JPL Status Report, SCIGN Annual Meeting, 4/26/2004 JPL Update Danan Dong Michael Heflin Sharon Kedar Brian Newport Frank Webb

description

JPL Update. Danan Dong Michael Heflin Sharon Kedar Brian Newport Frank Webb. Overview. GIPSY Processing status NASA REASoN Project Status. Processing. Bias fixing strategy 5-7 Clusters per day CPU intensive Sensitivity to station outages 1 Cluster per day constructed from baselines - PowerPoint PPT Presentation

Transcript of JPL Update

Page 1: JPL Update

JPL Status Report, SCIGN Annual Meeting, 4/26/2004

JPL Update

Danan DongMichael HeflinSharon KedarBrian NewportFrank Webb

Page 2: JPL Update

JPL Status Report, SCIGN Annual Meeting, 4/26/2004

Overview

• GIPSY Processing status

• NASA REASoN Project Status

Page 3: JPL Update

JPL Status Report, SCIGN Annual Meeting, 4/26/2004

Processing

• Bias fixing strategy– 5-7 Clusters per day

• CPU intensive• Sensitivity to station outages

– 1 Cluster per day constructed from baselines• Distributable across many CPUs• Insensitive to station outages

• Developed and tested last year• Implemented in April 2003• Moving to web services for antenna metadata• New GIPSY version in Nov. 2003

Page 4: JPL Update

JPL Status Report, SCIGN Annual Meeting, 4/26/2004

Solutions

• Complete through March 31, 2004.– Available on internet– Free network

• Raw solutions• Loose covariance

– Accounts for frame noise

Page 5: JPL Update

JPL Status Report, SCIGN Annual Meeting, 4/26/2004

REASoN

• Reminder of Our Goals

• How we are organized

• A High Level Requirement

• High Level Architecture

• Baseline Schedule

• Status

Page 6: JPL Update

JPL Status Report, SCIGN Annual Meeting, 4/26/2004

REASoN Goals

• Apply modern IT methodology within SCIGN to:– Produce and disseminate higher-level data

products to a larger community• Scientists• Government agencies (Federal, State, and Local)• Surveyors• GIS professionals

• Product levels adopted by PBO

Page 7: JPL Update

JPL Status Report, SCIGN Annual Meeting, 4/26/2004

REASoN Goals• Build on current capabilities within SCIGN for data archiving,

information systems, and data analysis to disseminate the following products:– Geodetic position time series– Crustal motion models– Strain rate maps– Geologic fault models– Near-real-time earthquake response information– Geodetic reference systems for precise GIS and surveying

• Improve capabilities in– Archiving– End-user interfaces– Delivery mechanisms– Data modeling

• Open source project based on a redundant, multi-tiered “Virtual Archive” for GPS applications.

Page 8: JPL Update

JPL Status Report, SCIGN Annual Meeting, 4/26/2004

How we are organized• Around Four systems

– Product Input• Seamless Archive• Web services

– GPS Data Processing• GAMIT and GIPSY

– Product Generation• QOCA Based

– Product Output• Virtual Archive• Web services

– Meta data– Products

• Plus two NASA requirements – NASA SEEDs participation

• Standards Working Group– Open Source Project

• Virtual Archive

Page 9: JPL Update

JPL Status Report, SCIGN Annual Meeting, 4/26/2004

A High Level Requirement

• Need• Processing centers and processes use the same input data

• Goal• All processing retrieves data from a common source

• Objective• Seamless Archive• Web services• Pull data at time of analysis• Push results into archive• Pull products from archive for distribution

Page 10: JPL Update

JPL Status Report, SCIGN Annual Meeting, 4/26/2004

High Level Architecture

Page 11: JPL Update

JPL Status Report, SCIGN Annual Meeting, 4/26/2004

Architecture Interfaces

• Next slide shows– Functions on the

diagonal– Interfaces on the off

diagonals• Who and what in the

off diagonal boxes

Function 1

Function 2

Function 3

Function 4

Output fromFunction 1

which is input toFunction 4

Output fromFunction 4

which is input toFunction 2

Page 12: JPL Update

JPL Status Report, SCIGN Annual Meeting, 4/26/2004

Architecture InterfacesSeamless Archive - Product Input GPS Data processing Product Generation (Level 1-3) Seamless Archive - Product Output

End-user input to change data/analysis

settings.J PL Orbits; GIPSY setup files(SK, MH, FW, BN)

SIO Orbits; GAMIT Setup files(PJ )

Setup files defining how, when, etc.(DD, LP)

Setup files defining how, when, etc.(DD, LP)

Setup files defining how, when, etc.(DD, LP)

All setup files(SK,FW, DD, LP,??)

