Kotak Mahindra Bank Limited Corporate Office
Location: Bandra Kurla Complex, MumbaiDate: 26th June, 2009
Kotak Mahindra Bank Limited Corporate Office, Mumbai2
Genesis Architects is a team of young enthusiastic individuals keen to provide the assembly of knowledge, expertise, experience, creativity, and professionalism to our projects.
Led by a team of seasoned professionals with over 40 years of collective experience of architectural and interior design solutions, we are committed to provide innovative design solutions derived from a analytical design process.
Today, team Genesis constitutes of talent that originates from various parts of India that has lent us the diversity and local expertise to handle projects anywhere in the country.
We have had the opportunity to work at close quarters with the leading international brands looking to initiate and strengthen their presence in India and abroad.
In 2007, Genesis entered into a strategic alliance with US based MBH Architects in order to pool our expertise for selective projects.
Since then, the association has grown consistently leading to successful design bids for Delhi International Airport and other large scale commercial and hospitality projects.
http://www.genarch.in
http://www.mbharch.com
Kotak Mahindra Bank Limited Corporate Office, Mumbai3
. Project Highlights
Kotak Mahindra Bank Limited Corporate Office, Mumbai4
Kotak Mahindra Bank Limited Design Consultancy 35,000 Sq Ft K.G. Point, Surat
Project Highlights
Kotak Mahindra Bank Limited Corporate Office, Mumbai5
Kotak Mahindra Bank Limited Design Consultancy2,50,000 Sq Ft : Banking1,50,000 Sq Ft : Office
Pan-India Retail Banking and Group offices
Project Highlights
Kotak Mahindra Bank Limited Corporate Office, Mumbai6
22
International departure
Delhi T3 International Terminal Design Consultancy60,000 Sq Ft F&B and Retail Component
Project Highlights
Kotak Mahindra Bank Limited Corporate Office, Mumbai7
Yum! Restaurants International Corporate Office Design Consultancy15,000 Sq FtDLF towers, Gurgaon
Project Highlights
Kotak Mahindra Bank Limited Corporate Office, Mumbai8
Project Highlights
Design Consultancy
16,000 Sq Ft
Ensearch, Noida
Kotak Mahindra Bank Limited Corporate Office, Mumbai9
Project Highlights
Design Consultancy
35,000 Sq Ft
Louis & Dreyfus, DLF 9B, Gurgaon
Kotak Mahindra Bank Limited Corporate Office, Mumbai10
Project Highlights
Corporate Spaces . MBH
Kotak Mahindra Bank Limited Corporate Office, Mumbai11
The Infrastructure and Projects Department of “Kotak Mahindra Bank Limited” (KMBL) had decided to invite architectural design firms for the indicative concept design proposal for their planned Corporate Headquarters through survey of their property namely “Apple Finance Ltd.” situated at C-27, G Block, Bandra Kurla Complex, Bandra (E), Mumbai – 400051.
Objective
Kotak Mahindra Bank Limited Corporate Office, Mumbai12
Location . Site
‘G’ block of the Bandra Kurla Complex has been earmarked for International Finance and Business Center and is one of the most sought after commercial destinations for financial institutions in the city of Mumbai today
Bandra Kurla Complex
Kotak Mahindra Bank Limited Corporate Office, Mumbai13
Bank of BarodaLakshmi Towers
National Stock ExchangeSecurities & Exchange Board of IndiaBank of India ICICI Bank Ltd.
Location . Context
The ex ist ing structure known as “APPLE FINANCE LTD” is situated in the heart of Bandra Kurla complex with surrounding MCA grounds to the East, Laxmi Tower to the North and Bank of Baroda to the South.
Kotak Mahindra Bank Limited Corporate Office, Mumbai14
Location . Context
Main Arterial Road(BKC Road)
BEST Bus Stand
The site is strategically located in the heart of International finance and business centre, well connected by all modes of transportation through arterial roads and proposed railway projects.
