343 Fall 2011
Exam 1 Date Change!
2
![Page 3: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/3.jpg)
No homework next week. Homework 5 will be assigned next Friday Sep. 30
after Exam 1. Homework 5 is due Oct. 14 Exam 1 will have two parts: (Chapter 1 – 4) Part 1: Old problems randomly picked from Homework,
Lecture Notes and Textbook. (Just like Quizzes) Part 2: New problems to test your understanding
Details will be announced next Monday You can start to review Homework, Lecture Notes
and Textbook now! IE 343 Fall 2011
Announcement
3
![Page 4: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/4.jpg)
Textbook Tables (Appendix C) Excel VBA Solve some Practice Problems in Chapter 4 Note: Monday’s class is part of review 1. I will
teach how to use textbook tables (appendix C), Excel, and VBA to simply the computations, which is very useful in the Exam 1.
IE 343 Fall 2011
Next Class … Monday (Sep. 26)
4
![Page 5: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/5.jpg)
Question: What is the corresponding present equivalent value of the cash flow diagram below under a nominal interest rate r = 12% compounded annually, monthly and continuously? Is it a good investment?
IE 343 Fall 2011
*Example 4.22*
5
![Page 6: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/6.jpg)
IE 343 Fall 2011
*Example 4.22*
0 1 13 14 15
A = 3,000
….. 22 23 24 ……..…... 12
$19,000
2 3 4 5
A A 1.06A A06.1 2
A06.1 9
A06.1 10
A06.1 11
EOY
6
![Page 7: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/7.jpg)
IE 343 Fall 2011
*Example 4.22* - Decomposition
0 1
$19,000
2 3 23 24
0 1
A = 3,000
………... 2 3 4 5 12
A
Single Cash Flow
Deferred Annuities Start at EOY 3
23 24
PS
PD
7
![Page 8: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/8.jpg)
IE 343 Fall 2011
*Example 4.22* - Decomposition
Geometric Gradient Series Start at the end of year 13
13 14 15 ….. 22 23 24
A 1.06A A06.1 2
A06.1 9
A06.1 10
A06.1 11
0 1 PG
12 ……..
8
![Page 9: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/9.jpg)
Basic Idea: Evaluate the present equivalent value of the three decomposed cash flow diagrams separately and then sum them up.
Notation: PS : Present Value for the single cash flow PD : Present Value for the Deferred Annuities PG : Present Value for the Geometric Gradient Series iA : Effective interest rate with annual compounding iM : Effective interest rate with monthly compounding iC : Effective interest rate with continuous compounding
IE 343 Fall 2011
*Example 4.22* – Solution
9
![Page 10: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/10.jpg)
General Solution: PS = -19,000 PD = 3,000(P/A, i%, 10)(P/F, i%, 2) f = 6%, r = 12%, f ≠ r PG = (P/F, i%, 12)
P = PS + PD + PG
IE 343 Fall 2011
*Example 4.22* – Solution
06.0%)]12,06.0,/)(12%,,/(1[000,3
−−
iPFiFP
10
![Page 11: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/11.jpg)
Solution: Annual Compounding iA = r = 12% per year PS = -19,000 PD = 3,000(P/A, 12%, 10)(P/F, 12%, 2) = 13,513 f = 6%, i = 12%, f ≠ i PG = (P/F, 0.12, 12)
= 6,205 P = PS + PD + PG = 718 It is a good investment since P > 0!
IE 343 Fall 2011
*Example 4.22* – Solution
06.012.0)]12,06.0,/)(12,12.0,/(1[000,3
−− PFFP
11
![Page 12: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/12.jpg)
Solution: Monthly Compounding r = 12% per year iM = > iA = 0.12 PS = -19,000 PD = 3,000(P/A, 0.126825, 10)(P/F, 0.126825, 2) =
12985 f = 6%, i = 12.6825%, f ≠ i PG = (P/F,
0.126825, 12) = 5,569
IE 343 Fall 2011
*Example 4.22* – Solution
06.0126825.0)]12,06.0,/)(12,126825.0,/(1[000,3
−− PFFP
126825.011212.01
12
=−
+
12
![Page 13: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/13.jpg)
Solution: Monthly Compounding r = 12% per year iM = > iA = 0.12
P = PS + PD + PG = -446
It is a bad investment since P < 0!
