1s :774=19s4 Indian Standard SPECIFICATION FOR FLUSHING CISTERNS FOR WATEkCLOSETS AND URINALS ( OTHER THAN PLASTIC CISTERNS ) ( Fourth Revision ) First Reprint APRIL 1990 UDC 696.141.1:621.647.7 CT4 .?d~ 1985 BUREAU OF INDIAN STANDARDS MANAK BHAVAN, 9 BAHADUR SHAH ZAPAR MARC NEW DELHI 110002

Transcript of IS 774 1984 R 1995

Page 1: IS 774 1984 R 1995

1s :774=19s4

Indian Standard SPECIFICATION FOR

FLUSHING CISTERNS FOR WATEkCLOSETS AND URINALS

-. I .d

( OTHER THAN PLASTIC CISTERNS )

( Fourth Revision )

First Reprint APRIL 1990

UDC 696.141.1:621.647.7

CT4 .?d~ 1985

BUREAU OF INDIAN STANDARDS MANAK BHAVAN, 9 BAHADUR SHAH ZAPAR MARC

NEW DELHI 110002

..- _ z. I-_ - -----

Page 2: IS 774 1984 R 1995

* .

IS :774-1984

Indian Standard SPECIFICATION FOIi

FLUSHING CISTERNS FOR WATER-CLOSETS AND URINALS

( OTHER THAN PLASTIC CISTERNS )

( Fourth Revision )

Sanitary Appliances and Water Fittings Sectional Committee, BDC 3

Chairman SHRI K. D. MIJL~XAR

MImbcrJ

ADVISER

Rsprwnting Municipal Corporation of Greater Bombay

Central Public Health & Environmental Engi- neering Organization (Ministry of Works & Housing ) , New Delhi

DEPUYY ADVIBEB ( PHE ) ( Altmutu ) SHRI S. K. BAN~~JEE National Test House, Calcutta

SHBI D. K. KAXUN~O ( AZ&mutc ) SHRI M. K. BAEU Gr~ra&~~~ & Ceramic Research Institute ( CSIR ),

C~rxx ENOIN~EB Public Health Engineering Department, Government of Kerala, Trivandrum

SHRI K. RAYAOEANDRAN ( Aftsmuts ) CHIEF EN~IN~E~R U.P. Jal Nigam, Lucknow

SUPxnrXrlzNnrNQ ExoIrrxxn ( AZ&m& ) SEBI J. D’ CBUZ Municipal Corporation of Delhi

SRSI S. A. SWAMY ( Ahnab )

DIBE~TOIX Bombay Potteries & Tiles Ltd, Bombay S~BI B. R. N. GWPTA Engineer-in-Chief’s Branch, Army Headquarters

S~BI K. V. KBIBENAYU~TEY ( Altmutr ) Stir P. JAQAIVATH RAO E.I.D.-Parry ( India ) Ltd, Madras

SHRI M. MOOSA SVLA~YAN ( Aitaxate ) Snnr A. F. KHAN Municipal Corporation of Greater Bombay

DEPUTY HYDRAULIO E~~Ix~I~R ( Altmutr ) SXBI S. R. KaEntzAoA% National Environmental Engineering Research

Institute ( CSIR ), Nagpur SEEI R. C. RlCDDY ( AUnnatr )

SEEI K. LASWEM~I~ARAYA~~AN SEW A. Satir~v ( Alrnnotr )

Hindustan Shipyard Ltd, Vishakhapatnam -

( Confinrud ea page 2 )

@ Cepyrighl 1985

BUREAU OF INDIAN STANDARDS

‘l”hls publication is protected under the Z&m Ce#ri&f Ati ( XIV of 1957 ) and reproduction in whole or in part by any mearu except with written permission of the publirhar &all be deemed to be an infrmgement of copyright under the said Act.

Page 3: IS 774 1984 R 1995

lsr774=1!I84

( Contiruudfrom pdS6 1 )

M6&S Rcprrrrnting

DR A. V. R. Rno S~ai J. f!hTNOUPTA ( Ahfnab )

SENIOB CIVIL ENOINLER ( WATB~ SUPPLY )

SEE1 S. K. SHARYA

National Building6 Organization, New Delhi

Railway Board ( M&try of Railwayr )

Central Building Research Inrtitute (CSIR ),

SHBI R. K. SOYANY

SuPEarNTEND IN0 SnavEYoa OF WF$t;Y;;Z )

op Woaxs I ( NDZ ) ( ALt6rnat6 )

