James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by...

100
Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A. Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net September 21, 2020 8495 S HAVERHILL ROAD LLC 9290 NICKELS BLVD BOYNTON BEACH FL 33436 3149 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 8495 S HAVERHILL RD, BOYNTON BEACH FL 33472 1050 Dear 8495 S HAVERHILL ROAD LLC : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Transcript of James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by...

Page 1: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 8495 S HAVERHILL ROAD LLC 9290 NICKELS BLVD BOYNTON BEACH FL 33436 3149 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 8495 S HAVERHILL RD, BOYNTON BEACH FL 33472 1050 Dear 8495 S HAVERHILL ROAD LLC : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 2: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 3: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 5123 84TH PLACE S LLC 9290 NICKELS BLVD BOYNTON BEACH FL 33436 3149 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5123 84TH PL S, BOYNTON BEACH FL 33472 1051 Dear 5123 84TH PLACE S LLC : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 4: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 5: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 CRAIG CECI PO BOX 5702 LAKE WORTH FL 33466 5702 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5170 84TH PL S, BOYNTON BEACH FL 33472 1052 Dear CRAIG CECI : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 6: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 7: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 GAIL MOOTZ & MARTHA KAR 8524 MICHAEL DR BOYNTON BEACH FL 33472 1053 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 8524 MICHAEL DR, BOYNTON BEACH FL 33472 1053 Dear GAIL MOOTZ & MARTHA KAR: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 8: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 9: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 JOHN T DENNIS 5220 BENJAMIN AVE BOYNTON BEACH FL 33472 1059 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5220 BENJAMIN AVE, BOYNTON BEACH FL 33472 1059 Dear JOHN T DENNIS : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 10: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 11: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 GEOFFREY B PETERS 5234 BENJAMIN AVE BOYNTON BEACH FL 33472 1059 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5234 BENJAMIN AVE, BOYNTON BEACH FL 33472 1059 Dear GEOFFREY B PETERS : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 12: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 13: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 PABLO & JANINE RAMOS 5250 BENJAMIN AVE BOYNTON BEACH FL 33472 1059 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5250 BENJAMIN AVE, BOYNTON BEACH FL 33472 1059 Dear PABLO & JANINE RAMOS: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 14: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 15: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 OSVALDO JAIMAN & LILLIAN ROBLES 5264 BENJAMIN AVE BOYNTON BEACH FL 33472 1059 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5264 BENJAMIN AVE, BOYNTON BEACH FL 33472 1059 Dear OSVALDO JAIMAN & LILLIAN ROBLES: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 16: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 17: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 VALERIE J & KRISTEN E BARRETT 5278 BENJAMIN AVE BOYNTON BEACH FL 33472 1059 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5278 BENJAMIN AVE, BOYNTON BEACH FL 33472 1059 Dear VALERIE J & KRISTEN E BARRETT: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 18: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 19: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 KURT M & MARIE E ANDERSON 5294 BENJAMIN AVE BOYNTON BEACH FL 33472 1059 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5294 BENJAMIN AVE, BOYNTON BEACH FL 33472 1059 Dear KURT M & MARIE E ANDERSON: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 20: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 21: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 ALBERT A ASHMAN 9148 CARMA DR BOYNTON BEACH FL 33472 1229 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5308 BENJAMIN AVE, BOYNTON BEACH FL 33472 1229 Dear ALBERT A ASHMAN : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 22: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 23: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 HORACE D ESCOFFERY & JANICE WHITE NOVELYN 5322 BENJAMIN AVE BOYNTON BEACH FL 33472 1061 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5322 BENJAMIN AVE, BOYNTON BEACH FL 33472 1061 Dear HORACE D ESCOFFERY & JANICE WHITE NOVELYN: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 24: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 25: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 JAMES DAVID TAYLOR TR LEANNA J TAYLOR TR 5338 BENJAMIN AVE BOYNTON BEACH FL 33472 1061 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5338 BENJAMIN AVE, BOYNTON BEACH FL 33472 