Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

24
1 Javier Pérez Bartolomé Service Provision and Performance [email protected] European Commission TREN-G3

description

Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu European Commission TREN-G3. TENDER TOPIC: Galileo 2008-2.1.1: Simulators and Tools. General Overview and Context Purpose of the Contract Overall Logic and WP BS Tasks Description - PowerPoint PPT Presentation

Transcript of Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

Page 1: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

1

Javier Pérez BartoloméService Provision and Performance

[email protected] Commission TREN-G3

Page 2: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

2

TENDER TOPIC:Galileo 2008-2.1.1: Simulators and Tools

1. General Overview and Context2. Purpose of the Contract3. Overall Logic and WP BS4. Tasks Description5. Eligibility Criteria for the Bidders6. Financial and Admin Aspects

•Outline

Page 3: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

3

1. General Overview and Context 1/2

• GNSS Simulation and Testing Facilities are Key Enablers for application and receiver downstream industry

• The accesibility to this infrastructure should be ensured to any European user

• A coordinated approach is expected to provide a better service to end users

• A definition study on the potential harmonisation of the European GSTI has been launched recently (SCENIC - FP7 1st Call)

Page 4: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

4

1. General Overview and Context 2/2FP7 1st Call Study on Harmonisation: SCENIC

Page 5: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

5

1. General Overview and Context2. Purpose of the Contract3. Overall Logic and WP BS4. Tasks Description5. Eligibility Criteria for the Bidders6. Financial and Admin Aspects

Page 6: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

6

• Development of a networking platform which establishes a single entry point to the European Testing Labs

• Preliminary Mission Concept for GSTI V1:• Simplified access point for European users interested in GNSS

testing services • Enhance communication and coordination of actors (users, GNSS

centres, etc)• Dynamic management of available information on European

GNSS testing facilities• Provide web-based helpdesk service to the user community• Potentially become hosting platform for publicly owned GNSS

analysis and simulation SW tools

2. Purpose of the Contract 1/2

Page 7: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

7

• GSTI V1 System is conceived as:

• A centralised entry point to the European GNSS Testing Infrastructure

• A networking platform that should improve the coordination between European initiatives

European GSTI Web Portal

INTERNET

Austria

Bulgaria

Czech Republic

Finland

France

Germany

Greece

Ireland

Italy

Hungary

Latvia

Norway

Poland

Slovakia

Slovenia

Spain

Sweden

Switzerland

United Kingdom

Denmark

Portugal

Belgium

Netherlands

Estonia

Lithuania

Romania

Luxembourg

EUROPEAN GNSS LABORATORIES AND TEST FACILITIES

USER COMMUNITY- R&D (FP7 projects)- Universities- SMEs- Others

DB

2. Purpose of the Contract 2/2

Page 8: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

8

1. General Overview and Context2. Purpose of the Contract3. Overall Logic and WP BS4. Tasks Description5. Eligibility Criteria for the Bidders6. Financial and Admin Aspects

Page 9: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

9

1. Definition and Development of the GSTI V1 Platform• Task 2: USER AND SYSTEM REQUIREMENTS• Task 3: SYSTEM DESIGN AND DEVELOPMENT• Task 4: INTEGRATION AND TEST

2. System Ops&Maintenance, Awareness and Promotion, collection of User Feedback and Evolution to GSTI V2

• Task 5: INITIAL OPERATIONS AND MAINTENANCE• Task 6: USER SUPPORT, FEEDBACK COLLECTION AND AWARENESS• Task 7: PLATFORM EVOLUTION AND FINAL PLATFORM DELIVERY• Task 8: TECHNICAL STUDY ON ACCESIBILITY TO EC/GSA SW TOOLS

3. Overall Logic and WP Breakdown Structure 1/2

Page 10: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

10

3. Overall Logic and WP Breakdown Structure 2/2WP1 Management

WP2 User and System Requirements

SRR Milestone

WP3 System Design and Development

CDR Milestone

WP4 Integration and Test

FAT Milestone

WP5 Initial Operations and Maintenance

GSTI V1.0

WP6 User Support, Feedback Collection, Dissemination and Awareness

PERR Milestone

WP7 Platform Evolution

FAR Milestone - GSTI V2.0

WP8 Analysis of Accessibility to EC/GSA SW Tools

B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B

T0 T0+3 T0+7 T0+9 T0+14 T0+18

Page 11: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

11

1. General Overview and Context2. Purpose of the Contract3. Overall Logic and WP BS4. Tasks Description5. Eligibility Criteria for the Bidders6. Financial and Admin Aspects

Page 12: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

12

• Overall management of the contract

• Expected outputs:

4. Tasks Description 1/8

Project Milestone Review Schedule

Kick-Off Meeting KOM T0

System Requirements Review

SRR T0 + 3

Critical Design Review CDR T0 + 7

Factory Acceptance Test FAT T0 + 9

Platform Evolution Readiness Review

PERR T0 + 14

Final Acceptance Review FAR T0 + 18

Task 1: Management

Ref Title

D1.1 Project Management Plan

D1.2.x Status Report

D1.3 Final Report

Page 13: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

13

• Definition of user and system specification for the GSTI V1 platform• Analysis of outcomes produced in the GSTI definition study• Survey and assessment of COTS tools which may eventually used to support the implementation of the system• Expected outputs

