ITER CODAC

50
Instituto de Plasmas e Fusão Nuclear Instituto Superior Técnico Lisbon, Portugal http://www.ipfn.ist.utl.pt B. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition ITER CODAC ITER CODAC Bruno Soares Gonçalves [email protected] http://ipfn.ist.utl.pt/EU-PhD/

description

ITER CODAC. Bruno Soares Gonçalves [email protected] http://ipfn.ist.utl.pt/EU-PhD/. CODAC. CO ntrol, D ata A ccess and C ommunication system. Large-scale experiments: control and data aquisition challenges. The next generation of physics experiments will be highly complex - PowerPoint PPT Presentation

Transcript of ITER CODAC

Page 1: ITER CODAC

Instituto de Plasmas e Fusão NuclearInstituto Superior TécnicoLisbon, Portugalhttp://www.ipfn.ist.utl.pt

B. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition

ITER CODACITER CODAC

Bruno Soares Gonç[email protected]

http://ipfn.ist.utl.pt/EU-PhD/

Page 2: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition2

CODACCODAC

COntrol, Data Access and Communication system

Page 3: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition3

Large-scale experiments:Large-scale experiments:control and data aquisition challengescontrol and data aquisition challenges

The next generation of physics experiments will – be highly complex– raise new challenges in the field of control and

automation systems

– demand well integrated, interoperable set of tools with a high degree of automation

– deliver and process data at a rate of up to hundred GBytes/s.

– deploy and integrate systems with different degrees of complexity and provenience

Page 4: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition4

New projects prominently feature

– solutions adopted from other laboratories,

– hardware and software standards

– industrial solutions.

Are they any different from commercial systems?

– Although sharing a large degree of architectural commonality, given their unique requirements, traditionally, such systems have been purpose built.

• significantly greater amount of I/O capability required between computational elements

• unique and disparate I/O requirements imposed on their interfaces

Large-scale experiments:Large-scale experiments:control and data aquisition systemscontrol and data aquisition systems

Page 5: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition5

Commercial technology will likely meet the basic requirements on which physics

experiments can leverage for building future control systems

Large-scale experiments:Large-scale experiments:R&D on control and data aquisition R&D on control and data aquisition

• R&D activities target – Self-triggered front-end electronics with adequate

output bandwidth and data processing– MIMO controllers with efficient resource sharing

between control tasks on the same unit – Massive parallel computing capabilities.

Page 6: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition6

However…future systems are envisioned to be more than an order of

magnitude larger than those of today

More challenging will be… providing a robust, fault tolerant, reliable, maintainable,

secure and operable control systems

Large-scale experiments:Large-scale experiments:control and data aquisition (more) challengescontrol and data aquisition (more) challenges

Page 7: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition7

Is ITER any different?Is ITER any different?

ITER CODAC is a challenging endeavour

• ITER will generate a huge quantity of experimental data

– 150 plant systems– 1 000 000 diagnostic channels– 300 000 slow control channels– 5 000 fast control channels– 40 CODAC systems– 5 Gb/s data– 3Pb/year data (e.g. 12 IR cameras

in a 10 minutes discharge: 1.728 Tbytes)

In addition...

ITER will require a far higher level of availability and

reliability than previous/existing tokamaks.

Page 8: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition8

ITER Challenges:ITER Challenges:Scientific ExploitationScientific Exploitation

ITER will generate huge quantities of experimental data – PBytes per year (but still less than LHC)(e.g. 12 IR cameras data resulting from a 10 minutes shot: 1.728 TBytes)

ITER will provide tools for continuously accessing and analysing data during a pulse - Requires data indexing by events

ITER will have a very strong flexible set of diagnostics and tools for optimising the performance during a pulse - Adequate tools and methodologies need to be developed

ITER will have a limited number of pulse cycles and an unlimited number of ideas to be tested– Will schedule and reschedule many activities during a pulse

ITER will evolve both equipment and ideas over 20 years– A lifetime of 30 years including procurement – evolution must be built

into CODAC

Page 9: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition9

ITER Challenges:ITER Challenges:Inherent ConstraintsInherent Constraints

ITER site will be a Nuclear Registered site

• ITER environment between JET and a Nuclear power station in terms of quality, audit trails, ..... etc.