Kotak Mahindra Bank Limited Corporate Office, Mumbai15
Design PrinciplesTHE GOLDEN RECTANGLE
Since the Renaissance, artists and architects have proportioned their works to approximate the golden ratio - especially in the form of the golden rectangle, in which the ratio of the longer side to the shorter is the golden ratio.
The reason for the golden rectangle's charm is that it is considered to be one of the most pleasing shapes to look at.
THE GOLDEN RATIO
The golden ratio has fascinated intellectuals of diverse interests for at least 2,400 years.
1 : 1 : 1.6180 Our human eye perceives the golden rectangle as an
especially beautiful geometric form.
Kotak Mahindra Bank Limited Corporate Office, Mumbai16
Design Principles
• Balanced• Stable• Serene• Patient
Kotak Mahindra Bank Limited Corporate Office, Mumbai17
At Genesis, we believe that time spent in getting to know the Client and understand how they operate is invaluable.
On this basis, we propose a series of steps to fully understand and solicit the relevant information from your departments.
The next slides describe the process that we would undertake prior to construction as part of the fact gathering.
The Methodology that we propose is a series of stages with checks and balances at the end of each stage. This minimizes risk to KMBL, yet allows the project to progress at the required speed.
Strategic Planning
. Building Analysis
. Co-location Issues
Strategic Planning : our approach …
A structured approach to provide solutions specific to KMBL
Using tools and real world project experience
Multi-disciplinary : planning, design and technical
Methodology
Kotak Mahindra Bank Limited Corporate Office, Mumbai18
Methodology
Key planning criteria
. Planning efficiency
. Size of the floor plate / number of floors required
. Shape of the floor plate
. Shape of the core
. Access and circulation
floor 1-3floor 4-9
. Quadrilateral layout
. Lift lobby - false ceiling, marble flooring and cladding
. External leakage through the joints of the ACP
. Separation cracks between brick masonry and RCC slab
. First floor - open floor space, lift lobby and staircase
. Second floor - internal brick partition walls
. Third floor - exposed RCC slab, external leakage
. Lift lobby - false ceiling, marble flooring and cladding
lift lobby
exposed RCC slab
cracks in the walls
Kotak Mahindra Bank Limited Corporate Office, Mumbai19
Methodology
PROPERTY SURVEY
• Multiple access to site from east and west side
- important to counter congestion and control circulation at peak hours
• Sound Structure – Additional floor space may be added based on the extent of retro-fitting
• Existing Façade – Standard design, non-conforming to Brand Kotak
• Triple Height Portico – Imparts a sense of grandeur and scale, Impressive as the point of first impact
• Designed for individual office suites – Integrated Building lobby introduced to
• Challenging conditions for Car Parking – Vertical / multi-level stacking explored
Kotak Mahindra Bank Limited Corporate Office, Mumbai20
Methodology
section through core
existing :
required* : +
proposed : + +
atrium :
existing : 1,21,914 sq ft . FSI : 1.88
required* : 1,45,000 sq ft . FSI : 2.25
proposed : 2,05,000 sq ft . FSI : 3.15
* cafe / board rooms / recreation included
Kotak Mahindra Bank Limited Corporate Office, Mumbai21
. Best and most efficient fit
. Matches work culture
EXISTING IN USE NEW BUILDING
Establish the size and number of staff space standards
171 sf
39 sf28 sf 1620 x 1035 mm
Sample space standards
Methodology
Kotak Mahindra Bank Limited Corporate Office, Mumbai22
Planning Option
In this section, we use all of the findings and knowledge gained from previous sections to develop:
. Stacking Section
This section depicts how the available space on the floor can be used. It identifies the Business Units / Departments to be incorporated in the proposal. The locations may be adjusted based on further discussions with the KMBL management.
Test fits were developed as a resultant.
