Kevin Smith (BAE Systems) Brian Spedding (QinetiQ)
description
Transcript of Kevin Smith (BAE Systems) Brian Spedding (QinetiQ)
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
21 ISMOR:The Use of Objective Analysis for the Prioritisation of UK Equipment Plan Options for TST
Kevin Smith (BAE Systems)Brian Spedding (QinetiQ)
2
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
Presentation Structure
• Time Sensitive Targeting - the military task
• Analysis Challenge
• Assessment of Baseline military capability
• Assessment of Enhancement Options
• Critique of Approach
– strengths & weaknesses
– opportunities
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
Time-Sensitive Targeting:the Military Task
4
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
Time Sensitive Targets
Those targets requiring immediate response because they represent a
serious and imminent threat to friendly forces or are high payoff, fleeting targets
of opportunity
5
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
TST Categories
Imminent Threat
High pay-off
Limited window of vulnerability
Limited window of opportunity
Enemy Forces in transit
Aircraft refuelling/rearming
TBM in launch position
Surface-Air defences
TBM operations
“Terrorist in a Taxi”
Aircraft on the ground
Helicopter FOB
HQs/command centres
Early Warning sites
Leadership targets
Target at range/endurance limit
Timely intelligence
Operational environment (weather)
TST Examples
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
The Analysis Challenge
7
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
Analysis Challenge
• “What” do DECs need to do in order to make TST work?– assess likely performance of possible Kill Chains and impact of
potential enhancements
• Facilitate objective, analysis-based TST Decision Conference– Analytic definition of TST
– Evaluation of UK baseline capability
– Enhancement Options many and varied (aircraft sensors, C2 support tools, new comms bearers .... etc)
– Assess impact of these Options in a consistent way
• Within resource & timescale constraints
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
Assessment of Baseline Military Capability
9
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
Baseline Capability Assessment- Overview of approach“Operational Analysis in a Systems Engineering framework”
Operational Requirement
System Definition
Evaluate System against Requirement
attack the target, in its environment, under constraints
end-to-end kill chain, comprising equipment and military process,
implemented as a functional chain
sensitivity analysis
day/night
threat (S-A & A-A)
tgt mobility
weatherCCD
urban environment
10
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
Kill Chain Elements
C2 nodes
shooters
sensors
11
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
Kill Chain Examples
Shallow Targets
– IPB: Nimrod R > ASTOR > Fast Jet
– IPB: Land EW > WatchKeeper > MLRS
– IPB: Formation recce > Attack Helicopter
Deep Targets
– IPB: Surveillance UAV > Fast Jets
– IPB: Overhead > RAPTOR > Fast Jet
– IPB: Special Forces > Fast Jet
12
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
Level 1
Level 2Simple probability Analysis
Level 3Constructive Simulation
Level 4Synthetic Environments (NITEworks)
Level 5Trials / Warfighting Experiments
Kill Chain Evaluation - Analysis Levels
Level 1 - Preparation of a ‘capability map’ (traffic light analysis) using existing information
- basic performance data- SME opinion