S-1 R. THANJAN

Roorkee - Hindustan Sanitaryware 6 Industries Ltd,

Bahadurgarh Central Public Work6 Department, New Delhi

Directorate General _ New Delhi

of Technical Development,

S-1 M. M. A-HAN ( A~t6m6tr ) SH~I T. N. UBOVEJA Directorate General

New Delhi SHBI G. RAMAN,

Director ( Civ Engg ) Director General, IS1 ( Ex-om6 Mmrbrr )

of Supplies & Disporalr,

SEBI C. K. BEBUTA Senior Deputy Director ( Civ Engg ), ISI

Domestic and Municipal Water Fittings Subcommittee, BDC 3 : 2

iu6mb6rs

SEEI YASH RAJ AOOABWAL M/a Goverdhan Da6 P.A., Calcutta SHSI JOOIND~ RAJ AOOABWAL ( Ahrna~ )

cmxrENMx5B CEmrBquINlUm

Baogalore Water Supply & Sewemge Board Public Health Engineermg Department, Government

of Kerala, Trivadrum Cgm EN@- Tamzu Water Supply C Dminag; Board,

cEIlt# ENtXNEER U.P. Jai Nigam, Lucknow SUP~IIPO ~NtXNEJCB ( Ak6mat6 )

SEEI J. D’ C~nz SHB1S.A..wAmY(Alt6mat6)

Municipal Corporation of Delhi

DIE%lToB Mahara6htrA Engineering Research Irntitute

R~SM.BOH Or.r~orrr ( AC&mu& ) ( Government of Maharuhtra ), Na6ik

SHBI B. R. N. GUPTA Engiir-in-Chief’s Branch, &my Headquart- SEBI K. V. ~IglU6AHVBTW ( Aurrrvrtr )

HYDSAVLIO ENG~ Municipal Corportion of Greater Bombay DEWTP HYDEAVLIO Exommms

SEBI M. K. JAXX (Ati)

SEBI K. K. J~llr ( A-6 ) Hmd Tmding k Manufacturing Co Ltd, New Delhi

2

Page 4: IS 774 1984 R 1995

IS : 774 - 1984

lndian Standard SPECIFICATION FOR

FLUSHING CISTERNS FOR WATER-CLOSETS AND URINALS

( OTHER THAN PLASTIC CISTERNS )

( Fourth Revision )

0. FOREWORD

0.1 This Indian Standard ( Fourth Revision ) was adopted by the Indian Standards Institution on 29 June 1984, after the draft finalized by the Sanitary Appliances and Water Fittings Sectional Committee had been approved by the Civil Engineering Division Council.

0.2 This standard was first’issued in 1957 and subsequently revised in 1960, 1964 and 1971. In the present revision, cisterns with discharge capacity 12.5 litres have been excluded to conserve water; only 5 and 10 litres capacities are now covered. Since earthenware cisterns are no longer being used commonly, the provisions relating to these, stipuJated in the earlier version, have also been deleted. Besides, the scope of the standard has been extended to cover dual flush type cisterns allowing a short flush of 5 litres and full flush of 10 litres.

0.3 Plastic cisterns for water-closets and urinals are covered in IS : 7231- 1984+.

0.4 For the purpose of deciding whether a particular requirement of this standard is complied with, the final value, observed or calculated, expressing the result of a test, shall be rounded off in accordance with IS : 2-196Ot. The number of significant places retained in the rounded off value should be the same as that of the specified value in this standard.

*Specification for plastic flushing cisterns for water-closets and urinals ( jrst revision 1. tRules for rounding off numercial values ( mi.wd ).

3

Page 5: IS 774 1984 R 1995

IS : 774 - 1984

1. SCOPE

1.1 This standard covers requirements for manually-operated high-level and low-level flushing cisterns of capacities 5 litres and 10 litres, both single flush and dual flush types, for water-closets, squatting pans and urinals, together with flush pipe details.

1.2 Plastic flushing cisterns are not covered in this standard.

2. TERMINOLOGY

2.0 For the purpose of this standard, the following definitions shall apply.

2.1 High-Level Cistern - A cistern intended to operate at a minimum height of 1 250 mm between the top of the pan and the underside of the cistern.

2.2 Low-Level Cistern - A cistern intended to operate at a height not exceeding ‘Xi0 mm between the top of the pan and the underside of the cistern.

2.3 Conpled Ciatera - A cistern intended to operate sitting on flat surface provided at the back portion of wash-down water-closets.

2.4 Dual-Flush Cistern - A construction that enables the user to cause a short flush of partial discharge when only urine needs to be flushed away instead of the customary full flush.

NOTF, - A typical illustration of riphonic dual-flush ciaterna b given in Fig. 1.

3. MATERIALS .

3.1 The materials for manufacturing various components of the flushing cisterns shall conform to the requirements given in Table 1.

NOTE - Where the requirements for the material of any comp6nent or the relevant Indian Standard Designation for any material are not xpec~%ed, these rhrll be as agreed to between the manulkcturer and the purchaser.

4. CONSTRUCTION

dl Cistern - The thickness of the body including cover shall be not less than 5 mm and 6 mm for cast iron and vitreous china cisterns respectively. The body of the pressed steel cistern shall be of seamless or welded construction. The body and the cover of the pressed steel cistern shall be of thicknessnot less than l-6 mm and 1.3 mm respectively before coating and shall be vitreous enamelled or otherwise protected against corrosion by equally efficient coating. The cistern shall be frsa from manufacturing faults and other defects affecting its utility. All working parts shall be designed so as to operate smoothly and ei&iently.

