LDRRF Schemes in Cox's Bazar, Kurigram, Pirojpur,Rangpur, Lalmonirhat, Bhola, Barguna, Satkhira,...

download LDRRF Schemes in Cox's Bazar, Kurigram, Pirojpur,Rangpur, Lalmonirhat, Bhola, Barguna, Satkhira, Faridpur, Jhalokathi, Kishorganj

of 33

description

LDRRF Schemes in Cox's Bazar, Kurigram, Pirojpur,Rangpur, Lalmonirhat, Bhola, Barguna, Satkhira, Faridpur, Jhalokathi, Kishorganj

Transcript of LDRRF Schemes in Cox's Bazar, Kurigram, Pirojpur,Rangpur, Lalmonirhat, Bhola, Barguna, Satkhira,...

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Meeting of the LDRRF Technical Committee

    Venue: DMIC Conference Room, CDMP Office

    Date: 28th November, 2013

    Comprehensive Disaster Management Programme, Phase II

    Ministry of Disaster Management & Relief

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Major Hazards

    River bank erosion

    Flood

    Cyclone

    Tidal surge

    Salinity

    Source : FTRA Report

    Existing Resources

    Cyclone Shelter

    Embankment

    Road connection

    Ponds for sweet water

    Source : FTRA Report

    District: Coxs Bazar Upazila: Moheshkhali

    Union: Shaplaur

    Intervention proposed by UDMC

    Re-construction of Embankment from Loilachhara Sluice Gate to Mukber Hoingachhara

    Maitenance of Daneshpur Cyclone Shelter

    Source : FTRA Report

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Scheme detail Budget (BDT) Benf. Design Depth

    (m) Length (m) X

    Width (m)

    CBZ 0113005: Re-construction of Embankment from Loilachhara Sluice Gate to Mukber Hoingachhara

    7,445,918 3,000

    CBZ 0113006: Maitenance of Daneshpur Cyclone Shelter 573,017 3,500

    KHL0913009

    Impact CBZ 0113005:

    Protected fertile land from saline water intrusion

    Reinforced opportunities of fish culture, salt culture

    Served as shelter for people and livestock during flood

    CBZ 0113006:

    Served as safe shelter for people during flood and Cyclone

    District: Coxs Bazar, Upazila: Moheshkhali, Union: Shaplaur

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Major Hazards

    Flood, River Erosion, Drought,

    Tornado, Noreaster, Cold Spell and

    Soil Sedimentation on agricultural

    Land Source : FTRA Report

    District: Kurigram, Upazila: Ulipur & Nageswari Union: Bozra, Hatiya, Shaheber Alga & Kaliganj, Noonkhawa

    Intervention proposed by UDMC

    Construction of Earthen Killa

    Ground raising

    Installation of Tube-well and Sanitary Latrine

    Source : FTRA Report

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Scheme detail Budget (BDT) Benf. Design Depth (m) Length (m) X

    Width (m)

    KRG1013004: Construction of Earthen Killa of Char Bazra Dakkinpara Reg. Primary School field at Char Bazra.

    225,620 1,200

    KRG1013005: Construction of earthen Killa at Onontopur Char Dargar Kuthi Eidgah field

    574,099 3,000

    KRG1013008: Construction of Earthen Killa at Char Gander Alga.

    1,224,732 1200

    KRG1013009: Construction of Earthen Killa at Mekurar Alga 1,202,127 1800

    KRG1013010: Construction of Earthen Killa at Dai Khawa register primary school field.

    1,063,545 1200

    KRG1113011: Ground raising cluster village at Salmara Gucha Gram for 44 household including 44 sanitary latrines and 5 shallow tube well.

    1,877,200 264

    KRG1113012: Cluster ground rising, sanitary latrine and shallow tube well for 25 house hold at Namapara (bridgepar).

    1,687,348 150

    KRG1113013: Construction of Earthen Killa at Dharka Baparir Char.

