Transcript of King Street Station 7.28.11 slide show
![Page 1: King Street Station 7.28.11 slide show](https://reader035.fdocuments.in/reader035/viewer/2022070322/5591bc2d1a28abec448b4585/html5/thumbnails/1.jpg)
Phase 2AIn this slide show:
12th Floor Tower Lighting
July 28, 2011
![Page 2: King Street Station 7.28.11 slide show](https://reader035.fdocuments.in/reader035/viewer/2022070322/5591bc2d1a28abec448b4585/html5/thumbnails/2.jpg)
New lighting has been installed to improve illumination of the glass pyramid at the top of the tower.
![Page 3: King Street Station 7.28.11 slide show](https://reader035.fdocuments.in/reader035/viewer/2022070322/5591bc2d1a28abec448b4585/html5/thumbnails/3.jpg)
Another interior view of the glass pyramid.
![Page 4: King Street Station 7.28.11 slide show](https://reader035.fdocuments.in/reader035/viewer/2022070322/5591bc2d1a28abec448b4585/html5/thumbnails/4.jpg)
These reels raised and lowered the fluorescent lights that were used to illuminate the space before the new lighting replacement.
![Page 5: King Street Station 7.28.11 slide show](https://reader035.fdocuments.in/reader035/viewer/2022070322/5591bc2d1a28abec448b4585/html5/thumbnails/5.jpg)
These fixtures can be individually adjusted for the best angle of illumination.
![Page 6: King Street Station 7.28.11 slide show](https://reader035.fdocuments.in/reader035/viewer/2022070322/5591bc2d1a28abec448b4585/html5/thumbnails/6.jpg)
A view looking up the top of the tower shows the glass pyramid evenly lit.
![Page 7: King Street Station 7.28.11 slide show](https://reader035.fdocuments.in/reader035/viewer/2022070322/5591bc2d1a28abec448b4585/html5/thumbnails/7.jpg)
![Page 8: King Street Station 7.28.11 slide show](https://reader035.fdocuments.in/reader035/viewer/2022070322/5591bc2d1a28abec448b4585/html5/thumbnails/8.jpg)
New ticketing area
![Page 9: King Street Station 7.28.11 slide show](https://reader035.fdocuments.in/reader035/viewer/2022070322/5591bc2d1a28abec448b4585/html5/thumbnails/9.jpg)
A close-up view of the new ticket counter.
![Page 10: King Street Station 7.28.11 slide show](https://reader035.fdocuments.in/reader035/viewer/2022070322/5591bc2d1a28abec448b4585/html5/thumbnails/10.jpg)
Cabinets behind the ticketing counters are still under installation.
![Page 11: King Street Station 7.28.11 slide show](https://reader035.fdocuments.in/reader035/viewer/2022070322/5591bc2d1a28abec448b4585/html5/thumbnails/11.jpg)
Mezzanine break room for Amtrak employees
![Page 12: King Street Station 7.28.11 slide show](https://reader035.fdocuments.in/reader035/viewer/2022070322/5591bc2d1a28abec448b4585/html5/thumbnails/12.jpg)
New mezzanine restroom for Amtrak employees
![Page 13: King Street Station 7.28.11 slide show](https://reader035.fdocuments.in/reader035/viewer/2022070322/5591bc2d1a28abec448b4585/html5/thumbnails/13.jpg)
These refurbished windows provide natural lighting for both the station level and the new mezzanine level.
![Page 14: King Street Station 7.28.11 slide show](https://reader035.fdocuments.in/reader035/viewer/2022070322/5591bc2d1a28abec448b4585/html5/thumbnails/14.jpg)
Man lift for Amtrak’s new operations area
![Page 15: King Street Station 7.28.11 slide show](https://reader035.fdocuments.in/reader035/viewer/2022070322/5591bc2d1a28abec448b4585/html5/thumbnails/15.jpg)
A view inside the man lift.
![Page 16: King Street Station 7.28.11 slide show](https://reader035.fdocuments.in/reader035/viewer/2022070322/5591bc2d1a28abec448b4585/html5/thumbnails/16.jpg)
West side driveway repaved after the completion of geothermal wells installation.
![Page 17: King Street Station 7.28.11 slide show](https://reader035.fdocuments.in/reader035/viewer/2022070322/5591bc2d1a28abec448b4585/html5/thumbnails/17.jpg)
A view of the new bus/taxi queuing route from the station’s 12th floor balcony.
![Page 18: King Street Station 7.28.11 slide show](https://reader035.fdocuments.in/reader035/viewer/2022070322/5591bc2d1a28abec448b4585/html5/thumbnails/18.jpg)
Installation of new terrazzo treads for the Grand Stairs is almost complete.
![Page 19: King Street Station 7.28.11 slide show](https://reader035.fdocuments.in/reader035/viewer/2022070322/5591bc2d1a28abec448b4585/html5/thumbnails/19.jpg)
The New Jackson Plaza beautifully blend in with the city landscape.