IE 343 Fall 2011
*Example 4.22* – Solution
126825.011212.01
12
=−
+
13
![Page 14: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/14.jpg)
Solution: Continuous Compounding r = 12% per year iM = > iM = 0.126825 (> iA = 0.12) PS = -19,000 PD = 3,000(P/A, 0.1275, 10)(P/F, 0.1275, 2) = 12,934 f = 6%, i = 12.75%, f ≠ i PG = (P/F, 0.1275,
12) = 5,510
IE 343 Fall 2011
*Example 4.22* – Solution
06.01275.0)]12,06.0,/)(12,1275.0,/(1[000,3
−− PFFP
( ) 1275.0112.0 =−e
14
![Page 15: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/15.jpg)
Solution: Continuous Compounding r = 12% per year iM = > iM = 0.126825 (> iA = 0.12)
P = PS + PD + PG = -556
It is a bad investment since P < 0!
IE 343 Fall 2011
*Example 4.22* – Solution
( ) 1275.0112.0 =−e
15
![Page 16: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/16.jpg)
Chapter 5 - Evaluating a Single Project
IE 343 Fall 2011 16
![Page 17: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/17.jpg)
Time value of money - Application
IE 343 Fall 2011 17
![Page 18: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/18.jpg)
We will learn how to evaluate the profitability and liquidity of a single problem solution (or alternative). Minimum Attractive Rate of Return (MARR) is useful for this analysis. MARR ("hurdle rate") is usually organization-specific and determined based on the following: – Cost of money available for investment – Number of good projects available for investment – Risks involved in investment opportunities
IE 343 Fall 2011
Time value of money - Applications
18
![Page 19: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/19.jpg)
How to use MARR? Use it as an interest rate to convert cash flows into
equivalent worth at some point in time. The proposed problem solution (project or alternative) is profitable if it generates sufficient cash flow to recover the initial investment and earn an interest rate that is at least as high as MARR.
IE 343 Fall 2011
Time value of money - Applications
19
![Page 20: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/20.jpg)
Methods to evaluate profitability Present Worth (PW) Future Worth (FW) Annual Worth (AW) Internal Rate of Return (IRR) External Rate of Return (ERR)
Methods to evaluate liquidity Simple payback period Discounted payback period
IE 343 Fall 2011
Methods
20
![Page 21: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/21.jpg)
Present Worth method (PW)
IE 343 Fall 2011 21
![Page 22: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/22.jpg)
Discount all cash flows to the present time by using the MARR as the interest rate.
IE 343 Fall 2011
Present Worth (PW) method
NN iFiFiFiFiPW −−− ++++++++= )1(...)1()1()1(%)( 2
21
10
0
∑=
−+=N
k
kk iFiPW
0)1(%)(
22
![Page 23: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/23.jpg)
: represents future cash flow at the end of the compounding period k;
i: is the effective interest rate (MARR) per compounding period, which is assumed to be constant;
N represents the number of compounding periods in the planning horizon (i.e., study period).
IE 343 Fall 2011
Present Worth (PW) method N
N iFiFiFiFiPW −−− ++++++++= )1(...)1()1()1(%)( 22
11
00
∑=
−+=N
k
kk iFiPW
0)1(%)(
kF
23
![Page 24: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/24.jpg)
Rule: If PW(MARR) ≧ 0, the project is profitable If PW(MARR)< 0, the project is not profitable.
IE 343 Fall 2011
Present Worth (PW) method
24
![Page 25: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/25.jpg)
Consider a project that has the following cash flows over a study period of 5 years: Initial investment: $100,000 Annual revenues: $40,000 Annual expenses: $5,000 Salvage value: $20,000 MARR: 20%.
