June 2009Investor Presentation
Rob Solinger, VP Finance & CFOBill Manley, VP Engineering & Operations
![Page 2: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/2.jpg)
2
Ironhorse’s Advantages
![Page 3: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/3.jpg)
3
Corporate Overview
Listing TSX-Venture: IOG
Shares outstanding22 million basic
24 million fully diluted
Management ownership25% basic
30% fully diluted
Market capitalization $20 million
Net debt – April 30, 2009 $11 million
![Page 4: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/4.jpg)
4
Production
1,200 boe/d current
production
<$26,000 per boe/d enterprise
value
![Page 5: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/5.jpg)
5
Management andSenior Technical Team
Name Title Relevant Experience
Larry Parks President & CEO 33 years
Rob Solinger VP Finance & CFO 25 years
Bill Manley VP Engineering & Operations 30 years
Al Williams VP Exploration 30 years
Cam Weston VP Land 35 years
Jim Wilson VP & Corporate Secretary 30 years
Jack Green Manager Production 35 years
Wayne Beatty Manager, Reserves & Special Projects 30 years
Glenn Parrott Senior Geologist 25 years
Ian Baker Senior Geophysicist 35 years
![Page 6: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/6.jpg)
6
Ironhorse’s Strategy
Growth
![Page 7: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/7.jpg)
7
1.111.9
48.7
32.1
2005 2006 2007 2008
941
316
608
2,058
2,1721,905
69
10
2005 2006 2007 2008
4,230
2,513
1,257
79
Management estimates Pembina oil discovery may increase reserves up to 25% and NPV before tax discounted @ 10% by > $20 million
Gross Reserves(mboe)
Net Present Value before tax @ 10%($ million)
Reserves and Asset Value Growth Per GLJ Petroleum Consultants
Probable
Proved
![Page 8: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/8.jpg)
8
2008 Highlights
100% drilling success
• 31 (15 net) new gas wells on production in Shackleton area
• 61% increase in average production to 1,079 boe/d (93% natural gas weighted)
• Reserves additions of 2,109 mboe from infill drilling and upward technical revisions, net of production
• 68% increase in total proved plus probable reserves,net of production, for 2008
• Finding and development costs, including changes in future capital, of $11.75 per boe proved plus probable
![Page 9: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/9.jpg)
9
Q1 2009 Drilling Highlights
Prolific Nisku oil discovery
• CAPEX Q1/09 $6 million
• Drilled two (0.4 net) Nisku oil wells in the Pembina area, estimated to increase reserves by up to 1 million boe
• Drilled 32 (16 net) natural gas wells in Shackleton, which converted 0.8 million boes from Proved Undeveloped to Proved Producing reserves status as at March 31, 2009
• F&D including future capital in Q1 2009 estimated at $10 per boe
![Page 10: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/10.jpg)
10
100
200
8
68
37
2006 2007 2008 2009 Infill
Sustained Production Growth
• Currently producing 1,200 boe per day, Pembina may increase production by 600 to 800 boe per day
• 2P reserve life index of 10 years
Gross wells on production - Shackleton IOG working interest production - boe/d
![Page 11: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/11.jpg)
11
1.13.5
6.4
8.0
2006 2007 2008 2009 F
0.06
0.29
0.39
0.18
2006 2007 2008 2009 F
Operating costs for 2009 forecast at less than $2.75 per boeAssumes average production of 1,150 boe/d, gas price of $5 per mcf and oil price of $60Cdn per bbl
Cash Flow ($ Millions)
Cash Flow($ per Share)
Cash Flow
![Page 12: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/12.jpg)
12
Solid Asset Base with Significant Upside
$2.06
NAV per share at December 31, 2008
discounted at 10% before tax using GLJ reserve
report is $2.06
$1.00Pembina could add up to $1.00 to NAV per share
![Page 13: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/13.jpg)
13
Three Focus Areas
Resource gas play
High impact prolific oil
Multizone potential
![Page 14: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/14.jpg)
14
Shackleton, Saskatchewan25 Sections in the heart of the Milk River gas play
• 50% working interest in 25 sections
• 100 (50 net) producing gas wells producing 16 (8 net) Mmcf per day
• Own and operate all infrastructure keeps operating costs below $0.45 per mcf
T21 R20 R19 W3
T22
Gas Plant Capacity: 20 Mmcf/d
Company Leased Lands
Wells Drilled
Completed Pipeline
![Page 15: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/15.jpg)
15
Shackleton, Saskatchewan Evaluating 100 potential infill locations
Ironhorse Leased Land
Husky Land
Enerplus Land • Currently one gas well per quarter section
• Offsetting lands down spaced to two or more wells per quarter section
• Can drill up to 100 infill wells to maximize utilization of existing facilities