4

Page 6: IS 774 1984 R 1995

Is:??)- 1984

The cistern shall be mosquito-proof; it shall be deemed to be mosquito- proof only when there is no clearance anywhere in it which would permit a l-6 mm diameter wire to pass through. The outlet of each siphon or stand pipe shall be securely connected to the cistern by means of a lock-nut. In the case of plastic siphon, it shall be provided with suitable means of ensuring and maintaining watertight and airtight joint to the cistern. 4.2 Cover - The cistern shall be provided with a removable cover which shall fit closely and. shall be secured against displacement. In designs where the operating mechanism is attached to the cover, the cover may be made in two sections, the section supporting the mecha- nism being securely bolted or screwed to the body: 4.3 Flush Pipe - The flush pipe ( except plastic flush pipe ) shall have an internal diameter of 32 f 1 mm for high-level cisterns and 38 f 1 mm for low-level cisterns. The steel flush pipe shall be not less than 1 mm thick whereas the lead flush pipe shall have a minimum thickness of 3’5 mm. For high density polyethlyene and unplasticized PVC pipes, the outside diameter of the pipes shall be 40 mm. When PVC plumbing pipes are used, the outside diameter of the pipe shall be 40 mm for high-level cisterns and 50 mm for low-lenel cisterns. In the case of high-level flushing cisterns, a pipe clip fitted with a rubber buffer shall be fixed to the flush pipe to prevent damage either to the pipe or to the seat when the seat is raised. No flush pipe is required for coupled cisterns.

NOTE - The minimum thicknesses specified are for normal conditions of service; where highly corrosive atmospheres are expected, greater thicknesses are recommended.

4.3.1 Flush Pipe Connection to Cistern - The flush pipe shall be securely connected to the cistern outlet and made airtight by means of a coup- ling nut. The nuts made of injection-moulded HDPE/PVC may be used only if the end pipe is also made of plastic. The nominal internal diameter of the cistern outlet shall be not less than 32 mm and 38 mm for high-level and low-level cisterns respectively. The screw threads for connection to the flush pipe shall conform to size 14 of IS : 2643 ( Part 3 )-1975*. In the case of polyethylene and unplasticized PVC flush pipes, the upper end of the flush pipe shall be provided with suitable means of ensuring and maintaining a watertight and airtight joint to the flushing cistern and the flush pipe shall be detachable from the flushing cistern. When ordered for use with a lead flush pipe, the outlet connection may be supplied with coupling nut made cf a copper based alloy or other non-corrodible material and a plain tail piece having a minimum length of 6 cm. The centre of the outlet hole shall be gene- rally central to the length of the cistern. The length of the outlet @all be 37 f 2 mm.

*Dimensions for pipe threads for fastening purposes: Part 3 Limits ofsizes (Ar~t revision ) .

5

Page 7: IS 774 1984 R 1995

. rhOA r COVER

SlPnOMlC CHAMBER a

- FLUSH PIPE

- AIR NLET

b

AIR PIPE

KNOB

F.O.-FULL DISCHARGE

P.O.-PARTIAL DISCHARGE

CURVED SIPHONIC TYPE BELL TYPE

FIG. 1 TYPICAL ILLUSTRATIONS OF SIPHONIC TYPE DUAL- FLUSH CISTERNS

Page 8: IS 774 1984 R 1995

IS : 774 - 1984

SL coarpoNmT(s) No.

(1) (2) i) Cistetn

MATERIAL

(3) Cart iron

ii) Plush pipe

01

Vitreous china

of

Enamelled pressed steel:

a) Pressed steel

b) Vitreous enamelling

Steel tube, seamless or welded, medium or light, completely prnx tected inside outside by hot-dip galvanizing, electro- plating or vitreous enamelling

Of

Lead pipe

Of

Copper alloy tube

Of

High density polyethy- lene pipe

REQVIREEJENT/ CONrORYINGTO

($1

Quality not less than Grade FG 150 of IS : 210-1978.

IS,;;:6 ( Part 1 )-

IS : 513-1973$

IS : 1239 ( Part 1 )- 1979%

IS;gy7i ( Part 1 )-

IS : 407-198ln

or

IS : 2501-1972”

IS : 4984- 1978w

%pecification for grey iron castings ( third mision ). $Specification for vitreous sanitary appliances ( vitreous china ): Part 1 General

requirements ( suond rmimn 1. SSpecification for cold rolled carbon steel sheets ( sscrmd r&ion ). @Specification for mild steel tubes, tubulan and, other wrought steel fittings: Part 1

Mild steel tubes ( fovrlA r&ion 1. IlSpecification for lead pipes: Part 1 For other than chemical purposes ( second

k&n ). ~Specification for brass tubes for general purposes ( third misim ). **Specification for copper tubes for general engineaing purposes (Jifs; fmision ). t$Specification for high density polyethylene pipes for potable water supplies,

sewage and industrial effluents ( s6c0nd rroision ).

