Case Study: KFC Maintenance Brief: Ci Parnters has become the preffered supplier to KFC in the Western Cape for all types of maintenance logs. This includes replacing of LED’s, replacement of signage components damaged by vandalism or weather and repairing old wiring and lighting. Upgrading of shop signage is also within our scope of work. KFC Ceres Replacement of old cladding. Replaced flat logo with 3D illuminated letters KFC Hermanus Replacement of old, vandalised toilet signs to new spec ACM panel signage. After Before Before After

Transcript of KFC Maintenance Case Study - CI PartnersKFC Maintenance Case Study.cdr Author Private Created Date...

Page 1: KFC Maintenance Case Study - CI PartnersKFC Maintenance Case Study.cdr Author Private Created Date 3/9/2020 4:23:56 PM ...

Case Study: KFC Maintenance

Brief: Ci Parnters has become the preffered supplier to KFC in the Western Capefor all types of maintenance logs.This includes replacing of LED’s, replacement of signage components damaged byvandalism or weather and repairing old wiring and lighting. Upgrading of shopsignage is also within our scope of work.

KFC CeresReplacement of old cladding. Replaced flat logo with 3D illuminated letters

KFC HermanusReplacement of old, vandalised toilet signs to new spec ACM panel signage.

AfterBefore

Before After

Page 2: KFC Maintenance Case Study - CI PartnersKFC Maintenance Case Study.cdr Author Private Created Date 3/9/2020 4:23:56 PM ...

KFC PaarlReplacement of PVC print that was vandalised

AfterBefore

KFC PicketburgReplacement of faulty LED’s and power supply.

Before After