1061 Dear JAMES DAVID TAYLOR TR LEANNA J TAYLOR TR: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 26: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 27: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 LARRY L & DIANA F WOLVERTON 5352 BENJAMIN AVE BOYNTON BEACH FL 33472 1061 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5352 BENJAMIN AVE, BOYNTON BEACH FL 33472 1061 Dear LARRY L & DIANA F WOLVERTON: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 28: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 29: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 JAMES & BARBARA PIERSANTE 5366 BENJAMIN AVE BOYNTON BEACH FL 33472 1061 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5366 BENJAMIN AVE, BOYNTON BEACH FL 33472 1061 Dear JAMES & BARBARA PIERSANTE: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 30: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 31: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 MATTHEW S BAYER & JESSICA D LESLIE 5380 BENJAMIN AVE BOYNTON BEACH FL 33472 1061 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5380 BENJAMIN AVE, BOYNTON BEACH FL 33472 1061 Dear MATTHEW S BAYER & JESSICA D LESLIE: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 32: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 33: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 ALAN & DINA PHILLIPS 5396 BENJAMIN AVE BOYNTON BEACH FL 33472 1061 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5396 BENJAMIN AVE, BOYNTON BEACH FL 33472 1061 Dear ALAN & DINA PHILLIPS: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 34: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 35: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 WILLIAM & DEBRA SMITH 5410 BENJAMIN AVE BOYNTON BEACH FL 33472 1070 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5410 BENJAMIN AVE, BOYNTON BEACH FL 33472 1070 Dear WILLIAM & DEBRA SMITH: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 36: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 37: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 KARLA L & JOSEPH ANTHONY PELLEGRINO II 5426 BENJAMIN AVE BOYNTON BEACH FL 33472 1070 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5426 BENJAMIN AVE, BOYNTON BEACH FL 33472 1070 Dear KARLA L & JOSEPH ANTHONY PELLEGRINO II: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 38: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 39: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 RAYMOND E BROOKS III 1437 WATERCREST CT VIRGINIA BEACH VA 23464 6120 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5440 BENJAMIN AVE, BOYNTON BEACH FL 33472 1071 Dear RAYMOND E BROOKS III : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 40: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 41: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 KURT KYLE KOTKE 5456 BENJAMIN AVE BOYNTON BEACH FL 33472 1070 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5456 BENJAMIN AVE, BOYNTON BEACH FL 33472 1070 Dear KURT KYLE KOTKE : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 42: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 43: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 RONALD J FALIERO & RONALD J FALIERO TR 5470 BENJAMIN AVE BOYNTON BEACH FL 33472 1070 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5470 BENJAMIN AVE, BOYNTON BEACH FL 33472 1070 Dear RONALD J FALIERO & RONALD J FALIERO TR: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 44: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 45: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 JOSE G & MIGDALIA DUQUE 5113 ROSEN BLVD BOYNTON BEACH FL 33472 1275 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5113 ROSEN BLVD, BOYNTON BEACH FL 33472 1275 Dear JOSE G & MIGDALIA DUQUE: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 46: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 47: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 LUIS N & MARTAE ALEMAN 5119 ROSEN BLVD BOYNTON BEACH FL 33472 1275 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5119 ROSEN BLVD, BOYNTON BEACH FL 33472 1275 Dear LUIS N & MARTAE ALEMAN: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 48: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 49: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 BIRGIT & JAMES W BERRY 5125 ROSEN BLVD BOYNTON BEACH FL 33472 1275 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5125 ROSEN BLVD, BOYNTON BEACH FL 33472 1275 Dear BIRGIT & JAMES W BERRY: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 50: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 51: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 PROGRESS RESIDENTIAL BORROWER 5 LLC PO BOX 4090 SCOTTSDALE AZ 85261 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5131 ROSEN BLVD, BOYNTON BEACH FL 33472 1276 Dear PROGRESS RESIDENTIAL BORROWER 5 LLC : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 52: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 53: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 GEORGE W & ANGELA M MESSIHA 11062 MISTY RIDGE WAY BOYNTON BEACH FL 33473 4892 