FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY LAREDO DISTRICT FY 2011 - 2014 TIP 7- 2010

Transcript of Laredo - Welcome to the Texas Department of Transportation FTP

Page 1: Laredo - Welcome to the Texas Department of Transportation FTP

FY 2011-2014 S T I P

STATEWIDE TRANSPORTATION

IMPROVEMENT PROGRAM

HIGHWAY

LAREDO DISTRICT

FY 2011 - 2014 TIP

7- 2010

Page 2: Laredo - Welcome to the Texas Department of Transportation FTP
Page 3: Laredo - Welcome to the Texas Department of Transportation FTP
Page 4: Laredo - Welcome to the Texas Department of Transportation FTP
Page 5: Laredo - Welcome to the Texas Department of Transportation FTP
Page 6: Laredo - Welcome to the Texas Department of Transportation FTP
Page 7: Laredo - Welcome to the Texas Department of Transportation FTP
Page 8: Laredo - Welcome to the Texas Department of Transportation FTP
Page 9: Laredo - Welcome to the Texas Department of Transportation FTP
Page 10: Laredo - Welcome to the Texas Department of Transportation FTP
Page 11: Laredo - Welcome to the Texas Department of Transportation FTP
Page 12: Laredo - Welcome to the Texas Department of Transportation FTP
Page 13: Laredo - Welcome to the Texas Department of Transportation FTP
Page 14: Laredo - Welcome to the Texas Department of Transportation FTP
Page 15: Laredo - Welcome to the Texas Department of Transportation FTP
Page 16: Laredo - Welcome to the Texas Department of Transportation FTP
Page 17: Laredo - Welcome to the Texas Department of Transportation FTP
Page 18: Laredo - Welcome to the Texas Department of Transportation FTP
Page 19: Laredo - Welcome to the Texas Department of Transportation FTP
Page 20: Laredo - Welcome to the Texas Department of Transportation FTP
Page 21: Laredo - Welcome to the Texas Department of Transportation FTP
Page 22: Laredo - Welcome to the Texas Department of Transportation FTP
Page 23: Laredo - Welcome to the Texas Department of Transportation FTP
Page 24: Laredo - Welcome to the Texas Department of Transportation FTP
Page 25: Laredo - Welcome to the Texas Department of Transportation FTP
Page 26: Laredo - Welcome to the Texas Department of Transportation FTP
Page 27: Laredo - Welcome to the Texas Department of Transportation FTP
Page 28: Laredo - Welcome to the Texas Department of Transportation FTP

Statewide Transportation Improvement Program 2011-14

(STIP 2011-14)

Federal Highway Administration and

Texas Department of Transportation Laredo District

Public Meetings Summary Held At:

June 1, 2010 – Del Rio Civic Center RoomJune 2, 2010 – Eagle Pass Center for Trade June 3, 2010 – Carrizo Springs Civic Center June 7, 2010 – Laredo District Meeting Room

(Summary Compiled on June 29, 2010)

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

Page 29: Laredo - Welcome to the Texas Department of Transportation FTP

Laredo District Statewide Transportation Improvement Program 2011-14

(STIP 2011-14) June 1, 2, 3 and 7, 2010 Public Meetings Summary

Table of Contents

1. Public Meeting Summary and Photos Taken at the Meeting.

2. Public Meeting Newspaper Advertisements and Invitation Letters.

3. Public Meeting Handouts and Attendance Sign-In Sheets and List.

4. Public Meeting Project Map Exhibits.

5. Written Comments Received Within the Official Comment Period (ending 5 pm, June 21, 2010) and Official TxDOT – Laredo District Responses.

Page 30: Laredo - Welcome to the Texas Department of Transportation FTP

Section 1.

Public Meeting Summaryand

Photos Taken at the Meetings

Page 31: Laredo - Welcome to the Texas Department of Transportation FTP

1

Laredo District Statewide Transportation Improvement Program 2011-14

(STIP 2011-14) June 1, 2, 3 and 7, 2010 Public Meetings Summary

District/Counties: Laredo District (22) / Webb, Duval, La Salle, Dimmit, Zavala, Maverick, Val Verde and Kinney Counties

Times and Places Held: • 4:00 to 7:00 pm / June 1, 2010; Del Rio Civic Center – Kennedy Room, 1915

Veterans Boulevard, Del Rio, Val Verde County, Texas. • 4:00 to 7:00 pm / June 2, 2010; Eagle Pass Center for Trade, 3295 Bob Rogers

Drive, Eagle Pass, Maverick County, Texas. • 4:00 to 7:00 pm / June 3, 2010; Carrizo Springs Civic Center, 405 7th Street, Carrizo

Spring, Dimmit County, Texas. • 4:00 to 7:00 pm / June 7, 2010; TxDOT Laredo District Meeting Room, 1817 Bob

Bullock Loop, Laredo, Webb County, Texas.

Purpose of the Public Meetings: As part of public outreach for development of the upcoming Statewide Transportation Improvement Program for 2011 through 2014 (STIP 2011-14), the Texas Department of Transportation (TxDOT) Laredo District has held a series of four open forum public meetings throughout the district in order to present the proposed project lists for 2011 through 2014 to the public as well as to solicit input from the public. The STIP 2011-14 must, by federal regulations, contain only fiscally constrained projects that are to be implemented in fiscal years 2011 through 2014.

STIP 2011-14 Approval: The draft STIP 2011-14 list for the Laredo District is currently under final development and after public input, will be finalized in the overall Statewide Transportation Improvement Program 2011-14.

Notices and Pre-Event Outreach Activities: Previous to the public meetings, public outreach consisted of preliminary conversations with local officials and the Laredo Metropolitan Planning Organization as to prioritizing projects in their areas.

Public Notices were advertised in both English and Spanish in all of the newspapers that service the eight counties in the Laredo District, which included the following newspapers and dates:

• The Brackett News on April 29 and May 20, 2010.

• The Del Rio News-Herald on May 2 and May 23, 2010

• The Eagle Pass News Gram on May 2 and May 23, 2010

• The Eagle Pass News Guide on May 2 and May 23, 2010

• The Zavala County Sentinel on April 29 and May 20, 2010

• The Frio-Nueces Current on April 29 and May 20, 2010

• The Laredo Morning Times on May 2 and May 23, 2010

Page 32: Laredo - Welcome to the Texas Department of Transportation FTP

2

• The Duval County Press on May 2 and May 23, 2010

• The Freer Press on May 5 and May 26, 2010

A list of local public officials was developed and invitation letters or notices were sent out on May 11, 19 and 24, 2010.

Post-Event Media Articles: No post-event news articles were published within the 14-day post-event comment period.

