KidsAbility – Guelph Hub Renovation ADDENDUM #2...

11
KidsAbility – Guelph Hub Renovation ADDENDUM #2 Project No.: 2017-0342-10 December 14, 2017 Page 1 of 4 T 519.576.2150 F 519.576.5499 This Addendum amends and forms part of the Bidding and Contract Documents for the above Project as follows: CLARIFICATIONS Q1. Is it possible to set up a secondary walkthrough for the subcontractors? A1. Per subcontractors’ requests, KidsAbility Guelph will be open at 10:00 am on Monday, December 18th for a secondary walkthrough. Q2. Please clarify note 17, remove and store furniture. Where do we store and provide list of furniture with quantity, and return requirements? In place set up etc? A2. KidsAbility will remove ALL furniture (modular, desks, chairs, shelving, and wall mounted white boards/tack boards) in space prior to construction commencement. Q3. Provide location for dust control and hoarding note 12 on drawing A1-1. A3. Hoarding is to be provided above ceiling at existing partition wall between two units (refer to specifications section 01 50 00 Temporary Facilities and Controls article 1.3 Temporary Barriers and Enclosures) . Q4. Provide detail on PLAM counters and exterior of cabinets. A4. PLAM counters to be priced based on Formica Laminate, matte finish. Refer to addition to 06 40 00 below for cabinets. Q5. Provide detail on barn board feature wall and at reception desk. A5. Barn board to be grey washed. Contact Barn Board Store in Hamilton at 647-667-2102. Q6. New asphalt patch at entry will be difficult to complete in early spring. A6. Refer to drawing A2-1. Note regarding asphalt patch to remain. Asphalt patch can be completed when asphalt plant is open. Q7. Parking lot signage. A7. Any additional parking lot signage required to be covered under signage allowance. CHANGES TO SPECIFICATIONS FRONT END Section 00 43 33.26 ADD2 Approved Manufacturers List - Electrical 1. Replace with the attached up-to-date proposed products form. Section 00 01 13 List of Standard Details 1. Refer to 8000-1 Door and Screen Schedule - WSC doors, finish to be PNT.

Transcript of KidsAbility – Guelph Hub Renovation ADDENDUM #2...

Page 1: KidsAbility – Guelph Hub Renovation ADDENDUM #2 …crdconstruction.on.ca/wp-content/uploads/2017/12/Addendum-2-002.pdf · KidsAbility – Guelph Hub Renovation ADDENDUM ... Provide

KidsAbility – Guelph Hub Renovation ADDENDUM #2 Project No.: 2017-0342-10

December 14, 2017 Page 1 of 4 T 519.576.2150 F 519.576.5499

This Addendum amends and forms part of the Bidding and Contract Documents for the above Project as follows:

CLARIFICATIONS

Q1. Is it possible to set up a secondary walkthrough for the subcontractors?

A1. Per subcontractors’ requests, KidsAbility Guelph will be open at 10:00 am on Monday, December 18th for a secondary walkthrough.

Q2. Please clarify note 17, remove and store furniture. Where do we store and provide list of furniture with quantity, and return requirements? In place set up etc?

A2. KidsAbility will remove ALL furniture (modular, desks, chairs, shelving, and wall mounted white boards/tack boards) in space prior to construction commencement.

Q3. Provide location for dust control and hoarding note 12 on drawing A1-1.

A3. Hoarding is to be provided above ceiling at existing partition wall between two units (refer to specifications section 01 50 00 Temporary Facilities and Controls article 1.3 Temporary Barriers and Enclosures) .

Q4. Provide detail on PLAM counters and exterior of cabinets.

A4. PLAM counters to be priced based on Formica Laminate, matte finish. Refer to addition to 06 40 00 below for cabinets.

Q5. Provide detail on barn board feature wall and at reception desk.

A5. Barn board to be grey washed. Contact Barn Board Store in Hamilton at 647-667-2102.

Q6. New asphalt patch at entry will be difficult to complete in early spring.

A6. Refer to drawing A2-1. Note regarding asphalt patch to remain. Asphalt patch can be completed when asphalt plant is open.

Q7. Parking lot signage.

A7. Any additional parking lot signage required to be covered under signage allowance.