( Carlint& )

7

Page 9: IS 774 1984 R 1995

IS s 774 - 1984

TABLE 1 MATERuL8 FOR VARIOUS COMPONENTS OF FLUSHMC CISTERNS - Cimtd

SL COMPONENT(S) MATEBIAL No.

(1) (2) (3)

or

Unplasticized PVC Pipe

iii) Cover Same material aa that of the body

iv) Chain H;;+dP galvanized wire, inter-

locked non-ferrous metal or any other corrosion-resistant material

v) Overflow plpe Non-ferrous metal, high density polyethy- lene, unplasticized PVC or any other corrosion-resistant material

vi) Siphon ( where provided ) Cast iron

or

Vitreous china

or

High density polyethy- lene ( HDPE )

or

Polystyrene, high impact

or

Polypropylene

or

Glass fibre reinforced plastic ( GRP )

IS : 4985.1981.

-

-

Quality not less than Grade FG 150 of IS : 210-1978t

1slrg;z.;5r6 ( Part 1 )-

IS : 7328-1974§

IS : 2267-1972K

-

l Speci6cation for unplasticized PVC pipes for potable water supplies ( jrst revision ). Wpecification for grey iron castings ( third revision ). ISpecification for vitreous sanitary appliances ( vitreous china ): Part 1 General

requirements ( second raoisivn ). SSpecification for high density polyethylene materials for moulding and extrurion. JlSpecification for polystyrene moulding materials (first rsuision ).

( Continfud)

8

Page 10: IS 774 1984 R 1995

ISr774=l!W

TABLE1 MATMUAL!S FOR VARIOUS GGM?GNENTs OF FLUSIiING USTERNS - Cod

SL CoMPoNNNT( e) No.

(1) (2)

vii) Lever

viii) Ball valve

ix) Polyethylene float for ball valve

x) Bolts and nuts

MATNBIAL

(3) or

Acrylonitrlle-butadiene styrene (ABS)

Cast iron

R=PJ=EYIGHTI CONFOBA~~N~ TO

(4)

Quality not less than Grade FG 150 of IS : 210-1978.

or

Non-ferrous metal or any other corrosion- reristant material

Aa specified in IS : 170%1977t

Aa speci8ed in IS : 9762-1981$

xi) Coupling nut and lock-nut

Non-ferrous motrl or hot-dip galvanized steel

Non-ferrous metal, hot- dip galvanixed steel, hot-dip galvanized

malleable iron or any Other non-corrosive

metal or injection- moulded HDPE/PVC ( see also 43.1 )

*Specification for grey iron castings ( third rmision ). +Specitication for ball valves ( horizontal plunger type ) including floats for water

supply purposes ( second reuision ). $Specification for polyethylene floats for ball valves.

9

Page 11: IS 774 1984 R 1995

IS& 774-1964

NOTE - The length of the cistern outlet.shall be the dimeasion from the bottom surface of the cirtern to the end of the outlet after the &tern with riphon/stand pipe has been duly fitted with all wruhm, lofk nuts, MC.

4.4 Inlet and Overflow Holes - II’he cistern shall be provided with inlet and overflow holes, situated one at each-end, which shall be capable of accommodating an overflow pipe of not less than 20 mm nominal bore and a 15 mm size ball valve ( scd 4.5 ). The holes shall be cleanly cast or drilled and the adjacent surfaces shall be smooth.

4.5 Bali Valve - The ball valve shall be of 15 mm nominal size and shall conform to IS : 170%1977*.

4.6 Lever -The lever shall not project beyond the side of the cistern for a distance greater than 350 mm measured from the centre of the cistern to the end of the lever arm. The lever arm shall be provided with a suitable hole near the end through which a split ring or S-hook can be inserted. A chain shall be attached to the ring or hook. When S-hook is employed, it shall be effectively closed after assembly to prevent accidental disconnection.

4.6.1 In the case of low-level cisterns, where the mechanism is handle operated, the handle, whether situated on the front or at the end of the cistern, shall be within the projection limit for lever given in 4.6. Particular attention shall be given to the ease of operation of the handle.

4.7 Chain - The chain shall be of such a strength as to su&in a dead load of 50 kg without any apparent or permanent deformation of the shape of the links.

4.7.1 The chain shall terminate in a suitable handle oi pull made of hot-dip galvanized iron or non-ferrous metal or a moulding in any heat resisting and non-absorbent plastic or any other equally suitable material. The finish shall be smooth and all burrs which are liable to cause injury to the hand when gripped shall be removed.

4.8 Overflow Pipe - The overflow pipe shall be of not less than 20 mm nominal bore and shall incorporate a non-corrodible mosquito- proof device secured in a manner which will permit it to be readily cleaned or renewed when necessary. No provision shall be made whereby the overflow from the cistern shall discharge directly into the water-closet or soil pipe without being detected.

4.8.1 The invert ofthe overflow pipe in the case of high-level and low-level cisterns and the top edge of the overflow pipe in the case of coupled cisterns shall be 19 mm minimum above the working water level. In case of overflow due to any reason, water should drain out through the overflow pipe and not through the siphon pipe ( see also 6.3 ).