• To accomplish the scientific objectives will need control system architecture with freedom but within the licensing constraints

• Requires tools to guarantee safety, protection of investment (and a unique facility) and guaranteed operation

• Hostile environment for measurements, networks, electronics – human access will be restricted

• ITER will require a far higher level of availability and reliability than previous/existing tokamaks

IT security will be a major issue

• Security with transparency is required. What does this mean for Remote participation?

Page 10: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition10

ITER Challenges:ITER Challenges:Inherent ConstraintsInherent Constraints

ITER is assumed to be totally legacy-free for hardware and software• Methodologies will have to be tested and proved on existing fusion

devices before implementation on ITER• It will be necessary to take informed decisions based on technology

progress• Maintenance will be an issue and proliferation of technologies must be

avoided

ITER is an international project• In-kind procurement world-wide• Integration of Plant Systems from all participants• The implications of in-kind delivery of subsystems need to be recognised• Powerful remote access networks• Remote access security

Page 11: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition11

ITER CODACITER CODAC

CODAC provides the COntrol, Data Access and Communication functions

for ITER, allowing integrated operation.

This includes:

•continuously monitoring the Plant Systems;

•displaying their status to operators including alarms;

•preparing and automating scheduled operations (including plasma pulses);

•recovering data from Plant Systems;

•storing and making all the data available.

CODAC uses multiple logical and physical networks to segregate these disparate functions.

Page 12: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition12

ITER: ITER: as seen by CODACas seen by CODAC

• CODAC integrates ALL ITER Plant Systems

• Many networks: operation, interlocks, safety

• CODAC functions are like present tokamaks

Typical CODAC Functions

Time & Synchronisation

Data Access

Gateway

Safety NetworkCODAC Network

I nterlock Network

Coil power supply & distribution

system

TF coil system

PF coil system

Correction coil system

CS coil system

Diagnostic systems

Additional heating & power supply systems

Gas inj. system

Pellet injector system

Remote handling system

Component cooling & chilled

water system

Tokamak cooling water

system

Heat rejection system

Tritium plant

system

Cryoplant system

Glow discharge system

Radiation & Environmental

monitoring system

Cryostat & VV pressure suppression

system

FPSS VVPSS

Access control

ECH&CD system

NBH&CD system

ICH&CD system

LHH&CD system

Experiment Sites

Central Interlock System

Steady state power supply

system

Vacuum pumping system

Magnet I&C

system

Miscellaneous instrumentation

systems

Liquid distribution

Gas distribution & compressors

Central Safety System

Plant Monitoring

Operation Scheduling

Plant Operation

Page 13: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition13

ITER:ITER:Instrumentation and ControlInstrumentation and Control

I&C is in 3 clear tiers– Safety: protects

personnel, population and environment

– Interlock: protects ITER investment

– CODAC: operates ITER

I&C is in 2 layers– Plant Systems: local

responsibility

– Networks when responsibility lies across Plant Systems• ITER operation will be complex

• The investment needs to be reliable• The licensing has to be simple

CODAC Systems

InterlockSystem

SafetySystem

Plant SystemHost (PSH)

Main Control Room

CODAC Networks

Central Interlock Network

Central Safety Network

Central Safety SystemsCentral CODAC Central Interlock System

Plant Operation Zone

Subsystem

Subsystem Controller

Equipment

Sensors / Actuators

Sensors /

Plant Safety System

Subsystem Controller

Equipment

Sensors / Actuators

ITE

R_C

OD

AC

_P

CD

H_F

igu

res_

Vis

io_0

002

Plant Interlock System

Subsystem Controller

Equipment

ActuatorsP

rocu

rem

ent

Bo

un

dry

Pla

nt

Sys

tem

CO

DA

C

Page 14: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition14

CODACCODAC

CODAC shall provide:

• Supervisory control functions as a project wide and interface specifications between CODAC and Plant Systems.

