JHA Rendering Works for Buildings

download JHA Rendering Works for Buildings

of 2

Transcript of JHA Rendering Works for Buildings

  • 8/12/2019 JHA Rendering Works for Buildings

    1/2

    Odebrecht - Al Jaber JVNew 2k Runway Main Runway WorksContract No. NR!W-"##$-CN

    JHA JOB HAZARD ANALYSIS

    The responsible person is to ensure the control measures below are in place before the activity is carried out

    TASK:Rendering Works for Buildings Date: 26thSeptember 2007

    No ATI!ITY HAZARD RISK ONTROL "#AS$R#S TO "INI"IS# % #LI"INAT# RISK R#S&ONSIBL# RSON

    ' Renderin% Works&se o' handtools

    Cuts( abrasions(broken bones( eyein)uries

    *u+er,isor to ins+ect hand tools +rior to coenceent o' works to ensure tools arein %ood condition.*ite iniu / to be worn at all ties

    Manual handlin%o+erations0M1Os3

    Work related u++erlib disorders.Musculoskeletalin)uries. Cuts(abrasions. 4oot 5toe in)uries( eyein)uries

    Ma6iu use o' e7ui+ent to reduce need 'or M1OsM1O !rainin% +rior to any work bein% carried out (Too)bo* ta)+ atta,he-.!his trainin% is to be docuentedWearin% o' %lo,esWearin% o' sa'ety shoesWearin% o' sa'ety %lasses

    /6tree heat8ehydration( heate6haustion. 1eatstroke

    Ready su++ly o' cold water and Oral rehydration +roducts ie *alt 9 8e6trose tablets.No work to be conducted under the sun between "2## 9 ":## 0July 9 Au%ust only3.;n the e,ent that natural air'low is restricted( industrial air o,ers will be e+loyed.No worker shall work within the e6ca,ation 'or lon%er than

  • 8/12/2019 JHA Rendering Works for Buildings

    2/2

    Odebrecht - Al Jaber JVNew 2k Runway Main Runway WorksContract No. NR!W-"##$-CN

    JHA JOB HAZARD ANALYSIS

    TASK:444444444444444444444444444444444444444444444444444444444444444444 Date: 4444444444444444444

    &er5o5 hare De5ato Sat8re

    '

    2

    9

    ;

    6

    A)) #mp)o 2>

    '0 20 90

    /orm: '00 OAJ /" JHA1RO

    &ae 2 o3 2