IE 343 Fall 2011
Present Worth (PW) method - Example 5.1
25
![Page 26: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/26.jpg)
IE 343 Fall 2011
Example 5.1 - Cash Flow Diagram
0 1 2 3 4
$100,000
5
MARR = 2%
$40,000
$5,000
S=$20,000
26
![Page 27: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/27.jpg)
Solution: PW(20%)=-100,000+(40,000-
5,000)(P/A,20%,5)+20,000(P/F,20%,5)=$12,709. Is this a profitable project? Yes! Because: We recovered $100,000 (investment). We
earned an interest rate of 20% which was desired. We even made a profit that has a present equivalent value of $12,709, which is beyond what was required.
IE 343 Fall 2011
Example 5.1 – Solution
27
![Page 28: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/28.jpg)
Suppose we had an interest rate higher than 20%. For example, 20% nominal interest rate
compounded continuously. Then, the effective interest rate is
PW(i=22.14% discrete compounding) = PW(r= 20% continuous compounding) = $7,285.7 Still profitable but PW is lower when the effective
interest rate increases.
IE 343 Fall 2011
Example 5.1 – Cont’d
%.14.2212.0 =−= ei
28
![Page 29: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/29.jpg)
Note: If the first cash flow of a project is negative and its subsequent cash flows are positive, then PW is a decreasing function of the effective interest rate i.
For a general pattern of cash flows, PW may not be the decreasing function of i.
IE 343 Fall 2011
Example 5.1 – Cont’d
29
![Page 30: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/30.jpg)
Future Worth method (FW)
IE 343 Fall 2011 30
![Page 31: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/31.jpg)
Find the equivalent worth of all cash flows at the end of the study period by using the MARR as the interest rate.
Note that FW and PW of a project are equivalent at the interest rate of i%, i.e., FW=PW(F/P,i%,N).
IE 343 Fall 2011
Future Worth (FW) method
022
110 )1(...)1()1()1(%)( iFiFiFiFiFW N
NNN ++++++++= −−
∑=
−+=N
k
kNk iFiFW
0)1(%)(
31
![Page 32: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/32.jpg)
Rule: If FW(MARR) ≧ 0, the project is profitable If FW(MARR)< 0, the project is not profitable.
IE 343 Fall 2011
Future Worth (FW) method
32
![Page 33: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/33.jpg)
Back to Example 5.1 with the following project: Initial investment: $100,000 Annual revenues: $40,000 Annual expenses: $5,000 Salvage value: $20,000 MARR: 20%. N: 5 years.
IE 343 Fall 2011
Future Worth (FW) method - Example 5.1
33
![Page 34: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/34.jpg)
IE 343 Fall 2011
Example 5.1 - Cash Flow Diagram
0 1 2 3 4
$100,000
5
MARR = 2%
$40,000
$5,000
S=$20,000
34
![Page 35: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/35.jpg)
Solution: FW(20%)=-100,000(F/P,20%,5)+(40,000-
5,000)(F/A,20%,5)+20,000=$31,624. Since FW(20%) ≧ 0, the project is profitable.
IE 343 Fall 2011
Future Worth (FW) method - Example 5.1
35
![Page 36: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/36.jpg)
Capitalized Worth method (CW)
IE 343 Fall 2011 36
![Page 37: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/37.jpg)
Definition: Capitalized–Worth method involves determining the PW of all revenues or expenses over an infinitely length of time.
IE 343 Fall 2011
Capitalized – Worth (CW) Method
37
![Page 38: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/38.jpg)
CW of a perpetual series of end-of-period uniform payments A, with interest at i% per period is A(P/A, i%, ∞)
IE 343 Fall 2011
Capitalized – Worth (CW) Method
0 ∞
A A A . . . . . . . . . . . . . . . . . . . . . . . . . . …
1 2 3 . . . . . . . . . . . . . . . . . . . . . . . . ….
To find P?