• Central data management functions i.e. data archiving, data monitoring and visualization functions.

• PSH functional profile and data exchange software for the asynchronous communication interface between CODAC and Plant System.

• Mini CODAC as a tool to carry out FAT (Factory Acceptance Test)

• Specifications for the Network Interface Units with their interface specifications.

• Self-description schema and tool for Plant System I&C designers.

• Functional mimic diagrams for Plant System data monitoring, trends, plasma discharge preparation, sequencing, and data display.

• Functions for global and plant operating states management, plasma control, data recording with time stamp, data marshalling, data archiving etc.

• Capability to log all commands and state transitions along with all the associated data with time stamping.

Page 15: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition15

CODAC and Plant Systems I&C CODAC and Plant Systems I&C architecturearchitecture

ITE

R_C

OD

AC

_P

CD

H_

Fig

ure

s_

Vis

io_0

00

3

CODAC Networks

Equipment Equipment Equipment

Equipment

Subsystem(PLC)Subsystem

(PLC)

Digitizers

Subsystem(PLC)

Subsystem(PLC)

Plant System - A Plant System - B Plant System - C

Subsystem(PC)

Subsystem(PLC)

Subsystem(PLC)

Digitizers

Digitizers

Digitizers Equipment

CODAC Systems

I&C Bridge I&C Bridge I&C Bridge

Plant System Host Plant System Host Plant System Host

CODAC Systems

Provides supervisory functions of ITER plant operation, plasma experiment, overall ITER plant operating status monitoring, data archiving and alarm handling, HMI interface and remote experiment handling functions.

Modular design with Dual Redundancy required

Page 16: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition16

CODAC componentsCODAC components

The principal CODAC System is the Supervisory Control System

The Supervisory Control System:

• dynamically allocates any required resources to an ITER operation Task.

• manages a dynamically evolving set of concurrent activities, each of which is driven by an Operation Schedule.

The Operation Schedule

• is prepared by Schedule Preparation and each Operation Schedule requires Schedule Validation before becoming executable.

• is executed by Schedule Execution once the resources are made available by SCS.

There is a strong interface between scheduling and ITER operation planning

Page 17: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition17

CODAC componentsCODAC components

The status of ITER is obtained from Plant Monitoring, which also generates a data stream for Data Logging.

•Maximum refresh frequency proposed is 3 Hz, corresponding to a human reaction.

•Minimum rate is 0.1 Hz to ensure a continuous record and continuous functionality checking.

Monitoring data are available in the Experiment Sites to enhance contact with operation.

The functionality is typical of an industrial SCADA (Supervisory Control And Data Acquisition)

•displays on mimic diagrams,

•trending,

•warning and alarm handling,

•manual triggering of commands or changes to set-points.

Page 18: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition18

Central data management functionsCentral data management functions

• CODAC shall provide data logging, data monitoring, data archiving and data visualisation functions within the Main Control Room.

• Data provided from the Plant System I&C in a format compatible with the CODAC specifications

• Data are generated by different parts of the ITER plant at different sampling rates according to the information itself and according to the operational state of ITER.

• The notion of pulse archive also disappears, replaced by the data in a particular pulse being and identifiable time interval in a continuous data retrieval stream.

• Storage strategies required for efficient recovery of data taken at different sampling rate (0.1 Hz to 1 MHz). Separating the total data flow into suitable streams to optimize the retrieval of archived information.