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5137 ROSEN BLVD, BOYNTON BEACH FL 33473 4892 Dear GEORGE W & ANGELA M MESSIHA: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 54: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 55: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 KATHLEEN WALDROPT 5143 ROSEN BLVD BOYNTON BEACH FL 33472 1275 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5143 ROSEN BLVD, BOYNTON BEACH FL 33472 1275 Dear KATHLEEN WALDROPT : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 56: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 57: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 CARLOS SAMOUR 5149 ROSEN BLVD BOYNTON BEACH FL 33472 1275 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5149 ROSEN BLVD, BOYNTON BEACH FL 33472 1275 Dear CARLOS SAMOUR : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 58: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 59: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 MARIE L & WILLIAM J SMITH 5155 ROSEN BLVD BOYNTON BEACH FL 33472 1275 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5155 ROSEN BLVD, BOYNTON BEACH FL 33472 1275 Dear MARIE L & WILLIAM J SMITH: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 60: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 61: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 BARKLEY IV & MELISSA A WYCKOFF 5161 ROSEN BLVD BOYNTON BEACH FL 33472 1275 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5161 ROSEN BLVD, BOYNTON BEACH FL 33472 1275 Dear BARKLEY IV & MELISSA A WYCKOFF: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 62: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 63: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 IH4 PROPERTY FLORIDA LP INVITATION HOMES - C/O TAX DEPT 1717 MAIN ST STE 2000 DALLAS TX 75201 4657 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5167 ROSEN BLVD, BOYNTON BEACH FL 33472 1276 Dear IH4 PROPERTY FLORIDA LP INVITATION HOMES - C/O TAX DEPT: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 64: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 65: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 JAIME ACEVEDO & CLARICE E LODERMEIER 5173 ROSEN BLVD BOYNTON BEACH FL 33472 1275 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5173 ROSEN BLVD, BOYNTON BEACH FL 33472 1275 Dear JAIME ACEVEDO & CLARICE E LODERMEIER: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 66: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 67: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 TERRI LYNN KORCHICK & DANIEL D DENTON 5179 ROSEN BLVD BOYNTON BEACH FL 33472 1275 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5179 ROSEN BLVD, BOYNTON BEACH FL 33472 1275 Dear TERRI LYNN KORCHICK & DANIEL D DENTON: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 68: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 69: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 IH5 PROPERTY FLORIDA LP INVITATION HOMES - C/O TAX DEPT 1717 MAIN ST STE 2000 DALLAS TX 75201 4657 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5185 ROSEN BLVD, BOYNTON BEACH FL 33472 1276 Dear IH5 PROPERTY FLORIDA LP INVITATION HOMES - C/O TAX DEPT: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 70: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 71: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 MICHAEL R JOLLY 5191 ROSEN BLVD BOYNTON BEACH FL 33472 1275 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5191 ROSEN BLVD, BOYNTON BEACH FL 33472 1275 Dear MICHAEL R JOLLY : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 72: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 73: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 ANTHONY N & TERRI A CAPPELLO 5197 ROSEN BLVD BOYNTON BEACH FL 33472 1275 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5197 ROSEN BLVD, BOYNTON BEACH FL 33472 1275 Dear ANTHONY N & TERRI A CAPPELLO: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 74: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 75: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 MARCELO F & CHERENE CASTILLO 5203 ROSEN BLVD BOYNTON BEACH FL 33472 1277 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5203 ROSEN BLVD, BOYNTON BEACH FL 33472 1277 Dear MARCELO F & CHERENE CASTILLO: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 76: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 77: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 CHANDRA BOSE SUBHASH & PUSHPAWATTIE HUSAIN 5209 ROSEN BLVD BOYNTON BEACH FL 33472 1277 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5209 ROSEN BLVD, BOYNTON BEACH FL 33472 1277 Dear CHANDRA BOSE SUBHASH & PUSHPAWATTIE HUSAIN: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 78: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 79: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 WACLAW & BOZENA FEDAK 5215 ROSEN BLVD BOYNTON BEACH FL 33472 1277 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5215 ROSEN BLVD, BOYNTON BEACH FL 33472 1277 Dear WACLAW & BOZENA FEDAK: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 80: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 