![Page 1: Kristopher Cummings Accident Tolerant FuelAccident Tolerant Fuel Developing an Efficient Approval Process Kristopher Cummings Sr. Project Manager, Fuel and Decommissioning Jack Grobe](https://reader033.fdocuments.in/reader033/viewer/2022051917/6008f1403ea577381d6af127/html5/thumbnails/1.jpg)
Accident Tolerant FuelDeveloping an Efficient Approval Process
Kristopher CummingsSr. Project Manager, Fuel and Decommissioning
Jack GrobeDirector, Strategic ProjectsExelon
September 7th, 2017Rockville, MD
![Page 2: Kristopher Cummings Accident Tolerant FuelAccident Tolerant Fuel Developing an Efficient Approval Process Kristopher Cummings Sr. Project Manager, Fuel and Decommissioning Jack Grobe](https://reader033.fdocuments.in/reader033/viewer/2022051917/6008f1403ea577381d6af127/html5/thumbnails/2.jpg)
AGENDA• NEI Committee Structure for ATF• Regulatory Framework for Handling, Irradiation
and Storage of ATF Lead Test Assemblies and Rods
• Regulatory Framework for ATF Fuel Qualification
• Conclusions and Path Forward
2
![Page 3: Kristopher Cummings Accident Tolerant FuelAccident Tolerant Fuel Developing an Efficient Approval Process Kristopher Cummings Sr. Project Manager, Fuel and Decommissioning Jack Grobe](https://reader033.fdocuments.in/reader033/viewer/2022051917/6008f1403ea577381d6af127/html5/thumbnails/3.jpg)
Desired Outcomes• A mutual commitment to develop an approach that will support more
timely fuel qualification and licensing for ATF
• A common understanding on use and implementation of LTR/LTA programs for ATF along with steps/schedule to formalize this understanding.
• Communication of industry proposed process for the development of an efficient and reliable pathway for ATF Fuel Qualification
• Common understanding of NRC ATF Project Plan
• Agreement to quarterly meetings between NRC ATF Steering Committee and NEI ATF Fuel Licensing Task Force3
![Page 4: Kristopher Cummings Accident Tolerant FuelAccident Tolerant Fuel Developing an Efficient Approval Process Kristopher Cummings Sr. Project Manager, Fuel and Decommissioning Jack Grobe](https://reader033.fdocuments.in/reader033/viewer/2022051917/6008f1403ea577381d6af127/html5/thumbnails/4.jpg)
NSIACGAAC
Accident Tolerant Fuel Working Group (ATFWG)Mission: Guide Industry Policy and Actions on ATF
Executive Sponsor: Joe Grimes, TVANEI Sponsoring Executive: Pamela CowanNEI Sponsoring Director: Rod McCullum
NEI Staff Lead: Andrew Mauer
EPRI ATFResearch Collaboration
Mission: Foster Research Cooperation and Collaboration
Al Csontos, EPRI
National Labs
Universities
International
CAC
ATF External Affairs Task ForceFunding and Schedule Acceleration
Andrew Mauer/Bruce Montgomery, NEITom Craig, Duke Energy Corporation
• Exelon Generation Company, LLC • Tennessee Valley Authority• Duke Energy Corporation• Entergy Operations, Inc.• Southern Nuclear Operating
Company• Dominion Generation • Arizona Public Service Company• Xcel Energy
• GE Hitachi Nuclear Energy • AREVA Inc.• Westinghouse Electric Company • Lightbridge Corporation• General Atomics• Jensen Hughes• Electric Power Research Institute• Nuclear Energy Institute
ATF Fuel Licensing Task ForceFuel Qualification to Deployment
Kris Cummings, NEIJack Grobe, Exelon Generation Company, LLC
Regulators
ATF Safety Benefits Task ForceRealization of Regulatory Benefits
Kris Cummings, NEIJohn Williams, Southern Nuclear Operating Company
Utilities
Fuel Vendors
4
![Page 5: Kristopher Cummings Accident Tolerant FuelAccident Tolerant Fuel Developing an Efficient Approval Process Kristopher Cummings Sr. Project Manager, Fuel and Decommissioning Jack Grobe](https://reader033.fdocuments.in/reader033/viewer/2022051917/6008f1403ea577381d6af127/html5/thumbnails/5.jpg)
ATF Concepts Under Development• DOE down selection to 3 ATF concepts for their Phase 2
program:
• One design by Lightbridge under development outside DOE cost-share program.