Page 19: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition19

Issues:Issues:Operation SoftwareOperation Software

Issues Actions

Operation for longer periods or even continuous

•the operation should be considered continuous and the ageing ‘shot’ paradigm shall be replaced•Event-driven support where data is acquired or actions performed only when relevant events occur

– data indexing using events and time-stamps with synchronism of all digitizer and generator endpoints (absolute time)

•Provide tools for continuously accessing and analysing data during a pulse

Page 20: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition20

CODAC and Plant Systems I&C CODAC and Plant Systems I&C architecturearchitecture

ITE

R_C

OD

AC

_P

CD

H_

Fig

ure

s_

Vis

io_0

00

3

CODAC Networks

Equipment Equipment Equipment

Equipment

Subsystem(PLC)Subsystem

(PLC)

Digitizers

Subsystem(PLC)

Subsystem(PLC)

Plant System - A Plant System - B Plant System - C

Subsystem(PC)

Subsystem(PLC)

Subsystem(PLC)

Digitizers

Digitizers

Digitizers Equipment

CODAC Systems

I&C Bridge I&C Bridge I&C Bridge

Plant System Host Plant System Host Plant System Host

CODAC Networks

Provide ITER wide physical and logical interconnections between CODAC and the Plant Systems.

The roles and functions of networks are defined according to their performance requirements.

Page 21: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition21

CODAC NetworksCODAC Networks

The CODAC architecture is based on distributed systems connected

over a set of complementary asynchronous and synchronous networks

Each Plant System and CODAC Systems can communicate over one or more networks

•Asynchronous general purpose Plant Operation Network (PON) provides the backbone of CODAC communication for most CODAC data traffic.

•General ITER Networks (GIN) used to connect between the Plant Operation Zone and external Experiment and Analysis Sites.

Networks used will depend on the required functionality, volume of data, bandwidth and latency.

Page 22: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition22

High Performance NetworksHigh Performance Networks

Some functions of CODAC require deterministic, hard real-time communication and synchronization between distributed nodes.

These requirements are addressed by the CODAC High Performance Networks

•Synchronous DataBus Network (SDN)

•Time Communication Network (TCN)

•Event Distribution Network (EDN)

•Audio Video Network (AVN)

Page 23: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition23

Issues:Issues:Timing, Synchronization, events and Synchronous Timing, Synchronization, events and Synchronous data Transport Networksdata Transport Networks

Issues Actions

Distribution of timing signals from central unit to sub-system timing decoder cards where timing signals are subsequently connected to digitizers and control processors

•Include timing, synchronization and event decoder directly on digitizers and control processors

– Higher reliability

– Improve commissioning and maintenance efforts

– Possibility of performing the timing and synchronization of control processes over the synchronous network (IEEE 1588)

Absolute time concept •CODAC shall provide absolute time broadcast; triggers are timing events; clocks are recovered from the synchronous data (optical) links used for events transport.

– Autonomous local absolute time clock units on the digitizers synchronized through a fast network

New diagnostics and plasma controllers may require an updated real-time control and monitoring hardware infrastructure

•Specify a new synchronous network infrastructure

– Lower latency distribution of plasma variables and events (< 2 us)

Page 24: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition24

CODAC and Plant Systems I&C CODAC and Plant Systems I&C architecturearchitecture

ITE

R_C

OD

AC

_P

CD

H_

Fig

ure

s_

Vis

io_0

00

3

CODAC Networks

Equipment Equipment Equipment

Equipment

Subsystem(PLC)Subsystem

(PLC)

Digitizers

Subsystem(PLC)

Subsystem(PLC)

Plant System - A Plant System - B Plant System - C

Subsystem(PC)

Subsystem(PLC)

Subsystem(PLC)

Digitizers

Digitizers

Digitizers Equipment

CODAC Systems

I&C Bridge I&C Bridge I&C Bridge

Plant System Host Plant System Host Plant System Host

Plant Systems provide data acquisition, operation & control, status/alarm monitoring, and data communication functions with the CODAC systems.

Also have local autonomous operation control independent from the CODAC.

Plant Systems communicates only through CODAC.