*Specification for ball valves ( horizontal plunger type ) including floats for water supply purposes ( second revision ) .

10

Page 12: IS 774 1984 R 1995

IS t 771- MS4

5. FINISH

5.1 Cast iron cisterns shall be painted inside with suitable an&corrosive paint and with a protective coat on the outside before delivery. Moulding sand shall be removed from all surfaces before application of the protective coating. Painting and finishing shall be done in accor- dance with the recommendations made in IS : 1477 ( Part 1 )-1971* and IS : 1477 ( Part 2 )-1971t. Alternatively, cast iron ‘cisterns shall be protected against corrosion by a coating of enamel.

6. OPERATIONAL AND PERFORMANCE REQ~MENTS

6.1 Flushing Arrangement - The cistern under working conditions and with the’ ball valve in closed position shall operate on a single operation of the lever without calling for a sudden jerk in pulling. If a valve is used instead of siphon for flushing purposes, the valve shall be completely leakproof.

6.2 Working Water Level - The working water level shall be a mininium of 6.5 cm below the effective top edge of the cistern and shall be legibly and permanently marked on the inside of the cistern.

6.3 Freedom from Self-Siphonage - The siphonic system shall be capable of being rapidly brought into action when the water is at the working water level, but shall not self-siphon or leak into the flush pipe when the water is up to 1 cm above the invert of the overflow pipe.

6.4 Reduced Water Level - The discharge shall operate satisfactorily when the cistern is filled to a level up to 1 cm below the working water level.

6.5 Discharge Capacity - When tested in accordance with the procedure described in 7.1, cisterns of 5 and 10 litres capacities, when required to give a full flush, shall respectively discharge 5 litres and 10 litres with variation of f 0.5 litres. Dual flush cisterns of 10 litres capacity shall discharge alternatively a short fiush of 5 * 0.5 litres.

6.6 Discharge Rate - When tested in accordance with the procedure described in 7.2, the discharge rate shall be IO 5 0.5 litres in 6 seconds and 5 f 0.5 litres in 3 seconds for cisterns of capacities 10 litres and 5 litres respectively. The cisterns shall be so designed that there is no appreciable variation in the force of the flush during the discharge of the required quantity of water. For dual flush type cisterns, there is no specified rate of discharge for the short flush. For coupled cisterns, this test shall not be applicable.

*Code of practice for painting of ferrous metals in buildings: Part 1 Pretreatment ( fist rroisietl ) .

tcode of practice for painting of ferrous metals in buildings: Part 2 Painting (first rmision ) .

11

Page 13: IS 774 1984 R 1995

IS I 774 0. MS4

7. TESTING

7.0 Cisterns shall be tested in accordance with the test procedures given in 7.1,7.2 and 7.3. operation, if desired.

The tests in 7.1 and 7.2 may be combined in one

7.1 Test of Discharge Capacity - With the water supply shut off or the cistern disconnected, and with the ball valve fitted, fill the cistern with water up to the marked water Iine. Operate the flushing mecha- nism and on completion of the flush, measure tW quantity of water that has to be added to refill the cistern to the level of the marked water line. Alternatively, any suitable device may be used for measu- ring the quantity of water discharged from the cistern. The cistern should have a flush pipe fitted but need not be connected to a pan for this test.

7.2 Test for Discharge Rate - Connect the cistern to an appropriate flush pipe ( see 7.2.1 ). Fill the cistern to the water line as for the capacity test and place a vessel under the open end of the flush pipe. Operate the flush mechanism and as water appears at the open end of the flush pipe start a stop watch. At the end of 6 seconds in case of cistern of IO litres capacity and 3 seconds in case of cistern of 5 Iitres capacity, rapidly draw the vessel clear or otherwise divert the flow of water. Ascertain either by measuring or weighing the volume of water collected in the vessel.

7.2.1 For the purpose of test, the following shall be deemed to be the ‘appropriate flush pipe’:

a) A vertical steel pipe, 1 250 mm long, having a nominal in:ernal diameter of 32 mm, in the case of high-level cisterns; and

b) A vertical steel pipe, 300 mm long, having a nominal internal diameter of 38 mm, or the pipe actually supplied/recommended by the cistern manufacturer, in the case of low-level cisterns.

7.3 Endnrande Test - A sample of flushing cistern picked at random from production shall be first checked for conformity to the requirements for materials ( see 3 ) and construction ( see 4 ) and operational and perfor- mance requirements ( see 6) and if it complies with these requirements, it should be operated 3 000 times. After this test, the cistern and its component parts shall not show any damage or defects and all the parts shall be satisfactory; necessary checks shall be made for this purpose. If a valve has been used instead of siphon, during the test run of 3 000 times the valve should show no sign of leakage when the cistern is operated to its rated capacity.

NOTE - This is a type test to be carried out by recognized testing laboratory and shall be conducted whenever there are changes in the design, materials, manufacture and construction.