Metrics: - Kill Chain element compliance - overall Kill Chain compliance - overall Kill Chain timeliness
Level 1
Full Compliance
Non-Compliance
Uncertain ComplianceFurther Analysis Required
13
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
Search/Detect
Locate
Identify
Assess
Decide
Plan/Re-Plan
Effect/Deny
BDI
Kill Chain Functions
Transit
Disseminate
Acquire
14
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
Search/Detect
Locate
Identify
Assess
Decide
Plan/Re-Plan
Effect/Deny
BDA
Assess
Search/Detect
Locate
Decide
Plan/Re-Plan
Assess AssessSearch/Detect
Locate
Identify
Nimrod-R Aircraft
Nimrod-R Gnd Stat
JFACHQ-JAOC-Intell
ASTOR Gnd Stat
ASTOR Aircraft
JFACHQ-JAOC- Combat Plans/Operations
Tornado GR4
Search/Detect
Acquire
Identify
Assess
Decide
Plan/Re-Plan
Effect/Deny
BDI
Assess
Search/Detect
Locate
Decide
Plan/Re-Plan
Assess AssessSearch/Detect
Locate
Identify
Example Kill Chain - Simplified
Initial TargetDetection
Exploitation, tasking ofadditional information
Target Confirmation
Decision to attack;retasking of GR4
Attack sequence
Initial assessment of attack effectiveness
PossibleCommunication
15
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
Detailed Kill Chain Definition
SENDING ACTIVITY INFORMATION EXCHANGE RECIEVING ACTIVITYSearch and Detect(NR) Sigint Assess (NR)IPB Charts & Maps (MC&G) Assess (NR)IPB Weather Forecast Assess (NR)IPB Background Environment (luminescence, sun angles, IR clutter, etc.) Assess (NR)IPB Current Intel on Changes in Threat Tactics, Systems & Weapon Performance Assess (NR)IPB Threat Position/Type Assess (NR)Background Unit Readiness Information Assess (NR)IPB Threat Weapon System Capabilities Assess (NR)Identify NR Sigint Assess ACC-A2BDI - GR4 Bomb Damage Assessment (BDA) / Bomb Damage Indication (BDI) Information Assess ACC-A2Assess Astor Bomb Damage Assessment (BDA) / Bomb Damage Indication (BDI) Information Assess ACC-A2BDI NR Bomb Damage Assessment (BDA) / Bomb Damage Indication (BDI) Information Assess ACC-A2IPB Charts & Maps (MC&G) Assess ACC-A2IPB Weather Forecast Assess ACC-A2IPB Background Environment (luminescence, sun angles, IR clutter, etc.) Assess ACC-A2
Functional Definition
IERs - Kill Chain Delivered and Others External to Kill Chain
Decide (DIV HQ)
Locate (S/sayer)
Assess (DIV HQ)
Search & Detect
(S/sayer)
Plan/Re-plan
(DIV HQ)
Plan/Re-plan
(JFACC)
Plan/Re-plan
(WKGS)
Transit (WK)
Soothsayer DIV HQ JFACC WKGS WK
Identify/ Acquire (WK)
Assess (WKGS)
Assess (DIV HQ)
Decide (DIV HQ)
Plan/Re-plan
(MLRS Regt CP)
MLRS Bty
MLRS Regt CP
Effect/ Deny
(MLRS Bty)
BDI (WK)
Assess (WKGS)
Assess (DIV HQ)
Decide (MLRS
Regt CP)
Decide (DIV HQ)
Decide (DIV HQ)
Locate (S/sayer)Locate
(S/sayer)
Assess (DIV HQ)
Assess (DIV HQ)
Search & Detect
(S/sayer)
Search & Detect
(S/sayer)
Plan/Re-plan
(DIV HQ)
Plan/Re-plan
(DIV HQ)
Plan/Re-plan
(JFACC)
Plan/Re-plan
(JFACC)
Plan/Re-plan
(WKGS)
Plan/Re-plan
(WKGS)
Transit (WK)Transit (WK)
SoothsayerSoothsayer DIV HQDIV HQ JFACCJFACC WKGSWKGS WKWK
Identify/ Acquire (WK)
Identify/ Acquire (WK)
Assess (WKGS)Assess
(WKGS)
Assess (DIV HQ)
Assess (DIV HQ)
Decide (DIV HQ)
Decide (DIV HQ)
Plan/Re-plan
(MLRS Regt CP)
Plan/Re-plan
(MLRS Regt CP)
MLRS Bty
MLRS Bty
MLRS Regt CP
MLRS Regt CP
Effect/ Deny
(MLRS Bty)
Effect/ Deny
(MLRS Bty)
BDI (WK)BDI
(WK)
Assess (WKGS)Assess
(WKGS)
Assess (DIV HQ)
Assess (DIV HQ)
Decide (MLRS
Regt CP)
Decide (MLRS
Regt CP)
20
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
Nodal PerformanceAnalysis
Time
Nodal ResourceAnalysis
TimeIdentify
Assess
DIV HQNimrodR
IPB
How long does it take for the KC to complete?
