Joe Alvarez EIA Engineer
description
Transcript of Joe Alvarez EIA Engineer
-
Joe AlvarezEIA EngineerKumurana Project status:Limestone Channels and abandoned mine sealingEngineers in ActionBuilding a better future for tomorrow
-
Limestone DeliveryChannels:~358m tonsAbandoned Mine:~135m tons
-
Limestone ChannelsLimestone deliveryRequired Volume for channles:2027m3
Amount of Limestone Delivered:~358 Metric tons for the channels [About 14% of the total limestone delivery]
-
Required:108m3Delivered: ~135m tonsRequired:213m3Delivered: ~262.5m tonsRequired:132m3Delivered: ~27m tonsLEGENDDelivery completed
Partial Delivery
No delivery
Required:348m3Delivered: ~67.5m tonsMap source EWB-OU
-
Limestone Channels ContdInstallationThe installation of limestone into the channels is pendingTaking advantage of trucksCommunity support to install the limestoneWater analysis coordination with CIMA and Universidad Tomas Frias
-
Limestone Channels ContdConstructions issuesProject issuesAccessibility issuesDistance [about 100miles/trip]Heavy Rain/HailWorking with the governmentBureaucracy at the governmentNo continuous of flow workBorrowed trucks
-
Accessibility issues
-
Rain
-
Bureaucracy
-
Abandoned Mine sealingLimestoneDelivered 108m3 of limestone delivery-completeLimestone installation is pendingOxidation pond90% completedSome improvements needed to finishInaccessible with a heavy equipment to continue digging and finish. [wetlands]Wall sealingConstruction starts when the worksite area becomes accessibleEstimated length of conclusion of the wall about 2-3 weeks
-