...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John...

220
Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A. Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net February 4, 2019 RICHARD BOGATIN PALM BEACH COUNTY PREM DIVISION C/O 2633 VISTA PKWY WEST PALM BEACH FL 33411 5613 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR7 to L42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9779 LIBERTY RD BOCA RATON FL 33487 Dear RICHARD BOGATIN PALM BEACH COUNTY PREM DIVISION C/O: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E- 1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Transcript of ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John...

Page 1: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 RICHARD BOGATIN PALM BEACH COUNTY PREM DIVISION C/O 2633 VISTA PKWY WEST PALM BEACH FL 33411 5613 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9779 LIBERTY RD BOCA RATON FL 33487 Dear RICHARD BOGATIN PALM BEACH COUNTY PREM DIVISION C/O: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 2: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 3: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 SOUTHWIND LAKES HOA INC CREST MGMT GROUP C/O 6413 CONGRESS AVE STE 200 BOCA RATON FL 33487 2839 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: KIMBERLY BLVD BOCA RATON FL 33487 2839 Dear SOUTHWIND LAKES HOA INC CREST MGMT GROUP C/O: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 4: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 5: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 CELESTE T. FOUTY & CELESTE T. FOUTY TR. 9811 LIBERTY CT BOCA RATON FL 33434 2670 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9811 LIBERTY CT BOCA RATON FL 33434 2670 Dear CELESTE T. FOUTY & CELESTE T. FOUTY TR.: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 6: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 7: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 JOHN P. & DIANE C. REIDY 9812 LIBERTY CT BOCA RATON FL 33434 2604 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9812 LIBERTY CT BOCA RATON FL 33434 2604 Dear JOHN P. & DIANE C. REIDY: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 8: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 9: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 PARBAT R. PATEL 9836 LIBERTY CT BOCA RATON FL 33434 2604 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9836 LIBERTY CT BOCA RATON FL 33434 2604 Dear PARBAT R. PATEL : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 10: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 11: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 MATTHEW SANABRIA 9842 LIBERTY CT BOCA RATON FL 33434 2604 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9842 LIBERTY CT BOCA RATON FL 33434 2604 Dear MATTHEW SANABRIA : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 12: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 13: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 JANET M. HARRINGTON 9866 LIBERTY CT BOCA RATON FL 33434 2604 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9866 LIBERTY CT BOCA RATON FL 33434 2604 Dear JANET M. HARRINGTON : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 14: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 15: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 KAMIL KRUKOWSKI 3515 SW 39TH BLVD GAINESVILLE FL 32608 6564 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9872 LIBERTY CT BOCA RATON FL 33434 2604 Dear KAMIL KRUKOWSKI : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 16: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 17: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 PATRICIA ZOCCALI 9878 LIBERTY CT BOCA RATON FL 33434 2604 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9878 LIBERTY CT BOCA RATON FL 33434 2604 Dear PATRICIA ZOCCALI : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 18: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 19: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 RAOUL RIMONDINI & MARINA COLOMBO 9884 LIBERTY CT BOCA RATON FL 33434 2604 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9884 LIBERTY CT BOCA RATON FL 33434 2604 Dear RAOUL RIMONDINI & MARINA COLOMBO: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 20: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 21: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 BONNY K. KENT 9890 LIBERTY CT BOCA RATON FL 33434 2604 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9890 LIBERTY CT BOCA RATON FL 33434 2604 Dear BONNY K. KENT : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 22: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 23: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 PROGRESS RESIDENTIAL BORROWER 5 LLC PO BOX 4090 SCOTTSDALE AZ 85261 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9896 LIBERTY CT BOCA RATON FL 33434 2604 Dear PROGRESS RESIDENTIAL BORROWER 5 LLC : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 24: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 25: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 ADRIAN M. & DORIS Y. RORIE 9902 LIBERTY CT BOCA RATON FL 33434 2604 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9902 LIBERTY CT BOCA RATON FL 33434 