    2,121,523 1,900

    District: Kurigram, Upazila: Ulipur & Nageswari Union: Bozra, Hatiya, Shaheber Alga & Kaliganj, Noonkhawa

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    District: Kurigram, Upazila: Ulipur & Nageswari Union: Bozra, Hatiya, Shaheber Alga & Kaliganj, Noonkhawa

    Impact of proposed

    schemes

    Livestock saved from flood

    People are saved during flood

    In normal time used for community programs

    hygienic sanitation and safe drinking water for ultra-poor families

    Vulnerable people are more resilient to disaster especially flood.

    KRG1013013: Killa KRG 1013012: Earth raising

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    District: Kurigram, Upazila: Ulipur & Nageswari Union: Bozra, Hatiya, Shaheber Alga & Kaliganj, Noonkhawa

    KRG1013010: Killa KRG 1013004: Killa

    KRG1013011: Cluster village ground raising

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Major Hazards

    Cyclone and tidal surge, seasonal high tide, raising river basin due to silt and soil sedimentation, river bank erosion, water logging, Draught, salinity

    Source : FTRA Report

    District: Pirojpur Upazila: Nesarabad and Mothbaria Union: Sudoykathi Mirukhali, Danisafa, Halta Gulshakhali, Boro Masua, Mothbaria

    Sadar, Betmore Rajapara

    Intervention proposed by UDMC

    Construction of Earthen Killa

    Installation of Solar System and provide Hand Mike

    Re-excavation of Pond

    Source : FTRA Report

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Scheme detail Budget (BDT) Benf. Design Depth (m) Length (m) X

    Width (m)

    PRJ 1013017: Construction of earthen Killa near Laxmankathi Cyclone shelter at Village Laxmankathi in Wd # 1.

    50,546 500

    PRJ 1013018: Installation of Solar System and provide Hand Mike for 7 Cyclone Shelters cum Primary schools in Wd # 1, 2, 4, 5, 6, 7 & 8

    654,500 5,000

    PRJ0613017: Re-Excavation of govt Pond near Near house of Nanna member

    343,672 446

    PRJ0613018: Re-Excavation of govt Pond near Near house of Chan Gazi

    538,429 500

    PRJ0613019: Re-Excavation of Pond near DSH Dakhil Madrasha

    276,279 700

    PRJ0613020: Re-Excavation of Pond near Boro Showla Adarsha High School

    337,638 840

    PRJ0613021: Re-Excavation of Pond near house of Boro Showla sudonna mistri bari (Jakir Sikdar)

    352,456 600

    PRJ0613022: Re-Excavation of govt. Pond near house of Choto showla Ali Mollick

    325,755 640

    PRJ0613023: Re-Excavation of govt Pond near Near house of Faruk Mia

    598,476 700

    PRJ0613024: Re-Excavation of govt Pond near Near house of Nafaz Mukter

    444,009 500

    District: Pirojpur Upazila: Nesarabad and Mothbaria Union: Sudoykathi Mirukhali , Danisafa, Halta Gulshakhali , Boro Masua, Mothbaria

    Sadar, Betmore Rajapara

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Scheme detail Budget (BDT) Benf.

    PRJ0613025: Re-Excavation of govt Pond near Near house of Asmot Ali 431,713 640

    PRJ0613026: Re-Excavation of govt. Pond at danisafa Bazar 571,551 1,500

    PRJ0613027: Re-Excavation of govt. Pond near Danisafa Salahia Fazil Madrasha 351,617 1,000

    PRJ0613028: Re-Excavation of govt. Pond near house of Nur Mohammad Talukder 434,428 500

    PRJ0613029: Re-Excavation of Pond near near Uttar Kobotorkhali Primary School 403,663 500

    PRJ0613030: Re-Excavation of govt. Pond at Boro masua Bazar 794,958 1,500

    PRJ0613031: Re-Excavation of Pond adjacent to Majid Contractor Jamey Mosque 368,554 900

    PRJ0613032: Re-Excavation of Pond near house of Suja hawlader 811,289 2,000

    PRJ0613033: Re-Excavation of govt. Pond near house of Rajbihari Kritonia 306,418 2,100

    PRJ0613034: Re-Excavation of Pond adjacent to Jankhali high school 133,135 2,100

    PRJ0613035: Re-Excavation of Upazila Dormitory Pond 440,250 2,000

    District: Pirojpur Upazila: Nesarabad and Mothbaria Union: Sudoykathi Mirukhal i , Danisafa, Halta Gulshakhal i , Boro Masua, Mothbaria Sadar, Betmore Rajapara