Overall Kill Chain time analysis including identification of critical path
T1
T2
T3
T4
Time for this part of the KC = T1+T2+Fn(T3,T4)
Information
Solution Analysis•KC delivered IER Analysis•IPB/Background delivered IER Analysis•IER Time Analysis
Kill Chain Analysis – Integration
21
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
Search/Detect
Locate
Identify
Assess
Decide
Plan/Re-Plan
Effect/Deny
BDA
Assess
Search/Detect
Locate
Decide
Plan/Re-Plan
Assess AssessSearch/Detect
Locate
Identify
Nimrod-R Aircraft
Nimrod-R Gnd Stat
JFACHQ-JAOC-Intell
ASTOR Gnd Stat
ASTOR Aircraft
JFACHQ-JAOC- Combat Plans/Operations
Tornado GR4
Search/Detect
Locate
Identify
Assess
Decide
Plan/Re-Plan
Effect/Deny
BDI
Assess
Search/Detect
Locate
Decide
Plan/Re-Plan
Assess AssessSearch/Detect
Locate
Identify
Example KC Assessment
What do we need to do to make this part
work?
What do we need to do to make this part
work?
What do we need to do to make this part
work?PossibleCommunication
22
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
Baseline Analysis outputs - by KC, by tgt
KC 1 Functional Time (%) Analysis - Use Case 1
Search and Detect
Locate
Identify
Disseminate
Assess
Decide
Plan/Replan
Transit
Acquire
Effect
BDI
Comms
Time Budgets & delays
Insight for ‘processre-engineering’
Functional deficiencies1
Search/Detect
Locate
Identify
Assess
Decide
Plan/Re-Plan
Effect/Deny
BDA
Assess
Search/Detect
Locate
Decide
Plan/Re-Plan
Assess AssessSearch/Detect
Locate
Identify
Nimrod-RAircraft
Nimrod-RGnd Stat
JFACHQ-JAOC-Intell
ASTORGnd Stat
ASTORAircraft
JFACHQ-JAOC-CombatPlans/Operations
TornadoGR4
Search/Detect
Locate
Identify
Assess
Decide
Plan/Re-Plan
Effect/Deny
BDI
Assess
Search/Detect
Locate
Decide
Plan/Re-Plan
Assess AssessSearch/Detect
Locate
Identify
PossibleCommunication
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
Assessment of Enhancement Options
24
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
KC 5 - Vignette 1 Kill Chain B Version 1.4 UC00001 - Updated 03 June 2003.
16 AAB HQISTAR Co-ord
CellLCC HQ (US)
Notes/Comments
Green Text Timing - tbd. TST Processes - V1 KC B
Creator: M Ballone /P Wainwright
Based on: Range of data:
Created: 05/06/03, 10:37:43
QINETIQ Malv ern
Purpose of report:
UK RESTRICTED
CONCEPTUAL PROCESS MODEL - 2006/8
DIV HQG3 Ops
Div Recce (UK) AH TGAvn Regt HQ
Note: For this KC many of the processes are shared betweenG2/ISTAR, G3 Ops and other cells/groups within the Div HQ.The distinction shown is only intended to ref lect who is likelyto lead the activ ity .
Search and Detect
Locate
Identif y
Disseminate(Create Tgt
Report)Assess
Assess (TST, CollatoralDamage, AGM, DALO)
Decide (Re-task StrikeAsset)
Plan / Replan (Deconf liction)
Decide (Finalise Plan)
Disseminate Plan Decide (Strike Mission)
Disseminate Taskingto AH TG
Plan / Replan (MissionRouting)
Decide (FinaliseMission)
Transit to Target
Acquire
Ef f ect
BDI
Disseminate
DisseminateTarget Updates
BDI
Disseminate
KC 5 - Vignette 1 Kill Chain B Version 1.4 UC00001 - Updated 03 June 2003.
16 AAB HQISTAR Co-ord
CellLCC HQ (US)
Notes/Comments
Green Text Timing - tbd. TST Processes - V1 KC B
Creator: M Ballone /P Wainwright
Based on: Range of data:
Created: 05/06/03, 10:37:43
QINETIQ Malv ern
Purpose of report:
UK RESTRICTED
CONCEPTUAL PROCESS MODEL - 2006/8
DIV HQG3 Ops
Div Recce (UK) AH TGAvn Regt HQ
Note: For this KC many of the processes are shared betweenG2/ISTAR, G3 Ops and other cells/groups within the Div HQ.The distinction shown is only intended to ref lect who is likelyto lead the activ ity .