CHANGES TO SPECIFICATIONS

FRONT END

Section 00 43 33.26 ADD2 Approved Manufacturers List - Electrical

1. Replace with the attached up-to-date proposed products form.

Section 00 01 13 List of Standard Details

1. Refer to 8000-1 Door and Screen Schedule - WSC doors, finish to be PNT.

Page 2: KidsAbility – Guelph Hub Renovation ADDENDUM #2 …crdconstruction.on.ca/wp-content/uploads/2017/12/Addendum-2-002.pdf · KidsAbility – Guelph Hub Renovation ADDENDUM ... Provide

KidsAbility – Guelph Hub Renovation ADDENDUM #2 Project No.: 2017-0342-10

December 14, 2017 Page 2 of 4 T 519.576.2150 F 519.576.5499

Section 00 21 13 Instructions to Bidders

1. Clarification : Refer to 1.12.7 Undertaking of Insurance is required.

ARCHITECTURAL

Section 06 40 00 Architectural Woodwork

1. Add 2.1.8 to read: “Premanufactured cabinets to be melamine, ready to assemble, sizes as shown on drawings, in solid colours. Colour to be selected by Consultant.”

Section 08 80 00 Glazing

1. Revise 2.4.2.(3) to read: “Insulated back pan complete with galvanized metal and mineral woolinsulation. For areas where back pan is exposed to interior, back pan to be covered with interior drywallfinish flush with adjacent.

Section 09 65 00 Resilient Flooring

1. Add article 2.1.4.2 as follows:

.2 Allow 20% accent colours in treatment rooms and hallways.

Section 10 20 00 Interior Specialties

1. Remove article 1.2.2 Corner Guards.

2. Remove article 2.3 Corner Guards.

CHANGES TO DRAWINGS

ARCHITECTURAL

Drawing A2-1

1. Drawing A2-1: front edge of accessible portion of reception desk to be flush with top counter edge.

ELECTRICAL

Drawing E2-1

1. Refer to “Lighting General Notes and add note 15 as follows:

“Support all grid-mounted fixtures from metal deck. Metal deck is approximately 20’-0” above finishedfloor.”

2. Refer to Room 128:

a. Provide three (3) “B1” pot lights within room 128. Pot lights to be spaced 5’-6” on center from eachother. The center point of the northern most light shall be located 2’-6” from north wall. Center point oflights shall be located 1’-0” east of gridline 6. Lights shall be circuited to D:87.

Page 3: KidsAbility – Guelph Hub Renovation ADDENDUM #2 …crdconstruction.on.ca/wp-content/uploads/2017/12/Addendum-2-002.pdf · KidsAbility – Guelph Hub Renovation ADDENDUM ... Provide

KidsAbility – Guelph Hub Renovation ADDENDUM #2 Project No.: 2017-0342-10

December 14, 2017 Page 3 of 4 T 519.576.2150 F 519.576.5499

b. Provide manual light switch in accessible location within room 128. Switch will control all lighting

within room 128. Switch shall be configured to control scheme “b”.

3. Refer to room 129 and add additional C1 fixture to circuit D:89. Fixture shall be located 8’-0” west of northern occupancy sensor.

4. Refer to ADE-2 and provide E1 remote head as shown on ADE-2. Circuit to EBB5.

5. Refer to room 135A and provide E1 remote head mounted on north wall. Circuit to EBB2.

6. Refer to ADE-3: a. Provide two (2) type “X1” exit lights on room 134 exit doors as shown on ADE-3. b. Provide one (1) type “E1” emergency light in room 134 as shown on ADE-3.

7. Revise all C1 fixtures in the following rooms to F1:

a. 103, 106, 107, 110, 118, 120, 122, 123, 129, 139,140, 141, 142, 143, 144, 145 8. Delete B1 fixtures and associated light switch from the following rooms:

a. 116, 117 Drawing E2-2 1. Provide two (2) additional receptacles as shown on ADE-1. Circuit receptacles to D:34.

2. Provide one (1) additional data outlet as shown on ADE-1.

3. Refer to room 135:

a. Revise two (2) GFCI receptacles located on south wall to be non-GFCI receptacle. Exact location

shall be coordinated on site with owner.

4. Refer to room 135A: a. Provide ground bus bar behind door swing.

5. Refer to room 101:

a. Receptacles and telecommunications outlets on east side of room shall be installed in millwork.

6. Refer to room 113:

a. Junction box in room shall be located in ceiling space. Conduit to extend from junction box through

wall to beneath the floor. Drawing E3-1 1. Refer to detail 1:

Page 4: KidsAbility – Guelph Hub Renovation ADDENDUM #2 …crdconstruction.on.ca/wp-content/uploads/2017/12/Addendum-2-002.pdf · KidsAbility – Guelph Hub Renovation ADDENDUM ... Provide

KidsAbility – Guelph Hub Renovation ADDENDUM #2 Project No.: 2017-0342-10

December 14, 2017 Page 4 of 4 T 519.576.2150 F 519.576.5499

a. Clarification: For fuses indicated to be disconnected and removed, only fuses shall be removed while

existing disconnects shall remain.

2. Refer to detail 2: a. Revise single line diagram as per ADE-4 & ADE-5. b. Revise drawing note 1 to read: “Coordinate with Guelph Hydro for installation of new meter.

