KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Innovative recycled plastic based panels for...
-
Upload
erin-kelly -
Category
Documents
-
view
212 -
download
0
Transcript of KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Innovative recycled plastic based panels for...
KICK-OFF MEETING - Brindisi 21 July 2011
EcoPlasBrick
Innovative recycled plastic based panels for building field
WP3: PRODUCT DESIGN AND VALIDATIONWP3: PRODUCT DESIGN AND VALIDATION
ACA
KICK-OFF MEETING - Brindisi 21 July 2011
EcoPlasBrick
WP3: Product design and validation
Work Package DescriptionWork Package Description
1. Vertical solutions (ventilated façades, self-standing walls)
The main objective of the WP3 is the design of different solutions and applications of the panels as environmentally friendly construction components.
ACTIVITIES
2. Horizontal solutions (raised floors)
KICK-OFF MEETING - Brindisi 21 July 2011
EcoPlasBrick
• TASKS
3.1. Design of vertical solutions
3.2. Validation of vertical solutions
WP3: Product design and validation
Work package no: 3 Start date: MONTH 12 End date: MONTH 36
Work package title PRODUCT DESIGN AND VALIDATION
Partner Number 1 2 3 4 5 6
Partner Shortname CETMA TRE PANDORA MOTULAB ACCIONA ACA
Task ParticipationTechnicalsupport
3.13.2
3.13.3
3.23.4
3.33.43.5
Work Package DescriptionWork Package Description
TRE
ACCIONA
3.3. Design of horizontal solutions
3.4. Validation of horizontal solutions
3.5. Technical-commercial schedules
KICK-OFF MEETING - Brindisi 21 July 2011
EcoPlasBrick
WP3: Product design and validation
• Task 3.1 “Design of vertical solutions” • Task 3.3 “Design of horizontal solutions”
Tasks DescriptionTasks Description
Defining the optimal size of the panels for different applications
Optimization of panel properties
T 2.2 Product DesignT 3.1, T 3.3
Production of panelsT 3.2, T 3.4
Validation T 3.2, T 3.4
TREACCIONA
WP2 WP3
(TRE)
TREACCIONA
MOTULAB
KICK-OFF MEETING - Brindisi 21 July 2011
EcoPlasBrick
Tasks DescriptionTasks Description
WP3: Product design and validation
• Task 3.2 “Validation of vertical solutions” • Task 3.4 “Validation of horizontal solutions”
Testing the mechanical and thermal/fire properties of full scale elements
Mechanical PropertiesThermal and Fire properties
ValidationT 3.2, T 3.4
Manufacture and Test of full scale Elements
for different solutionsTREACCIONA
WP3 WP6
DisseminationActivities
(ACA)
KICK-OFF MEETING - Brindisi 21 July 2011
EcoPlasBrick
WP3: Product design and validation
Tasks DescriptionTasks Description
• Task 3.5 “Technical-commercial schedules”
Description of applications, technical data, environmental and economic aspects, etc.
Test resultsT 3.2, T 3.4
Technical-commercialSchedules
T 3.5
ACCIONA
WP3
(TRE, ACCIONA)
EnvironmentalCompatibility
analysis
WP4
(CETMA, TRE, MOTULAB)
KICK-OFF MEETING - Brindisi 21 July 2011
EcoPlasBrick
• Steps:
1.DesignDesign of the panels: optimal dimensions for different applications.
2.ProductionProduction of the panels.
3.ManufactureManufacture of full scale elements.
4.ValidationValidation: testing the mechanical and thermal/fire properties,
depending on the application.
5.EvaluationEvaluation of the results. Analysis of the advantages and
disadvantages of the different designs to select the best option for
each application.
6.DescriptionDescription of technical-commercial schedules for each product.
WP3: Product design and validation
MethodologyMethodology
KICK-OFF MEETING - Brindisi 21 July 2011
EcoPlasBrick
WP3 Product design and validation
TASK
2011 2012 2013 2014
III IV I II III IV I II III IV I II
TASK 3.1 D 3.1
TASK 3.2 D
3.2.1D
3.2.2
TASK 3.3 D 3.3
TASK 3.4 D
3.4.1 D
3.4.2
TASK 3.5 D 3.5
PlanningPlanning
DELIVERABLE DELIVERABLE NAMEDELIVERY
DATEPARTNERS INVOLVED
D 3.1 Design of vertical solutions Month 18 TRE
D 3.2.1D 3.2.2
Validation of vertical solutionsFull scale example of vertical solution for demonstration purposes
Month 30Month 36 TRE
D 3.3 Design of horizontal solutions Month 18 ACCIONA
D 3.4.1D 3.4.2
Validation of horizontal solutionsFull scale example of horizontal solution for demonstration purposes
Month 30Month 36 ACCIONA
D 3.5 Technical-commercial schedules Month 36 ACCIONA
KICK-OFF MEETING - Brindisi 21 July 2011
EcoPlasBrick
Innovative recycled plastic based panels for building field
WP3: PRODUCT DESIGN AND VALIDATIONWP3: PRODUCT DESIGN AND VALIDATION
ACA