Phase 2AIn this slide show:
Brick pavers for Jackson Plaza and lower station pathway
March 30, 2011
![Page 2: King Street Station 3.30.11 slide show](https://reader036.fdocuments.in/reader036/viewer/2022062405/5554f1dab4c905bb2a8b4eac/html5/thumbnails/2.jpg)
Reinforced architectural stamped curb casted to protect the red brick pavers next to the station from vehicles.
![Page 3: King Street Station 3.30.11 slide show](https://reader036.fdocuments.in/reader036/viewer/2022062405/5554f1dab4c905bb2a8b4eac/html5/thumbnails/3.jpg)
The stamped curb is separately casted in blocks and connected with an expansion joint. Groove details aid with traction.
![Page 4: King Street Station 3.30.11 slide show](https://reader036.fdocuments.in/reader036/viewer/2022062405/5554f1dab4c905bb2a8b4eac/html5/thumbnails/4.jpg)
Stamped curb shown above is partially casted. It follows the contour of the station southward.
![Page 5: King Street Station 3.30.11 slide show](https://reader036.fdocuments.in/reader036/viewer/2022062405/5554f1dab4c905bb2a8b4eac/html5/thumbnails/5.jpg)
Red pavers are individually hand set to the tightest fit. Sand sub base helps create a level surface for the pavers.
![Page 6: King Street Station 3.30.11 slide show](https://reader036.fdocuments.in/reader036/viewer/2022062405/5554f1dab4c905bb2a8b4eac/html5/thumbnails/6.jpg)
Most of the west walkway pavers are in place.
![Page 7: King Street Station 3.30.11 slide show](https://reader036.fdocuments.in/reader036/viewer/2022062405/5554f1dab4c905bb2a8b4eac/html5/thumbnails/7.jpg)
A large crane pumped gravel which will be use as sub base for the Jackson Plaza above.
![Page 8: King Street Station 3.30.11 slide show](https://reader036.fdocuments.in/reader036/viewer/2022062405/5554f1dab4c905bb2a8b4eac/html5/thumbnails/8.jpg)
The gravel was spread over the black drain mats.
![Page 9: King Street Station 3.30.11 slide show](https://reader036.fdocuments.in/reader036/viewer/2022062405/5554f1dab4c905bb2a8b4eac/html5/thumbnails/9.jpg)
An overview of Jackson Plaza with the gravel in place and insulation being installed.
![Page 10: King Street Station 3.30.11 slide show](https://reader036.fdocuments.in/reader036/viewer/2022062405/5554f1dab4c905bb2a8b4eac/html5/thumbnails/10.jpg)
Bedding sand between the crushed base help level the red brick pavers.
![Page 11: King Street Station 3.30.11 slide show](https://reader036.fdocuments.in/reader036/viewer/2022062405/5554f1dab4c905bb2a8b4eac/html5/thumbnails/11.jpg)
The new pedestrian pathway for the station entry is almost fully paved.
![Page 12: King Street Station 3.30.11 slide show](https://reader036.fdocuments.in/reader036/viewer/2022062405/5554f1dab4c905bb2a8b4eac/html5/thumbnails/12.jpg)
All planters were painted with black color sealer to help prevent dirt moisture from escaping and help reduce effervescence..
![Page 13: King Street Station 3.30.11 slide show](https://reader036.fdocuments.in/reader036/viewer/2022062405/5554f1dab4c905bb2a8b4eac/html5/thumbnails/13.jpg)
A northeast sidewalk section was leveled to match Jackson Plaza.
![Page 14: King Street Station 3.30.11 slide show](https://reader036.fdocuments.in/reader036/viewer/2022062405/5554f1dab4c905bb2a8b4eac/html5/thumbnails/14.jpg)
Planting dirt filled all of the planters.
![Page 15: King Street Station 3.30.11 slide show](https://reader036.fdocuments.in/reader036/viewer/2022062405/5554f1dab4c905bb2a8b4eac/html5/thumbnails/15.jpg)
Waterproof membrane shown helps prevent leaks in the 12th floor level.