• Si-C composite cladding• U3Si2 high density fuel
• Fe-Cr-Al cladding• Conventional UO2 fuel
• Cr-coated zircaloy cladding• Chromium doped UO2
• Metallic uranium alloy
5
![Page 6: Kristopher Cummings Accident Tolerant FuelAccident Tolerant Fuel Developing an Efficient Approval Process Kristopher Cummings Sr. Project Manager, Fuel and Decommissioning Jack Grobe](https://reader033.fdocuments.in/reader033/viewer/2022051917/6008f1403ea577381d6af127/html5/thumbnails/6.jpg)
ATF Path Forward
6
![Page 7: Kristopher Cummings Accident Tolerant FuelAccident Tolerant Fuel Developing an Efficient Approval Process Kristopher Cummings Sr. Project Manager, Fuel and Decommissioning Jack Grobe](https://reader033.fdocuments.in/reader033/viewer/2022051917/6008f1403ea577381d6af127/html5/thumbnails/7.jpg)
REGULATORY FRAMEWORK FORACCIDENT TOLERANT FUEL
LEAD TEST ASSEMBLIES AND RODS
7
![Page 8: Kristopher Cummings Accident Tolerant FuelAccident Tolerant Fuel Developing an Efficient Approval Process Kristopher Cummings Sr. Project Manager, Fuel and Decommissioning Jack Grobe](https://reader033.fdocuments.in/reader033/viewer/2022051917/6008f1403ea577381d6af127/html5/thumbnails/8.jpg)
HISTORY • Handling, irradiation and storage of Lead Test
Assemblies and Rods (LTAs) has been implemented for decades
• Technical Specification 4.2.1 permits the irradiation of LTAs in the reactor core for:o A limited number of LTAs that have not completed
representative testingo Placed in a non-limiting core regions
• LTA Programs are an authorized activity in the facility license8
![Page 9: Kristopher Cummings Accident Tolerant FuelAccident Tolerant Fuel Developing an Efficient Approval Process Kristopher Cummings Sr. Project Manager, Fuel and Decommissioning Jack Grobe](https://reader033.fdocuments.in/reader033/viewer/2022051917/6008f1403ea577381d6af127/html5/thumbnails/9.jpg)
HISTORY – Cont’d • Licensees planning near-term ATF LTA programs have
scheduled meetings with NRR technical staff to discuss the program:o Southern (Hatch) meeting with NRR regarding Spring
2018 insertion of ATF LTAs with UO2 fuel and ferritic steel cladding in June 2017
o Exelon (Byron) meeting planned with NRR regarding Spring 2019 insertion of ATF LTAs with U3Si2 fuel and chromium coated zircaloy cladding in October 2017
• Several other ATF LTA programs anticipated9
![Page 10: Kristopher Cummings Accident Tolerant FuelAccident Tolerant Fuel Developing an Efficient Approval Process Kristopher Cummings Sr. Project Manager, Fuel and Decommissioning Jack Grobe](https://reader033.fdocuments.in/reader033/viewer/2022051917/6008f1403ea577381d6af127/html5/thumbnails/10.jpg)
IRRADIATION OF LTAs IN THE CORE• Engineering design control process under 10CFR50,
Appendix Bo Design and safety analysis supporting irradiating LTAs in the core
performed under the design control process
• Confirms the safety basis for the LTAs
• Authorized activity under TS 4.2.1o “…. A limited number of lead test assemblies that have not completed
representative testing may be placed in non-limiting core regions.”• Purpose of irradiating LTAs in the reactor is to collect data and validate
performance• Codes and methods do not need to have been submitted to NRC
10
![Page 11: Kristopher Cummings Accident Tolerant FuelAccident Tolerant Fuel Developing an Efficient Approval Process Kristopher Cummings Sr. Project Manager, Fuel and Decommissioning Jack Grobe](https://reader033.fdocuments.in/reader033/viewer/2022051917/6008f1403ea577381d6af127/html5/thumbnails/11.jpg)
LTAs IN THE CORE – Cont’d• All facility design changes enter the station 10CFR50.59
processo Reactor core irradiation of LTAs is an authorized activity
under the operating license – TS 4.2.1
o 10 CFR 50.59 process is exited since further NRC authorization is not necessary for reactor core irradiation of LTAs
11
![Page 12: Kristopher Cummings Accident Tolerant FuelAccident Tolerant Fuel Developing an Efficient Approval Process Kristopher Cummings Sr. Project Manager, Fuel and Decommissioning Jack Grobe](https://reader033.fdocuments.in/reader033/viewer/2022051917/6008f1403ea577381d6af127/html5/thumbnails/12.jpg)
LTAs IN THE CORE – Cont’d• 10 CFR 50.46 “Acceptance Criteria for Emergency Core
Cooling Systems for Light-Water Nuclear Power Reactors”o “Each … light-water nuclear power reactor fueled with uranium oxide
pellets within cylindrical zircaloy or ZIRLO cladding …”
o This regulation establishes the ECCS criteria for cores of fuel that are comprised of “uranium oxide pellets within cylindrical zircaloy or ZIRLO cladding”
o Therefore, an exemption to 10CFR50.46 is not necessary for fuel that is not “uranium oxide pellets within cylindrical zircaloy or ZIRLO cladding”
12
![Page 13: Kristopher Cummings Accident Tolerant FuelAccident Tolerant Fuel Developing an Efficient Approval Process Kristopher Cummings Sr. Project Manager, Fuel and Decommissioning Jack Grobe](https://reader033.fdocuments.in/reader033/viewer/2022051917/6008f1403ea577381d6af127/html5/thumbnails/13.jpg)
STORAGE OF LTAs • Depending on facility design ATF LTAs will need to be
stored in dry and/or wet storage locations before and after irradiation
• As long as the design control process concludes that ATF LTAs/LTRs are bounded by the current analysis, they may placed in the storage areas.