Attendance: A total of 49 persons attended the four Public Meeting events. Of these persons, seventeen were private citizens; nineteen were local officials or local government staff; one was a newspaper reporter and twelve were TxDOT staff. Attendance at each Public Meeting consisted of:

• A total of sixteen persons registered at the June 1st Del Rio Meeting; eight were private citizens; five were local officials/government staff; and three were TxDOT staff.

• A total of fourteen persons registered at the June 2nd Eagle Pass Rio Meeting; six were private citizens; six were local officials/government staff; and two were TxDOT staff.

• A total of eight persons registered at the June 3rd Carrizo Springs Rio Meeting; one was a private citizen; three were local officials/government staff; and four were TxDOT staff.

• A total of eleven persons registered at the June 7th Laredo Meeting; two were private citizens; five were local officials/government staff; one was a reporter for the Laredo Morning Times; and three were TxDOT staff.

Exhibits: Proposed project location maps for all eight Laredo District counties were on exhibit for the audience at all four meetings.

Verbal Questions and Comments from the Public: One-on-one comments and discussions from the general public were requested as part of the Public Meeting and discussions with meeting attendees were held with members of the project planning team. Spanish speaking staff members were available throughout all of the Public Meetings and team members were available to record any comments that attendees might have wished to provide. The one-on-one discussions are summarized below:

• The attendees paid close attention as to the locations of the roadway projects as proposed. (LRD Response – The TxDOT staff present assisted in these persons orienting themselves as to the locations on the exhibits.)

• At the June 1st meeting at Del Rio, Val Verde County representatives left a list of projects with the TxDOT staff to be considered for inclusion in the 2011-14 STIP. (LRD Response – The projects proposed by Val Verde County will be closely

Page 33: Laredo - Welcome to the Texas Department of Transportation FTP

3

considered for implementation. Specific LRD responses are included in the written comment section.)

• Several persons commented at the June 1st meeting at Del Rio about flooding issues in Del Rio, especially after the recent heavy rainfall events, and requested that TxDOT consider measures to ameliorate the flooding problems. These verbal comments were also submitted as written comments. (Specific LRD responses are included in the written comment section.)

• Several members of a local bicycle club made the comment at the June 2nd Eagle Pass meeting requesting adding bicycle facilities on the rural highways in the Eagle Pass area. (LRD Response – At this time, funding is not available to include bicycle lanes, including shoulder re-striping, on the rural roadways in our district. The addition of signs alerting vehicle drivers to be aware of bicyclists will be considered. Specific LRD responses are included in the written comment section.)

• One person commented at the Carrizo Springs meeting that heavy oil-field truck traffic is breaking up the pavement on FM 186 southeast of Carrizo Springs in Dimmit County which does not have shoulders. This person is requesting that this project be undertaken at the earliest time possible. (LRD Response – Restoration of this roadway is proposed to be undertaken FY 2013 using state funds only, which precludes it being included on the 2011-14 STIP. Advancing the project schedule will be considered but will need to be balanced with available funding.)

Overall Verbal Comments:During this series Public Meetings, the general public and local officials or their representatives were generally supportive of the projects and recognized the need to improve the roadway infrastructure for the driving public as well as the residents of their communities.

Generally, comments were made by the public meeting attendees that they are looking forward to the projects and their positive benefits to improving safety and driving efficiency. No persons at these meetings spoke primarily in Spanish and no one indicated that translation services or Spanish-speaking staff was needed to discuss the projects as proposed in the 2011-14 STIP.

Written Comments from the Public: Eight written comments were received on or before 5:00 pm, June 21, 2010 which was the stated deadline for the official comment period for this series of public meetings. The written comments were the same as all but one of the verbal comments. The written comments and official responses are included in Appendix 5.

• Two written comments from the Val Verde County Judge and assistant requested that four projects be implemented in the future, preferably within the 2011-14 STIP. (LRD Response – Dedicated funding for these projects is not available at this time, but we look forward to continuing to work with the County on these issues.)

Page 34: Laredo - Welcome to the Texas Department of Transportation FTP

4

• Three written comments were received concerning flooding problems on properties adjacent to TxDOT right-of-way in western Del Rio. (LRD Response – TxDOT is in coordination with the City of Del Rio, which is preparing to initiate a hydraulic study in this area to determine the causes of the flooding in this area and any possible remedies that can be undertaken.)

• One person who represented bicycling enthusiasts in the Eagle Pass and Maverick County area requested that TxDOT work with the local governments to develop bicycling lanes and other facilities for the Eagle Pass and Maverick County area. (LRD Response Summary – TxDOT will work with the local governments in considering measures to improve the transportation infrastructure for bicyclists in this area.)

• One person representing the City of Eagle Pass requested consideration of several project specific situations in Eagle Pass including a new corridor project in south Eagle Pass and several pedestrian, signal or lighting situations. (LRD Response Summary – TxDOT will work with the City of Eagle Pass on these situations. The detailed response is included in Appendix 5.)

• One written comment received at the June 7th Laredo meeting (attached in Appendix 5) from the Webb County Engineer was inquiring about the inclusion into the 2011-14 STIP of the Webb County proposal to upgrade the northern portion of Loop 20 by the addition of main lanes and overpasses at three intersections (at IH 35, McPherson Avenue and International Boulevard). (LRD Response – Because dedicated federal funding is not assigned at this time, this County proposed work on Loop 20 will be included on the 2011-14 STIP at the appropriate time after dedicated funding is assigned using the normal STIP revision process.)

Proposed Changes to the Laredo District STIP 2011-14 Project List: Based on the public input from this series of public meetings, no substantial changes to the Laredo District STIP 2011-14 project list as proposed at this series of public meetings.

Recommendation: All comments have been satisfactorily addressed and the draft Statewide Transportation Improvement Program 2011-14 project list for the Laredo District is recommended to proceed in the project approval process.

Page 35: Laredo - Welcome to the Texas Department of Transportation FTP

5

Photos Taken At The June 7, 2010 Public Meeting Held At The TxDOT Laredo District Office Meeting Room.

Page 36: Laredo - Welcome to the Texas Department of Transportation FTP

Section 2.

Public MeetingNewspaper Advertisements

and Invitation Letters

Page 37: Laredo - Welcome to the Texas Department of Transportation FTP

Public Notices were advertised in both English and Spanish in all of the newspapers that service the eight counties in the Laredo District, which included the following newspapers and dates:

• The Brackett News on April 29 and May 20, 2010.

• The Del Rio News-Herald on May 2 and May 23, 2010

• The Eagle Pass News Gram on May 2 and May 23, 2010

• The Eagle Pass News Guide on May 2 and May 23, 2010

• The Zavala County Sentinel on April 29 and May 20, 2010

• The Frio-Nueces Current on April 29 and May 20, 2010

• The Laredo Morning Times on May 2 and May 23, 2010

• The Duval County Press on May 2 and May 23, 2010

• The Freer Press on May 5 and May 26, 2010

Page 38: Laredo - Welcome to the Texas Department of Transportation FTP

Open-House Public Meetings State Transportation Improvement Program 2011-14

The Texas Department of Transportation (TxDOT) – Laredo District will host a series of open house-style public meetings for the development of the State Transportation Improvement Program (STIP) for 2011-2014. This plan will establish a framework for addressing the challenges of improving our roadway infrastructure from fiscal years 2011 through 2014. The plan will also address the need for improvements to all modes of transportation including roadways, pedestrian and bicycle facilities, transit and Intelligent Transportation Systems.

