    FEDERAL ROADS MAINTENANCE AGENCY (FERMA)

    ROAD CONDITION SUMMARY SHEET/INVENTORY OF FEDERAL ROADS IN (BAUCHI STATE) AS AT (DEC

    S/N NAME OF ROADS ROUTE NO

    TOTAL

    LENGTH(KM)

    WIDTH SHOULDER WIDTH S.D EARTH

    W.C B.C

    1 Bauchi-Jos road p/s border R70/A3 114 7.3 2.75 40 40

    2 Bauchi-kari -Yobe/s border R95/A3 137 7.3 2.75 40 40

    3 Kari- Yobe state border R95/A3 47 7.3 2.75 40

    4 Bauchi-Gombe road R85/A345 116 7.3 2.75 60

    5 Bauchi -Ningi Jig/s border R85/A345 119 7.3 2.75 60

    6 Bauchi-T-balewa p/s Border R325/F245 126 7.3 2.75 40 40

    7 Kari-Yana Jig/s Border R95A237 92 7.3 2.75 50

    8 Azare-Jama'are Jig/s border R329/F130 48 7.3 1.5 40

    9 Azare-Bulkachuwa road R239/F130 101 7.3 1.5 40

    10 Azare-Yana road R330/F248 6.8 1.5 39

    11 Azare- Misau Road R70/F249 54 7.3 1.5 40

    TOTAL 954

    Classification of road condition

    A.C = Asphalt concrete Good = Stable pavement structure with asphalt overlay. No or v

    W.c = Wearing course Fair = Stable pavement structure with asphalt overlay. Has po

    B.C = Binder course Poor = presence of undulating road sections,alligator cracks an

    S.D = Surface dressed Bad = Predominanly unstable road sections, wide alligator cra

    pavement washout, peaty surface . No safe for vehicula

    AC

    TYPE OF SURFACING/LENGTH (M)

    LEGEND

    RECOMMENDED WORK STREAM FOR THE FEDERAL RO

    GOOD FAIR

    preventive maintenance (OPRC &Routine maintenace by direct labour) Special Repairs & Pavement Strenthening

  • 8/12/2019 Inventory. of Federal Roads in Bauchi

    2/2

    FEDERAL ROADS MAINTENANCE AGENCY (FERMA)

    ROAD CONDITION SUMMARY SHEET/INVENTORY OF FEDERAL ROADS IN (BAUCHI STATE) AS AT (DEC

    S/NNAME OF ROADS ROUTE NO

    TOTAL

    LENGTH(KM)

    WIDTH SHOULDER WIDTHS.D EARTH

    W.C B.C

    12 Azare-Gadau road R70/F249 30 7.3 1.5 40

    13 Gadau- jigawa border R70/F249 10 10

    14 J/s -B -katagum gam road R333/F131 53 40

    15 Gamawa-Udaba Road R333/F131 30 7.3 1.5 40

    16 Udobo- yobe state Border R333/F131 56 7.3 1.5 40

    17 Ningi -Fus. Mata P/S Border R314/F245 193 193

    18

    19

    20

    21

    22

    TOTAL 1326

    Classification of road condition

    A.C = Asphalt concrete Good = Stable pavement structure with asphalt overlay. No or v

    W.c = Wearing course Fair = Stable pavement structure with asphalt overlay. Has po

    B.C = Binder course Poor = presence of undulating road sections,alligator cracks an

    S.D = Surface dressed Bad = Predominanly unstable road sections, wide alligator cra

    pavement washout, peaty surface . No safe for vehicula

    RECOMMENDED WORK STREAM FOR THE FEDERAL RO

    TYPE OF SURFACING/LENGTH (M)

    AC

    LEGEND

    GOOD FAIR

    preventive maintenance (OPRC &Routine maintenace by direct labour) Special Repairs & Pavement Strenthening