Keys to Asset Management Carl J. Larosche, PE...Email: [email protected] Phone: 512-257-4811...
Transcript of Keys to Asset Management Carl J. Larosche, PE...Email: [email protected] Phone: 512-257-4811...
![Page 1: Keys to Asset Management Carl J. Larosche, PE...Email: clarosche@wje.com Phone: 512-257-4811 (office) Address: 9511 N. Lake Creek Parkway Austin, Texas 78717 Questions…? Title PowerPoint](https://reader037.fdocuments.in/reader037/viewer/2022100506/6082c10cb2bc96750b3733e7/html5/thumbnails/1.jpg)
www.wje.com
SOLUTIONS FOR THE BUILT WORLD
Carl J. Larosche, PE
Assess & PrioritizeKeys to Asset Management
![Page 2: Keys to Asset Management Carl J. Larosche, PE...Email: clarosche@wje.com Phone: 512-257-4811 (office) Address: 9511 N. Lake Creek Parkway Austin, Texas 78717 Questions…? Title PowerPoint](https://reader037.fdocuments.in/reader037/viewer/2022100506/6082c10cb2bc96750b3733e7/html5/thumbnails/2.jpg)
▪ The Case for Asset Management
▪ Executive Decision-making
▪ Element-based Inspection
▪ Process & Procedure
▪ Asset Rating
Presentation Outline
![Page 3: Keys to Asset Management Carl J. Larosche, PE...Email: clarosche@wje.com Phone: 512-257-4811 (office) Address: 9511 N. Lake Creek Parkway Austin, Texas 78717 Questions…? Title PowerPoint](https://reader037.fdocuments.in/reader037/viewer/2022100506/6082c10cb2bc96750b3733e7/html5/thumbnails/3.jpg)
Port Facilities - Asset Management
![Page 4: Keys to Asset Management Carl J. Larosche, PE...Email: clarosche@wje.com Phone: 512-257-4811 (office) Address: 9511 N. Lake Creek Parkway Austin, Texas 78717 Questions…? Title PowerPoint](https://reader037.fdocuments.in/reader037/viewer/2022100506/6082c10cb2bc96750b3733e7/html5/thumbnails/4.jpg)
Structural Deterioration
Establish Priorities
Operational Impact
Environmental Impact
Return on Investment
Cost
Safety Hazards
![Page 5: Keys to Asset Management Carl J. Larosche, PE...Email: clarosche@wje.com Phone: 512-257-4811 (office) Address: 9511 N. Lake Creek Parkway Austin, Texas 78717 Questions…? Title PowerPoint](https://reader037.fdocuments.in/reader037/viewer/2022100506/6082c10cb2bc96750b3733e7/html5/thumbnails/5.jpg)
Overall Priority
Wharf/Structural Asset
Characteristics
Condition Assessment
Repair Recommendations
Cost & Revenue
Basis for Prioritization
![Page 6: Keys to Asset Management Carl J. Larosche, PE...Email: clarosche@wje.com Phone: 512-257-4811 (office) Address: 9511 N. Lake Creek Parkway Austin, Texas 78717 Questions…? Title PowerPoint](https://reader037.fdocuments.in/reader037/viewer/2022100506/6082c10cb2bc96750b3733e7/html5/thumbnails/6.jpg)
▪ Cost of Repair Program
▪ Maintain current loads?
▪ Upgrade to greater loads?
▪ Revenue
▪ Current
▪ Projected (no repairs)
▪ Projected (with repairs)
Cost & Revenue
![Page 7: Keys to Asset Management Carl J. Larosche, PE...Email: clarosche@wje.com Phone: 512-257-4811 (office) Address: 9511 N. Lake Creek Parkway Austin, Texas 78717 Questions…? Title PowerPoint](https://reader037.fdocuments.in/reader037/viewer/2022100506/6082c10cb2bc96750b3733e7/html5/thumbnails/7.jpg)
▪ Element-by-Element
▪ Current Condition
▪ Future Condition
▪ Years of Service Remaining
Condition Assessment
![Page 8: Keys to Asset Management Carl J. Larosche, PE...Email: clarosche@wje.com Phone: 512-257-4811 (office) Address: 9511 N. Lake Creek Parkway Austin, Texas 78717 Questions…? Title PowerPoint](https://reader037.fdocuments.in/reader037/viewer/2022100506/6082c10cb2bc96750b3733e7/html5/thumbnails/8.jpg)
▪ Dock Configuration
▪ Area
▪ Usage
▪ Load Rating
▪ Location on Site
▪ Channel
Wharf Characteristics
![Page 9: Keys to Asset Management Carl J. Larosche, PE...Email: clarosche@wje.com Phone: 512-257-4811 (office) Address: 9511 N. Lake Creek Parkway Austin, Texas 78717 Questions…? Title PowerPoint](https://reader037.fdocuments.in/reader037/viewer/2022100506/6082c10cb2bc96750b3733e7/html5/thumbnails/9.jpg)
▪ Objectives and Measure
▪ Performance Gap Identification
▪ Lifecycle Cost & Risk Management Analysis
▪ Financial Planning – Capital Budget
Asset Management Plan