Search and Detect
Locate
Identif y
Disseminate(Create Tgt
Report)Assess
Assess (TST, CollatoralDamage, AGM, DALO)
Decide (Re-task StrikeAsset)
Plan / Replan (Deconf liction)
Decide (Finalise Plan)
Disseminate Plan Decide (Strike Mission)
Disseminate Taskingto AH TG
Plan / Replan (MissionRouting)
Decide (FinaliseMission)
Transit to Target
Acquire
Ef f ect
BDI
Disseminate
DisseminateTarget Updates
BDI
Disseminate
KC 5 - Vignette 1 Kill Chain B Version 1.4 UC00001 - Updated 03 June 2003.
16 AAB HQISTAR Co-ord
CellLCC HQ (US)
Notes/Comments
Green Text Timing - tbd. TST Processes - V1 KC B
Creator: M Ballone /P Wainwright
Based on: Range of data:
Created: 05/06/03, 10:37:43
QINETIQ Malv ern
Purpose of report:
UK RESTRICTED
CONCEPTUAL PROCESS MODEL - 2006/8
DIV HQG3 Ops
Div Recce (UK) AH TGAvn Regt HQ
Note: For this KC many of the processes are shared betweenG2/ISTAR, G3 Ops and other cells/groups within the Div HQ.The distinction shown is only intended to ref lect who is likelyto lead the activ ity .
Search and Detect
Locate
Identif y
Disseminate(Create Tgt
Report)Assess
Assess (TST, CollatoralDamage, AGM, DALO)
Decide (Re-task StrikeAsset)
Plan / Replan (Deconf liction)
Decide (Finalise Plan)
Disseminate Plan Decide (Strike Mission)
Disseminate Taskingto AH TG
Plan / Replan (MissionRouting)
Decide (FinaliseMission)
Transit to Target
Acquire
Ef f ect
BDI
Disseminate
DisseminateTarget Updates
BDI
Disseminate
Analysis of Enhancement Options Embedded Option in appropriate node in relevant KCs
e.g. new effector sensor
Consider Savings Measures also - buy back
Re-evaluate node or link, and IER - compliance - time
Determine effect on overall Kill Chain
25
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
KC 5 - Vignette 1 Kill Chain B Version 1.4 UC00001 - Updated 03 June 2003.
16 AAB HQISTAR Co-ord
CellLCC HQ (US)
Notes/Comments
Green Text Timing - tbd. TST Processes - V1 KC B
Creator: M Ballone /P Wainwright
Based on: Range of data:
Created: 05/06/03, 10:37:43
QINETIQ Malv ern
Purpose of report:
UK RESTRICTED
CONCEPTUAL PROCESS MODEL - 2006/8
DIV HQG3 Ops
Div Recce (UK) AH TGAvn Regt HQ
Note: For this KC many of the processes are shared betweenG2/ISTAR, G3 Ops and other cells/groups within the Div HQ.The distinction shown is only intended to ref lect who is likelyto lead the activ ity .
Search and Detect
Locate
Identif y
Disseminate(Create Tgt
Report)Assess
Assess (TST, CollatoralDamage, AGM, DALO)
Decide (Re-task StrikeAsset)
Plan / Replan (Deconf liction)
Decide (Finalise Plan)
Disseminate Plan Decide (Strike Mission)
Disseminate Taskingto AH TG
Plan / Replan (MissionRouting)
Decide (FinaliseMission)
Transit to Target
Acquire
Ef f ect
BDI
Disseminate
DisseminateTarget Updates
BDI
Disseminate
plus Option “X”
KC 5 - Vignette 1 Kill Chain B Version 1.4 UC00001 - Updated 03 June 2003.