2604 Dear ADRIAN M. & DORIS Y. RORIE: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 26: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 27: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 DOLORES PURCELL 9908 LIBERTY CT BOCA RATON FL 33434 2604 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9908 LIBERTY CT BOCA RATON FL 33434 2604 Dear DOLORES PURCELL : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 28: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 29: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 NESTOR L. & CELIA R. TORRES 9914 LIBERTY CT BOCA RATON FL 33434 2604 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9914 LIBERTY CT BOCA RATON FL 33434 2604 Dear NESTOR L. & CELIA R. TORRES: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 30: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 31: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 RICHARD BOGATIN PALM BEACH COUNTY PREM DIVISION C/O 2633 VISTA PKWY WEST PALM BEACH FL 33411 5613 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9815 KIMBERLY BLVD BOCA RATON FL 33434 2604 Dear RICHARD BOGATIN PALM BEACH COUNTY PREM DIVISION C/O: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 32: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 33: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 GEORGIA K. BALLEW 19686 CAROLINA CIR BOCA RATON FL 33434 2613 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19686 CAROLINA CIR BOCA RATON FL 33434 2613 Dear GEORGIA K. BALLEW : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 34: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 35: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 BERTA BROCK 19672 CAROLINA CIR BOCA RATON FL 33434 2613 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19672 CAROLINA CIR BOCA RATON FL 33434 2613 Dear BERTA BROCK : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 36: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 37: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 WAYNE A. WALKER & WAYNE A. WALKER TRUST 19658 CAROLINA CIR BOCA RATON FL 33434 2613 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19658 CAROLINA CIR BOCA RATON FL 33434 2613 Dear WAYNE A. WALKER & WAYNE A. WALKER TRUST: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 38: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 39: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 MC ARTHUR L. & GLENNA R. ASHTON 19644 CAROLINA CIR BOCA RATON FL 33434 2613 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19644 CAROLINA CIR BOCA RATON FL 33434 2613 Dear MC ARTHUR L. & GLENNA R. ASHTON: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 40: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 41: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 BHUPENDRA M. & JYOTI B. PATEL 19630 CAROLINA CIR BOCA RATON FL 33434 2613 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19630 CAROLINA CIR BOCA RATON FL 33434 2613 Dear BHUPENDRA M. & JYOTI B. PATEL: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 42: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 43: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 JOHN & ALICE MAGDITS 19616 CAROLINA CIR BOCA RATON FL 33434 2613 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19616 CAROLINA CIR BOCA RATON FL 33434 2613 Dear JOHN & ALICE MAGDITS: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 44: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 45: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 FONTE BETINA 19602 CAROLINA CIR BOCA RATON FL 33434 2613 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19602 CAROLINA CIR BOCA RATON FL 33434 2613 Dear FONTE BETINA : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 46: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 47: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 PROGRESS RESIDENTIAL 2015 1 BORROWER LLC PO BOX 4090 SCOTTSDALE AZ 85261 4090 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19588 CAROLINA CIR BOCA RATON FL 33434 2613 Dear PROGRESS RESIDENTIAL 2015 1 BORROWER LLC : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 48: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 49: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 HENRY RODRIGUEZ & MARTHA R. GIRALDO RODRIGUEZ 19574 CAROLINA CIR BOCA RATON FL 33434 2611 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19574 CAROLINA CIR BOCA RATON FL 33434 2611 Dear HENRY RODRIGUEZ & MARTHA R. GIRALDO RODRIGUEZ: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 50: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 51: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 CERBERUS SFR HOLDINGS LP 1850 PARKWAY PL STE 900 MARIETTA GA 30067 8261 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19560 CAROLINA CIR BOCA RATON FL 33434 2611 Dear CERBERUS SFR HOLDINGS LP : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 52: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 53: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 SCOTT & JANET C. GREEN 19546 CAROLINA CIR BOCA RATON FL 33434 2611 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19546 CAROLINA CIR BOCA RATON FL 33434 2611 Dear SCOTT & JANET C. GREEN: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 