The purpose of these meetings is to present an overview of the currently proposed projects for fiscal years 2011 through 2014 and to solicit comments and input to aid in the development of the plan. Information will be available for viewing at the meetings including exhibits of the current list of projects. Representatives from TxDOT will be in attendance to discuss the development of the list of projects and to answer questions. Forms will be provided for submitting written comments.

The open-house style public meetings encompassing the TxDOT Laredo District area will be held on:

June 1, 2010 from 4:00 pm to 7:00 pm at:Del Rio Civic Center, Kennedy Room, 1915 Veterans Blvd., Del Rio, Texas 78840

June 2, 2010 from 4:00 pm to 7:00 pm at:Eagle Pass Center for Trade, 3295 Bob Rogers Drive, Eagle Pass, Texas 78852

June 3, 2010 from 4:00 pm to 7:00 pm at:Carrizo Springs Civic Center, 405 7th Street, Carrizo Springs, Texas 78834

June 7, 2010 from 4:00 pm to 7:00 pm at:Texas Department of Transportation Laredo District Meeting Room 1817 Bob Bullock Loop, Laredo, Texas 78043

For those unable to attend the open house-style public meetings, written comments will be accepted until 5:00 PM June 21, 2010 at:

Mail: Texas Department of Transportation, Attn: Melisa D. Montemayor, 1817 Bob Bullock Loop, Laredo, Texas 78043

E-Mail: [email protected]: (956) 712-7402

Persons with special communication or accommodation needs may call Raul Leal – Laredo District Public Information Officer at (956) 712-7416. Requests should be made no later than three days prior to the meeting. Every reasonable effort will be made to accommodate needs.

Page 39: Laredo - Welcome to the Texas Department of Transportation FTP

Sesión Pública 2011-14 State Transportación Improvement Programé

El Departamento de Transporte de Texas (TxDOT) – Distrito Laredo sostendrá una serie de Sesiones Abiertas Publicas para el desarrollo del Programa de Mejoras del Transporte del Estado. Este plan establecerá el marco para tratar los de nuestra infraestructura carretera que se esta deteriorando para los anos 2011 al 2014. El plan también tratara con la necesidad de mejoras a todas la modalidades de transporte incluyendo caminos, instalaciones para peatones, y bicicletas, transito, trenes de carga y de pasajeros, tubería y sistemas de transporte inteligente.

El propósito de esta primera serie de reuniones es presentar una visión general del proyecto y solicitar comentario para contribuir al desarrollo del plan. La información estará disponible en las reuniones, incluyendo exposición de mapa con la lista de proyectos. Representantes de TxDOT estarán presentes para hablar con el público sobre el desarrollo del plan y para responder a preguntas. Se proveerán también formularios para sus comentarios escritos.

La Sesión Pública en esta área se llevará a cabo:

1 de Junio, 2010 y 4:00 PM - 7:00 PM:Del Rio Civic Center, Kennedy Room, 1915 Veterans Blvd., Del Rio, Texas 78840

2 de Junio, 2010 y 4:00 PM - 7:00 PM at:Eagle Pass Center for Trade, 3295 Bob Rogers Drive, Eagle Pass, Texas 78852

3 de Junio, 2010 y 4:00 PM - 7:00 PM at:Carrizo Springs Civic Center, 405 7th Street, Carrizo Springs, Texas 78834

7 de Junio, 2010 y 4:00 PM - 7:00 PM at:Texas Department of Transportation Laredo District Meeting Room 1817 Bob Bullock Loop, Laredo, Texas 78043

Para aquellas personas que no pueden asistir a la reunión, se aceptan comentarios por escritos hasta el 5:00 PM 21 día de Junio en:

Texas Department of Transportation, Attn: Melisa D. Montemayor, 1817 Bob Bullock Loop, Laredo Texas / e-mail: [email protected] / Fax: (956) 712-7402.

Personas con necesidades especiales de comunicación o necesitando acomodaciones especiales pueden llamar al Raúl Leal y (956) 712-7416 La solicitud de acomodaciones especiales debe hacerse 3 días antes de la reunión. Se hará todo posible para acomodar las necesidades especiales.

Page 40: Laredo - Welcome to the Texas Department of Transportation FTP

Honorable Val Verde County Judge Mike FernandezVal Verde County Courthouse P.O. Box 4250 Del Rio, Texas 78841

The Honorable Del Rio Mayor Efrain V. Valdez City of Del Rio 109 W. Broadway Del Rio, Texas 78840

Del Rio City Manager Frances Rodriguez City of Del Rio109 W. Broadway Del Rio, Texas 78840

The Honorable Kinney County Judge Tim Ward Kinney County Courthouse P.O. Box 348 Brackettville, Texas 78832

The Honorable Brackettville Mayor Charles Feagley City of Brackettville P.O. Box 526 Brackettville, Texas 78832

Brackettville City Manager Enrique Garcia City of Brackettville P.O. Box 526 Brackettville, Texas 78832

The Honorable Spofford Mayor Alex Soliz City of Spofford P.O. Box 1541 Brackettville, Texas 78832

Spofford City Manager Sara Terrazas City of Spofford P.O. Box 1541 Brackettville, Texas 78832

Honorable Maverick County Judge Jose Aranda, Jr. Maverick County Courthouse500 Quarry Street – Suite 3 Eagle Pass, Texas 78852

The Honorable Eagle Pass Mayor Chad Foster City of Eagle Pass 100 S. Monroe Street Eagle Pass, Texas 78852

Eagle Pass City Manager Daniel Valenzuela City of Eagle Pass 100 S. Monroe Street Eagle Pass, Texas 78852

The Honorable Zavala County Judge Joe Luna Zavala County Courthouse Plaza – Box 3 Crystal City, Texas 78839

The Honorable Crystal City Mayor Benito C. Perez Crystal City Hall 101 Dimmit Street Crystal City, Texas 78839

Crystal City Manager Alfredo Gallegos Crystal City Hall 101 Dimmit Street Crystal City, Texas 78839

Page 41: Laredo - Welcome to the Texas Department of Transportation FTP

Honorable Dimmit County Judge Francisco Ponce Dimmit County Courthouse102 N. 5th Street Carrizo Springs, Texas 78834

Honorable Carrizo Springs Mayor Ralph E. Salinas City of Carrizo Springs P.O. Box 329 Carrizo Springs, Texas 78834