16 AAB HQISTAR Co-ord
CellLCC HQ (US)
Notes/Comments
Green Text Timing - tbd. TST Processes - V1 KC B
Creator: M Ballone /P Wainwright
Based on: Range of data:
Created: 05/06/03, 10:37:43
QINETIQ Malv ern
Purpose of report:
UK RESTRICTED
CONCEPTUAL PROCESS MODEL - 2006/8
DIV HQG3 Ops
Div Recce (UK) AH TGAvn Regt HQ
Note: For this KC many of the processes are shared betweenG2/ISTAR, G3 Ops and other cells/groups within the Div HQ.The distinction shown is only intended to ref lect who is likelyto lead the activ ity .
Search and Detect
Locate
Identif y
Disseminate(Create Tgt
Report)Assess
Assess (TST, CollatoralDamage, AGM, DALO)
Decide (Re-task StrikeAsset)
Plan / Replan (Deconf liction)
Decide (Finalise Plan)
Disseminate Plan Decide (Strike Mission)
Disseminate Taskingto AH TG
Plan / Replan (MissionRouting)
Decide (FinaliseMission)
Transit to Target
Acquire
Ef f ect
BDI
Disseminate
DisseminateTarget Updates
BDI
Disseminate
Baseline
plus Option “Y”
KC 5 - Vignette 1 Kill Chain B Version 1.4 UC00001 - Updated 03 June 2003.
16 AAB HQISTAR Co-ord
CellLCC HQ (US)
Notes/Comments
Green Text Timing - tbd. TST Processes - V1 KC B
Creator: M Ballone /P Wainwright
Based on: Range of data:
Created: 05/06/03, 10:37:43
QINETIQ Malv ern
Purpose of report:
UK RESTRICTED
CONCEPTUAL PROCESS MODEL - 2006/8
DIV HQG3 Ops
Div Recce (UK) AH TGAvn Regt HQ
Note: For this KC many of the processes are shared betweenG2/ISTAR, G3 Ops and other cells/groups within the Div HQ.The distinction shown is only intended to ref lect who is likelyto lead the activ ity .
Search and Detect
Locate
Identif y
Disseminate(Create Tgt
Report)Assess
Assess (TST, CollatoralDamage, AGM, DALO)
Decide (Re-task StrikeAsset)
Plan / Replan (Deconf liction)
Decide (Finalise Plan)
Disseminate Plan Decide (Strike Mission)
Disseminate Taskingto AH TG
Plan / Replan (MissionRouting)
Decide (FinaliseMission)
Transit to Target
Acquire
Ef f ect
BDI
Disseminate
DisseminateTarget Updates
BDI
Disseminate
some within KC
improvementsSECONDARY
Effect on Overall Kill Chain
PRIORITY
KC now feasible,
leading to more
engagement opportunities
KC 5 - Vignette 1 Kill Chain B Version 1.4 UC00001 - Updated 03 June 2003.
16 AAB HQISTAR Co-ord
CellLCC HQ (US)
Notes/Comments
Green Text Timing - tbd. TST Processes - V1 KC B
Creator: M Ballone /P Wainwright
Based on: Range of data:
Created: 05/06/03, 10:37:43
QINETIQ Malv ern
Purpose of report:
UK RESTRICTED
CONCEPTUAL PROCESS MODEL - 2006/8
DIV HQG3 Ops
Div Recce (UK) AH TGAvn Regt HQ
Note: For this KC many of the processes are shared betweenG2/ISTAR, G3 Ops and other cells/groups within the Div HQ.The distinction shown is only intended to ref lect who is likelyto lead the activ ity .
Search and Detect
Locate
Identif y
Disseminate(Create Tgt
Report)Assess
Assess (TST, CollatoralDamage, AGM, DALO)
Decide (Re-task StrikeAsset)
Plan / Replan (Deconf liction)
Decide (Finalise Plan)
Disseminate Plan Decide (Strike Mission)
Disseminate Taskingto AH TG
Plan / Replan (MissionRouting)
Decide (FinaliseMission)
Transit to Target
Acquire
Ef f ect
BDI
Disseminate
DisseminateTarget Updates
BDI
Disseminate
Baseline
26
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
Brigading Options - Synergy
Baseline Kill Chain Capability
KC 5 - Vignette 1 Kill Chain B Version 1.4 UC00001 - Updated 03 June 2003.