![Page 10: Keys to Asset Management Carl J. Larosche, PE...Email: clarosche@wje.com Phone: 512-257-4811 (office) Address: 9511 N. Lake Creek Parkway Austin, Texas 78717 Questions…? Title PowerPoint](https://reader037.fdocuments.in/reader037/viewer/2022100506/6082c10cb2bc96750b3733e7/html5/thumbnails/10.jpg)
![Page 11: Keys to Asset Management Carl J. Larosche, PE...Email: clarosche@wje.com Phone: 512-257-4811 (office) Address: 9511 N. Lake Creek Parkway Austin, Texas 78717 Questions…? Title PowerPoint](https://reader037.fdocuments.in/reader037/viewer/2022100506/6082c10cb2bc96750b3733e7/html5/thumbnails/11.jpg)
▪ Database of Asset inspection and inventory
▪ Element-level Inspection
▪ Feeds into Component Level Data
▪ Rates Asset Performance
▪ Monitors Deterioration
▪ Maximizes Owner Benefits
▪ Minimizes Owner costs
Facility Inspection Program
![Page 12: Keys to Asset Management Carl J. Larosche, PE...Email: clarosche@wje.com Phone: 512-257-4811 (office) Address: 9511 N. Lake Creek Parkway Austin, Texas 78717 Questions…? Title PowerPoint](https://reader037.fdocuments.in/reader037/viewer/2022100506/6082c10cb2bc96750b3733e7/html5/thumbnails/12.jpg)
Hierarchy of Facility Terms - Elemental Based
Property or
Terminal Maritime Asset Component Element
• Consists of several
maritime assets
• e.g., Container
Terminal, Bulk Caro
Terminal,
Transportation Area
• Wharf
• Boat Dock
• Bulkhead
• Shoreline
• Consists of one or
more components
• Structural or non-
structural system
of elements
• Structural (e.g.,
superstructure,
bulkhead)
• Berthing system
• Shoreline
• Ancillary (e.g.,
crane rails, access
systems)
• Individual elements
that make up a
component
• Structural or non-
structural
• e.g., RC slab, RC
deck beam, steel
pile, timber pile,
cleat, bollard,
wearing surface
![Page 13: Keys to Asset Management Carl J. Larosche, PE...Email: clarosche@wje.com Phone: 512-257-4811 (office) Address: 9511 N. Lake Creek Parkway Austin, Texas 78717 Questions…? Title PowerPoint](https://reader037.fdocuments.in/reader037/viewer/2022100506/6082c10cb2bc96750b3733e7/html5/thumbnails/13.jpg)
Inspection Types
Type Sub-type Primary Objective
BaselineAbove water Inspection to establish the baseline (initial) asset inventory information,
element condition states, component ratings and asset condition for a new
asset or for an existing asset where no previous record exists.Underwater
RoutineAbove water Regularly-scheduled inspection to define asset condition, component ratings,
and element condition states at a point in time and to allow tracking of
conditions over time.Underwater
Special
Post-eventRapid inspection to assess overall condition following an extreme event such
as a hurricane, flood, or vessel impact.
In-Depth
In-Depth inspection to determine cause and/or significance of damage or
distress, to aid in determining a suitable repair approach, or to define
quantities necessary for repair purposes.
Due Diligence
Inspection to establish the general condition, asset value, or need for and
approximate cost of repairs, at times of change of ownership, lease, or for
insurance purposes.
Primary aspects
![Page 14: Keys to Asset Management Carl J. Larosche, PE...Email: clarosche@wje.com Phone: 512-257-4811 (office) Address: 9511 N. Lake Creek Parkway Austin, Texas 78717 Questions…? Title PowerPoint](https://reader037.fdocuments.in/reader037/viewer/2022100506/6082c10cb2bc96750b3733e7/html5/thumbnails/14.jpg)
Relationship Between Inspection TypesA
t s
pe
cif
ied
fre
qu
en
cy
*Immediate Actions: Respond to conditions that
may compromise facility operations or lead to loss
of life, property damage or environmental damage
Construction
In-depth Inspection
OutcomesNo
Action
More
info
needed
Repair/
Strengthen
Immediate
Action*
Baseline Inspection
Outcomes No Action
More
information
or repairs
needed
Immediate
Action*
Routine Inspection
Outcomes No Action
More
information or
repairs needed
Immediate
Action*
![Page 15: Keys to Asset Management Carl J. Larosche, PE...Email: clarosche@wje.com Phone: 512-257-4811 (office) Address: 9511 N. Lake Creek Parkway Austin, Texas 78717 Questions…? Title PowerPoint](https://reader037.fdocuments.in/reader037/viewer/2022100506/6082c10cb2bc96750b3733e7/html5/thumbnails/15.jpg)
Discussion – Inspection FrequencySource Max. Above
Water
Max.
