AgendaPrecedence Research – Seeking Inspiration / Structure and the BuiltEnvironment / Construct a Small Scale Model that Explores a selected Structural Approach – Iteration 1
Dynamics of Pattern
Dynamics of Folding
z
Factors to considerAnd analysis for 1,2 and 3.
• Climate : - Precipitation- Wind- Temperature (Fog or rain)- Sun path• Geography• History• Infrastructural existing physical
conditions(What are the boundaries?)
1
Site 3
Factors to considerAnd analysis for 1,2 and 3.
• Climate : EXTREMELYwindy because of itsspaces opened up to foursides. Wind comes fromthe different directions sothat it was hard to defineexactly where the windcomes from. Installationwould be wind-safe, solidor light flowing material soit can endure the hardpressure from the differentweathers.
• Geography: Rough andslanted and made me like Iam climbing the mountain.If the installation set here, Ithink it Is good to see itfrom the bottom part toupward.
• Infrastructural existingphysical conditions
(What are the boundaries?): The space is in thegarden back of the architecturedepartment in the BatmaleBuilding of CCSF. Nothingsurrounds the space except forsome fences at the edge orsome trees. There are soccerfields right next to the place butit is separated by the road. It iscompletely feels free and fresh.
Factors to considerAnd analysis for 1,2 and 3.
• Climate : Wind is blocked by the wall as shown on the picture, so the weather will not be a huge problem on installing. Since the sun directly shine up from the right wall-free zone, the shadow come along clearly with the wall.
• Geography : Flat space allowing a plenty of free spaces for installing. It has wall that installation can be hold up tightly up and down.
• Infrastructural existing physical conditions
(What are the boundaries?) : There is pathway to the exit of building connected to the spaces. Any installation here would not be huge to block up the pathway.
Site two
Site Three
•
•
•
Site analysis on surrounding
Site analysis on weather
#1 Literation
#2 and final Literation
Items Quantity Price
2x4 84 x $2.34/
each
$196.56
Flat Washer
s
2 boxes x $
10.98
$21.96
Lock Washer
s
1 box x $14
.87
$14.87
⅜ Bolt 6
”
3 boxes x $
18.97
$56.91
⅜ Hex Nut 1 boxes x $
9.57
$9.57
Eye Bolt 4 x $.85 $3.40
Turnbuckle 4 x $ 3.27 $ 13.08
Cable 100ft x $.3
5/ft
$35.00
Total $351.35
Budget & Material
Michael is cutting off the wood
•
•
•
•
•
•
•
•
•
•Picture of wood arranged from the elevated view
Connecting system
Wire connection
Spike
Sky view