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    District: Kurigram, Upazila: Ulipur & Nageswari Union: Bozra, Hatiya, Shaheber Alga & Kaliganj, Noonkhawa

    Impact of proposed schemes

    Ensured early warning and awareness on disaster before and during disaster through Miking

    Ensured light at the Cyclone shelter during disaster

    Reduced insecurity and awkwardness by avoiding darkness specially at night

    Ensured round the year solar energy for the respective schools

    People will be more resilient to disaster especially Cyclone

    Ensured shelter for about 400 livestock during Cyclone

    Used in social programs

    People will be more resilient to disaster especially Cyclone

    People and animal could access arsenic and saline free water

    Saved from health hazards and will prevent water scarcity during dry season

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Major Hazards

    Flood, River Erosion, Drought, Tornado, Noreaster, Cold Spell and Soil Sedimentation on agricultural Land

    Source : FTRA Report

    District: Rangpur Upazila: Gangachara and Piragacha Union: Nohali, Kolkonda, Laxmitari and Sawla

    Intervention proposed by UDMC

    Construction of Earthen Killa

    Cluster village ground raising

    Re-construction of road cum embankment

    Re-excavation of canal

    Source : FTRA Report

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Scheme detail Budget (BDT)

    Benf.

    RAN1013021: Construction of Earthen Killa at Char Bugduhohora (Purbapara).

    457,200 1,200

    RAN1013022: Construction of Earthen Killa at Char Bugduhohora Chwkidar para.

    1,072,027 1,600

    RAN1013023: Ground rising of Cluster village for 50 poor HH including 50 sanitary latrines and 5 Shallow tube well.

    2,879,456 300

    RAN1013024: Re-construction of Embankment cum road from house of Chotour mur at Binbiner Char to H/O Atiar at Sankardha The scheme ended with WDB embankment.

    3,713,157

    3,000

    RAN1013025: Re-construction of embankment cum road from house of Hafizul at Mutukpur to H/O Rafiqul at Chila khal

    2,045,695 2,500

    RAN1013026: Re-construction of embankment cum road from house of Hafizul at Mutukpur to H/O Rafiqul at Chila khal

    1,719,598 3,200

    RNG 0613001: Road cum Embankment re-construction from the west side of Mohipur new bridge to the H/o Mokbul of Char Sankardah village via H/o Ekramul (2120m)

    2,985,818

    2,750

    RAN1113027: Construction of Earthen Killa at Zowan mouza.

    726,777 2300

    RAN1113028: Re-excavation of canal starts from near H/o Siraj at Ramsingh and ended at brench of Tista river near house of Earshad at Zowan moza

    5,216,472

    3500

    District: Rangpur Upazila: Gangachara and Piragacha Union: Nohali, Kolkonda, Laxmitari and Sawla

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    District: Kurigram, Upazila: Ulipur & Nageswari Union: Bozra, Hatiya, Shaheber Alga & Kaliganj, Noonkhawa

    Impact of proposed schemes

    Ensured shelter for people and livestock during flood

    Used in social programs

    People will be more resilient to disaster especially Cyclone

    Ensured hygienic sanitation and safe drinking water for people

    Reduced health hazards

    Ensured easy access and communication from and to vulnerable areas

    RNG 1013021: Killa

    RNG 1013022: Killa

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    District: Kurigram, Upazila: Ulipur & Nageswari Union: Bozra, Hatiya, Shaheber Alga & Kaliganj, Noonkhawa

    RNG 1013024: Embankment RNG 1013025: Embankment

    RNG 1013026: Embankment

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    District: Kurigram, Upazila: Ulipur & Nageswari Union: Bozra, Hatiya, Shaheber Alga & Kaliganj, Noonkhawa

    RNG 1013028: Canal RNG 1013025: Embankment

    RNG 1013027: Killa

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Major Hazards

    Flood, River Erosion, Drought, Tornado, Noreaster, Cold Spell and Soil Sedimentation on agricultural Land

    Source : FTRA Report

    District: Lalmonirhat, Upazila: Patgram, Union: Dahagram

    Intervention proposed by UDMC

    Construction of cluster village by constricting 60 flood resilient house with CI sheet on top, 60 sanitary latrine, 6 shallow tube well with cattle as livelihood support.

