Page 1: JICAvoltage transformer, which is connected to 220 kV bus, new installation of 220 kV disconnecting switches and surge arresters, are installation of new gantries to support 220kV
Page 2: JICAvoltage transformer, which is connected to 220 kV bus, new installation of 220 kV disconnecting switches and surge arresters, are installation of new gantries to support 220kV
Page 3: JICAvoltage transformer, which is connected to 220 kV bus, new installation of 220 kV disconnecting switches and surge arresters, are installation of new gantries to support 220kV
Page 4: JICAvoltage transformer, which is connected to 220 kV bus, new installation of 220 kV disconnecting switches and surge arresters, are installation of new gantries to support 220kV
Page 5: JICAvoltage transformer, which is connected to 220 kV bus, new installation of 220 kV disconnecting switches and surge arresters, are installation of new gantries to support 220kV
Page 6: JICAvoltage transformer, which is connected to 220 kV bus, new installation of 220 kV disconnecting switches and surge arresters, are installation of new gantries to support 220kV
Page 7: JICAvoltage transformer, which is connected to 220 kV bus, new installation of 220 kV disconnecting switches and surge arresters, are installation of new gantries to support 220kV
Page 8: JICAvoltage transformer, which is connected to 220 kV bus, new installation of 220 kV disconnecting switches and surge arresters, are installation of new gantries to support 220kV

Appendix 6 Installation Position of the Main Transformers

1

Installation Position of the Main Transformers

The Study Team discussed with AZERENERJI’s staff on the installation position of the main

transformers and method of construction. As a result, we reached mutual agreement once to

adopt the idea that new transformers were installed at the neighboring positions of the existing

ones and switched over the connections in series as shown in the attached figure to minimize the

power outage period considering the importance of Mushviq Substation.

In this idea, however, new construction of transformer’s foundation, removal of the existing

voltage transformer, which is connected to 220 kV bus, new installation of 220 kV

disconnecting switches and surge arresters, are installation of new gantries to support 220kV

conductors are additionally needed comparing with the idea that the new transformers are to be

installed at the same positions where the existing ones are currently installed. The Chief

Engineer of AZERENERJI, therefore, refused the first idea and suggested to adopt the second

idea as shown in Drawing AZ_BM_04. We finally reached mutual agreement that

AZERENERJI will execute power outage during the replacement work and the scheduled

partial load shedding on the customer side taking all responsibilities, if necessary (refer to item

2.1 in Technical Note).

Page 9: JICAvoltage transformer, which is connected to 220 kV bus, new installation of 220 kV disconnecting switches and surge arresters, are installation of new gantries to support 220kV

Drawing No.

Title

The Basic Design Studyon

the Project forImprovement of Mushviq Substation

inthe Republic of Azerbaijan

AZERENERJI Joint Stock Company

Nippon Koei Co., Ltd.Not to scale Alternative Idea

Japan Internatonal Cooperation Agency

DSSPDS CB DS

SADSDSCBDSDS

DS VT SA

DSDSCBSPSPDS

VT SA

Station Srvice TR

Contr

ol B

uild

ing

DSCBDS SPDS DS

DSCB DSDS SPDS

CVTDSDSCBDSDS SP

SP

Com

munic

ations

Equip

ment

Guard House

SP

CT

DS

LT

CVT

SP

CT

DS

LT

CVT

SP

CT

DS

LT

CVT

SA

DS

SP

DS

CB

CT

DS

SP

DS

CB

CT

DS

SP

DS

CB

CT

DS

SP

DS

CB

CT

DS

DS

SA VT

SP

DS

CB

CT

DS

SP

DS

CB

CT

DS

DS

VT

SP

SP

DS

10 kVcubicle

reactorroom

10 kVcubicle

TR#2

reactorroom

pumproom

water storage tank(160 m3)

newTR#2 TR#1

DS

SA

DS

SA

newTR#1

#1 Bus

#2 Bus

Page 10: JICAvoltage transformer, which is connected to 220 kV bus, new installation of 220 kV disconnecting switches and surge arresters, are installation of new gantries to support 220kV
Page 11: JICAvoltage transformer, which is connected to 220 kV bus, new installation of 220 kV disconnecting switches and surge arresters, are installation of new gantries to support 220kV
Page 12: JICAvoltage transformer, which is connected to 220 kV bus, new installation of 220 kV disconnecting switches and surge arresters, are installation of new gantries to support 220kV