Carrizo Springs City Manager Mario Martinez City of Carrizo Springs P.O. Box 329 Carrizo Springs, Texas 78834

The Honorable Big Wells Mayor Randall Matthews City of Big Wells P.O. Box 68 Big Wells, Texas 78830

The Honorable Asherton Mayor Ramon Saldivar, Jr. City of AshertonP.O. Box 450 Asherton, Texas 78827

Honorable La Salle County Judge Joel Rodriguez, Jr.La Salle County Courthouse1101 Courthouse Square – Suite 105 Cotulla, Texas 78014

The Honorable Cotulla Mayor Joe Lozano City of Cotulla117 North Front Street Cotulla, Texas 78014

Cotulla City Manager Larry Dovalina City of Cotulla117 North Front Street Cotulla, Texas 78014

The Honorable Encinal Mayor Silvano Sanchez City of Encinal P.O. Box 120 Encinal, Texas 78019

The Honorable Duval County Judge Abel Aragon Duval County CourthouseP.O. Box 189 San Diego, Texas 78384

The Honorable San Diego Mayor Roberto Canales City of San Diego404 South Mier San Diego, Texas 78384

San Diego City Manager Ernesto Sanchez City of San Diego404 South Mier San Diego, Texas 78384

The Honorable Freer Mayor Arnoldo Cantu City of FreerP.O. Box N Freer, Texas 78357

The Honorable Benavides Mayor Cynthia Canales City of BenavidesP.O. Drawer R Benavides, Texas 78341

Page 42: Laredo - Welcome to the Texas Department of Transportation FTP

The Honorable Webb County Judge Danny Valdez Webb County Courthouse1000 Houston Street Laredo, Texas 78040

The Honorable Laredo Mayor Raul Salinas City of Laredo1110 Houston Street Laredo, Texas 78040

Laredo City Manager Carlos Villarreal City of Laredo1110 Houston Street Laredo, Texas 78040

Keith Selman Director of Laredo Planning and Zoning City of Laredo P.O. Box 579 Laredo, Texas 78042

The Honorable Rio Bravo Mayor Juan G. Gonzalez City of Rio Bravo1224 Paseo de Neva Rio Bravo, Texas 78046

The Honorable El Cenizo Mayor Raul Reyes City of El Cenizo507 Cadena El Cenizo, Texas 78046

Page 43: Laredo - Welcome to the Texas Department of Transportation FTP
Page 44: Laredo - Welcome to the Texas Department of Transportation FTP

Open-House Public Meetings State Transportation Improvement Program 2011-14

The Texas Department of Transportation (TxDOT) – Laredo District will host a series of open house-style public meetings for the development of the State Transportation Improvement Program (STIP) for 2011-2014. This plan will establish a framework for addressing the challenges of improving our roadway infrastructure from fiscal years 2011 through 2014. The plan will also address the need for improvements to all modes of transportation including roadways, pedestrian and bicycle facilities, transit and Intelligent Transportation Systems.

The purpose of these meetings is to present an overview of the currently proposed projects for fiscal years 2011 through 2014 and to solicit comments and input to aid in the development of the plan. Information will be available for viewing at the meetings including exhibits of the current list of projects. Representatives from TxDOT will be in attendance to discuss the development of the list of projects and to answer questions. Forms will be provided for submitting written comments.

The open-house style public meetings encompassing the TxDOT Laredo District area will be held on:

June 1, 2010 from 4:00 pm to 7:00 pm at:Del Rio Civic Center, Kennedy Room, 1915 Veterans Blvd., Del Rio, Texas 78840

June 2, 2010 from 4:00 pm to 7:00 pm at:Eagle Pass Center for Trade, 3295 Bob Rogers Drive, Eagle Pass, Texas 78852

June 3, 2010 from 4:00 pm to 7:00 pm at:Carrizo Springs Civic Center, 405 7th Street, Carrizo Springs, Texas 78834

June 7, 2010 from 4:00 pm to 7:00 pm at:Texas Department of Transportation Laredo District Meeting Room 1817 Bob Bullock Loop, Laredo, Texas 78043

For those unable to attend the open house-style public meetings, written comments will be accepted until 5:00 PM June 21, 2010 at:

Mail: Texas Department of Transportation, Attn: Melisa D. Montemayor, 1817 Bob Bullock Loop, Laredo, Texas 78043

E-Mail: [email protected]: (956) 712-7402

Persons with special communication or accommodation needs may call Raul Leal – Laredo District Public Information Officer at (956) 712-7416. Requests should be made no later than three days prior to the meeting. Every reasonable effort will be made to accommodate needs.

Page 45: Laredo - Welcome to the Texas Department of Transportation FTP

Section 3.

Public Meeting Handouts and

Attendance Sign-In Sheets and Lists

Page 46: Laredo - Welcome to the Texas Department of Transportation FTP
Page 47: Laredo - Welcome to the Texas Department of Transportation FTP
Page 48: Laredo - Welcome to the Texas Department of Transportation FTP
Page 49: Laredo - Welcome to the Texas Department of Transportation FTP
Page 50: Laredo - Welcome to the Texas Department of Transportation FTP
Page 51: Laredo - Welcome to the Texas Department of Transportation FTP
Page 52: Laredo - Welcome to the Texas Department of Transportation FTP
Page 53: Laredo - Welcome to the Texas Department of Transportation FTP
Page 54: Laredo - Welcome to the Texas Department of Transportation FTP
Page 55: Laredo - Welcome to the Texas Department of Transportation FTP
Page 56: Laredo - Welcome to the Texas Department of Transportation FTP
Page 57: Laredo - Welcome to the Texas Department of Transportation FTP
Page 58: Laredo - Welcome to the Texas Department of Transportation FTP

List of Public Meeting Attendees:

Name and Affiliation Contact Information June 1, 2010 Meeting Held at the Del Rio Civic Center Kennedy Room: Joe Frank Martinez – Val Verde Co. Sheriff [email protected] Daniel A. Lopez – Val Verde Co. Health Dept. [email protected] L. Fernandez – Val Verde Co. Judge Jeannie Smith Quemada, Texas; [email protected] W. Smith Quemada, Texas Thomas Qualia 100 Qualia Dr. Del Rio, Texas 78840 Francis Rodriguez – Del Rio City Manager 109 W. Broadway, Del Rio, Texas 78840 Laura Douglas – Controller, TBM Carriers 1927 Spur 239, Del Rio, Texas 78840;

[email protected] Garcia – Brackettville City Manager 119 W. Spring St., Brackettville, Texas; (830) 775-8283

[email protected] George A. Rogers 499 Farley Lane, Del Rio, Texas 78840; (830) 719-9914