Underwater
Comments
WJE 3 yrs 6 yrs
• Interval may be reduced or increased
depending on condition or use
• Specific guidance is not provided in
Manual
• Engineer recommends, PHA decides
Bridges
(FHWA BIRM)2 yrs 5 yrs
• Interval may be reduced or increased
depending on condition or use
• FHWA must approve increases
Waterfront
Structures
0.5 to 6 yrs
(ASCE 130)
0.5 to 6 yrs
(ASCE 101)
• Interval depends on previous condition
rating, material and environment
(see ASCE 130 Table 2-2)
![Page 16: Keys to Asset Management Carl J. Larosche, PE...Email: clarosche@wje.com Phone: 512-257-4811 (office) Address: 9511 N. Lake Creek Parkway Austin, Texas 78717 Questions…? Title PowerPoint](https://reader037.fdocuments.in/reader037/viewer/2022100506/6082c10cb2bc96750b3733e7/html5/thumbnails/16.jpg)
▪ Overall Asset Rating (AR) for Baseline, Routine, and Due Diligence Inspections
▪ Reflects overall adequacy and safety of the asset
▪ Based on ratings for structural and non-structural components
AR = SR + FR for all assets except shorelines
AR = 4 × FR for shoreline assets
0 ≤ AR ≤ 100
Overall Asset Condition Assessment
Entirely adequate and safeEntirely deficient
![Page 17: Keys to Asset Management Carl J. Larosche, PE...Email: clarosche@wje.com Phone: 512-257-4811 (office) Address: 9511 N. Lake Creek Parkway Austin, Texas 78717 Questions…? Title PowerPoint](https://reader037.fdocuments.in/reader037/viewer/2022100506/6082c10cb2bc96750b3733e7/html5/thumbnails/17.jpg)
Sample Calculations for 4 Hypothetical Assets
Components Component Ratings Deductions by Component
Group Type Dock1 Dock 5 Wharf 20 Dock 10 Dock1 Dock 5 Wharf 20 Dock 10
Structural Components
Superstructure 3 6 5 4 SP 13 0 3 6
Substructure 4 5 5 4 SB 8 4 4 8
Deck 4 5 3 4 DK 3 1 5 3
Bulkhead 5 5 4 2 BH 4 4 8 30
Non-Structural Components
Bearings NA NA NA NA BR 0 0 0 0
Joints 4 6 4 4 JN 2 0 2 2
Fender System 2 6 4 2 FS 13 0 3 13
Mooring System 5 6 5 5 MS 2 0 2 2
Shoreline Comp. NA NA NA NA SH 0 0 0 0
Ancillary Comp. 3 5 5 4 AC 3 1 1 1
Asset Rating 52 90 72 35SR = 47 66 55 28
Note: NA = component type not applicable to asset. FR = 5 24 17 7
![Page 18: Keys to Asset Management Carl J. Larosche, PE...Email: clarosche@wje.com Phone: 512-257-4811 (office) Address: 9511 N. Lake Creek Parkway Austin, Texas 78717 Questions…? Title PowerPoint](https://reader037.fdocuments.in/reader037/viewer/2022100506/6082c10cb2bc96750b3733e7/html5/thumbnails/18.jpg)
Example Dock 1
![Page 19: Keys to Asset Management Carl J. Larosche, PE...Email: clarosche@wje.com Phone: 512-257-4811 (office) Address: 9511 N. Lake Creek Parkway Austin, Texas 78717 Questions…? Title PowerPoint](https://reader037.fdocuments.in/reader037/viewer/2022100506/6082c10cb2bc96750b3733e7/html5/thumbnails/19.jpg)
Summary: Assess and Prioritize1. Establish Priorities for Asset
Management
2. Condition Assessment
✓ Concrete Inspection & Evaluation
✓ Predicting Service Life
3. Prioritize Based on Assessment Results
4. Use AR to develop long-time capital expenditures
![Page 20: Keys to Asset Management Carl J. Larosche, PE...Email: clarosche@wje.com Phone: 512-257-4811 (office) Address: 9511 N. Lake Creek Parkway Austin, Texas 78717 Questions…? Title PowerPoint](https://reader037.fdocuments.in/reader037/viewer/2022100506/6082c10cb2bc96750b3733e7/html5/thumbnails/20.jpg)
Carl J. “Chuck” Larosche, PE
Email: [email protected]
Phone: 512-257-4811 (office)
Address: 9511 N. Lake Creek Parkway
Austin, Texas 78717
Questions…?