4. Tasks Description 2/8

Ref TitleD2.1 User Requirements Document (URD)

D2.2 System Requirements Document (SRD)

D2.3 Survey Report on IT COTS tools

Task 2: User and System Requirements

Page 14: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

14

• Develop logical and physical design for GSTI platform• Use of COTS SW solutions should be favoured• Prepare integration activities and define test cases• Expected outputs:

4. Tasks Description 3/8

Ref TitleD3.1 Architectural Design Document (ADD)

D3.2 Design Justification File (DJF)

D3.3 Ext. Interface Control Document (ICD)

D3.4 Inventory of IT COTS HW/SW

D3.5 Preliminary delivery of web GUI

Task 3: System Design and Development

Ref TitleD3.6 Integration and Test Plan

D3.7 Configuration Management Plan

Page 15: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

15

• Achieve system integration Complete (successfully!) the full test battery according to plan

• Populate tools’ database• Prepare operations and maintenance plan• Eventually make the system available to the user community• Expected outputs:

4. Tasks Description 4/8

Ref TitleD4.1 Integration and System Test Report

D4.2 GSTI V1 Platform

D4.3 GSTI V1 User Manual

Task 4: Integration and Testing

Ref TitleD4.4 GSTI V1 Initial Operational Procedures

D4.5 GSTI V1 Maintenance Plan

Page 16: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

16

• Procurement of hosting, operations and maintenance services for the GSTI platform from qualification (FAT) to end of activities (FAR)

The contractor shall keep the system “alive” during the whole duration of this task• Further develop operational procedures• Expected outputs:

4. Tasks Description 5/8

Ref TitleD5.1 Observation and Non Conformance Reports

D5.2.x Periodical reports on Operations

D5.3 GSTI V2 Operational Procedures

Task 5: Initial Operations and Maintenance

Page 17: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

17

• Support users through a helpdesk• Collect and synthesize user feedback to be taken into account for service improvements to be implemented in a

new system release• Promote the developed system by attending key conferences and/or establishing a user forum• Expected outputs:

4. Tasks Description 6/8

Ref TitleD6.1 GSTI User and Facilities feedback report

D6.2 Report on conducted awareness activities

D6.3 Delta features for next system release (GSTI V2)

Task 6: User Support, Feedback Collection & Awareness

Page 18: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

18

• Develop a new version of the tool taking into account feedback collected during the initial operations phase

• Address additional system evolutions and recommendations in an GSTI service roadmap• Expected outputs:

4. Tasks Description 7/8

Ref TitleD7.1 GSTI V2 Platform

D7.2 GSTI V2 User Manual

D7.3 GSTI Service Roadmap

D7.4 System Test report GSTI V2

D7.5 Hosting Site Interface requirements

Task 7: Platform Evolution and Final Platform Delivery

Page 19: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

19

• Assess suitability of the GSTI platform to provide public access to EC/GSA owned tools• Analyse implementation options for some specific tools (effort limited to 2 or 3 cases)

to be proposed at KO• Expected outputs:

4. Tasks Description 8/8

Ref TitleD8.1 TN on integration of EC/GSA SW RD tools in the GSTI web portal

Task 8: Technical Study on Accessibility to EC/GSA Tools

Page 20: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

20

1. General Overview and Context2. Purpose of the Contract3. Overall Logic and WP BS4. Tasks Description5. Eligibility Criteria for the Bidders6. Financial and Admin Aspects

Page 21: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

21

5. Eligibility Criteria for the Bidders1. Thorough understanding of global satellite navigation systems and

augmentation technologies2. Thorough understanding of the simulation and test field in satellite

navigation: main public and private actors, institutional framework, facilities, tools, etc.

3. Outstanding background on design, development and integration of IT systems and network features.

4. Sound experience on the development of web-based applications and knowledge management databases.

5. Sound experience in operations of web-based distributed networks and systems.

6. Good knowledge of the GNSS user community needs, present applications, trends, etc., especially related to simulation and testing activities.

Page 22: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

22

1. General Overview and Context2. Purpose of the Contract3. Overall Logic and WP BS4. Tasks Description5. Eligibility Criteria for the Bidders6. Financial and Admin Aspects

Page 23: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

23

6. Financial and Administrative Aspects• Firm Fixed Price Contract 100% Funded by EC• Indicative Budget: 500.000 Euro• Duration of the contract: 18 Months

• Call for Tender to be released soonIt will be announced in the usual communication channels

Page 24: Javier Pérez Bartolomé Service Provision and Performance javier.perez-bartolome @ec.europa.eu

24

Any question?

Thank you for your attention!Javier Pérez Bartolomé

[email protected] Commission DG TREN – G3