Page 25: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition25

CODAC and Plant Systems I&C CODAC and Plant Systems I&C architecturearchitecture

ITE

R_C

OD

AC

_P

CD

H_

Fig

ure

s_

Vis

io_0

00

3

CODAC Networks

Equipment Equipment Equipment

Equipment

Subsystem(PLC)Subsystem

(PLC)

Digitizers

Subsystem(PLC)

Subsystem(PLC)

Plant System - A Plant System - B Plant System - C

Subsystem(PC)

Subsystem(PLC)

Subsystem(PLC)

Digitizers

Digitizers

Digitizers Equipment

CODAC Systems

I&C Bridge I&C Bridge I&C Bridge

Plant System Host Plant System Host Plant System Host

Plant System Hoststandard image of Plant System to the CODAC.

It is a single point entry for the asynchronous communication with CODAC (data exchange)

Controls data flow, interprets all the commands and passes them to the Subsystem Controller for necessary actions.

Page 26: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition26

Plant System supplier’s Plant System supplier’s responsibilityresponsibility

Plant System suppliers shall:

– Provide self-description data of their Plant System I&C and shall receive interface requirements from the CODAC.

– Provide and implement applications for their Plant System monitoring, data acquisition, autonomous operation and control functions.

– Provide Plant System simulators/Plant subsystem simulators.

– Carry out Factory Acceptance Tests using mini-CODAC as a testing tool. Also Plant System is responsible to carry out installation, commissioning and SAT at the IO site.

Page 27: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition27

Mini-CODACMini-CODAC

Development of a mini-CODAC mandatory • It is required to test all CODAC concepts prior to full development and also to

provide a development and test tool for Plant System designers

Mini-CODAC is a CODAC emulator for development of Plant Systems

• Tool for carrying out functional testing of the Plant System to certify Plant System functional integration.

• Scalable functionality to achieve limited performance testing of the Plant System interfaces with CODAC.

• Used to carry out Provisional Acceptance Tests (and for repeating the FAT if needed) to prove and verify that all plant cabling and connections have been terminated correctly and that the input and output schedule is as required by the design.

• Does not define the technical functionality and test processes of Plant Systems but defines and provides environment with limited performance to facilitate integration testing of Plant Systems with CODAC.

Page 28: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition28

Plant System SimulatorPlant System Simulator

PSH

Mini CODAC Plant System # 1 Simulator

Plant System # 2 Simulator

Plant System simulator

ITER

_CO

DAC_

PCDH

_Fig

ures

_Vis

io_0

005

Plant Subsystem simulator

Used to test the behaviour of Plant Systems during different phases of integration (Factory Acceptance Tests, Commissioning and Site Acceptance Tests and also during plant operation).

Plant System/Sub-system simulator should be based on self description data from Individual Plant System/sub-system supplier.

Page 29: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition29

CODAC and Plant Systems I&C architectureCODAC and Plant Systems I&C architecture

ITE

R_C

OD

AC

_P

CD

H_

Fig

ure

s_

Vis

io_0

00

3

CODAC Networks

Equipment Equipment Equipment

Equipment

Subsystem(PLC)Subsystem

(PLC)

Digitizers

Subsystem(PLC)

Subsystem(PLC)

Plant System - A Plant System - B Plant System - C

Subsystem(PC)

Subsystem(PLC)

Subsystem(PLC)

Digitizers

Digitizers

Digitizers Equipment

CODAC Systems

I&C Bridge I&C Bridge I&C Bridge

Plant System Host Plant System Host Plant System Host

EquipmentMay not communicate in a project-wide standardised form.

Configured hierarchically according to the individual Plant System design.

Not procured for direct interface with CODAC but subject to an integration procurement arrangement to deliver as a Plant System component.