13
![Page 14: Kristopher Cummings Accident Tolerant FuelAccident Tolerant Fuel Developing an Efficient Approval Process Kristopher Cummings Sr. Project Manager, Fuel and Decommissioning Jack Grobe](https://reader033.fdocuments.in/reader033/viewer/2022051917/6008f1403ea577381d6af127/html5/thumbnails/14.jpg)
HANDLING OF LTAs/ PROCEDURE CHANGES• LTA programs may involve changes in handling equipment and/or plant
procedures:o Any necessary changes would be evaluated, reviewed and approved
under the facility design change process or procedures management process
o Changes in fuel handling equipment/procedures from that described in the facility Updated Safety Analysis Report would be evaluated under 10CFR50.59 to determine whether NRC review and approval of the change would be required.
14
![Page 15: Kristopher Cummings Accident Tolerant FuelAccident Tolerant Fuel Developing an Efficient Approval Process Kristopher Cummings Sr. Project Manager, Fuel and Decommissioning Jack Grobe](https://reader033.fdocuments.in/reader033/viewer/2022051917/6008f1403ea577381d6af127/html5/thumbnails/15.jpg)
ACCIDENT TOLERANT FUEL FUEL QUALIFICATION
REGULATORY FRAMEWORK
15
![Page 16: Kristopher Cummings Accident Tolerant FuelAccident Tolerant Fuel Developing an Efficient Approval Process Kristopher Cummings Sr. Project Manager, Fuel and Decommissioning Jack Grobe](https://reader033.fdocuments.in/reader033/viewer/2022051917/6008f1403ea577381d6af127/html5/thumbnails/16.jpg)
ATF FUEL QUALIFICATION ROADMAP
16
![Page 17: Kristopher Cummings Accident Tolerant FuelAccident Tolerant Fuel Developing an Efficient Approval Process Kristopher Cummings Sr. Project Manager, Fuel and Decommissioning Jack Grobe](https://reader033.fdocuments.in/reader033/viewer/2022051917/6008f1403ea577381d6af127/html5/thumbnails/17.jpg)
Key Activities – Remainder of 2017• Alignment and stability of LTA Regulatory Framework • Development and Alignment of Regulatory Roadmaps with
NRC ATF Project Plano ATF Fuel Qualification (10 CFR Part 50) o ATF Fabrication (10 CFR Parts 70, 73 and 74)o ATF Transportation (10 CFR Part 71)
• Identification of Areas for Rulemaking
17
![Page 18: Kristopher Cummings Accident Tolerant FuelAccident Tolerant Fuel Developing an Efficient Approval Process Kristopher Cummings Sr. Project Manager, Fuel and Decommissioning Jack Grobe](https://reader033.fdocuments.in/reader033/viewer/2022051917/6008f1403ea577381d6af127/html5/thumbnails/18.jpg)
Regulations• 10 CFR 50.46 – ECCS performance criteria for
non-zirconium/UO2 fuel• 10 CFR 50.68 – 5 wt% enrichment limit for the
spent fuel pool• Appendix A (GDC 35) – language specific to “fuel
and clad” and “clad metal-water reaction”• Evaluation of regulations continuing
18
![Page 19: Kristopher Cummings Accident Tolerant FuelAccident Tolerant Fuel Developing an Efficient Approval Process Kristopher Cummings Sr. Project Manager, Fuel and Decommissioning Jack Grobe](https://reader033.fdocuments.in/reader033/viewer/2022051917/6008f1403ea577381d6af127/html5/thumbnails/19.jpg)
Conclusions and Path Forward• ATF provides a significant safety advancement to the current
fleet of light-water reactors• More timely fuel qualification and licensing is needed to support
approval and implementation of ATF designs by early to mid-2020s
• Near-term alignment and stability of LTA Regulatory Framework is needed.
• Continued engagement will be key to making progress
19
![Page 20: Kristopher Cummings Accident Tolerant FuelAccident Tolerant Fuel Developing an Efficient Approval Process Kristopher Cummings Sr. Project Manager, Fuel and Decommissioning Jack Grobe](https://reader033.fdocuments.in/reader033/viewer/2022051917/6008f1403ea577381d6af127/html5/thumbnails/20.jpg)
Questions?
20
![Page 21: Kristopher Cummings Accident Tolerant FuelAccident Tolerant Fuel Developing an Efficient Approval Process Kristopher Cummings Sr. Project Manager, Fuel and Decommissioning Jack Grobe](https://reader033.fdocuments.in/reader033/viewer/2022051917/6008f1403ea577381d6af127/html5/thumbnails/21.jpg)
Acronyms• ATF – Accident Tolerant Fuel• ATR – Advanced Test Reactor• CFR – Code of Federal Regulations• GDC – General Design Criteria• LTA – Lead Test Assembly• LTR – Lead Test Rod(s)• TREAT – Transient Reactor Test Facility
21