Dalia A. Rogers 499 Farley Lane, Del Rio, Texas 78840; (830) 719-9910

Otila Gonzalez – Val Verde County Judge Assistant

Gerardo & Karla Hernandez 153 Farley Lane, Del Rio, Texas 78840; (830) 765-9368 / 765-9034

TxDOT – LRD Staff Present:Albert Quintanilla; Melisa Montemayor; Chris Kloss

June 2, 2010 Meeting Held at the Eagle Pass Center for Trade Jose G. Castillon 1826 Bryan St., Eagle Pass, Texas 78852 Charlie Ruiz – City of Eagle Pass 110 S. Monroe St., Eagle Pass, Texas 78852 Celestino Hernandez, Jr. – Eagle Pass Director of Planning

100 S. Monroe St. Eagle Pass, Texas 78852

Pepe Arranda – Maverick Co. Judge 500 Quarry St., Eagle Pass, Texas 78852 John Sullivan – Maverick Co. Judge Assistant 500 Quarry St., Eagle Pass, Texas 78852 Jerry Rhoden 500 E. Main St., Eagle Pass, Texas 78853 Ramsey English Cantu 100 South Monroe, Eagle Pass, Texas 78852 Rosa M. Aguirre 480 South Adams, Eagle Pass, Texas 78852 Beatriz Perez 1335 Chittim Trail, Eagle Pass, Texas 78852 Julio L. Salazar 1335 Chittim Trail, Eagle Pass, Texas 78852 Julio Perez Chavez Ernesto Pumpian 598 Madison St., Eagle Pass, Texas 78852;

(830) 968-8098 / 968-8099 TxDOT – LRD Staff Present:

Melisa Montemayor; Omar Cantu June 3, 2010 Meeting Held at the Carrizo Springs Convention Center David Avalos – MrgDC/Planner 307 W. Nolan, Carrizo Springs, Texas 78834

Page 59: Laredo - Welcome to the Texas Department of Transportation FTP

David Salazar – TxDOT Carrizo Springs Area Eng.

Christopher – TxDOT Carrizo Springs Ernest Flores – Dimmit County Greg Howard – Eagle Pass Engineer Clay Coleman Uvalde, Texas TxDOT – LRD Staff Present:

Melisa Montemayor; Walter Kolodziej June 7, 2010 Meeting Held at the TxDOT – Laredo District Meeting Room Mayor Sylvano Sanchez – City of Encinal 197 N. Tejas, Encinal, Texas 78019;

[email protected]; (956) 948-5226; 948-5771 Zach Lindsey – Laredo Morning Times Reporter Larry Dovalina – Cotulla City Manager 2401 Williams Court, Laredo, Texas 78045 Commissioner Juan C. Gonzalez – City of El Cenizo 507 Cadena St., El Cenizo, Texas 78046 Erika Madrigal – Teacher, United ISD 134 Horizon Loop, Laredo, Texas 78046 Erika Torres – Teacher, United ISD 1016 Dicky Lane - #11, Laredo, Texs 78043 Venessa Guerra – City of Laredo MPO (956) 794-1604

TxDOT – LRD Staff Present:Albert Quintanilla; Melisa Montemayor; Randy Aguilar

Page 60: Laredo - Welcome to the Texas Department of Transportation FTP

Section 4.

Public Meeting Project Map Exhibits

Page 61: Laredo - Welcome to the Texas Department of Transportation FTP

D I M M I T C O U N T Y

L A S A L L E C O U N T Y

Z A P A T A C O U N T Y

M A V E R I C K C O U N T Y

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

Statewide Transportation Improvement Program 2011-14Map of Webb County Projects

VA0922-00-051 From: Districtwide To: . Work: Resurface of Existing Roadway Districtwide Construction Cost: $10,281,626FY 2013

5/27/10

83

Project Legend

Fiscal Year 2011

Fiscal Year 2012

Fiscal Year 2013

Fiscal Year 2014

US 59 0542-01-074 From: 1.982-mi. east of Loop 20 To: 10-mi. east Work: Resurface Roadway Length: 14.775-mi. Construction Cost: $1,000,000 FY 2011

County Road (Rubios Road) 0922-33-092 From: At San Juanita Ck. on Rubios Rd. To: 0.74-mi, north of SH 359 Work: County Bridge Replacement Length: 0.067-mi. Construction Cost: $983,093 FY 2011

IH 35 0018-04-048 From: 1.1-mi. north of US 83 To: 9.421-mi. north of US 83 Work: Resurface Southbound Roadway Length: 8.702-mi. Construction Cost: $1,322,247 FY 2011

IH 35 0018-05-078 From: 0.836-mi. north of Uniroyal To: 1.1-mi. north of US 83 Work: Resurface Southbound Roadway Length: 5.534-mi. Construction Cost: $840,877 FY 2011

US 83 0037-09-026 From: Dimmit Co. Line To: 3.4-mi. south of SH 44 Work: Resurface Roadway Length: 16.479-mi. Construction Cost: $2,574,953 FY 2011

US 83 0037-10-026 From: 3.4-mi. south of SH 44 To: SH 255 Work: Resurface Roadway Length: 11.763-mi. Construction Cost: $1,838,047 FY 2011

SH 44 0237-03-025 From: La Salle Co. Line To: 13.947-mi. east Work: Resurface Roadway Length: 13.947-mi. Construction Cost: $1,080,066 FY 2012

US 59 0542-01-075 From: 12-mi. east of Loop 20 To: 7.4-mi. west of FM 2895 Work: Resurface Roadway Length: 8.633-mi. Construction Cost: $1,267,661 FY 2012

US 59 0542-02-030 From: 7.4-mi. west of FM 2895 To: 2.2-mi. west of FM 2895 Work: Resurface Roadway Length: 5.395-mi. Construction Cost: $792,196 FY 2012

VA0922-00-050 From: Districtwide To:.Work: Upgrade Bridge Rail and MBGF Construction Cost: $1,500,000 FY 2011

Preliminary Subject To Change

(Not To Scale)

VA0922-00-048 From: Districtwide To:.Work: Thermoplastic Re-Striping Construction Cost: $1,200,000 FY 2011

VA0922-00-053 From: Districtwide To:.Work: Upgrade Bridge Rail and MBGF Construction Cost: $1,500,000 FY 2012

VA0922-00-049 From: Districtwide To:.Work: Thermoplastic Re-Striping Construction Cost: $1,518,000 FY 2012

VA0922-00-054 From: Districtwide To:.Work: Thermoplastic Re-Striping Construction Cost: $1,530,450 FY 2013

VA0922-00-055 From: Districtwide To:.Work: Upgrade Bridge Rail and MBGF Construction Cost: $1,200,000 FY 2013

Page 62: Laredo - Welcome to the Texas Department of Transportation FTP

Preliminary Subject To Change

(Not To Scale)

CS (City Street) 0922-33-139 From/To: Along Manadas Creek Work: The construction of a hike and bike trail Length: 1.0-mi. Construction Cost: $299,949 FY 2011