Methodology
Parking + MEP Services
Vertical Core
Main Lobby + Retail Branch + Café + Recreation Zone
Corporate Banking + KMIL + Board room + Meeting Rooms
KMCC
KIAL + Wealth Management
KLI
future expansion
AMC
Treasury + KFBL
Compliance + CFO
Corporate
205k
Kotak Mahindra Bank Limited Corporate Office, Mumbai23
Methodology
Parking + MEP Services
Vertical Core
Retail Branch + Café + Recreation Zone
Main Lobby + Board room + Meeting Rooms + Public interaction zone
KLI + ARD
Compliance + CFO + AMC
Corporate
145k
Planning Option
A second option that satisfies the immediate requirements of KMBL.
The locations may be adjusted based on further discussions with the KMBL management.
Corporate Banking + Corporate Real-estate + KMIL
KMCC + KIE + KS Retail
KIAL + Wealth Management
Treasury + Op Man Com
Kotak Mahindra Bank Limited Corporate Office, Mumbai24
Methodology
GREEN CONCEPTS
. Green is going mainstream, and fast- GO GREEN
. External Façade Treatment - Sticking to the roots but eying the future.
. Soul of the building - Mural at the entrance portico.
. Designed attentively for people with special needs.
. Additional vertical circulation core - Decongestion at the proposed entrance lobby.
. Flexibility/Expansion – Modular furniture.
. Open Spaces
Kotak Mahindra Bank Limited Corporate Office, Mumbai25
Methodology
parking bays
cores
services
ground floor
traffic movement
site plan
Parking Bays >> 65 cars | 225 two wheelers
Kotak Mahindra Bank Limited Corporate Office, Mumbai26
Methodology
parking bays
cores
services
basement
traffic movement 205k
145k
Parking Bays >> 122 cars | 70 two wheelers
Kotak Mahindra Bank Limited Corporate Office, Mumbai27
Methodology
workstation area
executive area
discussion and meeting spaces
services
circulation
common facilities
205k
145k
Kotak Mahindra Bank Limited Corporate Office, Mumbai28
Methodology
workstation area
executive area
discussion and meeting spaces
services
circulation
common facilities
205k
145k
Kotak Mahindra Bank Limited Corporate Office, Mumbai29
Methodology
workstation area
executive area
discussion and meeting spaces
services
circulation
common facilities
205k
145k
Kotak Mahindra Bank Limited Corporate Office, Mumbai30
Methodology
205K
Kotak Mahindra Bank Limited Corporate Office, Mumbai31
Methodology
. Side elevation
. concept 3d
. overlay of golden rectangle on external facade
205K
Kotak Mahindra Bank Limited Corporate Office, Mumbai32
Methodology
145K
Kotak Mahindra Bank Limited Corporate Office, Mumbai33
Methodology
view 01
Kotak Mahindra Bank Limited Corporate Office, Mumbai34
Methodology
view 02
Kotak Mahindra Bank Limited Corporate Office, Mumbai35
. Design Features
Kotak Mahindra Bank Limited Corporate Office, Mumbai36
Floor Lift Lobby
Lounging Areas
Design Features
Kotak Mahindra Bank Limited Corporate Office, Mumbai37
Discussion & Conference Spaces
Design Features
Kotak Mahindra Bank Limited Corporate Office, Mumbai38
Open Office Spaces
Design Features
Kotak Mahindra Bank Limited Corporate Office, Mumbai39
Breakout Spaces
Design Features
Kotak Mahindra Bank Limited Corporate Office, Mumbai40
Concept for Reception Area
Design Features
Telephone Booth
Kotak Mahindra Bank Limited Corporate Office, Mumbai41
. Annexure I
Kotak Mahindra Bank Limited Corporate Office, Mumbai42
Our comments are based on the following reports and drawings:
a. General report with photographs
b. Architectural drawings
c. Basic structural drawings
1. Our understanding of the existing structure is as under:
a. Extents : The extent of the floor of the existing structure is as under
annexure I . structure
b. Grid pattern : As shown in the Arch. drawing, the structural grid are 8.0x9.0 for first
to third floor portion and 10.7x11.54 for fifth to ninth floor portion.
c. Expansion joint : There is no expansion joint.
d. Number of Basements : First basement - full, Second part basement
e. Levels : Kindly refer section on the side
Kotak Mahindra Bank Limited Corporate Office, Mumbai43
annexure I . structure
f. Building System : From structural drawings, the structural system is flat slab for first to third floor portion and flat plate for fifth to
ninth floor portion.
g. Foundation System : There is a mention of Raft foundation in the report. (Details to be confirm)
h. Transfer Beam : It seems that the column grid of fifth to ninth floor structure is not continuing in the atrium portion. There must be
a Transfer beam situation happening at that level. This Transfer beam is the most important component of the whole structure (Details
to be confirm).