(sensors, actuators, instrumentation, electronics, modules, racks, cabling, wiring,…)

Page 30: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition30

Sub-systems and equipments Sub-systems and equipments

Control System Interface Definition Optics alignment controller

interfaces Laser alignment unit interfaces Lasers controller interfaces Detection system controller

interfaces Windows monitoring unit

interfaces Inner wall monitoring unit

interfaces Control and monitoring software

specification Local controller hardware

specification

Radial Port Labyrinth

Primary Vacuum Window

Cryostat Window

Biological Shield Labyrinth

Beam Combiner

532 nm Lasers

Calibration Laser

1064 nm Lasers

PLASMA

VACUUMVESSEL

CRYOSTAT

PIT

M4

M5

LinearServomotors

Linear Servomotors

Alignment Optics Feedback Controller

CCCD

PIT RELAYS

Laser Alignment Feedback Controller

CCCD

CCCD Blanket

penetration

Primary imaging mirror

Laser Controller

Filter Spectometer

Gated Fast Detectors

(MCP PMTs)

Data Acquisition 20 GSPS, 10-bit,

6 GHz, 500 ps

Collected LightTransmission Line

Laser Transmission

Line

Detection System

Controller

LOCAL CONTROL

Windows Monitoring Unit

Inner-Wall Monitoring Unit(to be defined)

7 beams1 beam

7 beams

CCCD Back wall

2 cameras

XY axisXY axis

Laser control, triggering, fault detection and monitoring lines

30LIDAR CONTROL AND DATA ACQUISITION as example

Diagnostic systems will have local controllers and data acquisition which may have to be developed to meet the requirements

Page 31: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition31

Issues:Issues:Data AcquisitionData Acquisition

Issues Actions

The size of the data collected in each shot is increasing(ITER will generate huge quantities of data. e.g 12 IR cameras data resulting from a 10 minutes shot: 1.728 TBytes)

• Implement faster data transport to comply with cycle-time

• Higher-speed real-time pulse processing both during and after shot

High sampling rates and data bandwidth

• Data reduction techniques directly in the sub-system, preferably on the digitizer modules

– Increment the transient recorder time window

– Solve local bandwidth bottlenecks

– improve the CODAC performance since data reduction tasks will be parallelized, lessening data management burden on CODAC infrastructure thus helping meeting the operation delay constrains

Page 32: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition32

Issues:Issues:InstrumentationInstrumentationIssues Actions

Multitude of different hardware platforms to maintain

• ‘generic’ sub-system able to perform one or more of the (fast) local control operations, feedback and data acquisition tasks

• Develop for easy deployment and maintenance

Higher processing power requirements for local data reduction techniques, fast real-time local control or other specialized algorithms on the digitizers

• Use of processors with parallel processing capabilities (multicore, FPGAs,…), interconnected through a (multiple-) full-mesh topology low-latency high bandwidth network for transport of variables and data streams

Ease the programming of local real-time processing algorithms by non-specialized users

• Development of a set of helper tools for easier programming, simulation and deployment of code on reconfigurable devices (Field Programmable Gate Array - FPGA) and multi-core processors

Page 33: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition33

Issues:Issues:Instrumentation (cont.)Instrumentation (cont.)

Issues Actions

Improve systems reliability •Standards based instrumentation with inherent redundancy and mechanical/ thermal characteristics (e.g. Advanced Telecommunications Computer Architecture - ATCA)

Local and global management of hardware operation is required to improve maintainability

•Implementation of a standards based improved hardware management interface (e.g. Intelligent Platform Management Interface (IPMI), Shelf (crate) management (ShM)

Page 34: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition34

Issues:Issues:Instrumentation (Cont.)Instrumentation (Cont.)Issues Actions

Easier installation/replacement of hardware modules

•Hardware interface designed for ‘Plug-and-Play’, and ‘Hot-swap’e.g. ITER will evolve both equipment and ideas over 20 years therefore evolution must be built into CODAC

Improve the speediness of sub-system commissioning and integration on global CODAC

•Design the local sub-system control and data acquisition software for autonomous operation•Preliminary test operations during development can be performed autonomously

Scalability

Page 35: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition35

CODAC componentsCODAC components

Plasma Control is implemented as a specific Operation Schedule to maximise reuse of automation and plasma control tools.

•General feedback control, including Plasma Control, uses a Synchronous DataBus to communicate data converted to physics units, including an estimate of the error on each signal and its status.

