IPPC transposition and
experience with its implementation
in the Czech Republic
??
…!!
AjPíPíSí ??
Content of presentation• Preparation for transposition• Institutional building• Legal framework – permitting procedure• BAT information exchange system• IPPC implementation in practice• Lessons
Negotiation with EC
• Implementation plan (handbook of implementation)
• Transposition IPPC act + subsidiary regulation
• NO Transitory period communication with 700 operators
• New operations since 1999/2000 apply for IPPC permit by 31.3.2003
Preparation for implementation1. Draft Act + impact assessment – negotiation (est.
of cost for industry 0,3 – 1 bilion EUR)
2. Implementation plan - reports to Brussels + list of IPPC installation
3. Meeting with operators – seminars, web, direct mail, info centre
4. Participation in IEF, IPPC expert group, TWGs, Translation of BREFs
5. Pilot projects
6. EC peer reviews on the state of preparation 2002, 3
Overview of installations
Operators: 750 Instalations: 1312 How to get the list?
Institutional building and competenciesinstitution staff competencies
MoE – IPPC unit/ IPPC and EIA dept.
7 Appeal body, transboundary permits, interpretation of legis.,…
14 RA – IPPC units since 2002
14*2 (4)
Permitting bodies, permit reviews
AIP, CEU – since 2002
30 Assessment of IPPC permit application, IPRegister, assist in permit reviews, info exchange
CEInspectorate – 9 regional offices
15-20 Regular inspection, comment on application
MTI 2 BAT info exchange, CR IEF
Total 100 out of 144 plannedTotal 100 out of 144 planned
Legal frameworkAct no. 76/2002 Coll., on IPPC and IPRegister
- in force on 1.1.2003
- Transposition of IPPC Directive + PRTR protocol
- Special Special act to media and corresponding legislation
Decree no. 554/2002 Coll.,on integrated permit application
Gov. Decree no. 63/2003 Coll., on BAT information exchange system
Gov. Decree no. 368/2003 Coll., on integrated pollution register
Integrated permitting procedure• Preliminary consultations Preliminary consultations • Submitting IP application – formal beginning• RA check completness of application• Publishing of application summary, sending for
comments to related authorities and AIP for assessment• Public hearing with participants of procedure• Decision on application (issuing IP)• Publishing of IP
on www.env.cz
possible to appeal
Setting permit conditions
In practice for existing installation often JUST replacement of former media based permits, decision, statements,…
BAT for the BAT for the sectorsector
The local conditionsThe local conditions andand EEQQSS
PERMITPERMIT - site- site specificspecific
ELELVV and requirementsand requirementsin legin legislationislation-other directivesother directives-Technical normsTechnical norms-Previous permits, Previous permits, approvalsapprovals
Requirements of Requirements of effected effected authoritiesauthorities
BAT information exchange systemGov. Decree 63/2003 Coll. Sets:• TWG support participation of in EU TWGs and technical
support of Czech IPPC…finances??• MoE, MTI, MoA - responsible for translating BREFs• Czech Information exchange forum – (TWGs, permitting
auth., MoE, MTI, MoA, CEI, AIP, NGOs,…)
www.ippc.cz – linking web for all info on IPPC
Interpretation/guide on use of BREFs in permitting???
BAT aplication ??Comparison with BAT – in application:• Use sectoral or horizontal BREFs• Use sectoral studies• Comparison with competitors and info from suppliers
of technologies• Assess consideration from annex 4• Use UK guidance on
www.environment-agency.gov.ukIn practice „WE HAVE BAT because it was EXPENSIVE“
Support BAT programs – State Env. Fund
Implementation in practice1) 196 decision on IP + 100 application in the process
2) Need for negotiation of extent and content of application before official procedure
3) Best applications made by operators (3 months)
4) BAT assessment …???…different approaches
5) Operators rarely willing to specify improvements plans
6) EQS - Regional env. plans and local env. priorities –Available/How to use?
7) Lack of staff on RA and AIP, lack of practical guidance
Projects• 4 PHARE projects with Germ., Denmark, UK, Hol.:
- pilot applications, permit - LCP,
• Overview of Surface treatments techniques in CR• Assessment of steel industry preparedness • Guidance for landfills to fill the application for IPPC
permit• Instruction for IPPC system application for operators• Assessment of the application of the BREF on
Economic and crossmedia aspects in CR
http://sharepoint.infomil.nl/eu/czech/IPPC/
Lessons• What to define first - permit or application content and
template?• How to from media based to integrated permitting –
administration conflicts• Coordination of more institutions - (RA, CEI, RHyg.Off., AIP,
LA, MoE) – how to make it work• List of installation – base for planning and for interpretation
‘who falls in’• Preparation of permitting authorities - early pilot projects• Financing technical support of state admin. (AIP, TWGs)…• 1st round of permits => operators document’s inventory =>
improve
Useful contacts in CRCzech Environmental institute
Agency for Integrated Prevention [email protected], Kodanska 10, 100 10 Prague 10
www.ceu.cz/IPPC,
MoE website: www.env.czCEInspectorate website: www.cizp.cz
Monika PřibylováENVIROS, s.r.o. Na Rovnosti 1, 130 00 Prague 3
T: +420 603 96 46 [email protected]; www.enviros.cz