GPS Explorer Admin GUI Interface

(SIO-MS, USGS-KS)

GE Admin Function interacts with

database. (MS,BG)

GSAC/ WS/ DB (SIO -BG,MS) Station info (positions,

ant. types, ht, etc)(BN, MH, PJ )

Station info (positions, ant. types, ht, etc)(PJ )

Virtual Archive (SIO-MS,BG,USGS-

KS) Rinex files (BN, BG)

Rinex files(MS,PJ )

Request for station info; station list (BN, PJ )

Request for GPS data (BN, PJ )

GIPSY/ RTG(JPL - SK) GIPSY solution and

covariance (SK, MH, DD,?? )

GE Admin effects GAMIT processing.

(PF,PJ )Request for station info; station list(PJ )

Request for GPS data(MS,PJ )

GAMIT/ RTD (SIO-PF,PJ ,YB) GAMIT solution and

covariance(???)

QOCA Combination (JPL-DD, SIO-LP)

Combined Time Series (DD, LP, BG, MS)

QOCA Velocity Field (J PL-DD, SIO-LP,PJ )

Request for combined time series; Combined Velocity and Quality Metrics (DD, LP, BG, MS)

QOCA Geophysical Parameters

(J PL-DD, SIO-LP,PJ )

Request for combined product; Strain Map; Fault Param; Q- Metrics (DD, LP, BG, MS)

GE Admin will effect Virtual Archive

settings.

GIPSY and GAMIT solutions and covariance (DD, LP, ??)

Combined Time Series (DD, LP, BG, MS)

Combined Velocity Map (DD, LP, BG, MS)

Virtual Archive (SIO-MS,BG,USGS-

KS)

Archive requirements -> software devel

(MS,BG,KS)

Open Source [VA](KS, MS)

Web service request (background). No user intervention once setup. (MS,BG,KS)

GSAC/ WS/ DB (SIO -BG,MS)

Data and products (BG, MS, KS)

Request for products (BG, MS, KS)

SCIGN website, GE, GSAC

(SIO-PJ ,MS,BG,USGS-KS)

Page 13: JPL Update

JPL Status Report, SCIGN Annual Meeting, 4/26/2004

Baseline Schedule (draft)• Key milestones for the remainder of CY04 are:

– Approved Task Plan based on negotiated funding profile (ASAP)– High level system requirements definition and design (Jul 04)– Design and development of modifications to QOCA for combined geodetic time series (Level-1)

production software (Dec 04)– Design and development of automated GPS processing interfaces with GDPSES (Dec 04)

• Key milestones for CY05 - CY08 are:– Design, development, and implementation of automated Level 1 data products (Jul 05)– Design and development of modifications to QOCA for combined velocity field (Level-2)

production software (Dec 05)– Design, development, and implementation of automated Level 2 data products (Jul 06)– Design and development of modifications to QOCA for geophysical parameter (Level-3)

production software (Dec 06)– Design, development, and implementation of automated Level 3 data products (Jul 07)– Integrate Level-3 products with independent data products (Dec 07).– Incorporate PBO data into production process (Jul 08)– Deliver Adaptive Seamless Achive (Jul 08)– Deliver GPS Explorer (Jul 08)– Deliver Spatial Services (Jul 08)– Deliver Open Source Virtual Archive (Jul 08)

Page 14: JPL Update

JPL Status Report, SCIGN Annual Meeting, 4/26/2004

Status• Organized into initial teams• Worked most of the high level architecture• Working requirements and definitions of interfaces for

CY04:– Processing– Archive– Web services

• Working formats– Internal product and data sharing– Prototyped XML schema and formats for metadata and time

series products

• Product generation– Testing QOCA against GLOBK

• Loosely constrained agrees to sub-millimeter level

– Initial modifications to QOCA for S/T filter has begun

Page 15: JPL Update

JPL Status Report, SCIGN Annual Meeting, 4/26/2004

Status• Project library

– Document sharing web site for team• Configuration control• Password protected• https://scign-lib.jpl.nasa.gov

• NASA – Currently on startup funds– Draft task plan near completion for remaining funds

• PBO – Initial discussions have received a “Ho-Hum” response