•Evaluation of plasma diagnostic information is local in the diagnostic Plant System if this is straightforward.

•Information is collected over the Synchronous DataBus for analysing data from multiple Plant Systems and finally transmitted over the Synchronous DataBus to the actuators.

Page 36: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition36

High Maintenance•Proliferation of interfaces•Should converge on modern instrumentation, computer, etc. standards

Lack of commonality and functionality between different devices RTMC systems•e.g. JET PPCC not simply exportable to other devices and vice-versa

Lack of flexibility•Integration of new equipment and physics into the existing infrastructure is time-consuming.

Lack of good transport and integrated models and tools•Integrated development environment and interchange formats

Future developments should acknowledge these issues

Limitations of existing Control Systems: Limitations of existing Control Systems: JET as an exampleJET as an example

Page 37: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition37

Issues:Issues:Control SystemsControl Systems

Issues Actions

Higher algorithm complexity and higher number of input signals for plasma control

• Use of MIMO plasma controllers• Higher real-time processing power

Lower loop delays for time-critical real-time control

• Faster, lower latency real-time local synchronous network for variable sharing among processors

Faster design cycle of RT control systems

• Develop an improved integrated framework for code development, simulation and deployment

Page 38: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition38

JET has a wide range of Plasma Control Systems

Aim of Control Systems in fusion:Aim of Control Systems in fusion:JET as an exampleJET as an example

Magnetics

R-T Signal Server

R-T Controller

plasma

CXS Ti (R)

MSE pitch (R)

Flux surfaces EQX

Confinement

VUV impurities

Shape & Current Control (PPCC)

ECE Te (R)

q profile

Neutron X-ray etc.

Interferom/Polarim

NBI

ICRH

LHCD

GAS + Pellets

PF Coils

Vis H/D/T

Vis Da, Brem, ELM

Comms network ATM, some analogue

X-ray Ti (0)

LIDAR Ne&Te(R)

Simulink codeEQX kinetic map

Pale blue = Diagnostic, Sky blue = Analysis, Red = Heating / Fuelling / Magnets & Power, Yellow = PPCC (XSC), Green = RTMC

TAE / EFCC

Wall Load

Coil Protection

To reach and reproduce scenarios which cannot be programmed• Quasi-Steady State Experiments• Magnetic and Kinetic Profile & ITB Experiments• Mode Conversion Experiments• Radiation and Impurity Experiments• MHD Experiments

To protect Plasma and Machine• NB Shinethrough (WALLS, PEWS and NBLM)• LHCD Launcher (Monitor Iron and Radiation)• Avoid Disruptions• Mimize waste (Neutrons, Tritium)

Page 39: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition39

Control and data acquisition in fusion:Control and data acquisition in fusion:JET Vertical Stabilization as exampleJET Vertical Stabilization as example

• Elongated plasmas are vertically unstable

– If no corrective action is taken the plasma column moves vertically until it reaches the vessel protecting tiles.

– The plasma then rapidly shrinks and eventually disrupts discharging all its energy to the machine structures imparting large impulsive forces.

• Forces of hundreds of tons were measured at JET

• VS system designed to make the plasma vertically stable so that the Shape Controller can successfully control the plasma position and shape.

Page 40: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition40

Control and data acquisition in fusion: Control and data acquisition in fusion: ITER Vertical Position ControlITER Vertical Position Control

• Loss of vertical plasma position control in ITER will cause thermal loads

on Plasma Facing Components of 30-60 MJ/m2 for ~0.1s.

– PFCs cannot be designed to sustain (repetitive) thermal loads like those quoted above.

• VDE also generates the highest electromagnetic loads– A phenomenological extrapolation of horizontal forces from worst JET cases implies

horizontal loads ~45MN on ITER vacuum vessel.

– MHD wetted kink model developed to simulate the horizontal loads predicts ~20MN.