2. Inferences
a. Present structure is in good condition, although it is 10 year old construction.
b. Existing structure is subjected to the following load at this point of time –
i. Self Weight
ii. External walls with cladding
iii. Internal walls (To be confirm)
iv. Floor finishes in some area (To be confirm)
c. The following designed loads are still to be mobilized -
i. Live load
ii. Load of services at floor level
iii. Floor finishes
iv. Partition walls
v. False ceiling
vi. Terracing
vii. Water in overhead water tank
viii. Services at roof level and in the basement
ix. Water in the under ground water tank
x. Earthquake
d. Structure is presently carrying 60% of its design loads thereby it is not under fully stressed load condition.
Kotak Mahindra Bank Limited Corporate Office, Mumbai44
annexure I . structure
3. Suggestions and further actions to be considered for enhancing the FAR of the existing structure.
i. Addition of lifts : More lifts will certainly be required for increased FAR so these can be used to reduce the earthquake demand from
the existing column and thereby making them available to take more of vertical loads.
ii. Additional columns can be placed in the atrium in order to handle vertical load
without bothering the atrium’s aesthetics.
iii. Second and Third floor can be extended in the atrium for addition FAR.
Kotak Mahindra Bank Limited Corporate Office, Mumbai45
annexure I . structure
iv. To enhance the capacity of the 4th floor transfer beam, additional columns can be
proposed in the periphery to create additional transfer beams.
v. Strengthening of existing raft can be done by the following ways :
a. By using Rock anchors to reduce span of raft elements.
b. Increasing the thickness of existing raft.
c. Providing additional columns in basement and super structure where possible.
vi. Strengthening of existing columns can be done by the following ways :
a. Jacketing with micro concreting after drilling & grouting new reinforcement in the
existing structure..
b. Increasing the ductility by using fiber wraps.
c. Use of structural steel members and plates.
vii. The internal wall load can be reduced by using light weight concrete blocks. This will help in reducing the design loads.
viii. The new structure can be done in structural steel with metal deck slab in order to reduce the dead loads and also to reduce
the construction period.
Kotak Mahindra Bank Limited Corporate Office, Mumbai46
annexure I . structure
4. Detailed working for creating additional floors up to 4 to 6 numbers above terrace at
fourth floor level and 3 to 4 numbers above the terrace at 10th floor can be explored
after getting the following information
i. Structural drawings of existing building including PT drawings.
ii. Soil report
iii. Structural design report with loading assumptions
iv. Calculation
a. Analysis
b. Design of structure along with PT design
c. Foundation raft analysis and design
v. Concrete test report during construction
vi. NDT report for present day strength parameters
Kotak Mahindra Bank Limited Corporate Office, Mumbai47
. Annexure II
Kotak Mahindra Bank Limited Corporate Office, Mumbai48
annexure II . electrical
S.NO
EQUIPMENT DESCRIPTION
EXISTING STATUS REMARKS1 Incoming HT feeder Incoming Ht feeder is existing in the
basement. The rating of 630 A is adequate.
The HT feeder needs to be serviced and all interlocking etc. need to be rechecked before final clearance can be given for use.
2 Transformer 1250 kVA transformer is placed in the basement. The capacity is very near to what is required for the building. The final decision on this will be made after detailed loads are available.
The Transformer needs to be serviced and all functions need to be rechecked before final clearance can be given for use. Normally for important applications two transformers are preferred. Final decision on this may be taken by the client.
3 DG set 200 kVA DG Set is placed in the basement.
The capacity is not adequate. New DG sets as power back up will be proposed as part of new design.