Project Legend

Fiscal Year 2011

Fiscal Year 2012

Fiscal Year 2013

Fiscal Year 2014

US 59 (Saunders St.) 0542-01-073 From: 1.09-mi. west of Loop 20 To: Chacon Creek Bridge Resurface Highway Length: 0.86-mi. Construction Cost: $650,000 FY 2011

IH 35 0018-06-160 From: Washington St. To: Del Mar Avenue Work: Resurface Existing Highway Length: 4.017-mi. Construction Cost: $1,300,000 FY 2011

As Of 5/20/10

Statewide Transportation Improvement Program 2011-14Map of Grouped Projects within the Laredo Metropolitan

Planning Organization (MPO) Boundaries

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

BI 35-A 0018-08-019 From/To: On San Bernardo Ave. Work: Restoration of the Roadway Length: 1-mi. Construction Cost: $499,915 FY 2011

CS (City Street) 0922-33-105 From/To: Scott/Sanchez St. Work: Study Only for the construction of a railroad grade separation Length: 0.497-mi. Construction Cost: $382,800 FY 2011

CS (City Street) 0922-33-099 From/To: Arkansas Ave. Work: Design Only for the construction of a railroad grade separation Length: To Be Determined Construction Cost: $1,251,844 FY 2011

US 83 0038-01-068 From/To: At Cielito Lindo Intersection Work: Lengthen Left-Turn Lane Length: 0.362-mi. Construction Cost: $200,000 FY 2012

US 3590086-01-068 From: Chacon Cr. Bridge To: 1.0-mi. east of Loop 20 Resurface Highway Length: 2.34-mi. Construction Cost: $125,000 FY 2012

CS (City Street) 0922-33-100 From/To: Along Chacon Creek Work: The construction of a hike and bike trail Length: 1.0-mi. Construction Cost: $3,694,141 FY 2011

SH 255 3586-01-003 From: FM 1472 To: GSA Facility Resurface Highway Length: 0.943-mi. Construction Cost: $150,000 FY 2012

Page 63: Laredo - Welcome to the Texas Department of Transportation FTP

Preliminary Subject To Change

(Not To Scale)

Project Legend

Fiscal Year 2011

Fiscal Year 2012

Fiscal Year 2013

Fiscal Year 2014

As Of 5/20/10

Statewide Transportation Improvement Program 2011-14Map of Non-Grouped Projects within the Laredo Metropolitan

Planning Organization (MPO) Boundaries

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

SL 20 0086-14-046 From: US 59 To: SH 359 Work: Engineering and ROW to Widen to 6-lanes and Construct an Overpass at Spur 400 Length: 2.194-mi. Engineering & ROW Cost: $1,158,900 FY 2014

City Street 0922-33-071 From: Industrial Blvd. To: Flecha Lane Work: Construct a new location roadway with center-left turn lane Length: 1.4-mi. Construction Cost: $5,242,235 FY 2011

CS (City Street) 0922-33-076 From: 0.25-mi. east of Calton Rd. /Santa Maria To: 0.25-mi. east of Las Cruces/Flecha Lane Work: Realignment of Flecha Lane/Las Cruces along FM 1472 Length: 5.1-mi. Construction Cost: $7,654,091 FY 2012

CS (City Street) 0922-33-093 From: 0.25-mi. east of Calton/St. Maria Intersection To: 0.25-mi. west of Calton/St. Maria Intersection Work: Construct Railroad Grade Separation Length: 0.5-mi. Construction Cost: $12,786,986 FY 2011

CS (City Street) 0922-33-137 From/To: Sierra Vista Ave. Work: New location street extension of existing city streets to Loop 20 (Cuatro Vientos Road) Length: 0.10-mi. Construction Cost: $223,356 FY 2013

CS (City Street) 0922-33-133 From/To: Cielito Lindo Ave. Work: New location street extension of existing city streets to Loop 20 (Cuatro Vientos Road) Length: 1.363-mi. (Total Length) Construction Cost: $1,317,183 FY 2013

CS (City Street) 0922-33-134 From/To: Los Presidentes Ave. Work: New location street extension of existing city streets to Loop 20 (Cuatro Vientos Road) Length: 0.038-mi. Construction Cost: $88,215 FY 2013

CS (City Street) 0922-33-135 From/To: Southgate/Loma del Sur Work: New location street extension of existing city streets to Loop 20 (Cuatro Vientos Road) Length: 0.620-mi. Construction Cost: $1,492,636 FY 2013

CS (City Street) 0922-33-136 From/To: Pita Mangana Rd. Work: New location street extension of existing city streets to Loop 20 (Cuatro Vientos Road) Length: 0.089-mi. Construction Cost: $185,550 FY 2013

Page 64: Laredo - Welcome to the Texas Department of Transportation FTP

Freer

SanDiego

Benavides

Hebbronville

M c M U L L E N C O U N T Y

J I M H O G G C O U N T Y B R O O K S C O U N T Y

J

I M

W

E

L

L

S

C

O

U

N

T

Y

W

B B B C

O

U

N

T

Y

Preliminary Subject To Change

(Not To Scale)

FM 1329 1982-01-020 From: SH 359 To: 5.98-mi. south of SH 359 Work: Restoration of Existing Road Length: 5.98-mi. Construction Cost: $540,000 FY 2012

Project Legend

Fiscal Year 2011

Fiscal Year 2012

Fiscal Year 2013

Fiscal Year 2014

As Of 5/27/10

Statewide Transportation Improvement Program 2011-14Map of Duval County Projects

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

US 59 0542-03-031 From: 0.316-mi. west of SH 16 To: Webb County Line Work: Resurface Highway Length: 13.064-mi. Construction Cost: $2,109,000 FY 2011

SH 16 0517-04-051 From: SH 44 To: McMullen Co. Line Work: Resurface Roadway Length: 12.472-mi. Construction Cost: $563,000 FY 2012

SH 16 0517-08-015 From: 1.88-mi. north of FM 339 To: FM 2295 Work: Resurface Roadway Length: 18.29-mi. Construction Cost: $909,000 FY 2012

SH 339 0623-01-020 From: SH 16 To: SH 359 Work: Resurface Roadway Length: 20.625-mi. Construction Cost: $2,314,646 FY 2012

SH 44 0237-04-012 From: Webb Co. Line To: US 59 Work: Resurface Roadway Length: 9.632-mi. Construction Cost: $1,715,000 FY 2012

SH 44 0237-05-035 From: US 59 To: 1.0-mi. west of FM 3196 Work: Resurface Roadway Length: 10.894-mi. Construction Cost: $1,990,785 FY 2012

SH 44 0237-06-038 From: 1.0-mi. west of FM 3196 To: 0.5-mi. west of SH 359 Work: Resurface Roadway Length: 12.196-mi. Construction Cost: $1,901,800 FY 2012