12

Page 14: IS 774 1984 R 1995

8. SAMPLING AND CRITERIA FOR CONFORMITY

8.1 The sampling procedure and criteria for conformity of a lot to the requirements of this specification shall be as specified in Appendix A.

9. SUPPLY CONDITIONS

9.1 High-level flushing cisterns shall normally be supplied without flush pipes. If agreed to between the supplier and the purchaser, the flush pipes can be supplied with high-level cisterns, in which case these shall conform to the requirements given in 4.3 and 4.3.1 and Table 1.

9.2 Low-level flushing cisterns shall normally be supplied with flush pipes conforming to the requirements given in 4.3 and 4.3.1 and Table 1.

10. OPERATING INSTRUCTIONS FOR DUAL PLUSH CISTERNS

10.1 Every cistern of the dual flush type shall bear in legible lettering in a conspicuous position the operating instructions specified in 10.1.1 to 10.1.3 and these instructions shall not be readily removable. In addi- tion, when so ordered by the purchaser, a separate self-adhesive or other suitable label shall be supplied for use in association with the operating handle when the cistern is installed in a concealed position.

10.1.1 High-Lad Flushing Cisterns - The instructions shall read:

“Short flush : Pull and let go

Full flush : Pull and hold”

and shall appear as follows :

a) For rmersible tx3tern.f - On or near the lower edge of both long sides of the cistern shell, and

b) For non-reversiblt cisterns of the cistern shell.

- On or near the lower edge of the front

10.1.2 Low-Lez~l Flushing Cisterns - The instructions shall. read:

“Short flush : Press and let go

Full flush : Press and hold”

and shall appear on the upper half of the front of the cistern shell.

10.1.3 Where short flush and full flush is operated by a knob, the instructiona given in 10.1.1 and 10.1.2 will not be applicable and separate ilutructiom with respect to the operation of the’knob shall be provided.

13

Page 15: IS 774 1984 R 1995

IS I 774 - l!m4

11. MARRING

11.1 Each cistern shall be marked with the manufacturer’s name or trade-mark on the body, either inside or outside as found convenient to the manufacturer. The dixharge capacity ( see 6.5 ) and operating instructions (see 10) shall also be marked on the cistern.

11.2 A suitable declaration shall be put on each unit indicating to the consumer the list of components supplied.

11.3 Each cistern may also be marked with the IS1 Certification Mark. The marking shall be made on the body of the cistern.

NOTE - The use of the IS1 Certification Mark is governed by.the provisions of the Indian’ Standards Institution ( Certification Marks ) Act and the Rules and Regu- lations made thereunder. The IS1 Mark on products covered by an Indian Standard conveys the assurance that they have been produced to comply with the require- ments of that standard under a well-defined system of inspection, testing and quality control which is devised and supervised by IS1 and operated by the producer. IS1 marked products are also continuously checked by 1st for conformity to that standard as a further safesruard. Details of conditions under which a licence for the use of the IS1 Certificat:on Mark may be granted to manufacturers or processors, may be obtained from the Indian Standards Institution.

APPENDIX A ( Clause 8.1 )

SAMPLING AND CRITERIA FOR CONFORMITY

A-l. LOT

A-l.1 All the cisterns of the same type and Ievel ( set 2 ), similar in res- pect of materials, design and construction and produced essentially under similar conditions of manufacture shall be grouped to constitute a lot.

A-2. NUMBER OF TESTS AND CRITERIA FOR CONFORMITY

A-2.1 For determining the conformity of the lot to the requirements of material (see 3 ), construction ( see 4 ) and finish ( see S), a number of sample cisterns in accordance with co1 2 of Table 2 shall be selected at random.

A-21.1 The lot shall be considered to conform to the requirements of material, construction and finish if the number of the sample cisterns not meeting all of these requirements does not exceed the corresponding number given in co1 3 of Table 2.

14

Page 16: IS 774 1984 R 1995

1s : 774 - 1961

_

TABLE 2 SCALE OF SAMPLING AND CRMZRIA FOR coNFoRMrrY

( Cfau.ws A-2.1, A-2.1.1, A-2.2 and A-2.2.1 )

No. OF CIBTERNS FOB MATEBIAL., FOE OPERATIONAL AXD INTHELOT CONBTRUCTIONAND PElwORMAlaE

FINISH REQUIREMENTS I----- 7----7 Sample Acceptance

Size Number Sub-sample Ahcc;en

Size

(1) (2) (3) (4) (5) up to 50 8 0 5 0

51 to 100 * 13 0 8 0

101 to 150 20 1 13 0

151 to 300 32 1 20 1

301 to500 50 2 32 1 50 1 and above 80 .3 50 2

Ad.2 If the lot has been found conforming in A-2.1.1, it shall be tested for operational and performance requirements (sad 6 ) for which a num- ber of cisterns (sub-sample) shall be taken at random according to co1 4 of Table 2 from the sample cisterns found satisfactory in A-2.1.