    Source : FTRA Report & physical verification of scheme

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Scheme detail Budget (BDT)

    Benf.

    LMH1113025: Construction of cluster village by constricting 60 flood resilient house with CI sheet on top, 60 sanitary latrine, 6 shallow tube well with cattle as livelihood support.

    10,863,951 836

    District: Lalmonirhat, Upazila: Patgram, Union: Dahagram

    Impact of proposed schemes

    60 homeless ultra-poor families will have safe shelter on raised khas land

    60 homeless ultra-poor families will have access to hygienic sanitation and safe drinking water

    Women will have income generation support with cattle

    Vulnerable people of flood affected Chhit Mohal will be more resilient to disaster especially flood.

    LMH 1113025: Cluster village for 60 HHs

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Scheme detail Budget (BDT)

    Benf.

    BHL 0913019: Construction of Earthen Killa near Hanif Dalal Bazar (size: 120 m X 200 m) 8,756,661 1,710

    BHL 0913020: Construction of Earthen Killa near Muktijoddha Bazar (size: 120 m X 200 m) 8,756,661 1,710

    District: Lalmonirhat, Upazila: Patgram, Union: Dahagram

    Impact of proposed schemes

    * Livestock and people will get shelter during flood * People will be resilient to disaster espacially Cyclone and tidal surge * Could be used for social gathering

    BHL 0913019: Killa BHL 0913020: Killa

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Major Hazards

    Cyclone, Tidal surges, Monsoon flood, siltation and soil sedimentation at river basin, River bank erosion, Water logging, Salinity.

    Source : FTRA Report

    District: Bhola, Upazila: Tozummudin, Union: Chandpur

    Intervention proposed by UDMC

    Construction of killa

    Source : FTRA Report & physical verification of scheme

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Scheme detail Budget (BDT)

    Benf.

    BHL 0913019: Construction of Earthen Killa near Hanif Dalal Bazar (size: 120 m X 200 m) 8,756,661 1,710

    BHL 0913020: Construction of Earthen Killa near Muktijoddha Bazar (size: 120 m X 200 m) 8,756,661 1,710

    District: Bhola, Upazila: Tzumuddin, Union: Chandpur

    Impact of proposed schemes

    * Livestock and people will get shelter during flood * People will be resilient to disaster espacially Cyclone and tidal surge * Could be used for social gathering

    BHL 0913019: Killa BHL 0913020: Killa

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Major Hazards

    Cyclone, tidal surges, salinity, decrease land fartility, deterioration of under ground water level Source : FTRA Report

    District: Barguna, Upazila: Amtoli, Union: Chawra

    Intervention proposed by UDMC

    Construction of killa

    Source : FTRA Report & physical verification of scheme

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Scheme detail Budget (BDT)

    Benf.

    BAR 1113014: Re-excavation of Khash Pond near H/o Motiur Rahman at Gotkhali village with RCC Stair (size: 38 m X 36 m)

    535,002 500

    BAR 1113015: Re-excavation of Chawra Union Parishad Pond at Lodagram with RCC Stair (size: 61 m X 41 m)

    1,317,037 600

    BAR 1113016: Re-excavation of Pond near H/o Nasiruddin Hawlader at Chalitabunia with RCC Stair (size: 45 m X 36 m)

    710,769 500

    BAR 1113017: Re-excavation of Khash Pond near H/o Ruhul Amin at Patakata with RCC Stair (size: 55 m X 42 m)

    1,016,989 600

    BAR 1113018: Re-excavation of Khan Bari Jame Mosque Pond at Boithakata with RCC Stair (size: 44 m X 39 m)

    299,007 500

    District: Lalmonirhat, Upazila: Patgram, Union: Dahagram

    Impact of proposed schemes

    Enhanced source of surface water * Ensured sweet water for drinking and domestic use round the year * Reduced intensity of water borne diseases * Increased agriculratural production * Impact on favourable environment

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Major Hazards

    Cyclone, Tidal surges, Monsoon flood, siltation and soil sedimentation at river basin, River bank erosion, Water logging Source : FTRA Report

    District: Satkhira, Upazila: Assasuni, Union: Munshiganj, Shyamnagar, Anulia

    Intervention proposed by UDMC

    Construction of Embankment

    Provide (Motka) Pitcher

    Source : FTRA Report & physical verification of scheme

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Scheme detail Budget (BDT)

    Benf.