Contractor to provide meter cabinet in accordance with Guelph Hydro standards. Guelph Hydro to provide meter.”

c. Add drawing note 2 as follows: “Lighting branch wiring circuits run through Panel RP-D. Refer to

“LNCP” 8 Relay Panel Circuit Schedule for quantity and destination of circuits.” Drawing E3-2 1. Refer to the Light Fixture Schedule and replace type J1 with TCP, Flat Panel cat no. TCP-FP-2-U-ZD-36-

35K.

2. Refer to “Lighting Fixture Schedule” and revise Type E1 as follows:

“Refer to “Mounting Height” and revise to read: “If wall mounted, mount 8’-0” A.F.F. If shown to be ceiling mounted, suspend from ceiling with metal rods 8’-0” A.F.F.”

Drawing E3-3 1. Refer to Panel Schedule D and revise panel’s main breaker to be 400A breaker. 2. Refer to detail 2, room 115 and provide ground bus bar in northeast corner of room. 3. Refer to detail 7:

Clarification: Coordinate with Guelph Hydro for installation of new meter. Contractor to provide meter cabinet in accordance with Guelph Hydro standards. Guelph Hydro to provide meter.

END OF ADDENDUM

Attachment 00 43 33.26 ADE-1 ADE-2 ADE-3 ADE-4 ADE-5 Distribution Bidders Nancy Buchanan, KidsAbility Vikki Dupuis, KidsAbility Fei Wei, WalterFedy Elena Wiersma, WalterFedy Maria Melo, WalterFedy Sheri Thompson, WalterFedy Mike Snyder, WalterFedy

Page 5: KidsAbility – Guelph Hub Renovation ADDENDUM #2 …crdconstruction.on.ca/wp-content/uploads/2017/12/Addendum-2-002.pdf · KidsAbility – Guelph Hub Renovation ADDENDUM ... Provide

KidsAbility – Guelph Hub Renovation 00 43 33.26 ADD2 Project No.: 2017-0342-10 APPROVED MANUFACTURERS LIST – ELECTRICAL WALTERFEDY Page 1

1 General

1.1 The following information is submitted in conjunction with our firm bid to:

.1 WALTERFEDY

.2 __________________________________________________________________

(NAME OF GENERAL CONTRACTOR)

1.2 This list will be requested of the successful contractor within 24 hours of Bid Closing. (Email or fax is acceptable.)

1.3 This is a name type specification and the following applies:

.1 Material and equipment are specifically described and named in this specification for the purpose of establishing a minimum standard of materials, product quality and specific requirements to which each Trade must adhere.

.2 The price submitted for this contract shall be based on the use of materials and equipment as specified. If this Trade wishes to quote on materials and equipment other than that specified, the Trade may select from the Approved Manufacturer's List, shown below. The Trade may use this equipment in his bid but must submit the name of the manufacturer with his bid. Otherwise only the specified manufacturer's equipment will be accepted.

.3 All of the materials required for the performance of the work shall be new and the best of their respective kinds and a uniform pattern throughout the work.

.4 Any equipment substituted for the specified equipment must not exceed space requirements allocated on the drawings. Where equipment is substituted for that which is shown on the drawings, this Trade is to submit shop drawings showing revised layouts of equipment rooms, mechanical rooms, etc., for approval.

.5 Specified equipment or equipment listed by Model Number is usually used as a basis for design performance, physical arrangements, weights, shape, wiring, controls and starter requirements, etc. If any other alternate equipment is proposed, it is a requirement that all pertaining factors listed above are checked by this Trade, and allowance be made in his tender on a "Turn Key" basis. Furthermore, it is this Trade's responsibility to co-ordinate all above items prior to roughing in, in conjunction with other trades.

Division 26

Disconnect Switches, Eaton Lighting and power panels Siemens

Schneider Electric

Motor Controls, Relays, Contactors, etc. Allen-Bradley Siemens

Eaton Schneider Electric

Fuses Gould

Bussman

Page 6: KidsAbility – Guelph Hub Renovation ADDENDUM #2 …crdconstruction.on.ca/wp-content/uploads/2017/12/Addendum-2-002.pdf · KidsAbility – Guelph Hub Renovation ADDENDUM ... Provide

KidsAbility – Guelph Hub Renovation 00 43 33.26 ADD2 Project No.: 2017-0342-10 APPROVED MANUFACTURERS LIST – ELECTRICAL WALTERFEDY Page 2