A-2.2.1 The lot shall be considered to conform to the operational and performance requirements if the number of sample cisterns not meeting these requirements does not exceed the corresponding number given in co1 5 of Table 2.

A-2.3 For endurance ( se6 7.3 ), the test shall be performed whenever there are changes in the design, materials, manufacture and construc- tion. From the first lot after such a change takes place, 1 cistern at random shall be taken from those already found satisfactory in A-2.1 and A-22 in respect of all the other requirements of this specification. If this sample cistern passes the endurance test, the lot to which the, sample belongs and all the subsequent lots manufactured under the same conditions of design, materials, manufacture and construction shall be deemed to conform to the endurance test till any chang takes place.

15

Page 17: IS 774 1984 R 1995

IS t 774 - 1984

( Continwdfiom page 2 )

Members

SERI S. R. KEJHIIWAGAII

Represeating

National Environmental Engineering Research Institute

SHRI A. W. ~QIPANDE ( Ahmate ) ( CSIR ), Nagpur

SERI G. A. LUHAR Bombay Metal and Alloy Manufacturing Co Pvt Ltd, Bombay

SHRI D. K. SEHQAL Leader Engineering Works, Jalandhar SERI B. B. SIKXA ( &female )

SEIVIOR CXVIL ENGINEER ( WATER Railway Board ( Ministry of Railways ) SUPPLY )

SERI R. P. SIJKlCA Sant Brass Metal Works, Jalandhar SHSI K. SONIL KUMAR ( Aftmule )

Sam R. K. SOMANY Hindustan Sanitarvware & .Industries Ltd,

SERI T. N. UBOVEJA Bahadurgarh ’

Directorate General of Supplies & Disposals, New Delhi

16

Page 18: IS 774 1984 R 1995

BUREAU OF INDIAN STANDARDS

Headquarters:

Manak Bhavan, 9 Bahadur Shah Zafar Marg, NEW DELHI 110002

Telephones: 331 01 31. 331 13 75 Telegrams: Manaksanstha ( Common to all Offices)

Regional Offices: Telephone Central : Manak Bhavan, 9 Bahadur Shah Zafar Marg,

NEW DELHI 110002 I

331 01 31 331 13 75

*Eastern : l/l 4 C. I. T. Scheme VII M, V. I, P. Road, 36 24 99 Maniktota. CALCUTTA 700054

Northern : SC0 445-446, Sector 35-C,

I

2 18 43 CHANDIGARH 160036 3 16 41

I

41 24 42 Southern : C. I. T. Campus. MADRAS 600113 41 25 19

41 2916 TWestern : Manakalaya, E9 MIDC, Marol, Andheri ( East ), 6 32 92 95

BOMBAY 400093

Branch Offices:

IPushpak’. Nurmohamed Shaikh Marg, Khanpur.

I 2 63 48

AHMADABAD 380001 2 63 49 +,Peenya Industrial Area 1st Stage, Bangalore Tumkur Road 38 49 55

BANGALORE 560058 38 49 56 Gangotri Complex, 5th Floor. Bhadbhada Road, T. T. Naqar, 667 16

BH~PAL 462003 Plot No. 82183. Lewis Road, BHUBANESHWAR 751002 531’6. Ward No. 29, R.G. Barua Road, 5th Byelane,

GUWAHATI 781003 5-8-56C L. N. Gupta Marg ( Nampally Station Road ),

HYDERABAD 500001

R14 Yudhister Marg, C Scheme, JAIPUR 302005

1171418 B Sarvodaya Nagar, KANPUR 208005

Patliputra Industrial Estate, PATNA 800013 T.C. No. 14/1421. Universitv P.O.. Palayam

TRIVANDRUM 695035

5 36 27 3 31 77

23 1083

{ 6 6 34 98 71 32 I 21 21 68 82 92 76

6 23 05

(66 2’: :;

inspection Offices ( With Sale Point ):

Pushpanjali. First Floor, 205-A West High Court Road, Shankar Nagar Square, NAGPUR 440010

2 51 71

Institution of Engineers ( India ) Building, 1332 Shivaji Nagar, 6 24 35 PUNE 411005

*Sales Office in Calcutta is at 5 Chowringhee Approach, P. 0. Princep 27 68 00 Street. Calcutta 700072

tSales Office in Bombay is at Novelty Chambers, Grant Road, 89 85 28 Bombay 400007

$Sales Office in Bangalore is at Unity Building. Narasimharaja Square, 22 38 71 Bangalore 560002

Reprography Unit, BIS, New Delhi, India

Page 19: IS 774 1984 R 1995

AMENDMENT NO.1 OCTOBER 1988

TO

IS:77401984 SPECIFICATION FOR FLUSHING CISTbWS FOR WATER-CLOSETS AND URINALS (OTHER maw PLASTIC mnfas)

(Fourth Revidonl

(Puge 4, atau8e 4.1, line 5) - Substitute '1.25 mn' for '1.3 mm’.