![Page 16: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/16.jpg)
16
Pembina, AlbertaProlific Nisku oil wells
Ironhorse Nisku oil discoveries at9-5 and 14-5-50-6W5
analogous to 13-2-50-6 W6
West Energy Nisku Oil Well13-2-50-6 W6
20 m. pay>2,800 boe/d (Jan/09)
> 1 million bbls of oil to date
6” gas line
6” oil line
4” oil line
Inner Bank Margin
• 18.75% working interest
• Cost to tie-in and implement water flood $12 ($2.5 net) mm
• Initial restricted flow rates from two wells 800 - 1,000 (net 180) boe/d
• Unrestricted flow rates 3,000 – 5,000 (800 net) boe/d
• Oil in place estimated by management at >11 million bbls; recoverable oil with water flood 5 – 6 (1 net) million bbls
• Unrisked NPV @ 10% assuming WTI $50/bbl is $115 ($22 net) mm
Company Leased Lands
![Page 17: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/17.jpg)
17
Northeast British ColumbiaMultizone gas potential
• 50% working interest in four sections of land
• Identified drilling locations with multizone potential on a regional structure including potential resource play
• Targeting initial production rates of 1.5 mmcf/day and reserves of 1.5 to 2.0 Bcf/well for multizone wells
• Expect to drill first well late 2009
• Gross cost to drill and complete estimated at $1.5 MM
• Upside potential for resource plays could add significant additional reserves to Ironhorse
Baldonnel and Halfway
Charlie Lake Trend
Structural TrendBluesky, Gething, Baldonnel,
Charlie Lake, Halfway & Montney
Baldonnel and Halfway Trend
Company Leased Lands
![Page 18: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/18.jpg)
18
Shaunavon, SaskatchewanHorizontal oil
• 50 % working interest in two sections
• Close proximity to three new discoveries
• Estimated initial production rates from horizontal wells 100 bopd
• Recoverable reserves of 200,000 bbls per well
• Up to 4 wells per section
![Page 19: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/19.jpg)
19
Low Cost StructureCreates Superior Recycle Ratio
Field Netback for Q1 2009
Oil equivalent($ per boe)
Natural gas($ per mcf)
Sales price $31.14 $5.19
Royalties 8.38 1.40
Operating costs 2.82 0.47
Field Netback $19.94 $3.32
2P - F&D cost $10.00 $1.67
Recycle Ratio 2 times
![Page 20: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/20.jpg)
20
Taking Advantage of the Down Cycle
$10 million capital program
• Shackleton and Pembina drilling program in Q1 2009 has been completed under budget
• $14.5 million existing credit facility
– Will be positively impacted by recent drilling successes
– $11 million net debt at April 30/09 leaving $3.5 million for flexible growth options
![Page 21: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/21.jpg)
21
Full Cycle Exploration & Development
• Experience and track record to increase shareholder value
• Significant seismic database to exploit
• Actively generating prospects and evaluating acquisitions
![Page 22: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/22.jpg)
22
Three Reasons
balancedgrowth mix
low costproducer
clean and simple
structure
![Page 23: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/23.jpg)
23
Rob Solinger, VP Finance & CFOBill Manley, VP Engineering & Operations
(403) [email protected] www.ihorse.ca
Further Information
![Page 24: June 2009 Investor Presentation Rob Solinger, VP Finance & CFO Bill Manley, VP Engineering & Operations.](https://reader035.fdocuments.in/reader035/viewer/2022062518/5697bf711a28abf838c7e26f/html5/thumbnails/24.jpg)
24
Certain information regarding Ironhorse Oil & Gas Inc. (“Ironhorse”) included in this presentation including management’s assessment of production rates, timing of capital expenditures and on-stream dates, and anticipated revenues and costs relating to the operations of Ironhorse constitutes forward-looking information. This information is subject to risks, uncertainties and assumptions that may be difficult to predict. Actual results may differ and the difference may be material.
Readers are cautioned that any such forward-looking information are not guarantees of future performance and that the factors mentioned and other factors not mentioned may materially affect the performance of Ironhorse’s future operations. Furthermore, information presented herein is dated at the time prepared and Ironhorse does not undertake any obligation to updated publicly or to revise any of the forward-looking information, whether as a result of new information, future events or otherwise, except as required by applicable legislation.
Barrels of oil equivalent (boe) may be misleading, particularly if used in isolation. In accordance with NI 51-101, a Boe conversion ratio for natural gas of 6 Mcf: 1 Boe has been used which is based on an energy equivalency conversion method primarily applicable at the burner tip and does not represent a value equivalence at the wellhead.