54: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 55: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 ARTHUR & VICTORIA BRODE 19532 CAROLINA CIR BOCA RATON FL 33434 2611 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19532 CAROLINA CIR BOCA RATON FL 33434 2611 Dear ARTHUR & VICTORIA BRODE: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 56: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 57: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 JOHN P. & BRENDA D. GENTILE 4 JOVAL CT BROOKLYN NY 11229 5950 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19518 CAROLINA CIR BOCA RATON FL 33434 2611 Dear JOHN P. & BRENDA D. GENTILE: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 58: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 59: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 GUILLERMO A. RODRIGUEZ & DANAY G. VENTO 19504 CAROLINA CIR BOCA RATON FL 33434 2611 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19504 CAROLINA CIR BOCA RATON FL 33434 2611 Dear GUILLERMO A. RODRIGUEZ & DANAY G. VENTO: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 60: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 61: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 PAUL MALANAPHY 19490 CAROLINA CIR BOCA RATON FL 33434 2609 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19490 CAROLINA CIR BOCA RATON FL 33434 2609 Dear PAUL MALANAPHY : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 62: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 63: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 CSMA BLT LLC 1850 PARKWAY PL STE 900 MARIETTA GA 30067 8261 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19476 CAROLINA CIR BOCA RATON FL 33434 2609 Dear CSMA BLT LLC : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 64: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 65: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 MARGARET MEESE & ROBERT HENDRICKSON 19462 CAROLINA CIR BOCA RATON FL 33434 2609 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19462 CAROLINA CIR BOCA RATON FL 33434 2609 Dear MARGARET MEESE & ROBERT HENDRICKSON: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 66: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 67: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 RONALD B. & MICHELLE W. BRAY 19448 CAROLINA CIR BOCA RATON FL 33434 2609 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19448 CAROLINA CIR BOCA RATON FL 33434 2609 Dear RONALD B. & MICHELLE W. BRAY: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 68: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 69: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 RUTH PORRO 19434 CAROLINA CIR BOCA RATON FL 33434 2609 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19434 CAROLINA CIR BOCA RATON FL 33434 2609 Dear RUTH PORRO : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 70: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 71: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 VINCENT DINOLFO 8705 NW 38TH DR # 7A CORAL SPRINGS FL 33065 4336 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19420 CAROLINA CIR BOCA RATON FL 33434 2609 Dear VINCENT DINOLFO : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 72: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 73: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 VERNON V. & KATHLEEN A. BECK 19406 CAROLINA CIR BOCA RATON FL 33434 2609 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19406 CAROLINA CIR BOCA RATON FL 33434 2609 Dear VERNON V. & KATHLEEN A. BECK: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 74: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 75: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 YU FUN & THIEU NHU CHO 11041 SUNSET RIDGE CIR BOYNTON BEACH FL 33473 4871 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19392 CAROLINA CIR BOCA RATON FL 33434 2609 Dear YU FUN & THIEU NHU CHO: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 76: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 77: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 PETER DOTORATOS & PETER B. DOTORATOS TR. 19378 CAROLINA CIR BOCA RATON FL 33434 2607 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19378 CAROLINA CIR BOCA RATON FL 33434 2607 Dear PETER DOTORATOS & PETER B. DOTORATOS TR.: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 78: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 79: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 JAMES R. SINGLETON 599 HATCHERY RD NORTH KINGSTOWN RI 02852 4655 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19364 CAROLINA CIR BOCA RATON FL 33434 2607 Dear JAMES R. SINGLETON : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 80: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 81: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 MICHAEL & LUCILLE WOROBEL 19350 CAROLINA CIR BOCA RATON FL 33434 2607 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19350 CAROLINA CIR BOCA RATON FL 33434 2607 Dear MICHAEL & LUCILLE WOROBEL: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 82: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 83: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 RONI & MICHELLE GAFNI 19323 CAROLINA