(Page 5, alaus 4.3.1, fourth ssntmme) - Substitute the following for the existing sentence:

*The screw threads for connection to the flush pipe shall be not less than size 1% of IS:2643(Part 3). 1975*.'

*Dimensions for pipe threads for fastening purposes Part 3 Limits of sizes (first z%Wieion).

Reprography Unit, BIS, New Delhi, India

Page 20: IS 774 1984 R 1995

_- rp,

AMENDMENT NO. 2 DECEMBER 1989

TO

I8 : 774 - 1984 SPECIFICATION FOR FLUSHING CISTERNS FOR WATER CLOSETS AND

URINALS ( OTHER THAN PLASTIC CISTERNS )

( Fourth Rwision )

.

( Pa~c 9, Table 1 ):

a) Sf Jo. ( viii ), co1 2 end 3 - Substitute the following under the respective column for the existing matter:

‘ Float valve As specified in IS : 1703-1977t

or IS : 12234-1988~

II) $1 No. ( ix ), co1 2 - Suhtitute ’ fl0.r valve ‘fir ’ ball valve ‘in the second line.

c) Insert a foot-note marked with ‘ (j ’ mark:

‘fSpecification for equilibrium plastic float valve for cold water services.’

( Pap 10, clause 4.5 ) - Substitute the following for the existing

clause:

I ‘4.5 Float Valve - The float valve shall he of 15 mm nominal size and

. fitl:rll coriforrri to IS : I703-1!177+ or IS : I22%1-1 Wlf.

( Page 10 ) - Insert a foot-note markrd with ‘ t ’ mark:

‘tspecification for equilibrium plastic float valve for cold water services.’

Page 21: IS 774 1984 R 1995

AMENDMENT NO.3 JUNE 1992 TO

IS 774 : 1984 SPECIFICATION FOR FLUSHING CISTERNS FOR WATER-CLOSETS AND URINALS

(OTHER THAN PLASTIC CISTERNS)

(Page 8, Table 1) :

(Fourth Kevision)

a) Sf No. (vi) - Substitute the following matter under the respective columns for the existing matter :

‘vi) a) Siphon Cast iron Grade FG 150 or higher

(where Or of IS 210 : 1978+

provided) Vitreous IS 2556 ( Part 1) : 1974$

China

b) Siphon/valve High density IS 7328 : 1974 f polyethylene (HDPE)

or

Polystyrene high impact IS 2267 : 1972”

or

Polypropylene -

or Glass fibre reinforced -’

plastic (GRP)

(Page 9, Table 1) :

a) SI No. (viii), co1 3 and 4 ( see also Amendment No. 2 ) - Insert the following:

‘or IS 13049 : 1991 Q ‘.

b) Insert the following foot-note marked with ‘ 4 ’ mark:

‘4 Diaphragm type (plastic body ) float operated valves for cold water services - Specification.’

1

Page 22: IS 774 1984 R 1995

( Page 10, clause 45 ) ( see also Amendment No. 2 ) - Insert the following in continuity:

‘or IS 13049 : Ml*‘.

( Page 10, fool-n~res ) - Insert the following foot-note marked wtih ‘4’ nlark:

‘~Diaphngm type (plastic body) float operated valves for cold water senks - Specification’.

[ Page 12, clause 73.1 (b), 1 ines 2 and3 ] - Delete the following words:

‘ , or the pipe actually supplied/recommended by the cistern manufacturer.’

Reprography Unit, BE, New Delhi, India

2

Page 23: IS 774 1984 R 1995

,

AMENDMENT NO. 4 MAY 2002To

IS 774:1984 SPECIFICATION FOR FLUSHINGCISTERNS FOR WATER-CLOSETS AND URINALS

(OTHER THAN PLASTIC CISTERNS)

( Fourth Revision)

( Pa,qe 4, clause 2.4, Note ) — Insert the following at the end of the Note:

‘~nd non-siphm]c dual flush cistern at Fig. 2.’

( F’a,yc 13, c/(zusc>10.1.3 ) — Substitute the following for the existing:

10.1.3 Where the short flush and full flush are operated by a knob, theinstructions given in 10.1.1 and 10.1.2 will not be applicable. Operatinginstructions specified in 10.1.3.1 shall however be followed.

10.1.3.1 Each cistern shall incorporate a dual control method of operation, thatis one initiating a full flush and the other initiating a half flush. Dischargecap:~cities shall be as follows:

a) I’Llliflush — 10 f 0.5 Iitres

b) I{alfflttsh — 5 t 0.5 litres

NOTE — ‘This tigure is a typical illustration only. Dual control may be operated by two

[op hu[[ons, two handleskrobs on the fron( side, two concentric but separate handles or

any other dwicc in which one knob/handle actuates the full flush and the otherknoblhandlc ac[ua[es [he half’ flush.

Page 24: IS 774 1984 R 1995

Amend No. 4 to IS 774:1984.

---s

FULL ‘L”’”~”’” ““’”

BALLVE

OVERFLOHOLE

FIG. 2 NON-SIPHONICDUAL FLU.W CISTERN

(CED3)