    SAT..: Provide earthen Pitcher (Motka) for preserving rain water and Seed money to village women for IGA 400,000 285

    SAT.: Re-construction of BWDB road cum embankment near the land of Kalam Sardar to H/o Abdul Hakim in Anulia village

    2,699,974 14500

    District: Satkhira, Upazila: Assasuni, Union: Munshiganj, Shyamnagar, Anulia

    Impact of proposed schemes

    Enhanced source of surface water * Ensured sweet water for drinking and domestic use round the year * Reduced intensity of water borne diseases * Increased agriculratural production * Impact on favourable environment

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Major Hazards

    Cyclone, Tidal surges, Monsoon flood, siltation and soil sedimentation at river basin, River bank erosion, Water logging Source : FTRA Report

    District: Faridpur, Upazila: Char Bhadrasahn, Union: Jhaukanda

    Intervention proposed by UDMC

    Construction of killa

    Source : FTRA Report & physical verification of scheme

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Scheme detail Budget (BDT)

    Benf.

    FRD.: Re-excavation of earthen Killa at Char Gopalpur Cluster Village 1,572,053 4000

    District: Faridpur, Upazila: Char Bhadrasahn, Union: Jhaukanda

    Impact of proposed schemes

    * Ensured safe shelter for people and livestock during disaster * Improved communication * People will be more resilient to disaster especially Cyclone

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Major Hazards

    Cyclone, Tidal surges, Monsoon flood, Water logging, salinity, Arsenic contamination Source : FTRA Report

    District: Jhalokathi, Upazila: Nalchity, Union: Mollar hat, Kushangal

    Intervention proposed by UDMC

    Construction of killa

    Re-excavation of Canal

    Installation of Deep Tube-well

    Source : FTRA Report & physical verification of scheme

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Scheme detail Budget (BDT)

    Benf.

    JLK.: Installation of 30 nos. Hand Deep Tube-well at Ward # 1,2 3 & 9. 1,878,390 5500

    JLK: Re-excavation of Canal from Gohail Bari Khal to H/o Rafiqul Islam (UP Member) via H/o Mr. Mukim (Ex MP) at W # 4 (size: 2155 m).

    1,197,209

    1,900

    JLK: Re-construction of earthen Killa at Rajabaria (size: 38.11 m X 182.93 m).

    202,476 660

    JLK.: Installation of 11 nos. Hand Deep Tube-well at Ward # 9.

    688,743 1,650

    District: Jhalokathi, Upazila: Nalchity, Union: Mollar hat, Kushangal

    Impact of proposed schemes

    Ensured safe water for drinking and other domestic uses

    Reduced intensity of water borne diseases

    Ensured quick disposal of lodged water from homesteads and agricultural land

    Reduced intensity of water borne diseases

    Ensured safe shelter for livestock as well as people during disaster

    Used for community programs in normal time

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Major Hazards

    Cyclone, Tidal surges, Monsoon flood, Water logging, salinity, Arsenic contamination, Low plinth of houses, insufficient protection against wave, Arsenic contamination, unhygienic sanitation, poverty Source : FTRA Report

    District: Kishoreganj, Upazila: Nikli, Mithamoin and Austogram Union: Dampara, Chhatirhat, Goroi, Karpasha, Ghagra Dhaki, Abdullahpur, Adampur, Kalma and Kastul

    Intervention proposed by UDMC

    Ground raising

    Re-construction of embankment

    Installation of Sanitary latrine and Tube-well

    Source : FTRA Report & physical verification of scheme

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Scheme detail Budget (BDT)

    Benf.