– Vertical loads ~90MN

Plasma vertical position in ITER must be robust & reliable to ensure a vertical plasma position

control loss is a very unlikely event

Page 41: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition41

JET Vertical Stabilization:JET Vertical Stabilization:Specifications of the MIMO architectureSpecifications of the MIMO architecture

• Reduction of – loop delay on the signal acquisition/generation endpoints (down to 10 µs)

– on the data interconnect links from and to the processing unit

– on the analogue signal path (analogue filters);

• High processing power– on the acquisition/generator endpoints

– on the system controller;

– improvement of MIMO algorithm performance

• Synchronization of all digitizer/generator endpoints;

• Architecture designed for maintainability, upgradeability and scalability;

• Low cost per channel;

• Low risk of implementation and testing.

Page 42: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition42

JET Vertical StabilisationJET Vertical Stabilisation

Vertical Stabilization Controller (input signals >190):

• x86-based ATCA controller

• Up to 12 DGP cards (PCIe links through the ATCA full mesh backplane)

•Each board has 32 18 bit ADC channels, each separately isolated

• Parallel execution on FPGAs for MIMO signal processing (Control loop delay < 50s, aim < 10 s)

•Freeware operating system RTAI

•The Aurora and PCI Express communication protocols allow for data transport, between modules, with

expected latencies below 2 µs.

Page 43: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition43

ATCA @ JET Vertical StabilizationATCA @ JET Vertical Stabilization

Front view Rear view

192 input signals

Page 44: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition44

ITER relevant technology:ITER relevant technology:ATCAATCA

ATCA is the most promising architecture to substantially enhance the performance and capability of existing standard systems

• It is designed to handle tasks such as – event building, – feature extraction – high level trigger processing.– TeraOPS of processing power in a single sub-rack.

• First commercial open standard designed for – high throughput – High availability

High interest to data acquisition physics and attractive for

experiments requiring a very high up-time

Page 45: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition45

Why ATCA?Why ATCA?

ATCA platform is gaining traction in the physics community because of • Advanced communication bus architecture (serial gigabit replacing parallel buses)

• very high data throughput options and its suitability for real-time applications

• Agnostic backplane that accepts several serial switch network protocols

• Scalable shelf capacity to 2.5Tb/s

• Scalable system availability to 99.999%

• Robust power infrastructure (distributed 48V power system) and large cooling capacity (cooling for 200W per board)

• High levels of modularity and configurability

• Ease of integration of multiple functions and new features

• The ability to host large pools of DSPs, NPs, processors and storage

• The ability to host multiple controllers and storage on a shelf

• High security and regulatory conformance

• Reliable, full redundancy support

• Reliable mechanics (serviceability, shock and vibration)

• Hardware management interface

Page 46: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition46

ATCA @ JET Vertical Stabilization:ATCA @ JET Vertical Stabilization:“the star of the show”“the star of the show”

IPFN’s ATCA-MIMO-ISOL

Page 47: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition47

Does it work?Does it work?

VS controller in action - Vertical kicks experiment

Page 48: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition48

CODAC milestonesCODAC milestones

• First plasma assumed to be 2018

• All functionality available – end 2014

• Control room and site distribution operational – end 2012

• First integration – end 2012

• Mini-CODAC operational – end 2010

• Plant System Host –end 2009

These dates may be revised (and certainly not for earlier)

Page 49: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition49

Plant System

Plant System Host

Subsystem

CODAC Networks

Plant System Simulator

CODAC System #1

Plant Monitoring

Data Storage

Mini-CODAC

Synchronous DataBus

Tools for Plant System Simulator Development

Tools for Plant System Host Development

CODAC System #n

CODAC

I&C Bridge

SummarySummary

ITER CODAC is a challenging endeavour

Page 50: ITER CODAC

Author’s name | Place, Month xx, 2007 | EventB. Gonçalves | Lisbon, February 20, 2009 | Diagnostics & Data Acquisition50

A professor is only as good as the A professor is only as good as the questions he raises in his pupils minds...questions he raises in his pupils minds...

IEU PhDNot just PhD

EU PhD