Electric Heating Units and Controls Chromalox Ouellet Stelpro

Cable Tray Thomas & Betts

CER Pursley 2000

Service Poles Hubbell

Wiremold Emergi-Lite

Wiring Devices Hubbell

Pass and Seymour Leviton

Time Switches and Photo Electric Controls Tork

Paragon Intermatic

Lighting Controls Legrand/Watt Stopper

Leviton Sensor Switch/Accuity

Lutron Eaton

Philips Douglas

GE

LED Light Fixtures Lithonia Eaton Hubbell Philips

Emergency Lighting Fixtures and Battery Units Thomas & Betts Beghelli Stanpro

Exit Signs Thomas & Betts

Beghelli Stanpro

END OF SECTION

Page 7: KidsAbility – Guelph Hub Renovation ADDENDUM #2 …crdconstruction.on.ca/wp-content/uploads/2017/12/Addendum-2-002.pdf · KidsAbility – Guelph Hub Renovation ADDENDUM ... Provide

NA

675 Queen Street South, Suite 111, Kitchener, Ontario N2M 1A1

T: 519.576.2150 F: 519.576.5499 walter fedy.com

title:

project:

sheet no.:scale:

date:

job no.:

CAD file: E2-1_2017-0342-10

drawn by:

checked by:

Copyright © 2017 WalterFedy

KIDSABILITY GUELPH

HUB RENOVATION

ROOM 138 POWER &

SYSTEMS REVISIONS

(REFER TO DRAWING E2-2)

1/8"=1'-0"

2017.12.08

CM

2017-0342-10

ADE-1

Page 8: KidsAbility – Guelph Hub Renovation ADDENDUM #2 …crdconstruction.on.ca/wp-content/uploads/2017/12/Addendum-2-002.pdf · KidsAbility – Guelph Hub Renovation ADDENDUM ... Provide

D

C

675 Queen Street South, Suite 111, Kitchener, Ontario N2M 1A1

T: 519.576.2150 F: 519.576.5499 walter fedy.com

title:

project:

sheet no.:scale:

date:

job no.:

CAD file: E2-1_2017-0342-10

drawn by:

checked by:

Copyright © 2017 WalterFedy

KIDSABILITY GUELPH

HUB RENOVATION

EMERGENCY LIGHTING

REVISIONS

(REFER TO DRAWING E2-1)

1/8"=1'-0"

2017.12.11

CM

2017-0342-10

ADE-2

Page 9: KidsAbility – Guelph Hub Renovation ADDENDUM #2 …crdconstruction.on.ca/wp-content/uploads/2017/12/Addendum-2-002.pdf · KidsAbility – Guelph Hub Renovation ADDENDUM ... Provide

J

H

10

675 Queen Street South, Suite 111, Kitchener, Ontario N2M 1A1

T: 519.576.2150 F: 519.576.5499 walter fedy.com

title:

project:

sheet no.:scale:

date:

job no.:

CAD file: E2-1_2017-0342-10

drawn by:

checked by:

Copyright © 2017 WalterFedy

KIDSABILITY GUELPH

HUB RENOVATION

ROOM 134 EXIT

LIGHTING REVISIONS

(REFER TO DRAWING E2-1)

1/8"=1'-0"

2017.12.12

CM

2017-0342-10

ADE-3

Page 10: KidsAbility – Guelph Hub Renovation ADDENDUM #2 …crdconstruction.on.ca/wp-content/uploads/2017/12/Addendum-2-002.pdf · KidsAbility – Guelph Hub Renovation ADDENDUM ... Provide

FEEDER SCHEDULE

FEEDER SCHEDULE NOTES:

675 Queen Street South, Suite 111, Kitchener, Ontario N2M 1A1

T: 519.576.2150 F: 519.576.5499 walter fedy.com

title:

project:

sheet no.:scale:

date:

job no.:

CAD file: E2-1_2017-0342-10

drawn by:

checked by:

Copyright © 2017 WalterFedy

KIDSABILITY GUELPH

HUB RENOVATION

SINGLE LINE DIAGRAM

REVISIONS

(REFER TO DRAWING E3-1)

N.T.S.

2017.12.12

CM

2017-0342-10

ADE-4

Page 11: KidsAbility – Guelph Hub Renovation ADDENDUM #2 …crdconstruction.on.ca/wp-content/uploads/2017/12/Addendum-2-002.pdf · KidsAbility – Guelph Hub Renovation ADDENDUM ... Provide

675 Queen Street South, Suite 111, Kitchener, Ontario N2M 1A1

T: 519.576.2150 F: 519.576.5499 walterfedy.com

title:

project:

sheet no.:scale:

date:

job no.:

CAD file: E2-1_2017-0342-10

drawn by:

checked by:

Copyright © 2017 WalterFedy

KIDSABILITY GUELPH

HUB RENOVATION

SINGLE LINE DIAGRAM -

METER REVISIONS

(REFER TO DRAWING E3-1)

N.T.S.

2017.12.12

CM

2017-0342-10

ADE-5