CIR BOCA RATON FL 33434 2608 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19336 CAROLINA CIR BOCA RATON FL 33434 2608 Dear RONI & MICHELLE GAFNI: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 84: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 85: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 RONI GAFNI 19323 CAROLINA CIR BOCA RATON FL 33434 2608 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19323 CAROLINA CIR BOCA RATON FL 33434 2608 Dear RONI GAFNI : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 86: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 87: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 JOHN & LILLIAN MAJURE 9832 LIBERTY RD BOCA RATON FL 33434 2384 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9832 LIBERTY RD BOCA RATON FL 33434 2384 Dear JOHN & LILLIAN MAJURE: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 88: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 89: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 DIANE KISNER & THOMAS W. SLACK 9820 LIBERTY RD BOCA RATON FL 33434 2384 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9820 LIBERTY RD BOCA RATON FL 33434 2384 Dear DIANE KISNER & THOMAS W. SLACK: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 90: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 91: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 DIANN L. LYONS 9808 LIBERTY RD PO BOX 880472 BOCA RATON FL 33434 2384 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9808 LIBERTY RD BOCA RATON FL 33434 2384 Dear DIANN L. LYONS : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 92: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 93: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 PAUL & NATALIE CARUSO 9796 LIBERTY RD BOCA RATON FL 33434 2382 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9796 LIBERTY RD BOCA RATON FL 33434 2382 Dear PAUL & NATALIE CARUSO: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 94: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 95: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 SUZAN F. POSTHUMUS & GAIL A. WAGNER 9784 LIBERTY RD BOCA RATON FL 33434 2382 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9784 LIBERTY RD BOCA RATON FL 33434 2382 Dear SUZAN F. POSTHUMUS & GAIL A. WAGNER: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 96: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 97: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 TEMPLE BETH EL OF BOCA RATON INC 333 SW 4TH AVE BOCA RATON FL 33432 5709 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9800 YAMATO RD BOCA RATON FL 33434 Dear TEMPLE BETH EL OF BOCA RATON INC : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 98: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 99: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 CHRISTOPHER P. GRECO & STACEY N. PALAZZO 9792 ALASKA CIR BOCA RATON FL 33434 2702 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9792 ALASKA CIR BOCA RATON FL 33434 2702 Dear CHRISTOPHER P. GRECO & STACEY N. PALAZZO: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 100: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 101: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 DEREK P. FROST & DANA S. WIRTH 9805 ALASKA CIR BOCA RATON FL 33434 2703 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9805 ALASKA CIR BOCA RATON FL 33434 2703 Dear DEREK P. FROST & DANA S. WIRTH: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 102: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 103: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 PATRICIA J. COFFMAN & PATRICIA J. COFFMAN TR. 26779 COUNTY ROAD 1 COSHOCTON OH 43812 9616 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9793 ALASKA CIR BOCA RATON FL 33434 2703 Dear PATRICIA J. COFFMAN & PATRICIA J. COFFMAN TR.: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 104: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 105: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 MARIANO & LUCIA GONZALEZ 9781 ALASKA CIR BOCA RATON FL 33434 2701 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9781 ALASKA CIR BOCA RATON FL 33434 2701 Dear MARIANO & LUCIA GONZALEZ: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 106: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 107: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 RAPHAEL & ESTHER OUAKNINE 10350 CAMELBACK LN BOCA RATON FL 33498 4719 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9769 ALASKA CIR BOCA RATON FL 33434 2701 Dear RAPHAEL & ESTHER OUAKNINE: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 108: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 109: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 LAURA GOLDENBERG 19637 MONTANA LN BOCA RATON FL 33434 2726 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19637 MONTANA LN BOCA RATON FL 33434 2726 Dear LAURA GOLDENBERG : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 110: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 111: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 FREDERICK VANHINE 19627 MONTANA LN BOCA RATON FL 33434 2726 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19627 MONTANA LN BOCA RATON FL 33434 2726 Dear FREDERICK VANHINE : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 112: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 113: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 BELINDA G. KRAUSE 19607 MONTANA LN BOCA RATON FL 33434 2726 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19607 MONTANA LN BOCA RATON FL 33434 2726 Dear BELINDA G. KRAUSE : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 114: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 115: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 SARAY S. & DAVID GARCIA 19587 MONTANA LN BOCA RATON FL 33434 2724 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19587 MONTANA LN BOCA RATON FL 33434 2724 Dear SARAY S. & DAVID GARCIA: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 116: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 117: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 CLARE A. ANTHON & CLARE A. ANTHON TR. 19565 MONTANA LN BOCA RATON FL 33434 2724 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19565 MONTANA LN BOCA RATON FL 33434 2724 Dear CLARE A. ANTHON & CLARE A. ANTHON TR.: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 118: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 119: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 SYLVIA SHUMSKY SYLVIA SHUMSKY TR. 19541 MONTANA LN BOCA RATON FL 33434 2724 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19541 MONTANA LN BOCA RATON FL 33434 2724 Dear SYLVIA SHUMSKY SYLVIA SHUMSKY TR.: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 120: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 121: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 MARIA F. GARCIA 19521 MONTANA LN BOCA RATON FL 33434 2724 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19521 MONTANA LN BOCA RATON FL 33434 2724 Dear MARIA F. GARCIA : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 122: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 123: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 TODD & STEPHANIE CAMPBELL 19489 COLORADO CIR BOCA RATON FL 33434 2708 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19489 COLORADO CIR BOCA RATON FL 33434 2708 Dear TODD & STEPHANIE CAMPBELL: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 124: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 125: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 JESUS PEREZ & NELLY E. ALMEIDA 19483 COLORADO CIR BOCA RATON FL 33434 2708 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19483 COLORADO CIR BOCA RATON FL 33434 2708 Dear JESUS PEREZ & NELLY E. ALMEIDA: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 126: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 127: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 JOHANNA PEREZ 19463 COLORADO CIR BOCA RATON FL 33434 2708 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19463 COLORADO CIR BOCA RATON FL 33434 2708 Dear JOHANNA PEREZ : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 128: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 129: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 DONNA L. RIZZI 19443 COLORADO CIR BOCA RATON FL 33434 2708 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19443 COLORADO CIR BOCA RATON FL 33434 2708 Dear DONNA L. RIZZI : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 130: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 131: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 JESSICA W. REUM 19423 COLORADO CIR BOCA RATON FL 33434 2708 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19423 COLORADO CIR BOCA RATON FL 33434 2708 Dear JESSICA W. REUM : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 132: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 133: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 JOAN A. BRUNO 19403 COLORADO CIR BOCA RATON FL 33434 2708 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19403 COLORADO CIR BOCA RATON FL 33434 2708 Dear JOAN A. BRUNO : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 134: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 135: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 ALEXEI STAIKIDIS FERRUFINO & LAIVIS SOLLET OJEDA 19393 COLORADO CIR BOCA RATON FL 33434 2706 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19393 COLORADO CIR BOCA RATON FL 33434 2706 Dear ALEXEI STAIKIDIS FERRUFINO & LAIVIS SOLLET OJEDA: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 136: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 137: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 CHRISTOPHER K. & NANKUMAR CYRIL 19773 ARIZONA CT BOCA RATON FL 33434 2705 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19773 ARIZONA CT BOCA RATON FL 33434 2705 Dear CHRISTOPHER K. & NANKUMAR CYRIL: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 138: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 139: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 OSCAR GOMEZ 19795 ARIZONA CT BOCA RATON FL 33434 2705 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19795 ARIZONA CT BOCA RATON FL 33434 2705 Dear OSCAR GOMEZ : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 140: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 141: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 GEST HOLDING CORP 2100 N OCEAN