FM 1329 1982-01-021 From: FM 2295 To: 3.144-mi. north of FM 716 Work: Roadway Restoration Length: 10.433-mi. Construction Cost: $2,239,785 FY 2012

US 59 0542-04-027 From: SH 44 To: McMullen Co. Line Work: Restoration & Intermittent Passing LanesLength: 18.051-mi. Construction Cost: $5,360,000 FY 2013

Page 65: Laredo - Welcome to the Texas Department of Transportation FTP

F R I O C O U N T Y

W E B B C O U N T Y

M

c

M

U

L

L

E

N

C

O

U

N

T

Y

D I M

M I T C

O U

N T Y

Cotulla

Encinal

Preliminary Subject To Change

(Not To Scale)

Project Legend

Fiscal Year 2011

Fiscal Year 2012

Fiscal Year 2013

Fiscal Year 2014

As Of 5/2710

FM 624 2373-01-015 From: 8.37-mi. south of FM 469 To: McMullen Co. Line Work: Restoration of the Existing Roadway Length: 13.636-mi. Construction Cost: $4,084,152 FY 2013

FM 469 0852-01-027 From: 6.5-mi. north of SH 97 To: SH 97 Work: Restoration of the Existing Roadway Length: 6.502-mi. Construction Cost: $2,190,435 FY 2013

FM 469 1435-01-022 From: SH 97 To: FM 624 Work: Restoration of the Existing Roadway Length: 8.0-mi. Construction Cost: $3,000,000 FY 2013

Statewide Transportation Improvement Program 2011-14Map of La Salle County Projects

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

FM 133 0237-01-015 From: Dimmit County Line To: IH 35 West Frontage Road Work: Resurface Roadway Length: 6.902-mi. Construction Cost: $273,202 FY 2012

SH 44 2022-02-017 From: Webb County Line To: IH 35 Work: Resurface Roadway Length: 2.295-mi. Construction Cost: $133,600 FY 2012

SH 44 0237-02-015 From: IH 35 To: Webb County Line East Work: Resurface Roadway Length: 3.415-mi. Construction Cost: $200,400 FY 2012

Page 66: Laredo - Welcome to the Texas Department of Transportation FTP

W E B B C O U N T Y

Z A V A L A C O U N T Y

L

A

S

A

L

L

E

C

O

U

N

T

Y

M

V

A

R

I

C

K

C

O

U

N

T

Y

Big Wells

Carrizo Springs

Asherton

Catarina

Statewide Transportation Improvement Program 2011-14Map of Dimmit County Projects

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

Preliminary Subject To Change

(Not To Scale)

FM 133 0237-07-009 From: US 83 To: La Salle County Line Restoration of Existing Roadway Length: 13.73-mi. Construction Cost: $646,154 FY 2012

As Of 5/27/10

83

83

83

Project Legend

Fiscal Year 2011

Fiscal Year 2012

Fiscal Year 2013

Fiscal Year 2014

Total Project Cost Includes:• Preliminary Engineering • Right-of-Way Purchase • Construction Engineering • Construction Costs • Contingencies • Indirect Costs

US 83 0037-08-033 From: Webb County Line To: 0.97-mi. north Work: Resurface Roadway Length: 0.97-mi. Construction Cost: $153,000 FY 2011

Page 67: Laredo - Welcome to the Texas Department of Transportation FTP

EaglePass

Normandy

Quemado

K I N N E Y C O U N T Y

W E B B C O U N T Y

Z

A

V

A

L

A

C

O

U

N

T

Y

D

I

M

M

I

T

C

O

U

N

T

Y

Preliminary Subject To Change

(Not To Scale)

Project Legend

Fiscal Year 2011

Fiscal Year 2012

Fiscal Year 2013

Fiscal Year 2014

As Of 5/2710

FM 1021 1229-01-042 From: Monroe Street To: Austin Street Work: Construct Railroad Grade SeparationLength: 0.394-mi. Construction Cost: $ 8,257,855 FY 2012

Statewide Transportation Improvement Program 2011-14Map of Non-Grouped projects within Maverick County

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

Eagle Pass

VA0922-10-029 From/To: At International Bridge II Work: Upgrade International Bridge II Facility Length: 0.1mi. Construction Cost: $ 4,535,000 FY 2012

Page 68: Laredo - Welcome to the Texas Department of Transportation FTP

EaglePass

Normandy

Quemado

K I N N E Y C O U N T Y

W E B B C O U N T Y

Z

A

V

A

L

A

C

O

U

N

T

Y

D

I

M

M

I

T

C

O

U

N

T

Y

Preliminary Subject To Change

(Not To Scale)

Project Legend

Fiscal Year 2011

Fiscal Year 2012

Fiscal Year 2013

Fiscal Year 2014

As Of 5/2710

Statewide Transportation Improvement Program 2011-14Map of Grouped Projects within Maverick County

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

Eagle Pass

US 277 0299-04-063 From: 0.952-mi. south of BU 277N To: US 57 Work: Resurface Roadway Length: 1.839-mi. Construction Cost: $ 280,000 FY 2012

US 277 0299-03-049 From: 0.273-mi. south of FM 1665 South To: FM 1664 Work: Resurface Roadway Length: 5.333-mi. Construction Cost: $ 219,049 FY 2012

US 277 0299-04-064 From: 0.273-mi. south of FM 1665 To: BU 277N Intersection Work: Resurface Roadway Length: 10.435-mi. Construction Cost: $ 365,202 FY 2012

BU 277 0299-13-027 From: US 57 To: N. Ceylon St. Work: Resurface Roadway Length: 0879-mi. Construction Cost: $ 11,000 FY 2012

US 57 0300-01-076 From: Garrison Street To: US 277 east Work: Resurface Roadway Length: 1.368-mi. Construction Cost: $10,000 FY 2012

FM 2030 1229-06-010 From: FM 1021 To: FM 1021 Work: Resurface Roadway Length: 4.96-mi. Construction Cost: $ 1,473,000 FY 2012

Page 69: Laredo - Welcome to the Texas Department of Transportation FTP

582

155

582

1433

Preliminary Subject To Change

(Not To Scale)

Crystal City

D I M M I T C O U N T Y

F

R

I

O

C

O

U

N

T

Y

M A

V E R I C

K C

O U

N T Y

U V A L D E C O U N T Y

La Pryor

Project Legend

Fiscal Year 2011

Fiscal Year 2012

Fiscal Year 2013

Fiscal Year 2014

As Of 5/27/10

FM 65 0652-01-035 From: US 83 To: FM 1433 Work: Rehabilitation of Existing Roadway Length: 1.938-mi. Construction Cost: $1,570,000 FY 2011

FM 1433 2628-01-007 From: US 83 To: FM 65 Work: Rehabilitation of Existing Roadway Length: 2.123-mi. Construction Cost: $1,720,000 FY 2011

Loop 155 0037-04-018 From: US 83 To: FM 65 Work: Restoration of Existing Roadway Length: 0.63-mi. Total Project Cost: $306,000 FY 2011

FM 582 0037-04-017 From: FM 65 To: FM 1433 Work: Restoration of Existing Roadway Length: 0.47-mi. Construction Cost: $216,835 FY 2011

582

Statewide Transportation Improvement Program 2011-14Map of Zavala County Projects

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

Crystal City

1433

65

Page 70: Laredo - Welcome to the Texas Department of Transportation FTP

M A V E R I C K C O U N T Y

E D W A R D S C O U N T Y V

A

L

V

E

R

D

E

C

O

U

N

T

Y

U

V

A

L

D

E

C

O

U

N

T

Y

Brackettville

Spofford

LaughlinA.F.B.