4 Main LT panels and other distribution panels
LT panels are placed in the basement. The LT panels are of old design and are not suitable for use in latest state of the art buildings. New LT panels will be proposed as part of new design.
5 Rising Mains Not existing Most modern buildings are run on rising mains instead of conventional cabling system. The rising mains for normal and UPS power will be proposed as part of the new design.
EXISTING EQUIPMENT SURVEY
Kotak Mahindra Bank Limited Corporate Office, Mumbai49
The electrical system will be designed specifically keeping in consideration the following parameters:
. Safety
. Energy efficiency
. Maintenance and continuity of the system.
SAFETY
Following specific measures will be proposed to ensure high level of safety inside the building:
. Use of DRY type of equipment for all High Voltage items.
. All HT equipment like the HT panel, transformer, RMU breakers etc will be of DRY type technology.
. Use of Rising Mains instead of Conventional cabling system
. The distribution system will be carried out through high quality SANDWICH TYPE RISING MAINS. This reduces significantly chances of fire or breakdown in the backbone of the distribution system. It also ensures lower running losses and lower heat output in the shafts.
. Use of Addressable type of smoke detection system with systematic evacuation
. The building will be equipped with state of the art ADDRESSABLE TYPE of fire detection and alarm system. The addressable type of system helps pinpoint the source of fire quickly, which is a critical parameter in suppression of fire. The system also directs a systematic evacuation of the premises by directing exit of personnel area wise. The more vulnerable areas are evacuated first. This also reduces the chances of stampede.
. Use of CCTV monitoring and recording system & Access control
. The building will be equipped with state of the art CCTV based security system. This will act as deterrent towards unauthorized entry and possible terrorist attack. The building will have a biometric based access control system, which will ensure that access to sensitive parts of the building is made available to authorized personnel only.
DESIGN BASIS FOR NEW INFRASTRUCTURE
annexure II . electrical
Kotak Mahindra Bank Limited Corporate Office, Mumbai50
ENERGY EFFICIENCY
To make the building use energy most efficiently a state of the art Integrated Building Management system (IBMS) will be proposed . The IBMS will use the following specific measures:
Lighting Controls
. The lighting levels will be automatically regulated by extensive use of high resolution presence and movement sensors. This will ensure efficient use of lighting resources.
. All lighting fixtures used will be of high degree of efficiency. Depending on specific applications LED type and wherever possible solar light fixtures will be used.
HVAC Controls
. The HVAC system will be regulated and finely adjusted as per the requirements.
. High efficiency lighting fixtures:
. Use of Rising Mains instead of Conventional cabling system
. The distribution system will be carried out through high quality SANDWICH TYPE RISING MAINS. This reduces significantly chances of fire or breakdown in the backbone of the distribution system. It also ensures lower running losses and lower heat output in the shafts.
Maintenance and continuity of the system
. The design will ensure that there exists no single bottleneck which can cause a shut down to the entire premises. All distribution paths will have alternative options. All critical loads in the building will be on UPS back up and all important safety equipment will have a direct DG set back up available. The distribution system will be carried out through high quality SANDWICH TYPE RISING MAINS. This reduces significantly chances of fire or breakdown in the backbone of the distribution system. It also ensures lower running losses and lower heat output in the shafts
. A detailed maintenance chart and schedule will be drawn up for all critical equipments and checklists for preventive maintenance will be drawn for all electrical equipments.