BLVD APT 1001 FORT LAUDERDALE FL 33305 1972 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19807 ARIZONA CT BOCA RATON FL 33434 2705 Dear GEST HOLDING CORP : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 142: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 143: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 WAYNE HAWKE 19823 ARIZONA CT BOCA RATON FL 33434 2705 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19823 ARIZONA CT BOCA RATON FL 33434 2705 Dear WAYNE HAWKE : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 144: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 145: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 SOUTHWIND LAKES HOA INC CREST MGMT GROUP C/O 6413 CONGRESS AVE STE 200 BOCA RATON FL 33487 2839 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: BOCA RATON FL 33434 2705 Dear SOUTHWIND LAKES HOA INC CREST MGMT GROUP C/O: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 146: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 147: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 KATIE & ROBERT DECICCO 9787 LANCASTER PL BOCA RATON FL 33434 2746 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9787 LANCASTER PL BOCA RATON FL 33434 2746 Dear KATIE & ROBERT DECICCO: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 148: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 149: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 GERSHON GALICKI 9800 LANCASTER PL BOCA RATON FL 33434 2745 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9800 LANCASTER PL BOCA RATON FL 33434 2745 Dear GERSHON GALICKI : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 150: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 151: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 MARIA ELENA LANAO & MARIA ELENA LANAO TR. 9788 LANCASTER PL BOCA RATON FL 33434 2745 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9788 LANCASTER PL BOCA RATON FL 33434 2745 Dear MARIA ELENA LANAO & MARIA ELENA LANAO TR.: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 152: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 153: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 2018 1 IH BORROWER LP 1717 MAIN ST STE 2000 DALLAS TX 75201 4657 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9592 RICHMOND CIR BOCA RATON FL 33434 2745 Dear 2018 1 IH BORROWER LP : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 154: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 155: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 GIANA B. & STEVEN SIROTA 9596 RICHMOND CIR BOCA RATON FL 33434 2381 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9596 RICHMOND CIR BOCA RATON FL 33434 2381 Dear GIANA B. & STEVEN SIROTA: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 156: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 157: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 ANTHONY & ELIA MARTINEZ 9600 RICHMOND CIR BOCA RATON FL 33434 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9600 RICHMOND CIR BOCA RATON FL 33434 Dear ANTHONY & ELIA MARTINEZ: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 158: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 159: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 MANUEL MORALES 9604 RICHMOND CIR BOCA RATON FL 33434 2329 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9604 RICHMOND CIR BOCA RATON FL 33434 2329 Dear MANUEL MORALES : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 160: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 161: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 JAMES C. & CLAUDIA J. LOCH 9606 RICHMOND CIR BOCA RATON FL 33434 2329 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9606 RICHMOND CIR BOCA RATON FL 33434 2329 Dear JAMES C. & CLAUDIA J. LOCH: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 162: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 163: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 ROSEMEIRE GAUTHIER 9610 RICHMOND CIR BOCA RATON FL 33434 2329 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9610 RICHMOND CIR BOCA RATON FL 33434 2329 Dear ROSEMEIRE GAUTHIER : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 164: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 165: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 KEITH W. STEVENS & MARIA G. RODRIGUEZ ROSAS 9612 RICHMOND CIR BOCA RATON FL 33434 2329 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9612 RICHMOND CIR BOCA RATON FL 33434 2329 Dear KEITH W. STEVENS & MARIA G. RODRIGUEZ ROSAS: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 166: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 167: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 BARBARA DOBENS WALSH 9618 RICHMOND CIR BOCA RATON FL 33434 2329 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9618 RICHMOND CIR BOCA RATON FL 33434 2329 Dear BARBARA DOBENS WALSH : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 168: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 169: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 JAMES P. & DEBRA P. BEALE 9622 RICHMOND CIR BOCA RATON FL 33434 2329 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9622 RICHMOND CIR BOCA RATON FL 33434 2329 Dear JAMES P. & DEBRA