16 AAB HQISTAR Co-ord
CellLCC HQ (US)
Notes/Comments
Green Text Timing - tbd. TST Processes - V1 KC B
Creator: M Ballone /P Wainwright
Based on: Range of data:
Created: 05/06/03, 10:37:43
QINETIQ Malv ern
Purpose of report:
UK RESTRICTED
CONCEPTUAL PROCESS MODEL - 2006/8
DIV HQG3 Ops
Div Recce (UK) AH TGAvn Regt HQ
Note: For this KC many of the processes are shared betweenG2/ISTAR, G3 Ops and other cells/groups within the Div HQ.The distinction shown is only intended to ref lect who is likelyto lead the activ ity .
Search and Detect
Locate
Identif y
Disseminate(Create Tgt
Report)Assess
Assess (TST, CollatoralDamage, AGM, DALO)
Decide (Re-task StrikeAsset)
Plan / Replan (Deconf liction)
Decide (Finalise Plan)
Disseminate Plan Decide (Strike Mission)
Disseminate Taskingto AH TG
Plan / Replan (MissionRouting)
Decide (FinaliseMission)
Transit to Target
Acquire
Ef f ect
BDI
Disseminate
DisseminateTarget Updates
BDI
Disseminate
Brigaded Option
(A+B+C) KC 5 - Vignette 1 Kill Chain B Version 1.4 UC00001 - Updated 03 June 2003.
16 AAB HQISTAR Co-ordCellLCC HQ (US)
Notes/Comments
Green Text Timing - tbd. TST Processes - V1 KC B
Creator: M Ballone /P Wainwright
Based on: Range of data:
Created: 05/06/03 , 10:37:43
QINETIQ Malvern
Purpose of report:
UK RESTRICTED
CONCEPTUAL PROCESS MODEL - 2006/8
DIV HQG3 OpsDiv Recce (UK) AH TGAvn Regt HQ
Note: For this KC many of the processes are shared betweenG2/ISTAR, G3 Ops and other cells/groups within the Div HQ.The distinction shown is only intended to reflect who is likely
to lead the activity.Search and Detect
Locate
Identify
Disseminate(Create Tgt
Report)Assess
Assess (TST, CollateralDamage, AGM, DALO)
Decide (Re-task StrikeAsset)
Plan / Replan (Deconfliction)
Decide (Finalise Plan)
Disseminate Plan Decide (Strike Mission)
Disseminate Taskingto AH TG
Plan / Replan (MissionRouting)
Decide (FinaliseMission)
Transit to Target
Acquire
Effect
BDI
Disseminate
DisseminateTarget Updates
BDI
Disseminate
KC 5 - Vignette 1 Kill Chain B Version 1.4 UC00001 - Updated 03 June 2003.16 AAB HQISTAR Co-ord
CellLCC HQ (US)
Notes/Comments
Green Text Timing - tbd. TST Processes - V1 KC B
Creator: M Ballone /P Wainwright
Based on: Range of data:
Created: 05/06/03 10:37:43
QINETIQ Malvern
Purpose of report:
UK RESTRICTED
CONCEPTUAL PROCESS MODEL - 2006/8
DIV HQG3 Ops
Div Recce (UK) AH TGAvn Regt HQNote: For this KC many of the processes are shared betweenG2/ISTAR, G3 Ops and other cells/groups within the Div HQ.The distinction shown is only intended to reflect who is likely
to lead the activity.Search and Detect
Locate
Identify
Disseminate(Create Tgt
Report)Assess
Assess (TST, CollateralDamage, AGM, DALO)
Decide (Re-task StrikeAsset)
Plan / Replan (Deconfliction)
Decide (Finalise Plan)
Disseminate Plan Decide (Strike Mission)
Disseminate Taskingto AH TG
Plan / Replan (MissionRouting)
Decide (FinaliseMission)
Transit to Target
Acquire
Effect
BDI
Disseminate
DisseminateTarget Updates
BDI
Disseminate
+
Option BKC 5 - Vignette 1 Kill Chain B Version 1.4 UC00001 - Updated 03 June 2003.