38
![Page 39: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/39.jpg)
CW of a perpetual series of end-of-period uniform payments A, with interest at i% per period is A(P/A, i%, ∞)
IE 343 Fall 2011
Capitalized – Worth (CW) Method
=
+
−+=
∞==
∞→
∞→
iA
iiiAiCW
iAPAPWiCW
N
N
N
N
1)1(
1)1(lim%)(
)%,,/(%)(
39
![Page 40: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/40.jpg)
A practical approximation of “forever” (infinity) is dependent on the interest rate i%
E.g.1: i=8% (1/i = 12.5000), (P/A,8%,N) = 12.4943 when N = 100. So a good approximation for infinity when i=8% is N ≧ 100
E.g.2: i=20% (1/i =5.0000), (P/A,20%,N) = 4.9966 when N = 40. So a good approximation for infinity when i=20% is N ≧ 40
IE 343 Fall 2011
Capitalized – Worth (CW) Method
40
![Page 41: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/41.jpg)
Annual Worth method (AW)
IE 343 Fall 2011 41
![Page 42: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/42.jpg)
The AW of a project is an equal annual series of dollar amounts, for a stated study period, that is equivalent to the cash inflows and outflows at an interest rate that is generally the MARR. AW(i%)=R – E – CR(i%) R: Annual equivalent revenues E: Annual equivalent expenses CR: Annual equivalent Capital Recovery cost
IE 343 Fall 2011
Annual Worth (AW) method
42
![Page 43: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/43.jpg)
CR includes the loss in value of asset and interest on invested capital.
The CR can be computed by: CR(i%)=I(A/P,i%,N)-S(A/F,i%,N) I: Initial investment S: Salvage value.
IE 343 Fall 2011
Annual Worth (AW) method
43
![Page 44: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/44.jpg)
The above formula of CR can be interpreted in the way that the annual equivalent of the initial capital investment minus the annual equivalent of the salvage value.
IE 343 Fall 2011
Annual Worth (AW) method
44
![Page 45: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/45.jpg)
Back to Example 5.1: Initial investment (I): $100,000 Annual revenues (R): $40,000 Annual expenses (E): $5,000 Salvage value (S): $20,000 MARR (i%): 20%. N: 5 years.
IE 343 Fall 2011
Annual Worth (AW) method - Example 5.1
45
![Page 46: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/46.jpg)
Back to Example 5.1: I = $100,000 R = $40,000 E = $5,000 S = $20,000 MARR = 20%. N: 5 years.
CR(20%)=100,000(A/P,20%,5)-20,000(A/F,20%,5) =$30,750.
IE 343 Fall 2011
Annual Worth (AW) method - Example 5.1
46
![Page 47: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/47.jpg)
IE 343 Fall 2011
CR cost calculation - Example 5.1
Year
Value of investment
at BOY
Uniform loss in value of
year (A)
Interest on BOY (B) investment
(i=20%)(B)
CR cost for year
(A+B)
PW of CR amount at
i=20% 1 100,000 16,000 20,000 36,000 30000 2 84,000 16,000 16,800 32,800 22777.78 3 68,000 16,000 13,600 29,600 17129.63 4 52,000 16,000 10,400 26,400 12731.48 5 36,000 16,000 7,200 23,200 9323.56
Sum= 91962.45
Assume that the loss in value is uniform per year. So loss per year is (I – S)/N = (100,000 – 20,000)/5 = 16,000
47
![Page 48: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/48.jpg)
BOY stands for Beginning-of-Year. PW of CR cost= 36,000(P/F,20%,1)
+32,800(P/F,20%,2)+...+23,200(P/F,20%,5) =91,961.44
Uniform annual equivalent of CR cost =91,961.44(A/P,20%,5) = $30,750
IE 343 Fall 2011
CR cost calculation - Example 5.1
48
![Page 49: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/49.jpg)
AW(i%)= R – E – CR(i%) AW(20%)=40,000-5,000-30,750=4,250 Since AW(20%) ≧ 0, the project is profitable.
IE 343 Fall 2011
Annual Worth (AW) method - Example 5.1
49
![Page 50: Lec 14_Full](https://reader033.fdocuments.in/reader033/viewer/2022061104/542d8da0219acd4d4b8b5795/html5/thumbnails/50.jpg)
Note that AW, PW, and FW are equivalent measures of profitability of a project: AW=PW(A/P,i%,N), AW=FW(A/F,i%,N), PW=FW(P/F,i%,N), FW=PW(F/P,i%,N). (Check that these expressions hold for the project in
Example 5.1.)
Therefore if PW ≧ 0, then FW ≧ 0, and AW ≧ 0.
IE 343 Fall 2011
Annual Worth (AW) method
50