P. BEALE: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 170: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 171: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 FIROMAR Y. E. DE DUARTE & LUIS RENATO VIDAL 9626 RICHMOND CIR BOCA RATON FL 33434 2329 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9626 RICHMOND CIR BOCA RATON FL 33434 2329 Dear FIROMAR Y. E. DE DUARTE & LUIS RENATO VIDAL: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 172: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 173: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 MILLBRAE 1 LLC 7299 MANDARIN DR BOCA RATON FL 33433 7415 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9630 RICHMOND CIR BOCA RATON FL 33433 7415 Dear MILLBRAE 1 LLC : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 174: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 175: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 DAVID P. & TERESA M. NOLAN 9634 RICHMOND CIR BOCA RATON FL 33434 2329 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9634 RICHMOND CIR BOCA RATON FL 33434 2329 Dear DAVID P. & TERESA M. NOLAN: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 176: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 177: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 JHON M. OTALORA & ERIKA ZARATE 9638 RICHMOND CIR BOCA RATON FL 33434 2329 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9638 RICHMOND CIR BOCA RATON FL 33434 2329 Dear JHON M. OTALORA & ERIKA ZARATE: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 178: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 179: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 2017 2 IH BORROWER LP 1717 MAIN ST STE 2000 DALLAS TX 75201 4657 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9640 RICHMOND CIR BOCA RATON FL 33434 2329 Dear 2017 2 IH BORROWER LP : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 180: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 181: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 SEGISMUNDO J. & DELINDA G. WITKOWSKI 9644 RICHMOND CIR BOCA RATON FL 33434 2329 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9644 RICHMOND CIR BOCA RATON FL 33434 2329 Dear SEGISMUNDO J. & DELINDA G. WITKOWSKI: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 182: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 183: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 DEAN ATTRIDGE & SUSAN SWEITZER 9648 RICHMOND CIR BOCA RATON FL 33434 2329 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9648 RICHMOND CIR BOCA RATON FL 33434 2329 Dear DEAN ATTRIDGE & SUSAN SWEITZER: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 184: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 185: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 CLARA & JEFFREY SAMUELS 4326 TRANQUILITY DR BOCA RATON FL 33487 4218 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9652 RICHMOND CIR BOCA RATON FL 33487 4218 Dear CLARA & JEFFREY SAMUELS: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 186: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 187: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 MICHAEL R. & CARLA MONTI 9656 RICHMOND CIR BOCA RATON FL 33434 2329 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9656 RICHMOND CIR BOCA RATON FL 33434 2329 Dear MICHAEL R. & CARLA MONTI: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 188: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 189: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 BETTY THOMPSON 9660 RICHMOND CIR BOCA RATON FL 33434 2329 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9660 RICHMOND CIR BOCA RATON FL 33434 2329 Dear BETTY THOMPSON : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 190: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 191: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 JOHN P. & MELO F. MAGUIRE 9664 RICHMOND CIR BOCA RATON FL 33434 2329 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9664 RICHMOND CIR BOCA RATON FL 33434 2329 Dear JOHN P. & MELO F. MAGUIRE: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 192: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 193: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 TAMI & NICHOLAS TOBOLSKI 9668 RICHMOND CIR BOCA RATON FL 33434 2329 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9668 RICHMOND CIR BOCA RATON FL 33434 2329 Dear TAMI & NICHOLAS TOBOLSKI: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 194: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 195: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 JOHN H. & PATRICIA A. MAHER 9672 RICHMOND CIR BOCA RATON FL 33434 2329 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9672 RICHMOND CIR BOCA RATON FL 33434 2329 Dear JOHN H. & PATRICIA A. MAHER: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 196: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 197: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 MICHEL A. PUJAZON & HEDA V. LIZARRAGA 19831 COURT OF THE MYRTLES BOCA RATON FL 33434 3717 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19831 COURT OF THE MYRTLES BOCA RATON FL 33434 3717 Dear MICHEL A. PUJAZON & HEDA V. LIZARRAGA: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 