. Adequate measures will be taken to see that the electrical systems are protected against flood water.
annexure II . electrical
Kotak Mahindra Bank Limited Corporate Office, Mumbai51
. Annexure V
Kotak Mahindra Bank Limited Corporate Office, Mumbai52
annexure V . estimated cost
ESTIMATED COSTS FOR KOTAK OFFICE AT BKC,MUMBAIESTIMATED COSTS FOR KOTAK OFFICE AT BKC,MUMBAIESTIMATED COSTS FOR KOTAK OFFICE AT BKC,MUMBAIESTIMATED COSTS FOR KOTAK OFFICE AT BKC,MUMBAIESTIMATED COSTS FOR KOTAK OFFICE AT BKC,MUMBAIESTIMATED COSTS FOR KOTAK OFFICE AT BKC,MUMBAIS.NO. ITEM DESCRIPTION QUANTITY UNIT RATE AMOUNT
1 STRUCTURE AS PER ANNEXURE 1 LOT 6,20,00,0002 ELECTRICALS AS PER ANNEXURE 2 2,05,000 LOT 375 7,68,75,0003 HVAC AS PER ANNEXURE 3 LOT 7,57,00,0004 PLUMBING AS PER ANNEXURE 4 LOT 2,85,00,0005 CIVIL / INTERIORS (CARPET AREA) 2,05,000 SQ.FT. 1,400 28,70,00,0006 FAÇADE TREATMENT(ELEVATION AREA) 65,000 SQ.FT. 1,250 8,12,50,0007 LIFTS 6 NOS. 30,00,000 1,80,00,0008 ARCHITECT'S FEES AS PER ANNEXURE 5 LOT 1,20,00,000
GRAND TOTAL 64,13,25,000
205k
Kotak Mahindra Bank Limited Corporate Office, Mumbai53
annexure V . estimated cost
ESTIMATED COSTS FOR KOTAK OFFICE AT BKC,MUMBAIESTIMATED COSTS FOR KOTAK OFFICE AT BKC,MUMBAIESTIMATED COSTS FOR KOTAK OFFICE AT BKC,MUMBAIESTIMATED COSTS FOR KOTAK OFFICE AT BKC,MUMBAIESTIMATED COSTS FOR KOTAK OFFICE AT BKC,MUMBAIESTIMATED COSTS FOR KOTAK OFFICE AT BKC,MUMBAIS.NO. ITEM DESCRIPTION QUANTITY UNIT RATE AMOUNT
1 STRUCTURE AS PER ANNEXURE 1 LOT 1,75,00,0002 ELECTRICALS AS PER ANNEXURE 2 1,45,000 LOT 375 5,43,75,0003 HVAC AS PER ANNEXURE 3 LOT 6,28,00,0004 PLUMBING AS PER ANNEXURE 4 LOT 2,60,00,0005 CIVIL / INTERIORS (CARPET AREA) 1,45,000 SQ.FT. 1,400 20,30,00,0006 FAÇADE TREATMENT(ELEVATION AREA) 55,000 SQ.FT. 1,250 6,87,50,0007 LIFTS 2 NOS. 30,00,000 60,00,0008 ARCHITECT'S FEES AS PER ANNEXURE 5 LOT 90,00,000
GRAND TOTAL 44,74,25,000
145k
Kotak Mahindra Bank Limited Corporate Office, Mumbai54
required* : 1,45,000 sq ft . FSI : 2.25
* cafe / board rooms / recreation included
205k
145k
proposed : 2,05,000 sq ft . FSI : 3.15
PROJECTED DEVELOPMENT COST
64.5cr45cr
annexure V . estimated cost
Kotak Mahindra Bank Limited Corporate Office, Mumbai55
. Annexure VI
Kotak Mahindra Bank Limited Corporate Office, Mumbai56
* cafe / board rooms / recreation included
PROJECTED DEVELOPMENT TIMEFRAME
205k
annexure VI . projected timeframe
Kotak Mahindra Bank Limited Corporate Office, Mumbai57
* cafe / board rooms / recreation included
PROJECTED DEVELOPMENT TIMEFRAME
145k
annexure VI . projected timeframe
Kotak Mahindra Bank Limited Corporate Office, Mumbai58
required* : 1,45,000 sq ft . FSI : 2.25
* cafe / board rooms / recreation included
205k
145k
proposed : 2,05,000 sq ft . FSI : 3.15
PROJECTED DEVELOPMENT TIMEFRAME
69 weeks52 weeks
annexure VI . projected timeframe
Kotak Mahindra Bank Limited Corporate Office, Mumbai59
Thank you