Preliminary Subject To Change

(Not To Scale)

Project Legend

Fiscal Year 2011

Fiscal Year 2012

Fiscal Year 2013

Fiscal Year 2014

As Of 5/27/10

Statewide Transportation Improvement Program 2011-14Map of Kinney County Projects

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

US 90 0023-04-060 From: 8.5-mi. east of Brackettville To: Kinney County Line Work: Add Intermittent Passing Lanes Length: 10.2-mi. Construction Cost: $2,351,386 FY 2011

US 90 0023-04-059 From: 2.0-mi. east of Brackettville To: 8.5-mi. east Work: Widen to Add Intermittent Passing Lanes Length: 6.5-mi. Construction Cost: $1,498,432 FY 2012

US 90 0023-03-045 From: 1.4-mi. east of Elm Creek To: Brackettville Work: Widen to Add Intermittent Passing Lanes Length: 4.0-mi. Construction Cost: $922,112 FY 2012 US 90

0023-02-038 From: 7.4-mi. east of Sycamore Creek To: 1.4-mi. east of Elm Creek Work: Widen to Add Intermittent Passing Lanes Length: 7.381-mi. Construction Cost: $1,701,527 FY 2012

US 90 0023-02-037 From: Sycamore Creek Bridge To: 7.4-mi. east of Sycamore Creek Work: Widen to Add Intermittent Passing Lanes Length: 7.4-mi. Construction Cost: $1,705,907 FY 2012

Page 71: Laredo - Welcome to the Texas Department of Transportation FTP

S U T T O N C O U N T Y

E

D

W

A

D

S

C

O

U

N

T

Y

T E R R

E L L C O

U N

T Y

K

I

N

N

E

Y

C

O

U

N

T

Y

C R O C K E T T C O U N T Y

Pandale

Langtry

79

Lake Amistad

Del Rio

LaughlinAFB

Laughlin

Project Legend

Fiscal Year 2011

Fiscal Year 2012

Fiscal Year 2013

Fiscal Year 2014

As Of 5/27/10

Statewide Transportation Improvement Program 2011-14Map of Grouped Projects within Val Verde County

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

Preliminary Subject To Change

(Not To Scale)

US 90 0022-09-051 From: SS 454 To: 1.0-mi. east Work: Resurface Roadway Length: 1.0-mi. Construction Cost: $65,000 FY 2012

Spur 239 0161-03-014 From: US 90 To: 0.74-mi. west Work: Resurface Roadway Length: 0.758-mi. Construction Cost: $79,000 FY 2012

CS (City Street) 0922-11-036 From: Frontera Road To: Nicholson Street Work: Rehabilitation of Existing RoadLength: 1.6-mi. Construction Cost: $1,500,000 FY 2012

27790

90

Page 72: Laredo - Welcome to the Texas Department of Transportation FTP

S U T T O N C O U N T Y

E

D

W

A

D

S

C

O

U

N

T

Y

T E R R

E L L C O

U N

T Y

K

I

N

N

E

Y

C

O

U

N

T

Y

C R O C K E T T C O U N T Y

Pandale

Langtry

79

Lake Amistad

Del Rio

LaughlinAFB

Laughlin

Project Legend

Fiscal Year 2011

Fiscal Year 2012

Fiscal Year 2013

Fiscal Year 2014

As Of 5/27/10

Statewide Transportation Improvement Program 2011-14Map of Non-Grouped Projects within Val Verde County

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

TexasTexas

Department ofDepartment of

TransportationTransportation

Preliminary Subject To Change

(Not To Scale)

CS (City Street) 0922-11-031 From: Qualia Drive To: Spur 239 & Alderete Lane Work: New Two-Lane Roadway Length: 1.0-mi. Construction Cost: $2,785,000 FY 2011

CS (City Street) 0922-11-032 From: Del Rio Port of Entry To: Industrial Park Work: New Two-Lane Roadway w/Left-turn Lane Length: 5.6-mi. Construction Cost: $3,030,000 FY 2011

CS (City Street) 0922-11-033 From/To: Del Rio Port of Entry Work: Replace Toll Booths, Gates and ITS Length: 0.10-mi. Construction Cost: $2,930,000 FY 2012

27790

90

Page 73: Laredo - Welcome to the Texas Department of Transportation FTP

Section 5.

Written Comments Received and

Official TxDOT – Laredo District Responses

Page 74: Laredo - Welcome to the Texas Department of Transportation FTP
Page 75: Laredo - Welcome to the Texas Department of Transportation FTP
Page 76: Laredo - Welcome to the Texas Department of Transportation FTP
Page 77: Laredo - Welcome to the Texas Department of Transportation FTP
Page 78: Laredo - Welcome to the Texas Department of Transportation FTP
Page 79: Laredo - Welcome to the Texas Department of Transportation FTP
Page 80: Laredo - Welcome to the Texas Department of Transportation FTP
Page 81: Laredo - Welcome to the Texas Department of Transportation FTP
Page 82: Laredo - Welcome to the Texas Department of Transportation FTP
Page 83: Laredo - Welcome to the Texas Department of Transportation FTP
Page 84: Laredo - Welcome to the Texas Department of Transportation FTP
Page 85: Laredo - Welcome to the Texas Department of Transportation FTP
Page 86: Laredo - Welcome to the Texas Department of Transportation FTP
Page 87: Laredo - Welcome to the Texas Department of Transportation FTP
Page 88: Laredo - Welcome to the Texas Department of Transportation FTP
Page 89: Laredo - Welcome to the Texas Department of Transportation FTP
Page 90: Laredo - Welcome to the Texas Department of Transportation FTP
Page 91: Laredo - Welcome to the Texas Department of Transportation FTP
Page 92: Laredo - Welcome to the Texas Department of Transportation FTP
Page 93: Laredo - Welcome to the Texas Department of Transportation FTP
Page 94: Laredo - Welcome to the Texas Department of Transportation FTP