198: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 199: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 JOHN J. CANNELLA JR. & JANET E. CANNELLA 19830 COURT OF THE MYRTLES BOCA RATON FL 33434 3717 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19830 COURT OF THE MYRTLES BOCA RATON FL 33434 3717 Dear JOHN J. CANNELLA JR. & JANET E. CANNELLA: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 200: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 201: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 PAUL & OLGA MONROY 19844 COURT OF THE MYRTLES BOCA RATON FL 33434 3717 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 19844 COURT OF THE MYRTLES BOCA RATON FL 33434 3717 Dear PAUL & OLGA MONROY: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 202: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 203: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 MARC J. & CATHERINE DAVIS 9792 MAJORCA PL BOCA RATON FL 33434 3712 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9792 MAJORCA PL BOCA RATON FL 33434 3712 Dear MARC J. & CATHERINE DAVIS: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 204: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 205: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 NICK N. & SUNEE N. WONGCHINSRI 9786 MAJORCA PL BOCA RATON FL 33434 3712 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9786 MAJORCA PL BOCA RATON FL 33434 3712 Dear NICK N. & SUNEE N. WONGCHINSRI: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 206: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 207: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 JACQUES & JANA CARRIGLIO 9780 MAJORCA PL BOCA RATON FL 33434 3712 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9780 MAJORCA PL BOCA RATON FL 33434 3712 Dear JACQUES & JANA CARRIGLIO: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 208: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 209: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 MARK & VIKKI BERMAN 9774 MAJORCA PL BOCA RATON FL 33434 3712 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9774 MAJORCA PL BOCA RATON FL 33434 3712 Dear MARK & VIKKI BERMAN: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 210: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 211: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 JAMES & KRISTEN CRUZ 9768 MAJORCA PL BOCA RATON FL 33434 3712 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9768 MAJORCA PL BOCA RATON FL 33434 3712 Dear JAMES & KRISTEN CRUZ: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 212: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 213: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 PENNY BAKER 9762 MAJORCA PL BOCA RATON FL 33434 3712 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9762 MAJORCA PL BOCA RATON FL 33434 3712 Dear PENNY BAKER : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 214: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 215: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 TAMARA BARNEA 9756 MAJORCA PL BOCA RATON FL 33434 3712 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9756 MAJORCA PL BOCA RATON FL 33434 3712 Dear TAMARA BARNEA : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 216: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 217: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 HARUKO Y. SMITH & HARUKO Y. SMITH TR. 9750 MAJORCA PL BOCA RATON FL 33434 3712 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9750 MAJORCA PL BOCA RATON FL 33434 3712 Dear HARUKO Y. SMITH & HARUKO Y. SMITH TR.: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 218: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 219: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

February 4, 2019 JABBAR J. ALWARDI & KIRK FORNEY 9744 MAJORCA PL BOCA RATON FL 33434 3712 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION CCRP#4 Rehabilitation of the E-1 Canal from SR‐7 to L‐42 (via barge) Project No. 16-9970P.01; Job No. 164 Site Address: 9744 MAJORCA PL BOCA RATON FL 33434 3712 Dear JABBAR J. ALWARDI & KIRK FORNEY: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the E-1 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of January 28, 2019 to identify the boundaries of the District’s E-1 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. Please note, to share project-specific information with affected residents, the District may host an informational Open House Meeting from 8:00 AM to 9:00 AM on February 21, 2019 at District Headquarters located at 13081 South Military Trail, Delray Beach, Florida 33484. Meeting times and dates are subject to change. Prior to arrival, please confirm meeting time and date on the District’s website LWDD.net.

Page 220: ...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown …

Project No. 16-9970P.01 February 4, 2019 Page 2 If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed. Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early April 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. To view additional information regarding this canal rehabilitation project including a map of project boundaries, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580. Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District