ISE4 Integrated Demo
-
Upload
abbot-floyd -
Category
Documents
-
view
37 -
download
1
description
Transcript of ISE4 Integrated Demo
ISE4 Integrated Demo
Ver 2
May 11, 2005
May 11, 2005
ISE4 Integrated Demo 2
Revised Arrangements Demo Scenario• Design agent
– Export AP 216 hull form
• Navy – Import hull form - into Focus DB then to ASSET– Run ASSET to do ship arrangements - will add decks, pilot house,
machinery spaces, also define requirements– Output to Focus DB, Export AP 215
• Design agent– Import, complete ship arrangement– Add equipment
• Navy– Import back to LEAPS for vulnerability tool assessment– Generate recommendation
• Build yard– Import, fix arrangement
May 11, 2005
ISE4 Integrated Demo 3
Revised Arrangements Demo Scenario
Initial ASSETArrangement
+ Requirements(LEAPS)
Build Yard
Design Agent
AP 216 Hull
Initial Arrangement
Complete Arrangement + Equipment
Vulnerability Analysis(LEAPS)
Vulnerability Report
May 11, 2005
ISE4 Integrated Demo 4
ISE4 Integrated Demo
ArrangementRequirements
(LEAPs)Initial
Arrangement(Tribon) Updated Initial
Arrangement(Sener) Initial Electrical
System Design(KSSI)
Ship checkProject?
Detailed StructuralDesign
(Intergraph) FEM Analysis(EB)
Structural DesignFeedback
(Intergraph) NeutralManufacturing
(ISPE) Yard SpecificManufacturing
(EB & Intergraph )
May 11, 2005
ISE4 Integrated Demo 5
ISE4 Demo Scenario• ASSET mission and compartment requirements generated in LEAPS (P21)
• Create initial compartment and equipment arrangement (Tribon XML)– Include importing vendor data for main engine - CPC + AP 203– Incorporate Atlantec SBIR demonstration to import equipment?
• Update arrangement (Sener – P21)– Structural update required which impacts tank size (mission requirement)– Or incorporate Ship Check results to drive structural change
• Demonstrate Initial Electrical System design (KSSI)– Electronic system in Pilot House
• Transfer arrangements to detailed design (Intergraph)
• Extract structure for analysis (Intergraph)
• FEM analysis of Engine Room (EB)
• Feedback from Analysis (Ingr)
• Extract Structure for Manufacturing (Ingr)
• Develop neutral structural manufacturing model (ISPE)
• Generate yard-specific manufacturing data (EB, Ingr)– Compare EB and Avondale manufacturing outputs
May 11, 2005
ISE4 Integrated Demo 6
Demo Scenario Issues
• Better way to integrate Electrical into demo?
• Reason that arrangements are updated – Ship Check doesn’t fit with Initial Arrangement scenario
• If LEAPS does not provide initial ASSET data– Could provide reason arrangements are updated – Claim Navy Analysis programs determined xxx
May 11, 2005
ISE4 Integrated Demo 7
Eng Analysis Demo Scenario
AP 203P21
Shipyard(Add to CPC, CAD)
Vendor
Equip arrangement
Ship ProductModel(ISDP)
AP 227P28
Equip arrangement
AP 215P28
Compartmentation
AP 216P21
AP 218P28
AP 209P28
CPCCAD Parts
Analysis
(COG, weight,location)
AP 209 /218P28 GUID, doc URL
Feedback
May 11, 2005
ISE4 Integrated Demo 8
Notional Mediators RequiredAP ARM -> AIM AIM-ARM ARM-> 209 AIM
P21
216 Eng Analysis Eng Analysis
215 Arrangements Arrangements
218 Eng Analysis
227 Eng Analysis
209 Eng Analysis ??
May 11, 2005
ISE4 Integrated Demo 9
Mediators Required
209 218 216 215227 203/PLM
ARM
AIM
P28 P28
P28
P28 P28 P28
P21 P21 P21
P28
P21
P28