    KRG 1113001: Earth raising at Shekerhati Grave Yard 1,190,482 6,000

    KRG 1113002: Re-construction of sub-merged embankment from BWDB embankment near land of Ainuddin to Dongerpar Khal connecting road

    902,027

    10,000

    KRG 1113003: Re-construction of sub-merged early flood protection embankment from Dongerpar Khal near land of Musa to land of Abdul Quddus at Sokunmari

    2,161,411

    10,000

    KRG 1113004: Earth raising at Chhatirchar grave yard.

    245,052 3,500

    KRG 1113005: Installation of 55 nos. sanitary latrines and 10 nos. Tube-well

    702,000 2,000

    KRG 1113006: Construction of protection wall from Doulatpur Madrasha center wall to community clinic

    3,269,279 900

    KRG 1113007: Re-construction of sub-merged early flood protection embankment from Chhatirchar road DB point to Garimatra land of Netai

    1,774,715

    15,000

    KRG 1113008: Earth raising at Nayahati grave yard.

    308,901 10,000

    KRG 1113021: Installation of 04 nos. Deep Tube-well

    250,452 4,000

    KRG 1113022: Earth raising of cluster village at Nansree including 30 nos. sanitary latrine and 02 nos. Deep Tube-well

    1,588,709 400

    District: Kishoreganj, Upazila: Nikli, Mithamoin and Austogram Union: Dampara, Chhatirhat, Goroi, Karpasha, Ghagra Dhaki, Abdullahpur, Adampur, Kalma and Kastul

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    Scheme detail Budget (BDT)

    Benf.

    KRG1113009: Construction of Dhopajhura Eidgah cum Killa including protection wall, tree plantation, sanitary latrine-2 nos. & TW-01 nos.

    1,876,362 2,000

    KRG1113010: Re-construction of embankment at Mora ganger khal from the land of Abdur Rashid to Ratan Mia. 405,293 4,000

    KRG1113011: Installation of Sanitary latrine -40 Nos. and TW-11 nos. at Bajuka & Baligaon village ward # 03 & 09 under Abdullahpur Union

    1,092,743 7,000

    KRG1113012: Re-excavation of Canel from Culvert near L/S Land of Aziz Mia to Dholeswari rive 743,374 5,500

    KRG1113013: Earth raising at Baluchar grave yard 71,261 2,000

    KRG1113014: Earth raising at Nurpur grave yard 459,112 8,000

    KRG1113015: Re-construction of sub-merged early flood protection road cum embankment from Badhaghat Tufa sluidge gate to Joldubi Canel. Length 1950m

    1,364,561 10,000

    KRG 1113016: Re-construction of sub-merged early flood protection road cum embankment from Kuliarkandi land of Sohel to Badhaghat Tufa sluidge gate. Length 750m

    528,472 2,000

    KRG 1113017: Re-construction of sub-merged early flood protection road cum embankment from Badshala land of Mehraj mia to Bahadurpur embankment. Length 5250m

    3,138,092 8,000

    KRG 1113018: Re-construction of sub-merged early flood protection road cum embankment from Shekerhati to land of Jamaluddin at village Badshala. Length 4100m

    2,109,162 8,000

    KRG 1113019: Earth filling at Bahadurpur grave yard. 681,762 6,000

    KRG 1113020: Earth filling at Kastul grave yard. 428,593 4,000

    District: Kishoreganj, Upazila: Nikli, Mithamoin and Austogram Union: Dampara, Chhatirhat, Goroi, Karpasha, Ghagra Dhaki, Abdullahpur, Adampur, Kalma and Kastul

  • C D M P - I I M i n i s t r y o f D i s a s t e r M a n a g e m e n t & R e l i e f

    District: Kishoreganj, Upazila: Nikli, Mithamoin and Austogram Union: Dampara, Chhatirhat, Goroi, Karpasha, Ghagra Dhaki, Abdullahpur, Adampur, Kalma and Kastul

    KRG 1113003: Sub-merged Embankment KRG 1113001: Grave Yard KRG 1113010: Road cum Embankment

    KRG 1113015: Road cum embankment KRG 1113014: Grave Yard KRG 1113016: Road cum embankment