16 AAB HQISTAR Co-ordCell
LCC HQ (US)
Notes/Comments
Green Text Timing - tbd. TST Processes - V1 KC B
Creator: M Ballone /P Wainwright
Based on: Range of data:
Created: 05/06/03 10:37:43
QINETIQ Malvern
Purpose of report:
UK RESTRICTED
CONCEPTUAL PROCESS MODEL - 2006/8
DIV HQG3 Ops
Div Recce (UK) AH TGAvn Regt HQNote: For this KC many of the processes are shared betweenG2/ISTAR, G3 Ops and other cells/groups within the Div HQ.The distinction shown is only intended to reflect who is likely
to lead the activity.Search and Detect
Locate
Identify
Disseminate(Create Tgt
Report)Assess
Assess (TST, CollateralDamage, AGM, DALO)
Decide (Re-task StrikeAsset)
Plan / Replan (Deconfliction)
Decide (Finalise Plan)
Disseminate Plan Decide (Strike Mission)
Disseminate Taskingto AH TG
Plan / Replan (MissionRouting)
Decide (FinaliseMission)
Transit to Target
Acquire
Effect
BDI
Disseminate
DisseminateTarget Updates
BDI
Disseminate
+
Option CKC 5 - Vignette 1 Kill Chain B Version 1.4 UC00001 - Updated 03 June 2003.
16 AAB HQISTAR Co-ord
CellLCC HQ (US)
Notes/Comments
Green Text Timing - tbd. TST Processes - V1 KC B
Creator: M Ballone /P Wainwright
Based on: Range of data:
Created: 05/06/03, 10:37:43
QINETIQ Malv ern
Purpose of report:
UK RESTRICTED
CONCEPTUAL PROCESS MODEL - 2006/8
DIV HQG3 Ops
Div Recce (UK) AH TGAvn Regt HQ
Note: For this KC many of the processes are shared betweenG2/ISTAR, G3 Ops and other cells/groups within the Div HQ.The distinction shown is only intended to ref lect who is likelyto lead the activ ity .
Search and Detect
Locate
Identif y
Disseminate(Create Tgt
Report)Assess
Assess (TST, CollatoralDamage, AGM, DALO)
Decide (Re-task StrikeAsset)
Plan / Replan (Deconf liction)
Decide (Finalise Plan)
Disseminate Plan Decide (Strike Mission)
Disseminate Taskingto AH TG
Plan / Replan (MissionRouting)
Decide (FinaliseMission)
Transit to Target
Acquire
Ef f ect
BDI
Disseminate
DisseminateTarget Updates
BDI
Disseminate
Option A
27
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
Interaction with the Decision Maker
Overall Rating
KC CapabilityΔT
Environment Threat level Target chars
Light Weather Environt Sensitivity
Mobility Depth Size
good cloud rain
weightings
weightings
For each option, or group of options:• score capability increments• Hi-Priority used to combine scores
Decision maker selects &manipulates weightings
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
Critique of the Approach
29
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
Strengths & Weaknesses of the Approach
STRENGTHS
• Highly transparent & traceable
• End-to-end assessment across multiple DECs
– Based on whole system-level analysis, not individual equipment
• Inherently scaleable - targets, Kill Chains, analysis fidelity
• Generates database of analytic results providing objective evidence
WEAKNESSES
• Limited to mission-level analysis of a single Kill Chain
• Limited to the functional Kill Chain boundary
– target detection to initial BDI assumed
– prior ISR operations equally important
30
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
Critique - Opportunities
• Though branded ’TST’ this approach is equally applicable to other missions / targets– flexibility of capability chain methodology
• ‘Simple’ analysis highly valuable to focus detailed analysis & SE experimentation– e.g. NITEworks Kill Chain experiments
• Effective input into multi-mission and campaign analyses– multi-mission addressing resource conflicts with parallel Kill
Chains
– selection of effective Kill Chains at campaign level
UK Unclassified
UK Unclassified
© QinetiQ and BAE Systems 2004
Any questions?Kevin [email protected]
Brian [email protected]
QinetiQ/KI/CIS/Pub042262