ITAAC Closure Verification Process (ICVP)Process (ICVP)

16
ITAAC Closure Verification Process (ICVP) Process (ICVP) February 07, 2013

Transcript of ITAAC Closure Verification Process (ICVP)Process (ICVP)

Page 1: ITAAC Closure Verification Process (ICVP)Process (ICVP)

ITAAC Closure Verification Process (ICVP)Process (ICVP)

February 07, 2013

Page 2: ITAAC Closure Verification Process (ICVP)Process (ICVP)

ITAAC Closure Notifications(ICNs)

• Required under 10 CFR 52.99

• Submitted by the licensee for both staff use and publicSubmitted by the licensee for both staff use and public information

• Licensees have processes, templates and examplesLicensees have processes, templates and examples contained in industry guidance NEI 08-01

• NEI 08-01 endorsed through Regulatory Guide 1.215g g y

2

Page 3: ITAAC Closure Verification Process (ICVP)Process (ICVP)

ITAAC Closure Verification Process

Each ITAAC is completed by licensee

Licensee submits ICN f h ITAAC

ITAAC Inspection

ICN for each ITAAC

ITAAC Inspection Results

NRC verifies ITAAC closed

NRC publishes FRN3

Page 4: ITAAC Closure Verification Process (ICVP)Process (ICVP)

ITAAC Closure V ifi ti PVerification Process

• Led by NRO/DCIP• 100% of ICNs reviewed

– Thorough review but not a technical review– Input as needed from technical experts and

field Inspectors• NRC inspections completed prior to reviewing• NRC inspections completed prior to reviewing

the ICNs• Closure strategy requires 50% of the targetedClosure strategy requires 50% of the targeted

ITAAC in a Family be closed prior to closing any non-targeted ITAAC in the family.

44

Page 5: ITAAC Closure Verification Process (ICVP)Process (ICVP)

History/Background

• ICVP developed over last 4 years. Offi I t ti NRO REG 103 d l d• Office Instruction --NRO – REG – 103 developed with input from stakeholders (DNRL, Region II, OGC and NSIR)OGC, and NSIR)

5

Page 6: ITAAC Closure Verification Process (ICVP)Process (ICVP)

Closure Review Sequence• An ICN is received by Document Processing Center and entered into

ADAMS

• DNRL PM initiates the ICVP by changing status of NEW ICN record in VOICES as ready for review and assigning a DCIP BC as the lead approver

• DCIP BC assigns an ITAAC Engineer – The ITAAC Engineer reviews the ICN in accordance with the ITAAC

Verification Evaluation Form (the VEF).Verification Evaluation Form (the VEF). – The ITAAC Engineer determines if an ICN has sufficient information

• Entire scope of an ITAAC addressed including unique aspects• Important steps of licensee’s methodology provided• ICN confirmed by CIPIMS inspection results

6

Page 7: ITAAC Closure Verification Process (ICVP)Process (ICVP)

Closure Review Sequence ( t)(cont)

• ITAAC Engineer completes VEF in VOICESg p

• VOICES automatically establishes one of three statuses based on results of the review

DCIP BC concurs on results of ICN review• DCIP BC concurs on results of ICN review

Page 8: ITAAC Closure Verification Process (ICVP)Process (ICVP)

Outcomes of concurrence review

– ICN has insufficient information

– A potential material concern is identified

– ITAAC verified successfully completed

8

Page 9: ITAAC Closure Verification Process (ICVP)Process (ICVP)

Insufficient InformationInsufficient Information

• DNRL PM will notify the licensee by a letterDNRL PM will notify the licensee by a letter

• Licensee will submit a new ICN of record thatLicensee will submit a new ICN of record that addresses deficiencies in original ICN

• The ICVP will be initiated for the new ICN

9

Page 10: ITAAC Closure Verification Process (ICVP)Process (ICVP)

Potential Material Concern

• Potential material concern is an issue thatPotential material concern is an issue that could be material to meeting the acceptance criteria of an ITAACacceptance criteria of an ITAAC

Page 11: ITAAC Closure Verification Process (ICVP)Process (ICVP)

Material Concern (cont)ate a Co ce (co t)• If concern is not legitimate, ICN review will continue as

planned

• For a legitimate material concern, the DNRL PM will notify the licensee by letter of the concern The concernnotify the licensee by letter of the concern. The concern could be incorrect standard used for a calculation, improper welds in the field, or test for flow rate was not met due to flow rate being less than required

Li d t• Licensee responds to concern

11

Page 12: ITAAC Closure Verification Process (ICVP)Process (ICVP)

Material Concern (cont)• Region II may perform inspections and may confirm an ITAAC

Finding

• For an ITAAC Finding, the licensee performs corrective actions and submits a new ICN of record

• ICVP initiated for the new ICN and original ICN is superseded

If R i II d t i th i ITAAC fi di ICN i t t d• If Region II determines there is no ITAAC finding, ICN is treated as having insufficient information to properly address the concern

Page 13: ITAAC Closure Verification Process (ICVP)Process (ICVP)

ITAAC Verified Successfully CompletedSuccessfully Completed• In VOICES two possible outcomes – unconditionally

verified as completed and conditionally verified as completed

• Unconditionally verified as completed:NRC website and VOICES are updated to reflect completion of– NRC website and VOICES are updated to reflect completion of an ITAAC

– A draft FRN is generated by VOICES for multiple ITAAC on a monthly or quarterly basis to promote increased efficiencymonthly or quarterly basis to promote increased efficiency

– Successful completions of multiple ITAAC are published in Federal Register

13

Page 14: ITAAC Closure Verification Process (ICVP)Process (ICVP)

ITAAC Verified Successfully CompletedSuccessfully Completed

(cont)

• Conditionally verified as completed:– NRC website and VOICES status are updatedp

– ITAAC remains in this status until 50% of targeted ITAAC in its family are completedin its family are completed

– Once that threshold is met, VOICES changes the status of ITAAC to unconditionally verified as completedITAAC to unconditionally verified as completed

Page 15: ITAAC Closure Verification Process (ICVP)Process (ICVP)

Next Steps• First ICN for Vogtle Unit 3 was processed

by the ICVP in January of 2013by the ICVP in January of 2013• Continued enhancements of ICVP to

k it ffi i t f i fmake it more efficient for processing of ICNs in the future

15

Page 16: ITAAC Closure Verification Process (ICVP)Process (ICVP)

Acronymsy• ADAMS - Agencywide Documents Access & Management System

BC – Branch Chief• CIPIMS – Construction Inspection Program Information Management System• DNRL – Division of New Reactor Licensing• FRN – Federal Register Notice• ICN – ITAAC Closure Notification• ICVP – ITAAC Closure Verification Process• IPCN – ITAAC Post Closure Notification• NRO – Office of New Reactors• NSIR - Office of Nuclear Security and Incident Response• OGC – Office of General Counsel• VEF – ITAAC Closure Verification Evaluation Form• VOICES – Verification of ITAAC Closure, Evaluation, and Status