81: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 ANNA JARUSZEWSKA REV TRUST 1351 SW 4TH AVE BOCA RATON FL 33432 7128 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5221 ROSEN BLVD, BOCA RATON FL 33432 7128 Dear ANNA JARUSZEWSKA REV TRUST : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 82: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 83: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 IH5 PROPERTY FLORIDA LP INVITATION HOMES C/O TAX DEPT 1717 MAIN ST STE 2000 DALLAS TX 75201 4657 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5227 ROSEN BLVD, BOCA RATON FL 33432 7129 Dear IH5 PROPERTY FLORIDA LP INVITATION HOMES - C/O TAX DEPT: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 84: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 85: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 2018 3 IH BORROWER LP 1717 MAIN ST STE 2000 DALLAS TX 75201 4657 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5233 ROSEN BLVD, BOCA RATON FL 33432 7130 Dear 2018 3 IH BORROWER LP : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 86: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 87: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 HILLARY BARCOMB & STUART ROHRER 5239 ROSEN BLVD BOYNTON BEACH FL 33472 1277 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5239 ROSEN BLVD, BOYNTON BEACH FL 33472 1277 Dear HILLARY BARCOMB & STUART ROHRER: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 88: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 89: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 MICHAEL J & DEBBRA M ERRANTE 5245 ROSEN BLVD BOYNTON BEACH FL 33472 1277 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: 5245 ROSEN BLVD, BOYNTON BEACH FL 33472 1277 Dear MICHAEL J & DEBBRA M ERRANTE: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 90: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 91: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 FOUNTAINS OF RAINBOW LAKES 3600 S CONGRESS AVE STE K BOYNTON BEACH FL 33426 8488 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Site Address: PCN 00424514150010000 Dear FOUNTAINS OF RAINBOW LAKES : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 92: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 93: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 ROYAL MANOR ESTATES C/O PROPERTY MANAGER 4409 LADY BEVERLEE CT S BOYNTON BEACH FL 33436 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Dear ROYAL MANOR ESTATES C/O PROPERTY MANAGER: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 94: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 95: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 MANOR FOREST C/O PROPERTY MANAGER 6801 LAKE WORTH ROAD SUITE 111 GREENACRES FL 33467 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Dear MANOR FOREST C/O PROPERTY MANAGER: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 96: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 97: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 SAUSALITO PLACE CAMPBELL PROPERTY MANAGEMENT 9897 LAKE WORTH RD SUITE 304 LAKE WORTH FL 33467 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Dear SAUSALITO PLACE CAMPBELL PROPERTY MANAGEMENT: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 98: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District

Page 99: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Tommy B. Strowd, P.E. 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

September 21, 2020 MIRROR LAKES C/O PROPERTY MANAGER 5317 MIRROR LAKES RD BOYNTON BEACH FL 33472 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: L-21 Canal Rehabilitation from E-3 to Military Trail (CCRP #10) Dear MIRROR LAKES C/O PROPERTY MANAGER: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-21 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal right-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 11, 2021 to identify the boundaries of the District’s L-21 Canal right-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District will host an informational virtual meeting at 9 a.m. on Thursday, October 15, 2020. Please join the meeting from your computer, tablet, or smartphone at https://global.gotomeeting.com/join/943518053. You can also participate via phone by dialing (571) 317-3122; Access Code 943-518-053. Meeting times and dates are subject to change. Please confirm meeting time and date on the District’s website www.lwdd.net.

Page 100: James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr ...You can also participate via phone by dialing (571) 317- 3122; Access Code 943 -518-053. Meeting times and dates are subject

Project No. CCRP #10 September 21, 2020 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way, please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they may be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in late January 2021. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of the project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580 or [email protected]. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Tommy Strowd, P.E., Executive Director, Lake Worth Drainage District